Integrated Distribution & Integrated Distribution & Production PlanningProduction Planning
(DP/PP) (DP/PP)
EGN 5623 Enterprise Systems OptimizationEGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)
Fall, 2011 Fall, 2011
![Page 2: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/2.jpg)
Integrated Distribution Integrated Distribution Planning & Production Planning Planning & Production Planning
(DP/PP) (DP/PP)
Theories & ConceptsTheories & Concepts
EGN 5623 Enterprise Systems OptimizationEGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)
Fall, 2011 Fall, 2011
![Page 3: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/3.jpg)
SCM OverviewSCM Overview
SCM aims at managing and optimizing the information flow and the material flow through a network of suppliers, manufacturers, distributors, and customers.
![Page 4: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/4.jpg)
SCM OverviewSCM Overview
![Page 5: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/5.jpg)
SCM OverviewSCM OverviewTraditionally, distribution planning and production planning are carried out, independent of each other. Each seeks its own local optimum.
In SCM, distribution planning and production planning decisions should be integrated to promote global optimum.
This integrated distribution and production planning aims at :
•Reducing the costs for sourcing products and raw materials,•Improving customer service,•Dramatically reducing on-hand stocks, and•Making better use of company resources.
![Page 6: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/6.jpg)
An Integrated DP/PP ProblemAn Integrated DP/PP Problem
![Page 7: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/7.jpg)
An Integrated DP/PP ProblemAn Integrated DP/PP ProblemAn integrated DP and PP problem:
Suppose a supply chain system contains two distribution centers (XXW1 and XXW2) and two plants (XX01 and XX02). There are two finished products for selling: GIN and KORN. GIN is produced in both plants XX01 and XX02, and KORN is only produced in plant XX02. The key semi-finished good for both products is ALC, which is only produced in plant XX01 and can be sent from the plant XX01 to XX02. The DC XXW1 is supplied from both plant and DC XXW2 is supplied only by XX02 (see the Figure 10.1)
This is a classical transportation problem.
![Page 8: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/8.jpg)
An Integrated DP/PP ProblemAn Integrated DP/PP ProblemSome planning decisions include:1. Determine the source for warehouse XXW1:
• Procure GIN from XX01 or XX02, depending on the load in plants XX01 and XX02.
2.Prioritize production for plant XX02:• Produce GIN for both warehouses XXW1 or XXW2,
depending on whether XX01 has the capacity to supply additional quantities to XXW1.
3.Prioritize the production in plant XX02: • Produce GIN or KORN, depending on the product
priorities.
![Page 9: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/9.jpg)
An Integrated DP/PP ProblemAn Integrated DP/PP Problem1. Handle ALC:
• to ship ALC to XX02 or process it in XX01, depending on the production costs, the market and the product priorities and the demand structure in XX02.
2. Balance the loads for GIN between plants XX01 and XX02• depending on the production costs, the lot size
dependent production costs and the capacity extension costs and possibilities.
3. Make trade off • To optimize the lot size that strikes a balance between
set-up cost and storage cost, while improving sales flexibility.
![Page 10: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/10.jpg)
The SNP OptimiserThe SNP OptimiserObjective:
The SNP optimiser is to plan the entire supply chain (i.e., from distribution, production to procurement) at optimal costs by modelling the complete supply chain as linear equations and solve them by linear programming (LP) or mixed integer linear programming (MILP).
The difference between the two (LP and MILP) lies in the consideration of discrete decisions, as lot size intervals.
![Page 11: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/11.jpg)
The SNP OptimiserThe SNP OptimiserObjective function:
Min {product [(D –S) * Penalty + S * Cost supplychain]}
where D: the total demand quantity; S: total supply quantity (which is product and location dependent).
•The supply chain costs contain cost for production, procurement, transport, storage and handling. •The penalties are cost for lateness, non-delivery and safety stock violation. •SNP optimizer considers only one time interval at a time.
![Page 12: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/12.jpg)
The SNP OptimiserThe SNP OptimiserThe constraints for the plants are:
PGIN-XX01<= CGIN-XX01
PGIN-XX02 + PKRON-XX02 <= CGIN-KRON-XX02
PGIN-XX02 <= CGIN-XX02
PKRON-XX02 <= CKRON-XX02
PALC-XX01<= CALC-XX01
PGIN-XX01+ PGIN-XX02+ PKRON-XX02 <= BOM Ration * PALC-XX01
Where P: is the produced quantity, C: is the production capacity.
