Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by...
Transcript of Scone Airport Aviation Attraction and Terminal€¦ · project leader date authorised for issue by...
DD
preliminary issueCOPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au
31/10/2018 9:46:24 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
COVER SHEET & DRAWING LIST
8322 A 00-01
AuthorBunnan Road, Scone NSW 2337
A 00-00 DRAWING LIST
SHEET NUMBER SHEET NAME REVISIONCurrent Revision
Date
A 00-01 COVER SHEET & DRAWING LIST 5 31.10.18
A 00-02 LEGENDS SHEET 5 31.10.18
A 01-02 SITE PLAN 4 31.10.18
A 01-03 SITE GRID SETOUT PLAN 3 31.10.18
A 01-21 OVERALL FLOOR PLAN GROUND 5 31.10.18
A 01-22 OVERALL FLOOR PLAN LEVEL 1 5 31.10.18
A 02-10 STAGE 1 WORKS - VIEW 3 31.10.18
A 02-11 GENERAL ARRANGEMENT PLAN GROUND PART 1 STAGE 1 3 31.10.18
A 02-12 GENERAL ARRANGEMENT PLAN GROUND PART 2 STAGE 1 3 31.10.18
A 02-13 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 STAGE 1 3 31.10.18
A 02-14 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 STAGE 1 3 31.10.18
A 02-15 GENERAL ARRANGEMENT ROOF PLAN PART 1 STAGE 1 3 31.10.18
A 02-16 GENERAL ARRANGEMENT ROOF PLAN PART 2 STAGE 1 3 31.10.18
A 02-21 GENERAL ARRANGEMENT PLAN GROUND PART 1 5 31.10.18
A 02-22 GENERAL ARRANGEMENT PLAN GROUND PART 2 5 31.10.18
A 02-23 GENERAL ARRANGEMENT PLAN CARPARK 5 31.10.18
A 02-24 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1 5 31.10.18
A 02-25 GENERAL ARRANGEMENT PLAN LEVEL 1 PART 2 5 31.10.18
A 02-26 GENERAL ARRANGEMENT ROOF PLAN PART 1 5 31.10.18
A 02-27 GENERAL ARRANGEMENT ROOF PLAN PART 2 5 31.10.18
A 03-00 SLAB SETOUT PLAN GROUND PART 1 STAGE 1 3 31.10.18
A 03-01 SLAB SETOUT PLAN GROUND PART 1 5 31.10.18
A 03-02 SLAB SETOUT PLAN GROUND PART 2 5 31.10.18
A 03-03 SLAB SETOUT PLAN LEVEL 1 PART 1 3 31.10.18
A 03-04 SLAB SETOUT PLAN LEVEL 1 PART 2 5 31.10.18
A 03-31 PARTITION SETOUT PLAN GROUND PART 1 5 31.10.18
A 03-32 PARTITION SETOUT PLAN GROUND PART 2 5 31.10.18
A 03-33 PARTITION SETOUT PLAN LEVEL 1 PART 1 5 31.10.18
A 03-34 PARTITION SETOUT PLAN LEVEL 1 PART 2 5 31.10.18
A 04-01 REFLECTED CEILING PLAN GROUND PART 1 5 31.10.18
A 04-01A REFLECTED CEILING PLAN GROUND PART 1 1_50 3 31.10.18
A 04-02 REFLECTED CEILING PLAN GROUND PART 2 5 31.10.18
A 04-03 REFLECTED CEILING PLAN LEVEL 1 PART 1 5 31.10.18
A 04-03A REFLECTED CEILING PLAN LEVEL 1 PART 1 1_50 3 31.10.18
A 04-04 REFLECTED CEILING PLAN LEVEL 1 PART 2 5 31.10.18
A 05-01 FLOOR & WALL FINISHES PLAN GROUND PART 1 5 31.10.18
A 05-02 FLOOR & WALL FINISHES PLAN GROUND PART 2 5 31.10.18
A 05-03 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 1 5 31.10.18
A 05-04 FLOOR & WALL FINISHES PLAN LEVEL 1 PART 2 5 31.10.18
A 06-01 BUILDING ELEVATIONS 5 31.10.18
A 07-01 BUILDING SECTION 1 & 2 5 31.10.18
A 07-02 BUILDING SECTION 3 & 4 5 31.10.18
A 07-03 BUILDING SECTION 5 5 31.10.18
A 07-04 BUILDING SECTION 7 & 8 5 31.10.18
A 09-01 WALL TYPES 4 31.10.18
A 09-20 DETAIL SECTION SHEET 1 5 31.10.18
A 09-21 DETAIL SECTION SHEET 2 5 31.10.18
A 09-22 DETAIL SECTION SHEET 3 5 31.10.18
A 09-23 DETAIL SECTION WALLS 4 31.10.18
A 09-24 BULKHEAD DETAIL 1 31.10.18
A 09-40 DETAIL FRONT CLADDING SETOUT ELEVATIONS 4 31.10.18
A 09-50 HANGAR DOOR DETAILS 3 31.10.18
A 10-01 STAIR 1 PLANS & SECTIONS 5 31.10.18
A 10-02 STAIR 2 PLANS & SECTIONS 5 31.10.18
