Brant Liddle Centre for Strategic Economic Studies Victoria University Australia
Sean Keefe Donn Liddle Ed Oshel Val Papanyan Image Science & Analysis Group
description
Transcript of Sean Keefe Donn Liddle Ed Oshel Val Papanyan Image Science & Analysis Group
KX/ISAG Lighting and Camera View Requirementsfor Increment 15 Jettison of the Early Ammonia Servicer
Sean Keefe Donn Liddle Ed Oshel Val Papanyan Image Science & Analysis GroupImage Science & Analysis Group
KX/Office for Human Exploration Science February 28, 2007
http://isag.jsc.nasa.gov
Assumptions
2
EAS Removal Position (MT as WS 4, SSRMS on MBS PDGF 2)
SR SY SP EP WP WY WR
-36.2 +147.0 -111.2 +41.1 -6.9 -6.6 +17.7
Current EAS jettison coordinates in cm and degrees, relative to ISSACS:
X Y Z Pitch Yaw Roll
1100 500 1450 -10.0 0 +180.0
Data from Ed Birchnall, Mission Controller, Robotics Systems, 1/26/07
2
EAS Jettison Envelope:Length: (59.591 + 36.177) = 95.768” (includes soft dock latch/capture mechanism)Width: (22.543+ 23.179) = 45.722” (includes handrails & cables)Height: 68.201” (includes grapple fixture)Metadata: CAD dwg. below provided by Boeing 1/24/07
Assumptions
Early Ammonia Servicer (EAS) on P6 Truss fwd
3
Camera Parameters
Pan Tilt Zoom
CP_3
CP_9
CP_13 -30.0 -10.0 75.0
120.0 20.0 60.0
50.0 25.0 75.0
S1 ETVCG camera CP3 view at t0
3
S1 ETVCG camera CP3 view at t0+ 120 s
3
P1 ETVCG camera CP9 view at t0
3
P1 ETVCG camera CP9 view at t0+ 120 s
3
US Lab ETVCG camera CP13 view at t0
3
US Lab ETVCG camera CP13 view at t0+ 120 s
3
Lighting
• CP_3 – On
• CP_9 – On
• CP_13 – Off
• Helmet Lights - Optional
further questions?
Contact Sean Keefe, Research Scientist (281) 483-8215
[email protected] Image Science & Analysis GroupImage Science & Analysis Group
KX/Office for Human Exploration Science
http://isag.jsc.nasa.gov