Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD...
Transcript of Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD...
![Page 1: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/1.jpg)
Scorecard (as of June 30, 2017)2017 Work and Financial Plan
DEPARTMENT OF LABOR AND EMPLOYMENTRegional Office No. 8
Tacloban City
(Guiding Rate) SIGNAL
Below guiding utilization rate of 50%
Above guiding utilization rate of 50%
![Page 2: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/2.jpg)
Address the Persistent Problems of Unemployment and Underemployment
OBJECTIVES:
• Facilitate placement and job
matching of jobseekers to fill 7.5
million jobs to be created from
2017-2022
• Enhance employability of workers
assisted
• Improve labor laws compliance,
particularly in industries where jobs
will be created
• Improve productivity of MSMEs
• Develop sustainable livelihood
![Page 3: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/3.jpg)
Address the Persistent Problems of Unemployment and Underemployment
OUTCOME:1. 80% Placement rate of PESO
Percent share of establishments using employment
intermediaries
• PhilJobNet (16% in 2011 to 30% in 2022)
• PESO (26% in 2011 to 35% in 2022)
• Job Fair (32% in 2011 to 50% in 2022)
2. Placement rate
• Jobstart (75%)
• GIP (1%)
Job search period for Jobstarters
• From 2-3 years to 9-12 months for HS graduates and
from 1-2 years 6-9 months for college graduates
6 to 7% SPES beneficiaries completed techvoc or college
25% of seafarers-trainees trained/employed a year after
completion of mandatory training courses
3. Compliance rate in the priority industries
4. 90% of MSMEs assisted adopting Productivity Incentive
Program (PIP)
5. 320 livelihood projects transformed to sustainable livelihood
under the DOLE Sustainable Livelihood Framework
![Page 4: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/4.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL Signal
TARGET
ACCOMP ALLOTMENT OBLIGATION
Northern Leyte
1189 1538 3,882,000.00 0
Western Leyte
1783 1334 5,778,000.00 0
Southern Leyte
594 641 1,926,000.00 404,466.60
Biliran 594 508 1,926,000.00 1,341,885.00
Samar 1188 1143 3,852,000.00 336,607.81
Eastern Samar
594 621 1,926,000.00 657,221.90
Northern Samar
1192 1660 3,852,000.00 0
TOTAL 7,134 7,445 23,142,000.00 2,995,811.00
Jan-Dec target: 7,134 youth ben
accomplishment: 7,445 beneficiaries
accomplishment rate: 104% physical12% financial
![Page 5: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/5.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL Signal
TARGET
ACCOMP ALLOTMENT OBLIGATION
Northern Leyte
104 141 917,830.46 454,103.70
Western Leyte
456 247 2,884,400.00 49,900.00
Southern Leyte
17 29 108,085.00 108,085.00
Biliran 17 111,025.00 111,025.00
Samar 34 50 214,835.00 52,050.00
Eastern Samar
61 123 391,730.00 391,730.00
Northern Samar
38 60 242,938.00 179,156.00
TOTAL 727 650 4,870,843.46 1,495,500.00
Jan-Dec target: 727 youth ben
accomplishment: 650 beneficiaries
accomplishment rate: 89% physical30% financial
![Page 6: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/6.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL Signal
TARGET
ACCOMP ALLOTMENT OBLIGATION
Northern LeyteWestern Leyte
(Implemented
2016) 272,324.61 0
Southern Leyte
(Implemented
2016) 113,498.31 0
Biliran
Samar 525 367 1,108,982.63 0
Eastern Samar
162 209 623,500.00 0
Northern Samar
TOTAL 687 576 2,118,305.55 0
Jan-Dec target: 687 youth ben
accomplishment: 576 beneficiaries
accomplishment rate: 84% physical16% financial
![Page 7: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/7.jpg)
FIELD OFFICE PHYSICAL Signal FINANCIAL %
Target ACCOMP ALLOTMENTOBLIGATIO
N
GIP TUPAD GIP TUPAD
Northern Leyte
67 67 0 1,900,000 0 0%
Western Leyte 412 402 0 13,350,000 0 0%
745 0 0 6,600,000 0 0%
Western Samar
33 34 0 950,000 0 0%
Northern Samar
1310 0 0 3,800,000 0 0%
TOTAL 512 2055 503 0 26,600,000 0 0%
Jan-Dec target: 512 GIP2055 TUPAD
accomplishment: 503 (GIP)
accomplishment rate: 98% Physical (GIP)
NL-GIP
WL–GIP/TUPAD
SF-GIP
NS-TUPAD
![Page 8: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/8.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL Signal
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte
18 18 533,455.58 533,455.58
Western Leyte
115 107 3,250,764.74 3,250,765.71
Southern Leyte
