SciQuest Integration. Derrick Graham – SciQuest Product Owner Jim Arlington – SciQuest Client Partner. Session Etiquette. Please turn off all cell phones. Please keep side conversations to a minimum. If you must leave during the presentation, please do so as quietly as possible. - PowerPoint PPT Presentation

Transcript of SciQuest Integration

Page 1: SciQuest Integration

SciQuest IntegrationDerrick Graham – SciQuest Product Owner

Jim Arlington – SciQuest Client Partner

Page 2: SciQuest Integration

Session Etiquette

• Please turn off all cell phones.

• Please keep side conversations to a minimum.

• If you must leave during the presentation, please do so as quietly as possible.

• Thank you for your cooperation!

2

Page 3: SciQuest Integration

What We’ll Cover Today

• Non-PO Invoicing• Types of non-PO invoices• Traditional Problems with non-PO invoices• Best Practices to improve non-PO management and approval• How AP Director can help improve your non-PO processes

• Change Orders• Change Order Process Overview• Requirements for change order integration• Integration Details• Recent Improvements• Best Practices for change order processing• Frequently Asked Questions

3

Page 4: SciQuest Integration

Non-PO Invoices

• Whether we like it or not, Non-PO invoices are a part of doing business

• Some Non-PO invoices are unavoidable, but you can take steps to limit their impact on your organization

• When they arrive – how do you manage them effectively?

4

Page 5: SciQuest Integration

Types of Non-PO Invoices

• The Good• Dues or fees• Monthly/Annual charges such as rent or utility bills• Time-sensitive services such as emergency repairs

• The Bad• Purchases made outside the system• After-the-fact

• The Ugly• Non-compliant/off-contract spend, “gaming the system”

5

Page 6: SciQuest Integration

Pre-Approved PO Spend

6

Peer 1 Peer 2 Peer 3 Peer 4 Peer 5 AVG

Pre-approved PO's 170,653 104,396 125,478 27,710 18,550 89,357 Non-PO Invoices & Payment Requests 21,389 19,955 62,937 83,026 58,980 49,257 Total Transactions 192,042 124,351 188,415 110,736 77,530 138,615

Pre-approved PO's 89% 84% 67% 25% 24% 64%Non-PO Invoices & Payment Requests 11% 16% 33% 75% 76% 36%Total Transactions 100% 100% 100% 100% 100% 100%

We looked at 5 large universities that put a large % of their addressable spend through SciQuest:

• On average, 36% of their transactions are “after the fact” (non-PO or Payment Requests)

• There is a significant opportunity to drive more spend towards pre-approved catalogs and contracts

• SciQuest estimates 11% savings on catalog orders / contract compliance

Page 7: SciQuest Integration

Managing Non-PO Invoices

• Reduce Data Entry• Have supplier submit non-PO invoices through the portal or via cXML• Utilize Digital Mailroom or your own scanning provider to import

invoices and cut out paper processing• Some suppliers can do electronic non-po invoicing

• Automatically Assign Accounting Codes By• Supplier• Supplier Account Number• Invoice Owner• Business Unit or Department

7

Page 8: SciQuest Integration

Managing Non-PO Invoices

• Require Proper Commodity Codes• If you can’t manage the spend before the purchase, at least give your

organization the ability to categorize and report on it after the fact• Use this data to help purchasing identify problem areas

• Create Blanket POs• Use cost matching functionality and Advanced Dynamic Matching to

remove the need to touch every invoice (Note – will be a services engagement with SciQuest unless there is an upgrade to AP Director)

• Use Invoice-Attached or After the Fact Forms • Auto-create invoices after the form goes through existing purchasing

workflow• Control who has the ability to create non-PO invoices 8

Page 9: SciQuest Integration

Improving Non-PO Approvals

• Decentralize and automate approval of predictable spend such as rent payments or cell-phone bills using the supplier account number field

• Automatically route non-PO invoices to the invoice owner’s department or budget approver

• Restrict edits by departmental approvers to accounting codes (splitable custom fields) only

• Only give departmental approvers permission to approve to stop improper rejection

9

Page 10: SciQuest Integration

Non-PO Invoicing Wrap-up

• Some non-PO invoices are unavoidable, but you can take steps to lessen their impact

• Automate coding and approvals of non-PO invoices wherever possible

• Increase portal, cXML, and scanned invoices import usage to cut down on paper and expedite processing

• Work with procurement to analyze non-PO spend and identify opportunities to move to pre-approved catalogs and contracts

10

Page 11: SciQuest Integration

How Accounts Payable Director Can Help

• Cost-based matching with blanket POs and Advanced Dynamic Matching

• The Digital Mailroom add-on reduces paper and displays a scan of the original invoice. It also included the ability to receive a scanned image.