![Page 13: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/13.jpg)
The SNP OptimiserThe SNP Optimiser• The penalties for non-delivery and lateness are
maintained in the product master either globally or locally (by product-location).
• The supply chain costs are maintained in the master data for product, PDS, PPM, resource capacity variant and transportation lane.
• The SNP optimiser takes the production, transport, storage and handling costs into account for global optimization.
![Page 14: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/14.jpg)
The SNP OptimiserThe SNP OptimiserBy setting these costs, we can model for decisions such as:
• Extend production capacity in a plant or procure from a different plant considering increased production and transport costs,
• Extend production capacity in a plant or procure externally
• Switch to a more expensive transport method to speed up the transportation,
• Switch to another source if a transport capacity is already consumed, and
• Produce and ship just in time to minimise storage costs.
The more sourcing alternatives exists, the more complicated the planning problem becomes.
![Page 15: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/15.jpg)
The SNP CostsThe SNP CostsCost are used in SNP optimization to define the objective function.
Related SNP costs are listed in Table 10.2
![Page 16: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/16.jpg)
The SNP Costs for OptimisationThe SNP Costs for Optimisation
![Page 17: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/17.jpg)
The SNP CostsThe SNP CostsThe penalty costs for safety stock are defined with the number of stock-out days.
The storage costs are calculated as stock quantity multiplied by the number of time buckets (or in addition, multiplied by the number of days per bucket), according to the setting.
Costs for delay and non-delivery are maintained in the product master, for three demand types, corresponding to the demand priorities (set in the optimiser profile per demand type):
1: customer demand, 5: corrected forecast demand, and 6: forecast demand.
![Page 18: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/18.jpg)
The SNP CostsThe SNP Costs
The most critical issue in using the SNP optimiser is the appropriate maintenance of the costs.
For example, if storage costs are too high, it may result in no production at all, because supply chain costs exceed the penalties for non-delivery or permanent transport
![Page 19: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/19.jpg)
The SNP ConstraintsThe SNP Constraints
The constraints for the optimisation are the demand, the capacities, the material availability and the production and stock transfer horizons.
Most of these constraints are controlled in the optimiser profile as listed in Table 10.3.
The user may define a priority for each demand type. The user may also set priority in the optimiser profile in the “hard prioritisation” checkbox.
![Page 20: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/20.jpg)
Constraints for SNP OptimiserConstraints for SNP Optimiser
![Page 21: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/21.jpg)
The The DiscreteDiscrete Optimiser OptimiserDiscretization is required in the following cases:1.Lot-size dependence
• Such as decreasing costs due to less set-up or increasing costs if procurement contract are exceeded,
2.Technical restriction• When it requires different master data, e.g. if the
production process or the resource changes for huge lot sizes,
3.Fixed resource consumption• Such as set-up,
4.Technical restrictions• When it requires a fixed lot size, a lot size rounding, or
a minimum lot size, and5.Extension of the standard capacity.
![Page 22: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/22.jpg)
Discretization for OptimiserDiscretization for Optimiser• The use of discretization parameters in each bucket
complicates the planning problem, as it is a NP-hard problem in nature.
• Try to limit the use of discretization parameters and discrete buckets.
• The SNP optimiser makes use of a medium-term plan, to review each discretization step to see if it is really necessary.
![Page 23: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/23.jpg)
Discretization for OptimiserDiscretization for OptimiserCost functions are created for procurement, production, and transport and are assigned to the product master (procurement), PDS /PPM (production) and means of transport view of the transportation lane (transport).
Decreasing production costs can be modelled in two ways: one is to assign a cost function to PPM, the other one is to use two PPMs: one with higher cost, and the other one with lower cost but a minimum lot size. Depending on the modeling, the curve for the cost per quantity is different (see Figure 10.5).
