SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings...

17
Page 1 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474 SCREW COMPRESSOR INSPECTION REPORT Customer : HOS BV Ref . : Inspection Order : Contact person : Ted Swart Date : Compressor type : Mycom 200 SUD-HE Serial nr : 2053474 Running hours : 30619 Refrigerant : NH3 Type oil : Inspected by : INSPECTION AND REPAIR SCOPE Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “.

Transcript of SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings...

Page 1: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 1 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

SCREW COMPRESSOR INSPECTION REPORT Customer : HOS BV Ref . : Inspection Order : Contact person : Ted Swart Date : Compressor type : Mycom 200 SUD-HE Serial nr : 2053474 Running hours : 30619 Refrigerant : NH3 Type oil : Inspected by :

INSPECTION AND REPAIR SCOPE

Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “.

Page 2: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 2 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

MEASURMENTS AND CLEARENCES

END CLEARENCE male within factory settings female within factory settings RUN OUT ( male shaft ) 0.001 mm THRUST BEARING CONDITON male good , no wear female good , no wear AXIAL PLAY male 0.00 mm female 0.00 mm INDICATOR ASSEMBLY CONDITION working FLANGES PRESENT suction no , compressor mounted on skid discharge no , compressor mounted on skid

TYPE SEAL Double seal in good conditioning. NEW PARTS ADDED TO MACHINE SEAL PARTS LOCKNUTS & WASHERS X THRUSTBEARINGS MAINBEARINGS : O-RING & GASKETS : X BALANCEPISTON & SLEEVE GUIDEBLOCK & PIN PARTS MACHINED & METAL REMOVED LEAKTEST with NITROGEEN X SLIDEVALVE TEST with NITROGEEN PRESSURE X

Page 3: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 3 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 4: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 4 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 5: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 5 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 6: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 6 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 7: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 7 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 8: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 8 of 2 Compressor inspection Mycom SUD-HE / SN: 2053474

Page 9: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 1 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

SCREW COMPRESSOR INSPECTION REPORT Customer : HOS BV Ref . : Inspection Order : Contact person : Ted Swart Date : Compressor type : Mycom 200 SUD-HE Serial nr : 2053500 Running hours : 37639 Refrigerant : NH3 Type oil : Inspected by :

INSPECTION AND REPAIR SCOPE

Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “.

Page 10: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 2 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

MEASURMENTS AND CLEARENCES

END CLEARENCE male within factory settings female within factory settings RUN OUT ( male shaft ) 0.001 mm THRUST BEARING CONDITON male good , no wear female good , no wear AXIAL PLAY male 0.00 mm female 0.00 mm INDICATOR ASSEMBLY CONDITION working FLANGES PRESENT suction no , compressor mounted on skid discharge no , compressor mounted on skid

TYPE SEAL Double seal in good conditioning. NEW PARTS ADDED TO MACHINE SEAL PARTS X LOCKNUTS & WASHERS THRUSTBEARINGS MAINBEARINGS : O-RING & GASKETS : X BALANCEPISTON & SLEEVE GUIDEBLOCK & PIN PARTS MACHINED & METAL REMOVED LEAKTEST with NITROGEEN X SLIDEVALVE TEST with NITROGEEN PRESSURE X

Page 11: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 3 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 12: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 4 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 13: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 5 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 14: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 6 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 15: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 7 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 16: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 8 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500

Page 17: SCREW COMPRESSOR INSPECTION REPORT - HOS BV · Opened compressor for inspection of thrust-bearings , measuring the axial play and the “end-clearence “. Page 2 of 2 Compressor

Page 9 of 2 Compressor inspection Mycom SUD-HE / SN: 2053500