13 13 368,887.90 368,887.47
Biliran 2 2 54,048.37 54,048.37
Samar 52 53 1,485,202.10 1,485,202.18
Eastern Samar
119 128 3,378,520.69 3,378,520.42
Northern Samar
579 638 16,388,082.68 16,388,082.72
TOTAL 898 959 25,458,962.06 27,939,703.00
Jan-Dec target: 898 beneficiaries
accomplishment: 959 beneficiaries
accomplishment rate:
107%- physical100% - financial
![Page 9: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/9.jpg)
FIELD OFFICE PHYSICAL Signal FINANCIAL
TARGET ACCOMP ALLOTMENT
Northern Leyte 4466 9961
Charged to EPD Funds
Western Leyte 4500 6003
Southern Leyte 3857 2103
Biliran 1624 936
Samar 5012 2665
Eastern Samar 4669 2786
Northern Samar
4872 6308
TOTAL 29,000 30762
Jan-Dec target: 29,000 jobseekers Referred for placement
accomplishment: 30,762
accomplishment rate: 106%
![Page 10: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/10.jpg)
FIELD OFFICE
Individuals Reached
SignalInstitutions
ReachedSignal
TARGET ACCOMP TARGET ACCOMP
Northern Leyte
7000 6164 255 372
Western Leyte
5500 2791 192 286
Southern Leyte
4300 4062 129 186
Biliran 2800 1990 102 76
Samar 4400 933 154 33
Eastern Samar
4500 2409 157 29
Northern Samar
4500 4290 163 47
TOTAL 33,000 22,639 1152 1,029
Jan-Dec target: 33,000 Individuals Reached1,152 Institutions Reached
accomplishment: 22,639 Ind Reached1,029 Ins Reached
accomplishment rate: 69% - Ind Reached89% - Ins Reached
![Page 11: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/11.jpg)
2017 target: 1,364 individuals assessed
FIELD OFFICE Individuals Reached
TARGET ACCOMP
Northern Leyte
Western Leyte
Southern Leyte
Biliran
Samar
Eastern Samar
Northern Samar
TOTAL 1,364
![Page 12: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/12.jpg)
2017 target: 2 LGU covered;1,380 establishment covered
FIELD OFFICE LGUsEstablishments covered
TARGET ACCOMP TARGET ACCOMP
Northern Leyte
Western Leyte
Southern Leyte
Biliran
Samar
Eastern Samar
Northern Samar
TOTAL 2 1,380
![Page 13: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/13.jpg)
Productivity Toolbox
Status
Provide productivity trainings to displaced workers
Provide productivity training and technical assistance to
workers affected who availed of livelihood assistance
307 MSMEs were
provided productivity
training/tech assistance
Target: 750 MSMEs
41% Accomplishment
![Page 14: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/14.jpg)
Continuously Strengthen Protection and Security of our Overseas Filipino Workers
OUTCOME
• 2,600 OFWs and their families
trained through reintegration
services
OBJECTIVES
• Enhance protection and
welfare of OFWs and their
families
• Strengthen reintegration
of OFWs
• Strengthen engagement
of OFWs in governance
![Page 15: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/15.jpg)
2017 target: 30 qualified OFWs provided with livelihood training and starter kits
accomplishment: 20 qualified OFWs67%
Province 2017 target
Accomplishments
SPRS Data
N. Leyte 20
W. LeyteS. LeyteBiliranSamar
E.SamarN. Samar
TOTAL 30 20
![Page 16: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/16.jpg)
2017 target: 60 qualified OFWs provided with livelihood training and starter kits
accomplishment:18 qualified OFWs30%
Province 2017 target
Accomplishments
SPRS Data
N. Leyte 18
W. LeyteS. LeyteBiliranSamar
E.SamarN. Samar
TOTAL 60 18
![Page 17: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/17.jpg)
2017 quarter target: 90 qualified OFWs provided with livelihood training and starter kits
accomplishment :37 qualified OFWs41%
Province 2017 target
Accomplishments
SPRS Data
N. Leyte 37
W. LeyteS. LeyteBiliranSamar
E.SamarN. Samar
TOTAL 90 37
![Page 18: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/18.jpg)
2017 quarter target: 100% of application forms preliminary screened and endorsed to NRCO-CO within 7 days upon receipt of complete documents
accomplishment:20 or 100% screened and endorsed
Province 2017 target
Accomplishments
SPRS Data
N. Leyte 20
W. LeyteS. LeyteBiliranSamar
E.SamarN. Samar
TOTAL 20
![Page 19: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/19.jpg)
OBJECTIVE
Enhance access, adequacy and
sustainability of social protection programs
Bring More Focus and Accessibility in Workers’Protection and Welfare Programs
OUTCOME
• 5% percent of livelihood projects still
operational after two (2) years of grant.