![Page 24: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/24.jpg)
Cost Function for varying Cost Function for varying CapacitiesCapacities
![Page 25: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/25.jpg)
Cost Function for Varying quantities Cost Function for Varying quantities
![Page 26: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/26.jpg)
Discretization for the OptimiserDiscretization for the Optimiser
The SNP solution time depends on the number of locations, products and buckets.
To reduce the solution time, the user may aggregate the time buckets – e.g. by decreasing the granularity within the time horizon.
The main issue for SNP optimiser is 1. To maintain the relevant costs and 2. To integrate interactive planning steps into scenario
(See an example in the SAP implementation).
![Page 27: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/27.jpg)
Capable-to-Match (CTM)Capable-to-Match (CTM)
• Capable-to-match (CTM) is an APO tool to perform DP/PP interactively
• To run CTM, the user needs to prioritize demand elements, categorize supply elements, match demands with the supplies, according to a strategy to search existing stocks, planned receipts, and/or with production.
• CTM planning is a first-come, first-serve heuristic; as a result, shortages may occur to late comers.
• CTM approach usually applies when demand priorities (e.g. demand type, customer priorities, product priorities) exists
![Page 28: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/28.jpg)
Capable-to-Match (CTM)Capable-to-Match (CTM)
CTM is a heuristic approach; it does not optimize.
There is no re-planning for the created orders for other demands.
The structure of CTM is shown on the Figure 10.8.
Like the SNP optimizer, the user needs to first set up the CTM planning engine.
![Page 29: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/29.jpg)
Structure of CTMStructure of CTM
![Page 30: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/30.jpg)
Capable-to-Match (CTM)Capable-to-Match (CTM)
CTM Procedure:1.Prioritize demands and orders, and categorize supplies (production and/or stocks), according to the planning mode and the search strategy;2.Load the master data and the transaction data (demands and orders) into CTM engine; 3.Run CTM to match demands with supplies in a location-by-location procedure.
• All supply categories and the production are taken into account for each location, according to the search strategy.
![Page 31: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/31.jpg)
CTM ProfileCTM Profile
All relevance settings for CTM planning are made within the CTM profile.
CTM profile defines the planning parameters, and triggers CTM planning.
Figure 10.9 outlines the CTM profile. For example, the CTM scope is defined by
the master data selection. order selectionCTM time stream (e.g., time bucket definition)
![Page 32: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/32.jpg)
CTM ProfileCTM Profile
![Page 33: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/33.jpg)
CTM Categorization and Search CTM Categorization and Search StrategyStrategyTwo way to generate the supply categorisation:
1. Assigning an ATP category (e.g. stock or production order) and/or category groups to each supply category, and
2. defining limits per location-product and assigning the limits to each supply category (see Figure 10.11).• After the supply limits are defined, the supply
categories are assigned to the supply limits in the categorisation profile.
The main purpose of the supply categorisation is to keep the inventory level above a certain limit.
![Page 34: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/34.jpg)
Supply Categorisation Supply Categorisation
![Page 35: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/35.jpg)
CTM Categorisation and Search CTM Categorisation and Search Strategy Strategy The search strategy defines the sequence in which the supplies are matched with demands.
All the planning steps defined in the search strategy – the matching of supplies and the production – are carried out location-by-location.
The sequence of the locations is determined by the priorities (see Figure 10.12), where the location SOURCE1 has a higher priority than SOURCE2, so first all the planning steps are performed for the location SOURCE1.
![Page 36: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/36.jpg)
Supply and Demand Matching – Supply and Demand Matching – Search StrategySearch Strategy
![Page 37: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/37.jpg)
CTM PlanningCTM PlanningCTM takes into account, the transportation lane priority, the location priority, and the product priority; and uses them to make decisions as shown in Figure 10.14.
The transportation lane priority is used for sourcing decisions. The location and product priorities become significant when shortage occurs (in which the demand with the highest priority is considered first).
![Page 38: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/38.jpg)
Priorities for CTMPriorities for CTM
![Page 39: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/39.jpg)
Aggregation for CTMAggregation for CTMBy activating the aggregation selection in CTM profile, all orders can be aggregated to match resources according to the CTM time stream.
Figure 10.16 illustrates the impact of the three aggregation options:
•no aggregation,•demand aggregation at the start of CTM time steam, and•demand aggregation at the end of CTM time steam.