• Non-PO auto-coding cuts out manual intervention to speed up processing

11

Page 12: SciQuest Integration

Change Order Integration

Page 13: SciQuest Integration

Change Order – New Integration Point

13

• PO Revision Initiated by user

SciQuest

Page 14: SciQuest Integration

Requirements for Change Order Integration

• Banner Finance 8.8

• Banner Integration for eProcurement (IFEP) middleware 8.2

• Revisions in SciQuest must go through PO Workflow

• Existing PO Create Integration is used

Note – Banner Finance 8.8 and IFEP middleware 8.2 must be installed together – recommend upgrade of IFEP middleware on the same schedule of Finance 8.8

14

Page 15: SciQuest Integration

Change Order Integration Details

15

PO Revision

•User needs specific permissions •The PO must be totally approved in the SciQuest PO Workflow•Authorized user performs “Finalize Revision”

IFEP

Middleware

•Middleware determines that the PO Revision is a change to an existing PO

Fina

nce V

alidatio

ns

•Finance API’s validate that the PO is eligible to be changed •PO must be open, not canceled•PO Must be posted•Items to be changed must be open•Encumbrance fiscal year must match PO Revision transaction date

Fina

nce P

ostin

g

•Completed and approved Change Order is posted to ledgers•Posting process publishes a status update message

Dispatch to Supplier

•SciQuest updates status to “posted” and dispatches the revised PO•PO approvals completed•PO now eligible for further revision

Page 16: SciQuest Integration

Process Interaction Between SQ & Banner

• A change order in SciQuest is referred to as a PO Revision

• A user selects to create a revision on a PO and makes the necessary changes

• The revision causes the PO to flow back through WF

• A message is sent to Banner to create the Change Order

• History tab of the PO will reflect a change order was made

• The user is only required to change the PO in 1 system 16

Page 17: SciQuest Integration

Changes Sent to Banner From SciQuest

• Unit Price • Quantity • Ship to Location• Commodity Code• Accounting Date

• Must be combined with other changes to get updated • More details on an additional slide

• Accounting Distribution (FOAPAL)• Remove, modify, or add FOAPAL• Done via Accounting Splits

17

Page 18: SciQuest Integration

Accounting Date – Special Note

• Accounting Date – Changed Alone• The messaging integration supports a change to the accounting date

without any other supported changes. However, note that the resulting Banner change order is not posted.

• Using Banner Change Order (FPACHAR) the posting process (FGRACTG) does not post the change if limited to accounting date only

• Accounting Date – Combined With Other Changes• When combined with other supported changes that result in posting

the Banner PO, the accounting date will be changed

18

Page 19: SciQuest Integration

Change Order Originated in Banner

• The FPACHAR form can also be used to change a Banner PO, as before the change order integration existed.

• Note – A change order initiated in Banner Finance using FPACHAR will not be messaged to SciQuest through the integration for eProcurement.

19

Page 20: SciQuest Integration

Recent Updates to the Change Order Integration

• Budget Authorization • Budget Authorization is now being accounted for with the change

order integration. • Should a change be made to a PO that would cause the budget

authorization to fail, the error is being accounted for in SciQuest and the change order will stop in workflow.

• cXML PO Distribution• In the event that a user elects to send the change order to the supplier

and that supplier uses cXML as their primary distribution method, the change order will be sent using their alternate method. (Fax or Email)

• This change is in place due to suppliers not having a means of detecting duplicate electronic POs.

20

Page 21: SciQuest Integration

Determine Your Business Process

• PO Changes do not flow through requisition workflow

• Will need to determine who on your campus can make PO changes within SciQuest

• Are any additional PO workflow steps required for change orders?

• Should specific PO workflow steps be bypassed for change orders?

21

Page 22: SciQuest Integration

Change Order Best Practices

• Have a select group of users (buyers) who may perform PO revisions/change orders

• Shoppers/Requestors will fill out a change order form in SciQuest that will detail what changes need to be made to certain PO’s.

• That form will be routed to the individuals designated to perform change orders (with permission for PO revisions)

• The change order will be done in SciQuest and subsequently in Banner

• The requisition with the change order request will be approved or rejected and then completed. No PO gets created as there are not “items” on the requisition.

22

Page 23: SciQuest Integration

Change Order Integration Gaps

• The following are known issues that we are currently working together with Ellucian on:

• Cancelling line items – you must zero out the unit price in SciQuest • Accounting (Transaction) Date – must be left blank or always updated with change

orders• FOAPAL (Account Codes) – with respect to accounting code splits and invoicing• Already Invoiced – changing a PO that has already been invoiced • Postable Changes Only – Only certain fields can be modified and receive a “Posted”

message back from Banner

Note - Weekly calls are occurring between SciQuest and Ellucian

23

Page 24: SciQuest Integration

Release 14.1 Enhancements

AP Express and AP Director Enhancements• Invoice Import – Ability to import a header level invoice

discount amount• Workflow – New Invoice / PO Comparison capabilities for

workflow routing• Workflow – Ability to route if an invoice line item is under

invoiced• New Cycle Time Report – Invoice Create to Invoice Export• New Cycle Time Report – Invoice Submit to Invoice Export

24

Page 25: SciQuest Integration

Release 14.1 Enhancements – AP Reports

25

Page 26: SciQuest Integration

Release 14.1 Enhancements – AP Reports

26

Page 27: SciQuest Integration

Release 14.1 Enhancements – AP Reports

27

Page 28: SciQuest Integration

Frequently Asked Questions

• What was the first version of SciQuest to offer this? • 12.3 which was released November 4, 2012

• What Banner releases must we be on?• Banner Finance 8.8• Integration for eProcurement (IFEP) middleware version 8.2

• What can be changed on the PO?• You may change quantities, prices, ship to locations, and FOAPAL elements

• Does the change order get sent to the supplier?• It depends – Upon completing the PO revision you can specify if it should get resent to

the supplier or not

• Can the change order go through requisition workflow?• No, the change order flows through PO workflow 28

Page 29: SciQuest Integration

Additional Q & A

29