A 10-03 STAIR 3 & 4 PLANS & SECTIONS 5 31.10.18
A 10-04 STAIR DETAILS 5 31.10.18
A 10-05 STAIR 5 & 6 PLANS & SECTIONS 1 31.10.18
A 10-61 LIFT 1 PLANS & SECTIONS 5 31.10.18
A 11-00 AMENITIES STATUTORY SIGNAGE LOCATION PLANS 2 31.10.18
A 11-01 WET AREAS DETAILS SHEET 1 5 31.10.18
A 11-02 WET AREAS DETAILS SHEET 2 5 31.10.18
A 11-03 WET AREAS DETAILS SHEET 3 5 31.10.18
A 11-04 WET AREAS DETAILS SHEET 4 5 31.10.18
A 11-05 WET AREAS DETAILS SHEET 5 5 31.10.18
A 11-06 WET AREAS DETAILS SHEET 6 5 31.10.18
A 14-01 INTERNAL JOINERY DETAILS SHEET 1 4 31.10.18
A 15-01 DOOR SCHEDULE 4 31.10.18
A 15-20 DOOR DETAILS TYPICAL CIRCULATION AS1428.1_2009 5 31.10.18
A 16-01 WINDOW & LOUVRE LOCATIONS GROUND & LEVEL 1 5 31.10.18
A 16-51 WINDOW & LOUVRE ELEVATIONS SHEET 1 5 31.10.18
A 16-52 WINDOW & LOUVRE ELEVATIONS SHEET 2 3 31.10.18
A 16-53 WINDOW & LOUVRE ELEVATIONS SHEET 3 3 31.10.18
A 21-01 FINISHES DETAILS SHEET 1 4 31.10.18
Scone Airport Aviation Attraction and Terminal
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
PROPOSED CARPARK
PROPOSED AVIATION
ATTRACTION HANGER
PROPOSED TERMINAL
BUNNAN ROAD
WALTER PYE AVENUE
SITE BOUNDARY
SITE BOUNDARY
SITE BOUNDARY
DD
preliminary issueCOPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 400
31/10/2018 9:46:26 AM
31.10.18
4
Scone Airport Aviation Attraction and Terminal
SITE PLAN
8322 A 01-02
AuthorBunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
SCALE 1 : 400A 06-01
SITE PLAN1
LOCALITY PLAN
N
22.06.18 1 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 2 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 3 PRE TENDER ISSUE
31.10.18 4 TENDER ISSUE
UP
1
1
F F
2
2
H H
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
C C
A A
15
15
A 07-01
1
A 07-01
1
A 07-02
3
A 07-02
3
A 07-02
4
A 07-02
4
A 07-03
5
A 07-03
5
4A 06-01
1A 06-01
2A 06-01
3A 06-01
G G
E E
D D
B B
ZA 09-50
TERMINALARO
COMMS.MALE
9.32 m²FEMALE
PWD
ENTRANCE FOYER
OUTDOOR SERVICE AREA
ADMIN.
OFFICE
CAFE
THEATRE
STORE 1
STORE 2
STORE 3
HANGAR
64180
48000
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LIN
E O
F R
OO
F A
BO
VE
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LIN
E O
F R
OO
F A
BO
VE
LIN
E O
F R
OO
F A
BO
VE
LIN
E O
F R
OO
F A
BO
VE
SCONE AIRPORT FRONT
SIGN TO LANDSCAPE
ARCHITECTS DRAWINGS
A 07-01
2
A 07-01
2
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 200
31/10/2018 9:46:30 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
OVERALL FLOOR PLAN GROUND
8322 A 01-21
Author
08/21/11Bunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
UP
1
1
F F
2
2
H H
3
3
4
4
5
5
6
6
7
7
8
8
9
9
10
10
11
11
12
12
13
13
14
14
C C
A A
15
15
A 07-01
1A 07-02
3A 07-02
4A 07-03
5
4A 06-01
1A 06-01
2A 06-01
3A 06-01
G G
E E
D D
B B
1220
026
0036
0098
0035
0026
0057
00
7200 7200 7200 7200 8000 8000 8000 8000 8000 8000 8000 8000 8000 8000
21.06 m²KITCHEN
FOYER
FUNCTION 1
FUNCTION 2
STORE
STORE
FEMALE PWDMALE
OUTDOOR DECK
PLANT AREA
A 07-01
2
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 200
31/10/2018 9:46:33 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
OVERALL FLOOR PLAN LEVEL 1
8322 A 01-22
Author
08/21/11Bunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
DD
preliminary issueCOPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au
31/10/2018 9:46:34 AM
31.10.18
