SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

65
1 2 3 4 5 6 7 A B C D E LOT NUMBER: DRAWN BY: CHECKED BY: COPYRIGHT: CONSULTANTS NONE U.S. DEPARTMENT OF ENERGY SOLAR DECATHLON 2011 SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE [email protected] http://solardecathlon.sciarc.caltech.edu www.chip2011.com SCI-ARC / CALTECH RF #402 DATE: 08.11.2011 SUBMISSIONS: CALIFORNIA INSTITUTE OF TECHNOLOGY TEAM SCI-ARC / CALTECH 960 EAST 3RD STREET LOS ANGELES, CA 90013 1200 EAST CALIFORNIA BOULEVARD PASADENA, CA 91125 COMPACT HYPER-INSULATED PROTOTYPE CHIP 2011 STRUCTURAL ENGINEERS BURO HAPPOLD CONSULTING ENGINEERS, INC. 9601 JEFFERSON BLVD. STE B CULVER CITY, CA 90232. TEL: 310.945.4800 EXTERIOR SKIN THE VINYL INSTITUTE 1737 KING ST, STE 390 ALEXANDRIA, VA 22314. TEL: 571.970.3400 BUILDING CONSTRUCTION RJC BUILDERS, INC. 3509 W 6TH ST. LOS ANGELES, CA 90020 TEL: 213.388.9327 REVISIONS: AS-BUILT DRAWING SET 08/11/2011 CONSTRUCTION DRAWING SET 03/22/2011 CD SET REVISION 05/02/2011 1 DESIGN DOCUMENTATION SET 11/23/2010 8/12/2011 6:24:19 PM G-001 PROJECT COVER PROJECT INFORMATION: CHIP’S ARCHITECTURAL CONCEPT IS DRIVEN BY THE TWO SIDES OF THE SUSTAINABLE LIVING EQUATION: ENERGY PRODUCTION AND ENERGY CONSUMPTION. CHIP’S DESIGN IS BOTH RESPONSIVE TO THE SUN IN ITS ORIENTATION AND MASSING, WHILE SIMULTANEOUSLY EXPRESSING THE PERFORMATIVE DUTIES OF ITS ENVELOPE WITH RESPECT TO ENERGY CONSERVATION. THE MOST SINGULAR FEATURE OF THE DESIGN IS CHIP’S UNIQUE EXTERIOR ENVELOPE STRATEGY: A SKIN AND INSULATION ASSEMBLY WHICH TURNS CONVENTIONAL WISDOM ON ITS HEAD, WEARING ITS THERMAL PERFORMANCE “ON ITS SLEEVE”. SEPARATING THE STRUCTURAL MEMBERS FROM THE INSULATING LAYER, AND WRAPPING THE INSULATION ASSEMBLY IN A FLEXIBLE VINYL MEMBRANE, GIVES CHIP A AN EXTERIOR ENVELOPE WITH THE EXTREMELY HIGH R-VALUES NECESSARY FOR A NET-ZERO HOUSE, AT A SIGNIFICANTLY REDUCED COST, WHILE INDEXING THIS PERFORMANCE IN ITS PHYSICAL APPEARANCE. CHIP’S MASSING BEGINS AS A PRIMITIVE BOX, WHICH IS THEN FACETED IN SEVERAL DIMENSIONS: FIRST, IN ORDER TO NEGOTIATE BETWEEN AN OPTIMAL ROOF ANGLE FOR YEAR-ROUND SOLAR ENERGY COLLECTION, AND A COMFORTABLE, VAULTED INTERIOR SPACE. FURTHER FACETING OF THE PRIMITIVE SHAPE SHRINKS AND TORQUES THE PLAN TO MINIMIZE THE BUILDING’S FOOTPRINT ON THE EXTERIOR, WHILE ACCOMMODATING THE PROGRAMMATIC NEEDS OF THE OCCUPANT ON THE INTERIOR. CHIP’S FLEXIBLE, STEPPED INTERIOR ADOPTS THE ETHIC OF DOING-MORE-WITH-LESS, ALLOWING A