Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

12
Scott Craig Cody Maher Jesse Ross Brian Van Stratum

Transcript of Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Page 1: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Scott CraigCody Maher

Jesse RossBrian Van Stratum

Page 2: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Fall 2006◦ Site survey◦ Flow rate calculations◦ Turbine research◦ Turbine selection

Spring 2007◦ Economics

Turbine Cost Dam Reconstruction Power Company Lifecycle Cost Analysis

◦ Environmental Impacts◦Overall Feasibility

Multiple Options Recommendations

Page 3: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.
Page 4: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.
Page 5: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

All in one Design

Not available yet

Would need two to accommodate flow at Minors Millpond

Page 6: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

HydroWatt Wheel

Water Wheel Factory

Page 7: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

hrsmandaysmen *72015*6

00.10800$*

15**720 hrman

dallarshrsman

00.32400$00.10800$*3*3 paymentstimatetotalCostE

00.4320$3**

15*8*2*6 hrman

dollars

day

hrsdaysmen

Construction Cost Estimation for Water Wheel:

Demolition:

Materials: Concrete and Rebar $4000.00Consulting: $1300.00Equipment: $3000.00

Permitting: $15.00-$25.00Total: $45045.00

Page 8: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Voith Siemens U.C.M. Resita Water WheelTurbine/Wheel Cost $50,000.00 $60,000.00 $9,000.00Installation $3,000.00 $1,000.00 $2,000.00Redesign of Dam $67,567.50 $32,000.00 $45,045.00Efficiency 95% 90% 70%Turbine Life 50 yrs 25 yrs 12 yrMaintainance Costs per Year $100.00 $200 $25.00

Page 9: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Rate0.0655

kW hr

Pexpavg Rate 30 day 266.339

Pexpavg Rate 1 yr 3.243 103

Pexpavg Rate 50 yr 1.621 105Note: No inflation is figured in these calculations

Page 10: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

Buyback Rate Tax Benefits Rate at Which Energy Cost Increases IEEE 1547

Page 11: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.

www.fsuhydroturbine.com Link on BlackBoard website Will detail progress made in

the spring semester of 2007 Will host all available

information and multimedia obtained throughout project

Page 12: Scott Craig Cody Maher Jesse Ross Brian Van Stratum.