3
Scone Airport Aviation Attraction and Terminal
STAGE 1 WORKS - VIEW
8322 A 02-10
Author
08/22/18Bunnan Road, Scone NSW 2337
24.08.18 1 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 2 PRE TENDER ISSUE
31.10.18 3 TENDER ISSUE
UP
11
10
9
8
7
6
5
4
3
2
1
21
20
19
18
17
16
15
14
13
12
UP
11 10 9 8 7 6 5 4 3 2 1
21201918171615141312
UP
FB1
FB1
FB2
FB2
FB2
FB2
LSP
LSPRAS
22
1
1
F F
2
2
H H
3
3
4
4
5
5
6
6
7
7
8
8
C C
A A
7200 7200 7200 7200 8000 8000 8000
1220
026
0036
0098
0035
0026
0057
00
A 07-01
1
A 07-01
1
A 07-02
3A 07-02
4
A 07-02
4
A 07-04
1
A 07-04
2
4A 06-01
1A 06-01
7200 7200 7200 7200 8000 8000 8000
1A 11-01
LINE OF CATWALK ABOVE LINE OF CATWALK ABOVE
LIN
E O
F C
AT
WA
LK A
BO
VE
LIN
E O
F C
AT
WA
LK A
BO
VE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
TGSI
1A 11-02
1A 11-03
STAIR 1
1A 10-01
G G
E E
D D
B B
STAIR 2 STAIR 3
1A 10-02 1
A 10-03
1A 10-61
3A 16-51
2A 16-51
1A 16-51
4A 16-51
5A 16-51
6A 16-51
7A 16-51
8A 16-51
9A 16-51
TGSI
FRIDGE
PR
OF
ILE
WA
LL S
HE
ET
ING
PR
OF
ILE
WA
LL S
HE
ET
ING
PR
OF
ILE
WA
LL S
HE
ET
ING
PROFILE WALL SHEETING PROFILE WALL SHEETING PROFILE WALL SHEETING
TILED
FOOTPATH
TILED
FOOTPATH
10A 16-51
1A 09-40
2A 09-40
3A 09-40
2A 21-01
11A 16-51
1A 14-01
TILED
FOOTPATH
TILED
FOOTPATH
MAIN SWITCHBOARD TO
ELECTRICAL ENGINEERS DETAILS & DRAWINGS
DB & COMMS RACK TO
ELECTRICAL ENGINEERS DETAILS & DRAWINGS
PO
LE M
OU
NT
ED
LIG
HT
TO
ELE
CT
RIC
AL
EN
GIN
EE
RS
DE
TA
ILS
& D
RA
WIN
GS
FLO
OR
PO
WE
R B
OX
ES
TO
ELE
CT
RIC
AL
EN
GIN
EE
RS
DE
TA
ILS
& D
RA
WIN
GS
FIP ECP
FIRE FIP & ECP TO FIRE
ENGINEERS DETAILS & DRAWINGS
DP
FNCE 1
1A 16-52
12A 16-51
COL
COL
COL
COL
COL
COL
FNCE 1 3000
3548
LIN
E O
F R
OO
F A
BO
VE
LIN
E O
F R
OO
F A
BO
VE
D.GR.12
D.GR.02
D.G
R.1
1
D.G
R.0
8
D.G
R.0
6
D.G
R.0
4
D.G
R.3
1
D.GR.30
D.GR.19
D.GR.18
D.GR.17 D.G
R.0
7
PROFILE WALL SHEETING
BRE 01 BRE 01
BRE01
BR
E01
BR
E01
BR
E01
D.GR.21
TICKET
OFFICE
D.G
R.1
4
D.GR.03
1.49 m²STORAGE
7.12 m²COMMS.
8.81 m²MALE
7.16 m²PWD
9.32 m²FEMALE
D.GR.01
D.G
R.1
3
D.GR.09
D.GR.10
30.20 m²FOYER
48.88 m²ENTRANCE
36.89 m²AMENITIES' CORRIDOR
12.82 m²ARO
55.14 m²OUTDOOR SERVICE AREA
10.91 m²BIN STORE AREA
24.60 m²THEATRE
22.72 m²ADMIN.
8.97 m²OFFICE
85.43 m²CAFE
COVERED AREA
73.34 m²TERMINAL
D.GR.05RISER
D.GR.20
D.GR.15
D.GR.16
LV3LV3 LV3 LV3BRE 01
D.GR.32
CAFE DESIGN
ONLY INDICATIVE
DESIGN ONLY
INDICATIVE
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
1500
1500
1500
1500
1500
1500
1500
1500
1500
3100
STAINLESS STEEL
BOLLARD H1200mm
BOL 1
BOL 1
BOL 1
WATERTANKS & CONCRETE
PAD REFER TO HYDRAULIC ENGINEERS DETAILS
WATERTANK
CONCRETE FOOTPATH CONCRETE FOOTPATH
CO
NC
RE
TE
FO
OT
PA
TH
LAN
DC
AP
E Z
ON
E T
O L
AN
DC
SC
AP
E
AR
CH
ITE
CT
S D
RA
WIN
GS
LANDSCAPE ZONE TO LANDSCAPE
ARCHITECTS DRAWINGS
LANDSCAPE ZONE TO LANDSCAPE
ARCHITECTS DRAWINGS
LANDSCAPE ZONE TO LANDSCAPE
ARCHITECTS DRAWINGS
KERB / PRAM RAMP
TO CIVIL ENG.
DETAILS
KERB / PRAM RAMP
TO CIVIL ENG.
DETAILSBOL 1
BOL 1
REFER FOR THE STRUCTURE
TO STAGE 1 WORKS
LANDSCAPE ZONE TO LANDSCAPE
ARCHITECTS DRAWINGS
DPDP
DP DP DP
STAIR 6
A 07-01
2
A 07-01
2
4803
4848
9650
• ALL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE GENERAL NOTES, DWG. A 00-02
• USE FIGURED DIMENSIONS ONLY. DO NOT SCALE
FROM DRAWINGS. CHECK ALL DIMENSIONS ON SITE
BEFORE SETOUT OR FABRICATION.
