Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
1Seattle, Washington
Seattle Design CommissionAlley Vacation PetitionApril 3, 2008
Block 101
City Place IV, LLC505 5th Ave SSuite 900Seattle WA 98104(206) 342-2016Contact: Rachel Ben-Shmuel
Callison1420 5th Ave Suite 2400Seattle WA 98104(206) 623-4646Contact: Michael Medina
DPD Project #: 3008521
301 BOREN AVE. N.
PHASE 2 & 3
BLOCK 101
PHASE 1A
PHASE 4
PHASE 5BLOCK 100
PHASE 1B
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
2Seattle, Washington
9-BLOCK &TOPOGRAPHY
MAPS
9-Block Map
Block 102Phase 1A
Block 100Phase 5
Fred RogersBuilding
Bio-RadBuiding
Seattle TimesBuilding
Troy LaundryBuilding
Terr
y Av
e N
Bor
en A
ve N
Harrison St
Thomas St
9-Block TopographyCLASS 2 PEDESTRIAN STREET per Text Amendment Ordinance 122611
Van VorstBuilding
retail
offi ce/warehouse
offi ce
fl orist
offi ce
offi ce
offi ce/retail
offi ce/retail
proposedoffi ce
DavidSmith
Building
EL 52.0’
EL 96.0’
EL 128.0’
Block 101Phase 4
Westlake Terry
offi ce/retail
offi ce/retail
offi ce/retail
offi ce
offi ce
EL 64.0’
EL 60.0’
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
3Seattle, Washington
Bio-Rad
Harrison Street (Class 2 Pedestrian)
Bor
en A
venu
e N
orth
Terr
y Av
enue
Nor
th
South Lake UnionStreetcar
Stop
EXISTING SURFACECONDITIONS
Wes
tlake
Ter
ry
E. 52’
E. 96’
1-StoryTO BE
DEMOLISHED
1-StoryTO BE DEMOLISHED
Terry Ave BuildingTO REMAIN Retaining Wall
Site Constraints
1. BioRad Laboratories to remain
2. Desire to save the Terry Avenue Building
3. Signifi cant elevation change
E. 60’
E. 64’
Thomas Street (Class 2 Pedestrian)
2-StoryTO BE
DEMOLISHED
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
4Seattle, Washington
Terry Avenue Building from Terry Avenue
Terry Ave Bldg Roof from Boren Ave NAlley View
BLOCK 101EXISTING BUILDINGS
One Story ShedBio-Rad Laboratory
Aerial View from the West
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
5Seattle, Washington
Alley View to the South Alley View to the North
BLOCK 101 ALLEY VIEWS
INTERURBAN PROJECT(PHASE 1A)
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
6Seattle, Washington
No Vacation Option - Massing DiagramAerial View from West
With Vacation Option - Massing DiagramAerial View from West
MASSING DIAGRAMS
EXISTING TERRY AVENUE BUILDING
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
7Seattle, Washington
Massing Diagram - No VacationView from Terry Ave N looking East
Massing Diagram - With VacationView from Terry Ave N looking East
MASSING DIAGRAMS
EXISTING TERRY AVENUE BUILDING
TERRY AVENUE BUILDING
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
8Seattle, Washington
BLOCK 34PLANNING DIAGRAM
Harrison St.
Thomas St.
Bor
en A
venu
e
Terr
y Av
enue
North Building
South Building
Bio-Rad
Terry AveBuilding
Harrison St.
Thomas St.
Bor
en A
venu
e
Terr
y Av
enue
Bio-Rad
No Vacation Option Alley Vacation Option
710 cars
65 cars
Alle
y
Alley
Alle
y
EXISTING TERRY AVE BUILDING
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
9Seattle, Washington
SCHEMATICLOADING & GARAGE
ENTRY PLAN
Approx710 cars
Approx60 cars
Ramp Access from Thomas Street
to Bio-Rad Parking
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
10Seattle, Washington
SCHEMATICPLAZA AND LOBBY
ENTRY PLAN
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
11Seattle, Washington
OPEN SPACECONTEXT PLAN
Planned & ProposedThrough Block Connections
BLOCK 101
Planned & ProposedLandscape Plan
BLOCK 101
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
12Seattle, Washington
OVERALL VIEWSOF DEVELOPMENT
Looking East Along Terry Ave.
Looking West Along Boren Ave.
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
13Seattle, Washington
OVERALL VIEWSOF DEVELOPMENT
Looking Southwest
Looking Northwest
Looking Southeast
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
14Seattle, Washington
VIEWS OF COURTYARD
Landscaping at Boren Avenue Plaza View of Terry Avenue Building East Facade
View down Hillclimb from Boren Avenue PlazaView up Hillclimb from Terry Avenue North
Design Commission Meeting Block 101April 3, 2008
Callison Project #207193.00
Project: Amazon Phase IV
15Seattle, Washington
Bio-Rad Thomas St.
Harris
on S
t.
Terry Ave. N.
AERIAL VIEWOF HILLCLIMB