![Page 40: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/40.jpg)
Aggregation for CTMAggregation for CTM
![Page 41: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/41.jpg)
Integration to ERP Integration to ERP
There is a parameter in CTM, to specify if we want to transport receipt objects individually or not. 1.If we want to transport individually, then each supply (e.g. stock, planned order) will be transferred immediately,2.Otherwise, the transportation is based on the number of demands. (see Figure 10.19)
![Page 42: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/42.jpg)
Transport Receipt Objects Transport Receipt Objects IndividuallyIndividually
![Page 43: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/43.jpg)
Planned Stock TransfersPlanned Stock TransfersCTM considers the duration for goods issue, transport, and goods receipt to schedule stock transfer orders.
Goods issue and goods receipt are maintained in the product master in days (unit of measurement used), and transport duration is maintained in the transportation lane in hours (unit of measurement used).
Figure 11.3 shows the scheduling for stock transfer orders.
![Page 44: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/44.jpg)
Scheduling of Stock Transfer OrdersScheduling of Stock Transfer Orders
![Page 45: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/45.jpg)
Storage ResourceStorage Resource
![Page 46: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/46.jpg)
Handling CapacityHandling CapacityCapacity consumption of handling resources for goods issue and goods receipt is calculated using handling capacity consumption entries in the product master.
The capacity is represented by handling resources (Resource type “H”) and assigned to the location.
Capacity consumption is calculated as order quantity times capacity consumption for each day of the goods receipt and goods issue time.
![Page 47: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/47.jpg)
Integrated Distribution & Integrated Distribution & Production Planning Production Planning
SAP Implementation SAP Implementation
EGN 5623 Enterprise Systems OptimizationEGN 5623 Enterprise Systems Optimization(Professional MSEM)(Professional MSEM)
Fall, 2011 Fall, 2011
![Page 48: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/48.jpg)
Maintain Distribution Definitions in Maintain Distribution Definitions in SCM System SCM System
![Page 49: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/49.jpg)
Define Transfer of SNP Orders in Define Transfer of SNP Orders in SCM System SCM System
![Page 50: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/50.jpg)
Create Integration Model for Create Integration Model for Transactional Data in SAP ERP systemTransactional Data in SAP ERP system
![Page 51: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/51.jpg)
Create Integration Model for Create Integration Model for Transactional Data in SAP ERP systemTransactional Data in SAP ERP system
![Page 52: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/52.jpg)
Activate Integration Model for Plnd. Activate Integration Model for Plnd. Order and Prod. Order in SAP ERP Order and Prod. Order in SAP ERP SystemSystem
![Page 53: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/53.jpg)
IIActivate Integration Model for Plnd. Activate Integration Model for Plnd. Order and Prod. Order in SAP ERP Order and Prod. Order in SAP ERP SystemSystem
![Page 54: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/54.jpg)
Calendars in SAP APOCalendars in SAP APO
![Page 55: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/55.jpg)
HW 5: ExercisesHW 5: ExercisesModule 8 (Section 2) Supply Chain Model
Maintain supply chain model in SCM system Calculate transportation zone coordinates in SCM system Transportation mode and means
◦ Maintain means of transport in SCM system Assign means of transport to transportation lanes in SCM system Create transportation lanes in SCM system Mass generation of transportation lanes Display created transportation lanes Assign materials to transportation lanes Create quota arrangements in SCM system
◦ Quota arrangements for external procurement Master product setting Model consistency check
◦ Create profile◦ Check the consistency of the model
![Page 56: SCM Overview](https://reader036.fdocuments.us/reader036/viewer/2022062305/568159db550346895dc728f8/html5/thumbnails/56.jpg)
Exercises:Exercises:Module 9 (Section 2) Introduction Maintain the integration setting in SCM
maintain distribution definitions in SCM system Maintain Objects specifics settings in SCM system Define transfer of SNP orders in SCM system
Create integration model for transactional data in SAP ERP system Activate integration model for plnd. Order and prod order in SAP ERP
system Create integration model for purch. Orders and purch. Req. in SAP ERP
system Activate integration model for purch. Orders and purch. Req. in SAP ERP
system Create integration model for sales order Activate integration model for sales order