• THE CONTRACTOR MUST VERIFY AND CHECK ALL
SITE CONDITIONS INCLUDING CEILING HEIGHTS AND
DIMENSIONS BEFORE COMMENCING WORK ON SITE.
GENERAL NOTES
BUILDING ROOF ENCLOSURE - PHASE 1
BUILDING WORKS ENCLOSURE LEGEND
(BY OTHERS)
BRE 01
BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2
BUILDING WALL ENCLOSUREBWE
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 100
31/10/2018 9:46:43 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
GENERAL ARRANGEMENT PLAN GROUND PART 1
8322 A 02-21
AuthorBunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
F F
H H
8
8
9
9
10
10
11
11
12
12
13
13
14
14
C C
A A
15
15
A 07-04
1
A 07-04
2
A 07-03
5
A 07-03
5
3A 06-01
8000 8000 8000 8000 8000 8000 8000
TGSI
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
G G
E E
D D
B B
1220
026
0036
0098
0035
0026
0057
00
PR
OF
ILE
WA
LL S
HE
ET
ING
PROFILE WALL SHEETINGPROFILE WALL SHEETING
PR
OF
ILE
WA
LL S
HE
ET
ING
PROFILE WALL SHEETINGPROFILE WALL SHEETING
PROFILE WALL SHEETING PROFILE WALL SHEETING PROFILE WALL SHEETING
PROFILE WALL SHEETING
6A 16-52
DISTRIBUTION BOARD TO
ELECTRICAL ENGINEERS DETAILS & DRAWINGS
BRE 01BRE 01BRE 01BRE 01
BRE 01BRE 01
BR
E01
BR
E01
BRE01
D.GR.25
D.GR.24 D.GR.29
D.GR.23
D.GR.28
D.GR.22
D.GR.27
HEAL PROOF GRATE TO
HYD. ENGINEERS DETAILS & DRAWINGS
D.GR.26
41.02 m²STORE 2
37.03 m²STORE 1
37.03 m²STORE 3
HANGER
HANGAR DOORS
LV3 LV3 LV3 LV3 LV3 LV3 LV3 LV3 LV3
STAIR 4
WATERTANKS & CONCRETE
PAD REFER TO HYDRAULIC ENGINEERS DETAILS
WATERTANK WATERTANK WATERTANK WATERTANK
WATERTANKS & CONCRETE
PAD REFER TO HYDRAULIC ENGINEERS DETAILS
WATERTANKS & CONCRETE
PAD REFER TO HYDRAULIC ENGINEERS DETAILS
WATERTANKS & CONCRETE
PAD REFER TO HYDRAULIC ENGINEERS DETAILS
CONCRETE PATH
CONCRETE PATH
CO
NC
RE
TE
PA
TH
CO
NC
RE
TE
PA
TH
LINE OF CATWALK ABOVE
REFER FOR THE STRUCTURE TO
STAGE 1 WORKS
LINE OF CATWALK ABOVE
REFER FOR THE STRUCTURE TO
STAGE 1 WORKS
DP
STAIR 5
DP
DP
DP DP DP DP DP DP DP DP
BUILDING ROOF ENCLOSURE - PHASE 1
BUILDING WORKS ENCLOSURE LEGEND
(BY OTHERS)
BRE 01
BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2
BUILDING WALL ENCLOSUREBWE
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 100
31/10/2018 9:46:45 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
GENERAL ARRANGEMENT PLAN GROUND PART 2
8322 A 02-22
AuthorBunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
NOTE: REFER TO A09-01
FOR WALL DETAILS
FB2
FB2
FB2
FB2
1
1
C C
A A
A 07-01
1
A 07-04
2
1A 06-01
D D
B B
1220
026
0036
00
LINE OF ROOF ABOVE
LIN
E O
F R
OO
F A
BO
VE
010203040506070809101112131415161718
8000
8000
19
20
21
22
23
24
25
26
27
28
29 30 31 32 33 34 35 36 37 40 41 42 43 44 45 46 47 48 49
5051525354555657585960616263
64 65 66 67 68 69 70 71 72 73 74 75 76 77
TILED
FOOTPATH
TILED
FOOTPATH
TILED
FOOTPATH
8000
8000
CARPARK LEVELS & ROAD TO
CIVIL ENGINEERS DETAILS AND DRAWINGS
CARPARK LEVELS & ROAD TO
CIVIL ENGINEERS DETAILS AND DRAWINGS
CARPARK LEVELS & ROAD TO
CIVIL ENGINEERS DETAILS AND DRAWINGS
CARPARK LEVELS & ROAD TO
CIVIL ENGINEERS DETAILS AND DRAWINGS
TY
PIC
AL
5400
TY
PIC
AL
5400
TYPICAL
2500
COL
POLE MOUNTED LIGHT
TO ELECTRICAL
ENGINEERS DETAILS &
DRAWINGS
POLE MOUNTED LIGHT TO
ELECTRICAL ENGINEERS
DETAILS & DRAWINGS
KERB RAMP TO
AS1428,1
BOL
SITE BOUNDARY
SITE BOUNDARY
STAINLESS STEEL BOLLARDS WITH SOCKET
OUTLETS FOR EVENTS DAYS TO ELECTRICAL
ENGINEERS DETAILS & SPECIFICATION.