• 630,000 children removed from child
labor by 2022 (105,000 children per
year)
![Page 20: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/20.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte
676 329 13,520,000.00 5,162,829.2027%
Western Leyte
1013 875 20,250,000.00 7,316,975.0030%
Southern Leyte
338 350 6,760,000.00 3,581,861.5045%
Biliran 338 6,760,000.00 - 0%
Samar 676 1323 13,520,000.00 12,853,236.0095%
Eastern Samar
338 392 6,760,000.00 3,948,897.0058%
Northern Samar
676 13,520,000.00 - 0%
TOTAL 4055 3273 81,090,000.00 32,863,798.70
Jan-Dec target: 4,055 beneficiaries
accomplishment: 3,273 beneficiaries
accomplishment rate: 81% - physical41% - financial
![Page 21: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/21.jpg)
FIELD OFFICE
PHYSICAL Signal FINANCIAL
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte 175 50 1,458,236.82 1,458,236.00
Western Leyte 218 75 3,500,000.00 3,500,000.00
Southern Leyte 446 25 3,334,000.00 3,334,000.00
Biliran 376 127 4,720,000.00 4,720,000.00
Samar 184 81 795,950.00 788,853.00
Eastern Samar 60 100 600,000.00 600,000.00
Northern Samar* 197 0 1,514,932.00 1,514,932.00
TOTAL 1656 458 15,923,318.8215,916,201.00
*
Jan-Dec target: 1656 beneficiaries
accomplishment: 458 beneficiaries
accomplishment rate:
27% - physical100% - financial
*transferred to
Postal
![Page 22: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/22.jpg)
Jan-Dec target: 1,302 beneficiaries
accomplishment: 110 beneficiaries
accomplishment rate:
8% - physical100% - financial
FIELD OFFICE
PHYSICALSignal
FINANCIALSignal
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte 216 0 1,920,000.00 1,920,000.00
Western Leyte 324 0 2,878,000.00 2,878,000.00
Southern Leyte 110 0 977,000.00 977,000.00
Biliran 110 0 977,000.00 977,000.00
Samar 216 0 1,920,000.00 1,920,000.00
Eastern Samar 110 110 977,000.00 977,000.00
Northern Samar 216 0 1,920,000.00 1,920,000.00
TOTAL 1,302 110 11,569,000.0011,569,000.00
*
*transferred to
Postal
![Page 23: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/23.jpg)
2017 target: 100% displaced workers assisted
FIELD OFFICE PHYSICAL FINANCIAL %
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte 290 2,522,150.00 2,522,150.00 100%
Western Leyte 0%
Southern Leyte 0%
Biliran 0%
Samar 0%
Eastern Samar 0%
Northern Samar 0%
TOTAL 290 100%
![Page 24: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/24.jpg)
FIELD OFFICE
PHYSICAL FINANCIAL %
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte 676 329
Western Leyte 1013 789
Southern Leyte 338 440
Biliran 338
Samar 676 1323
Eastern Samar 338 392
Northern Samar 676
TOTAL 4055 3273
Jan-Dec target: 4,055 beneficiaries
accomplishment: 3,273 beneficiaries
accomplishment rate: 81% - physical
![Page 25: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/25.jpg)
2017 target: 100% of assessed establishment without FWP provided assistance in setting up FWP
FIELD OFFICE PHYSICAL FINANCIAL %
TARGET ACCOMP ALLOTMENT OBLIGATION
Northern Leyte
Western Leyte
Southern Leyte
Biliran
Samar
Eastern Samar
Northern Samar
TOTAL 225
![Page 26: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/26.jpg)
FIELD OFFICE TRAINING SCHOLARSHIP %
TARGET ACCOMP TARGET ACCOMP
Northern Leyte 2 1 1 ON-GOING 1
Western Leyte 2 0
Southern Leyte
Biliran 1 0
Samar
Eastern Samar
Northern Samar
TOTAL 1 1
![Page 27: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/27.jpg)
accomplishment as of June:2 workers benefitted for Maternity
accomplishment as of June:2 workers benefitted for Death Claims
![Page 28: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/28.jpg)
OBJECTIVE:
Eliminate all illegitimate
forms of contractualization
OUTCOME:
100% of workers affected (as
a result of assessment) are
regularized; or
In case of displacement:
100% of workers assisted
received their money claims
Ensure Full Respect for Labor Standards and the Fundamental Principles of Rights at Work
![Page 29: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/29.jpg)
Jan-Dec target: 1,330 establishments
accomplishment: 591 establishments assessed
accomplishment rate: 44% (as of June 30, 2017)
Region/
OfficeJan-Dec Target Accomplishment Signal
N. Leyte 300 188
W. Leyte 354 104
S. Leyte 165 70
Biliran 121 51
Samar 160 42
E. Samar 80 56
N. Samar 150 49
