SeabasingA National Imperative
For the Joint Battlespace
SeabasingSeabasingA National ImperativeA National Imperative
For the Joint For the Joint BattlespaceBattlespace
Brigadier General Thomas L. Conant, U.S. Marine CorpsDirector, Capabilities Development DirectorateMarine Corps Combat Development Command
Quantico, Virginia
![Page 2: Seabasing€¦ · 11/15/2005 10:01 AM 4 4 MPF(F) Required Capabilities And Squadron Composition 9Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) 9Close a](https://reader035.fdocuments.us/reader035/viewer/2022081615/5fd9cde09b639b54001f2f1b/html5/thumbnails/2.jpg)
11/15/2005 10:01 AM
2
2
Seabasing: Why do we care?
The Marine Corps is committed to warfighting excellence; to that end, our number one focus is to accelerate the realization of Seabasing as a Naval, Joint, and National capability.
Seabasing affords the Combatant Commanders options where access is increasingly a central concern – paucity of ports and waning host-nation support.
Seabasing is not about platforms – it is about breaking down the traditional barrier between land and sea power – to use the oceans and the seas as maneuver space.
“Our forces in the next century must be agile, lethal, readily deployable... We must be able to project our power over long distances, in days or weeks, rather than months” President G.W. Bush
““Our forces in the next century must be agile, lethal, readily deOur forces in the next century must be agile, lethal, readily deployable... We must ployable... We must be able to project our power over long distances, in days or weebe able to project our power over long distances, in days or weeks, rather than ks, rather than monthsmonths”” President G.W. BushPresident G.W. Bush
![Page 3: Seabasing€¦ · 11/15/2005 10:01 AM 4 4 MPF(F) Required Capabilities And Squadron Composition 9Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) 9Close a](https://reader035.fdocuments.us/reader035/viewer/2022081615/5fd9cde09b639b54001f2f1b/html5/thumbnails/3.jpg)
11/15/2005 10:01 AM
3
3
Seabasing Components
Sea Base1. Carrier Strike Group (CSG)2. Expeditionary Strike Group (ESG)3. Maritime Prepositioning Group (MPG)4. Combat Logistics Force (CLF)5. Connectors: High Speed Ship (HSS), High
Speed Vessel (HSV), Assault Connectors (LCAC, EFV)
6. Sister Service and Coalition Force Ships
Carrier Strike Group
Expeditionary Strike Group
Combat Logistics Force Ships
Connectors
Sister Service and Coalition Force Ships
Maritime Prepositioning Group
![Page 4: Seabasing€¦ · 11/15/2005 10:01 AM 4 4 MPF(F) Required Capabilities And Squadron Composition 9Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) 9Close a](https://reader035.fdocuments.us/reader035/viewer/2022081615/5fd9cde09b639b54001f2f1b/html5/thumbnails/4.jpg)
11/15/2005 10:01 AM
4
4
MPF(F) Required CapabilitiesAnd Squadron Composition
Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) Close a MEB in 10-14 daysAt Sea Arrival and Assembly in 24-72 Hours Employ one Surface Battalion and one Vertical Battalion in 8-10 hours Provide accommodations and aircraft/vehicle maintenance capability (O level/selected I level) for a MEBSustain the forces ashore from the Sea BaseProvide Level II (resuscitative surgery) medical supportAccommodate and operate organic surface connectorsConduct external operations in Sea State 3 threshold/Sea State 4 objectiveProvide MEB C2
1x LHD
3x T-AKR
3x MLPArtist Rendition/Notional Configuration
FLO/FLO Technology focused
3x T-AKE
2x Legacy
Artist Rendition/Notional Configuration
Artist Rendition/Notional Configuration
2x LHA
![Page 5: Seabasing€¦ · 11/15/2005 10:01 AM 4 4 MPF(F) Required Capabilities And Squadron Composition 9Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) 9Close a](https://reader035.fdocuments.us/reader035/viewer/2022081615/5fd9cde09b639b54001f2f1b/html5/thumbnails/5.jpg)
11/15/2005 10:01 AM
5
5
SeabasingThe Joint Force Multiplier
Across the Full Range of Military Capabilities
![Page 6: Seabasing€¦ · 11/15/2005 10:01 AM 4 4 MPF(F) Required Capabilities And Squadron Composition 9Preposition the MEB (1 Air and 2 Surface Battalions [selective offload]) 9Close a](https://reader035.fdocuments.us/reader035/viewer/2022081615/5fd9cde09b639b54001f2f1b/html5/thumbnails/6.jpg)
11/15/2005 10:01 AM
6
6
Questions ?