LAN
DS
CA
PE
ZO
NE
TO
LA
ND
SC
AP
E
AR
CH
ITE
CT
S D
RA
WIN
GS
LAN
DS
CA
PE
ZO
NE
TO
LAN
DS
CA
PE
AR
CH
ITE
CT
S D
RA
WIN
GS
LAN
DS
CA
PE
ZO
NE
TO
LAN
DS
CA
PE
AR
CH
ITE
CT
S D
RA
WIN
GS
LANDSCAPE ZONE TO
LANDSCAPE
ARCHITECTS DRAWINGS
SCONE AIRPORT FRONT
SIGN TO LANDSCAPE
ARCHITECTS DRAWINGS
SITE BOUNDARY
LAN
DS
CA
PE
ZO
NE
TO
LAN
DS
CA
PE
AR
CH
ITE
CT
S D
RA
WIN
GS
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
BOL 1
TILED
FOOTPATHKERB / PRAM RAMP
TO CIVIL ENG.
DETAILS
KERB / PRAM RAMP
TO CIVIL ENG.
DETAILS
KERB RAMP TO
AS1428,1
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 100
31/10/2018 9:46:46 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
GENERAL ARRANGEMENT PLAN CARPARK
8322 A 02-23
AuthorBunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
UP
UP
11
10
9
8
7
6
5
4
3
2
1
21
20
19
18
17
16
15
14
13
12
UP
16151413121110987654321
1:100
FA
LL
1:20
RA
MP
UP
1
1
F F
2
2
H H
3
3
4
4
5
5
6
6
7
7
8
8
C C
A A
A 07-01
1
A 07-02
3A 07-02
4
A 07-04
1
A 07-04
2
4A 06-01
1A 06-01
PUDDLE FRANGE DRAIN PUDDLE FRANGE DRAIN
SSL 224800
SSL 221950
1100
GLA
SS
BA
LUS
TR
AD
E
1100
GLA
SS
BA
LUS
TR
AD
E
VOID
VOID
1100
GLA
SS
BA
LUS
TR
AD
E
1100 GLASS BALUSTRADE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LIN
E O
F R
OO
F A
BO
VE
1A 11-04
1A 11-051
A 11-06
2A 10-01
G G
E
D D
B B
1220
026
0036
0098
0035
0026
0057
00
7200 7200 7200 7200 8000 8000 8000
1220
026
0036
0098
0035
0026
0057
00
2A 10-02
2A 10-03
STAIR 3
2A 10-61
OPERABLE WALL
VOID
VOID
TGSI1100 GLASS
BALUSTRADE
TGSI
PR
OF
ILE
WA
LL S
HE
ET
ING
PROFILE WALL SHEETING
PR
OF
ILE
WA
LL S
HE
ET
ING
PROFILE WALL SHEETING
10A 16-51
1A 09-40
2A 09-40
3A 09-40
11A 16-51
DPDPDP
DP DP DP DP
DP
DP
13A 16-51
14A 16-51
1A 16-52
LIN
E O
F R
OO
F A
BO
VE
LIN
E O
F R
OO
F A
BO
VE
BRE 01
D.L
1.03
D.L1.02D.L1.01
D.L1.06
D.L1.09
D.L1.08
D.L1.05
BRE01
BR
E01
BR
E01
SSL 225617
33.61 m²FUNCTION 2
33.75 m²FUNCTION 111.53 m²
STORE
21.06 m²KITCHEN
10.76 m²MALE
12.08 m²FEMALE
53.86 m²OUTDOOR DECK
FOYER
6.32 m²PWD
8.44 m²STORE
STAIR 2
STAIR 1
D.L1.07
D.L1.04
PROFILE WALL SHEETINGBRE 01
HANGAR DOORS TO STRUCTURAL
ENG. DETAILS AND DOOR MANUFACTURERS DETAILS.
WEATHERPROOF
LOUVRES TO
MECHANICAL DRAWINGS
WEATHERPROOF
LOUVRES TO
MECHANICAL DRAWINGS
CONCRETE WALKPATH TO LANDSCAPE
ARCHITECTURAL DRAWINGS
1100
GLA
SS
BA
LUS
TR
AD
E
STAIR 6
DP DP DP
WATER TANK TO CIVIL ENG. DETAILS
3A 10-05
D.L
1.10
JOINERY
PUDDLE FRANGE
DRAINAGE SYSTEM
TO HYD. ENG. DETAIL
A 07-01
2
• ALL DRAWINGS ARE TO BE READ IN CONJUNCTION
WITH THE GENERAL NOTES, DWG. A 00-02
• USE FIGURED DIMENSIONS ONLY. DO NOT SCALE
FROM DRAWINGS. CHECK ALL DIMENSIONS ON SITE
BEFORE SETOUT OR FABRICATION.
• THE CONTRACTOR MUST VERIFY AND CHECK ALL
SITE CONDITIONS INCLUDING CEILING HEIGHTS AND
DIMENSIONS BEFORE COMMENCING WORK ON SITE.
GENERAL NOTES
BUILDING ROOF ENCLOSURE - PHASE 1
BUILDING WORKS ENCLOSURE LEGEND
(BY OTHERS)
BRE 01
BRE 02 BUILDING ROOF ENCLOSURE - PHASE 2
BUILDING WALL ENCLOSUREBWE
DD
preliminary issueN
COPYRIGHT
All rights reserved. This work is copyright and cannot be reproduced or copied in any form or by any means
(graphic, electronic or mechanical, including photocopying) without the written permission of STEA
astute architecture. Any licence, express or implied, to use the document for any purpose whatsoever is restricted to the terms of the agreement or implied
agreement with STEA astute architecture.
DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensions on
site prior to fabrication or setout.
project details
job no.
stage
dwg no. revision
original sheet size A1 [594 x 841mm]
scale @ A1issue date
amendments
sheet setup date
dwg authors
project leader
date
authorised for issue by project leader
signature
date issue description auth proj ldrchecked by
input project leader name in titleblock
Ground Floor, 25 River St
PO Box 758
Mackay, QLD. 4740
T (07) 4957 7341
W www.stea.com.au 1 : 100
31/10/2018 9:46:50 AM
31.10.18
5
Scone Airport Aviation Attraction and Terminal
GENERAL ARRANGEMENT PLAN LEVEL 1 PART 1
8322 A 02-24
AuthorBunnan Road, Scone NSW 2337
0
SCALE 1:
5 m
100
4321
19.06.18 1 PRELIM ISSUE
22.06.18 2 ISSUED FOR FINAL CLIENTREVIEW
24.08.18 3 PRE TENDER ISSUE FORFINAL REVIEW
28.08.18 4 PRE TENDER ISSUE
31.10.18 5 TENDER ISSUE
NOTE: ALL COLUMNS SIZE AND DETAILS
TO STRUCTURAL ENG. DETAILS AND DRAWINGS
UP
TERMINALARO
COMMS.MALE
9.26 m²FEMALE
PWD
ENTRANCE FOYER
OUTDOOR SERVICE AREA
ADMIN.
OFFICE
CAFE
THEATRE
HANGAR
LINE OF ROOF ABOVE LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE
OF R
OOF
ABOV
E
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE OF ROOF ABOVE
LINE
OF R
OOF
ABOV
E
LINE
OF R
OOF
ABOV
ELIN
E OF
ROO
F AB
OVE
MAX 1:4 GRADE OFTURF MOUNDING
MAX 1:4 GRADE OFTURF MOUNDING
E1
E1
E1
E1 E1
E1
E2
E2
Signage wall - referto signage wall detail
T1T1
T1
PT1
PT1
M1 M1
M1
M1
M1
M1 PT1
M1
E1
M3
COPYRIGHTAll rights reserved. This work is copyright and cannot bereproduced or copied in any form or by any means(graphic, electronic or mechanical, includingphotocopying) without the written permission of PDTArchitects. Any licence, express or implied, to use thedocument for any purpose whatsoever is restricted to theterms of the agreement or implied agreement with PDTArchitects.DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensionson site prior to fabrication or setout.
project details
sheet title
document no.
stage
original sheet size A1 [594 x 841mm]
scaleissue date
amendments
sheet setup datedwg authors
datesignature
project leader
authorised for issue by project leader
Scone Airport
Scone Walter Pye Drive, Scone. NSW
8322
date issue description auth proj ldrchecked by
job sheet revision
- -
L3, 100 McLachlan St, 4006po box 607 fortitude valley qld 4006www.pdt.com.au
quality assurance AS/NZS ISO 9001t +61 7 3232 1300
construction issue
Scale 1:200
10m86420
SURFACE FINISHES PLAN
10-09-18 1:200 @ A1 CD
LA-02-01 B
28-08-18 A TENDER TB TB
AUGUST 2018
TAB
TAB
10-09-18 B TENDER TB TB
STORE 1
STORE 2
STORE 3
HANGAR
MAX 1:4 GRADE OFTURF MOUNDING
T1
PT1
E1
COPYRIGHTAll rights reserved. This work is copyright and cannot bereproduced or copied in any form or by any means(graphic, electronic or mechanical, includingphotocopying) without the written permission of PDTArchitects. Any licence, express or implied, to use thedocument for any purpose whatsoever is restricted to theterms of the agreement or implied agreement with PDTArchitects.DIMENSIONSUse figured dimensions only. DO NOT SCALE. Check all dimensionson site prior to fabrication or setout.
project details
sheet title
document no.
stage
original sheet size A1 [594 x 841mm]
scaleissue date
amendments
sheet setup datedwg authors
datesignature
project leader
authorised for issue by project leader
Scone Airport
Scone Walter Pye Drive, Scone. NSW
8322
date issue description auth proj ldrchecked by
job sheet revision
- -
L3, 100 McLachlan St, 4006po box 607 fortitude valley qld 4006www.pdt.com.au
quality assurance AS/NZS ISO 9001t +61 7 3232 1300
construction issue
Scale 1:200
10m86420
SURFACE FINISHES PLAN
10-09-18 1:200 @ A1 CD
LA-02-02 B
28-08-18 A TENDER TB TB
AUGUST 2018
TAB
TAB
10-09-18 B TENDER TB TB
H
Y
D
R
A
N
T
S
T
O
P
V
A
L
V
E
H
Y
D
R
A
N
T
T
E
L
.
P
I
T
S
T
O
P
V
A
L
V
E
P
O
W
E
R
P
O
L
E
S
IG
N
T
A
N
K
E
L
E
C
S
W
T
2
2
1
.
6
0221.70
2
2
1
.
8
0
2
2
1
.
8
0
2
2
1
.
9
0
2
2
1
.