TOTAL 1330 560
As of June 19
514-JA
43-CV
557 (42%)
As of June 30
591 (44%)
![Page 30: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/30.jpg)
workers regularized
as of April 2017
424 regular assessment
283
voluntary regularization
141
![Page 31: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/31.jpg)
Target: 100% disposition rate
Accomplishment:
98% (44 / 45 cases)
monetary benefits:
P4,651,660.24
workers benefitted:
344
Region/ Office2016 pending
cases
New Cases Handled
Disposed Pending
N. Leyte 1 16 17 0
W. Leyte 1 3 4 0
S. Leyte 1 2 3 0
Biliran 1 0 1
Samar 2 2 0
E. Samar 11 11 0
N. Samar 7 7 0
TOTAL 3 42 44 1
![Page 32: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/32.jpg)
77% settlement rate
Accomplishment:
88.67% (282 /318 RFAs)
monetary benefits:
P6,570,260.31
workers benefitted:
711
Region/
Office
2016 pending
cases
New Cases Handled
SettledTotal
DisposedPending
N. Leyte 0 129 112 126 3
W. Leyte 0 93 91 92 1
S. Leyte 0 14 14 14 0
Biliran 0 8 8 8 0
Samar 0 54 32 46 8
E. Samar 0 18 15 18 0
N. Samar 0 14 10 14 0
TOTAL 0 330 282 318 12
![Page 33: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/33.jpg)
70% Client Satisfaction Rate
Summary Clients Satisfaction Rate 2017 (at least 70%)
MAJOR FINAL OUTPUT / PERFORMANCE INDICATORS
MFO 2: Employment Facilitation and CapacityBuilding Services
Total No. of respondents
Total No. of respondents who rated the program
Percentage
Percentage and number of individuals/beneficiaries whorate the services provided as satisfactory or better
SPES Percentage and number of individuals/beneficiaries
who rate the services provided as satisfactory or better
GIP Percentage and number of individuals/beneficiaries
who rate the services provided as satisfactory or better
PES Percentage and number of individuals/beneficiaries
who rate the services provided as satisfactory or better
LMI Percentage and number of individuals/beneficiaries
who rate the services provided as satisfactory or better
DILEEP
1) Percentage and number of individuals/beneficiaries whorate the services provided as satisfactory or better
2) Percentage and number of individuals who rate theservices within the prescribed PCT
MFO 3: Labor Force Welfare Services
TRIPARTISM Percentage and number of workers who rate
the services provided as satisfactory or better
WODP Percentage and number of workers who rate the
services provided as satisfactory or better
LEES Percentage and number of workers who rate the
services provided as satisfactory or better
CHILD LABOR Percentage and number of workers who rate
the services provided as satisfactory or better
SAPFWP
REINTEGRATION (BPBH/10K)
REINTEGRATION (FAS/ SBMT)
MFO 4: Employment Regulation Services
SENASPEED
![Page 34: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/34.jpg)
Regional/Provincial Activities to be conducted
Regional/Provincial Activity TimelinesCGAP CGAP
Regional Career Advocacy Congress conducted by end of September 2017PESO LMI Analysis, BEST, PESO and SPES IRR
§ (20) PESO personnel participated in the capacity-building training on LMI Analysis, BEST, PESO Law IRR, and SPES Law IRR by end of September 2017PESO Employment Information System (PEIS), PhilJobNet and Talent Mapping § (20) FOs, PESO personnel, schools, training institutions, and establishments participated in capability-building training / orientation on PEIS, PhilJobNet, and Talent Mapping by end of September 2017
Jobsfit Stakeholder organizations consulted
Before May 31, 2017(May 26, 2017)
TNK National
Trabaho, Negosyo, Kabuhayan
§ Conducted Labor Day and Independence Day TNK Caravan Job and Livelihood Fairs May 1 and June 12, 2017§ Assessment report on placement submitted within 30 days for local employment, ad 90 days for overseas employment after the conduct of Job FairsLocal
§ Forged partnership among regional counterparts of DTI, DOLE, and LGUs on the TNK Caravan Job and Livelihood Fair
by end of December 2017(June 12, 2017)
K-12 Conducted at least 5 orientation activities / advocacy / information campaigns per semester and distributed advocacy materials on K-to-12 DOLE AMP
2 Semesters
RTIPC Regular quarterly RTIPC meetings conducted
Quarterly MeetingsNote: Please indicate agenda, date, venue and number of attendees in accomplishments
