Transcript of Scott Craig Cody Maher Jesse Ross Brian Van Stratum.
Scott CraigCody Maher
Jesse RossBrian Van Stratum
Fall 2006◦ Site survey◦ Flow rate calculations◦ Turbine research◦ Turbine selection
Spring 2007◦ Economics
Turbine Cost Dam Reconstruction Power Company Lifecycle Cost Analysis
◦ Environmental Impacts◦Overall Feasibility
Multiple Options Recommendations
All in one Design
Not available yet
Would need two to accommodate flow at Minors Millpond
HydroWatt Wheel
Water Wheel Factory
hrsmandaysmen *72015*6
00.10800$*
15**720 hrman
dallarshrsman
00.32400$00.10800$*3*3 paymentstimatetotalCostE
00.4320$3**
15*8*2*6 hrman
dollars
day
hrsdaysmen
Construction Cost Estimation for Water Wheel:
Demolition:
Materials: Concrete and Rebar $4000.00Consulting: $1300.00Equipment: $3000.00
Permitting: $15.00-$25.00Total: $45045.00
Voith Siemens U.C.M. Resita Water WheelTurbine/Wheel Cost $50,000.00 $60,000.00 $9,000.00Installation $3,000.00 $1,000.00 $2,000.00Redesign of Dam $67,567.50 $32,000.00 $45,045.00Efficiency 95% 90% 70%Turbine Life 50 yrs 25 yrs 12 yrMaintainance Costs per Year $100.00 $200 $25.00
Rate0.0655
kW hr
Pexpavg Rate 30 day 266.339
Pexpavg Rate 1 yr 3.243 103
Pexpavg Rate 50 yr 1.621 105Note: No inflation is figured in these calculations
Buyback Rate Tax Benefits Rate at Which Energy Cost Increases IEEE 1547
www.fsuhydroturbine.com Link on BlackBoard website Will detail progress made in
the spring semester of 2007 Will host all available
information and multimedia obtained throughout project