9
0
221.90
2
2
2
.
0
0
2
2
2
.
0
0
2
2
2
.
0
0
2
2
2
.
1
0
2
2
2
.
1
0
2
2
2
.
1
0
2
2
2
.
2
0
2
2
2
.
2
0
2
2
2
.
2
0
2
2
2
.
3
0
2
2
2
.
3
0
2
2
2
.
3
0
2
2
2
.
4
0
2
2
2
.
4
0
2
2
2
.
4
0
2
2
2
.
5
0
2
2
2
.5
0
2
2
2
.5
0
2
2
2
.6
0
2
2
2
.6
0
2
2
2
.
6
0
2
2
2
.7
0
2
2
2
.7
0
22
2.7
0
REMOVE EXISTING TREES
TIE INTO EXISTINGROADWAY AS PER DETAILON DRAWING C601
EXISTING GROUND SERVICES TO BEDELINEATED & PROTECTED DURING
THE COURSE OF THE WORKS (TYPICAL)
eFeF
eFeF
eFeF
eFeF
eFeF
eFeF
eFeF
eF
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW
eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW
eS eS eS X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X
eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW
eSeS
eSeS
eSeS
eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS eS
NP NP
NPNP
NPNP
NP
NP
NP NP NP NP NP NP NP NP NP NP
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
Ø225mm
Ø
3
7
5
m
m
Ø375mm
Ø375mm
Ø450mm
1-1
1-2
1-3
1-4
1-5
1-6
Ø
225m
m
2-1
Ø
3
7
5
m
m
Ø750mm
3-1
3-2
3-3
4-1
Ø
3
7
5
m
m
FUTURE Ø600mm EXTEN
SION
PROPOSED ELECTRICALPAD MOUNT
EXISTING DRIVEWAY TOBE DEMOLISHED ANDLANDSCAPED TO SUITADJACENT WORKS
PROPOSED HYDRANTCONCRETE PAD
PROPOSED ELECTRICAL AND HYDRAULICSERVICES TO BE INSTALLED UNDER SWALEAND LOWER SUBSOIL DRAINAGE LINE
PROPOSED HYDRAULIC SERVICES TO BEINSTALLED UNDER SWALE AND LOWERSUBSOIL DRAINAGE LINE
HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT
HANGAR DOWNPIPES TO CONNECTTO STORMWATER PIT
HANGAR DOWNPIPES TO CONNECTTO STORMWATER PIT
PROPOSED STORMWATER PIT ANDPIPE TO BE POSITIONED TO AVOIDFLOODLIGHT MAST FOOTING
PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM
300mm WIDE BERM BEHIND BACK OFASPHALT EXTENT AND/OR BACK OFKERB (TYPICAL)
EXISTING GROUND SERVICES TO BEDELINEATED & PROTECTED DURING
THE COURSE OF THE WORKS (TYPICAL)
BATTER TO EXISTING AT 1in4 SLOPEAND LANDSCAPE WITH APPROVED
GRASS TYPE (TYPICAL)
FUTURE AIRSIDE ACCESS GATE TO BELOCATED IN THE CORNER OF THE APRON. SITESUPERVISOR TO PROVIDE DIRECTION ONREQUIRED INTERFACE WORKS
ALL SEWER WORKS TO BE CLASS D RATEDAND SUITABLE FOR FUTURE ACCESS ROADOVER TOWARDS AIRSIDE ACCESS GATE
15 Jersey Street, TurramurraNew South Wales, Australia 2074
Telephone: 0408 696 526www.chrispconsulting.com.au
A.B.N. 11 164 806 044c Copyright
CHRISPCONSULTING
REVJOB NUMBER: SHEET No
REV DATE REVISION DESCRIPTION NAMETITLE CLIENT
SCALE
THIS DRAWING AND THE INFORMATION CONTAINED THEREON HAVE BEEN CREATED SOLELY FOR A PARTICULAR PURPOSE AND CLIENT. THIS ISPROTECTED BY COPYRIGHT. YOU MAY NOT REPRODUCE ANY OF IT IN ANY FORM WITHOUT THE WRITTEN PERMISSION BY CHRISP CONSULTING.IF YOU DO, YOU MAY HAVE TO PAY FOR DAMAGES TO CHRISP CONSULTING OR YOU MAY BE PROSECUTED.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
ISSUE FOR COORDINATION
UPPER HUNTER SHIRE COUNCIL
18016
KR
KL
CP
CP
CP
SCONE AIRPORT AVIATION VISITOR
ATTRACTION AND TERMINAL
C301 C
CIVIL WORKS PLAN - SHEET 1 OF 2
1:200@A1
A 06.06.18 ISSUE FOR COORDINATION
B 19.06.18 PRELIMINARY ISSUE
C 23.09.18 ISSUE FOR TENDER
AIRSIDE PAVEMENT GRADING TO BE CONFIRMED PRIOR TO CONSTRUCTION
KERB AND GUTTERK&G
CIVIL LEGEND
STORMWATER
EXISITNG POWER
EXISTING TELSTRA
EXISTING SEWER
EXISTING GAS
EXISTING WATER
PRAM RAMP
1-3
T
E
L
.
P
I
T
T
A
N
K
E
L
E
C
S
W
T
P
P
221.60
2
2
1
.
7
0
2
2
1
.