ITCOne (1) Resolution/Position Paper/Manifesto on labor and employment issues submitted to the NTIPC through the BLR per quarter Quarterly Submission
Regular quarterly ITC meetings conducted
Quarterly Meetings(Consultation of DO 174 & 156-
April 3, April 18 and 21)
NSRP: Submitted to BLE the regional post-activity reports as a result of the conduct of NSRP Regional Lessons Learned Workshop (i.e., “regional validation exercise”) by 15 September 2017 September 15, 2017
![Page 35: Scorecard (as of June 30, 2017)ro8.dole.gov.ph/fndr/mis/files/Scorecard as of June 30.pdf · FIELD OFFICE PHYSICAL Signal FINANCIAL Signal TARGE T ACCOMP ALLOTMENT OBLIGATION Northern](https://reader033.fdocuments.us/reader033/viewer/2022060502/5f1c59ad9c138e70107cff16/html5/thumbnails/35.jpg)
Monitoring Programs
Monitoring of ProgramsSPES: (7,633) youth-beneficiaries assisted (under Continuing-Regular funds -7,134, and Continuing-BUB funds 499)
SPES: Submitted to BLE the number of SPES graduates of techvoc and colleges by end of December 2017
JobStart: Submitted to BLE the (0) JobStart beneficiaries absorbed as employees (regular, contractual, project-based) by partner employers by end of December 2017JobStart: Submitted to BLE the Regional Report on JobsFit 2022 cum Employment Situationer and Inputs to HRD Roadmaps by end of May 2017GIP: Submitted to BLE the total number of GIP beneficiaries absorbed as employees (Job Orders Contractual, Project-Based) by the agencies deployed/partner government agencies after the program by end of December 2017PESO: Submitted to BLE the (number) of establishment submitted job vacancies through PESOs in FY 2017 by end of December 2017PhilJobNet: Submitted to BLE the (number of) establishments with posted vacancies in the by end of December 2017Job Search Kiosk: Submitted to BLE the quarterly report on the location and status of Job Search Kiosk 15 working days after the reference quarterJob Fairs: Submitted to BLE the number of qualified applicants hired-on-the-spot (HOTS) during the conduct of Job FairsJob Fairs: Submitted to BLE the number of establishment participated in National and Local Job Fairs in FY 2017 by end of December 2017NSRP: Submitted to BLE the Quarterly Monitoring Reports on NSRP within a week after the reference quarterNSRP: Submitted to BLE the regional post-activity reports as a result of the conduct of NSRP Regional Lessons Learned Workshop (i.e., “regional validation exercise”) by 15 September 2017JDMS: Submitted to BLE monthly Job Displacement Monitoring System (JDMS) report 15 working days after the reference monthNCGAP: Submitted to BLE the number of NCGAP members who participated in the capacity-building activities in the region by end of December 2017NCGAP: Submitted to BLE the number of Career Guidance and Employment Coaching (CGEC) Activities conducted in public education and training institutions (public high schools, TESDA Training Institutions, and State Universities and Colleges) in the region by end of December 2017DILEEP, SLF: Submitted to BWSC regular reports on:• Regular DILP – every 7th day after the reference quarter• Regular TUPAD – every 7th days after the reference quarter• Regular SLF – not later than 15 days after the reference semester
K-to-12 AMP: Submitted to BLE the monthly report on reported displacements and program beneficiaries 5 working days after the reference monthReintegration Services: Submitted monthly performance report to NRCO on its (NRCO) Livelihood Programs not later than 10th day of the succeeding month
LLCS: Submitted the LLCS (monthly) reports to BWC on or before the 10th day of the following month
LLCS: Submitted LLCS Annual Fund Utilization Report to BWC on or before end of January 2018
SEnA: Submitted to SEnA Secretariat monthly SEnA accomplishments not later than the 10th day following the reference monthSEnA: Submitted to the SEnA secretariat for the SEnA database not later than the 10th day following the reference month:1. Statistical Summary of SEnA RFAs2. Listing of SEnA RFAs3. Cumulative Report of SEnA RFAs
Project SpeED: Submitted to BWC (for LS cases) the monthly SpeED accomplishments at the end of the monthProject SpeED: Submitted to BLR (for appealed cases) the monthly SpeED accomplishments at the end of the month