8
0
2
2
1
.
9
0
2
2
2
.0
0
2
2
2
.1
0
2
2
2
.
2
0
2
2
2
.
3
0
2
2
2
.
4
0
ROADWAY AS PER DETAIL
eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW
X X X X X X X X X X X X X X X X X X X X X X X X X X X
eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW eCW
eSeS
eSeS
eSeS
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
ePO
NP NP
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
eCW
Ø375mm
Ø450mm
Ø525mm Ø525mm Ø525mm Ø525mm Ø525mm
1-5
1-61-7
1-8
1-9
1-10
1-11
Ø
3
7
5
m
m
Ø750mm Ø750mm
Ø750mm
Ø750mm
Ø
7
5
0
m
m
3-1
3-2
3-33-4
3-5 3-6
3-7
FUTURE Ø600mm EXTEN
SION
PROPOSED ELECTRICALPAD MOUNT
EXISTING DRIVEWAY TOBE DEMOLISHED ANDLANDSCAPED TO SUITADJACENT WORKS
PROPOSED HYDRANTCONCRETE PAD
PROPOSED ELECTRICAL AND HYDRAULICSERVICES TO BE INSTALLED UNDER SWALEAND LOWER SUBSOIL DRAINAGE LINE
PROPOSED HYDRAULIC SERVICES TO BEINSTALLED UNDER SWALE AND LOWERSUBSOIL DRAINAGE LINE
EXISTING POWER POLE TO BE REMOVED AS PARTOF BUILDING WORKS. REFER TO ELECTRICALWORKS PACKAGE FOR FURTHER DETAIL
HANGAR WORKS IS REQUIRED TO UPGRADEØ600mm RCP TO Ø750 RCP. STORMWATER LINE TOBE LOCATED WITHIN AIRSIDE APRON TO ALLOWFOR FUTURE MAINTENANCE
GRATED DRAIN AT HANGAR ENTRANCE TOCONNECT TO STORMWATER PIT
HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT
HANGAR DOWNPIPE TO CONNECT TOSTORMWATER PIT
PROPOSED RAINWATERTANK PAD FOOTINGS(TYPICAL)
PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM
PROPOSED HYDRANT LOCATION TOAVOID CLASH WITH STORMWATER PIPE.LOCALISED EARTHWORKS REQUIRED TOPROVIDE LEVEL ACCESS PLATFORM
REFER TO HYDRAULICPLANS FORSTORMWATERDRAINAGE IN THISLOCATION
STORMWATER TO OUTLET INTO PROPOSEDBASIN. AND MAKE GOOD FINISH TOPREVENT EROSION AT PIPE ENTRY. REFERTO AIRSIDE DRAINAGE DESIGN FOR DETAILS
STORMWATER TO OUTLET INTO PROPOSEDBASIN. AND MAKE GOOD FINISH TOPREVENT EROSION AT PIPE ENTRY. REFERTO AIRSIDE DRAINAGE DESIGN FOR DETAILS
BATTER TO EXISTING AT 1in4 SLOPEAND LANDSCAPE WITH APPROVED
GRASS TYPE (TYPICAL)
HANGAR FLOOR TO MEET PROPOSED APRONEDGE AT RL 222.00. CONFIRMATION WITH AIRSIDEDESIGNER AND COUNCIL REPRESENTATIVE PRIORTO COMMENCEMENT OF CONSTRUCTION
DETENTION BASIN TO BE CONSTRUCTEDPRIOR TO FINALISATION OF PROJECTSTORMWATER WORKS
15 Jersey Street, TurramurraNew South Wales, Australia 2074
Telephone: 0408 696 526www.chrispconsulting.com.au
A.B.N. 11 164 806 044c Copyright
CHRISPCONSULTING
REVJOB NUMBER: SHEET No
REV DATE REVISION DESCRIPTION NAMETITLE CLIENT
SCALE
THIS DRAWING AND THE INFORMATION CONTAINED THEREON HAVE BEEN CREATED SOLELY FOR A PARTICULAR PURPOSE AND CLIENT. THIS ISPROTECTED BY COPYRIGHT. YOU MAY NOT REPRODUCE ANY OF IT IN ANY FORM WITHOUT THE WRITTEN PERMISSION BY CHRISP CONSULTING.IF YOU DO, YOU MAY HAVE TO PAY FOR DAMAGES TO CHRISP CONSULTING OR YOU MAY BE PROSECUTED.
DRAWN
DESIGNED
DRG CHECK
DESIGN CHECK
APPROVED
ISSUE FOR COORDINATION
UPPER HUNTER SHIRE COUNCIL
18016
KR
KL
CP
CP
CP
SCONE AIRPORT AVIATION VISITOR
ATTRACTION AND TERMINAL
C302 C
CIVIL WORKS PLAN - SHEET 2 OF 2
1:200@A1
A 06.06.18 ISSUE FOR COORDINATION
B 19.06.18 PRELIMINARY ISSUE
C 23.09.18 ISSUE FOR TENDER
AIRSIDE PAVEMENT GRADING TO BE CONFIRMED PRIOR TO CONSTRUCTION
KERB AND GUTTERK&G
CIVIL LEGEND
STORMWATER
EXISITNG POWER
EXISTING TELSTRA
EXISTING SEWER
EXISTING GAS
EXISTING WATER
PRAM RAMP
1-3