SINGLE, CONTINUOUS VOLUME TO PERFORM IN A VARIETY OF DIFFERENT WAYS TO SERVE THE OCCUPANTS DAILY NEEDS. THE PROGRAM IS DIVIDED INTO A SERIES OF PLATFORMS WHICH ARE TERRACED UPWARDS AND INWARDS, FROM MOST PUBLIC TO MOST PRIVATE. THE DISTRIBUTION OF PROGRAM FROM NORTH-TO-SOUTH, AND HIGH-TO-LOW, FACILITATES THE OCCUPANTS’ DAILY RHYTHMS: A PROGRESSION DOWNHILL IN THE MORNING, -BED/GROOM/DRESS/EAT/LIVE/WORK- AND VICE VERSA IN THE EVENING. MECHANICAL SYSTEMS DESIGN SUMMARY THE HVAC AND WATER SYSTEMS MAXIMIZE ENERGY SAVINGS OVER A TYPICAL YEAR OF OPERATION IN CALIFORNIA WHILE LEVERAGING THERMAL SYNERGY BETWEEN THE TWO SYSTEMS. IN THE HOUSE’S DESIGN CLIMATE, THE LARGE MAJORITY OF HVAC LOADS ARE MANIFESTED IN COOLING LOADS. THE CORE OF THE SYSTEM IS A THERMAL STORAGE WATER TANK THAT ACTS AS BOTH A THERMAL MASS AND A HEAT TRANSFER MEDIUM. BECAUSE OF THE HIGH HEAT CAPACITY OF WATER, THE THERMAL MASS EFFICIENTLY EXTRACTS HEAT FROM THE HVAC SYSTEM WITH A MINIMUM OF ENERGY USE. IN ADDITION, THE HEATED THERMAL MASS PREHEATS THE DOMESTIC HOT WATER, THUS MAXIMIZING THE COMBINED EFFICIENCY OF THE TWO SYSTEMS. IN ADDITION, THE HVAC SYSTEM MAKES USE OF SIMPLE, CHEAP, YET COST-EFFECTIVE TECHNOLOGIES THAT REDUCE ENERGY USE BY TAKING ADVANTAGE OF THE CALIFORNIA CLIMATE. ECONOMIZERS AND WHOLE- HOUSE FANS SUBSTANTIALLY REDUCE COOLING DEMAND IN THE SUMMER AND IMPROVE OCCUPANT COMFORT AT MINIMAL COST AND ENERGY CONSUMPTION. DESIGN NARRATIVE CHIP'S STRUCTURAL DESIGN STRIKES A BALANCE BETWEEN THE UNIQUE GEOMETRIES OF CHIP'S MASSING AND THE DECATHLON'S AFFORDABILITY REQUIREMENTS. AS WITH OTHER DESIGN ELEMENTS IN THE PROJECT, THE STRUCTURAL DESIGN SEEKS TO ACCOMPLISH ITS OBJECTIVES (A SIMPLE MODULAR ASSEMBLY WHICH ENABLES THE APPEARANCE OF A SEAMLESS UNIFORM BUILDING) IN A ROBUST, LOW-TECH FASHION, USING AS MANY ELEMENTS FROM TYPE V CONSTRUCTION AS POSSIBLE. ADDITIONALLY, WE HAVE WORKED IN CONJUNCTION WITH OUR CONSULTANTS AT BURO HAPPOLD TO REDUCE REDUNDANT AND UNNECESSARY STRUCTURE FROM TYPE V ASSEMBLIES WHERE POSSIBLE IN ORDER TO DELIVER A LIGHTER, MORE EFFICIENT BUILDING. THE RESULT IS A UNIQUE PROJECT WHICH USES EVERY-DAY CONSTRUCTION METHODS TO LOWER THE OVERALL COST OF CONSTRUCTION AND TRANSPORT, WHILE ENABLING A STABLE PLATFORM FOR THE PROJECT'S OTHER ENGINEERING AND DESIGN ELEMENTS. STRUCTURAL DESIGN SUMMARY SCI-ARC/CALTECH SOLAR DECATHLON 2011 PROJECT NAME: CHIP 2011 LOCATION: NATIONAL MALL, WEST POTOMAC PARK WASHINGTON DC OCCUPANCY: R-RESIDENTIAL CONSTRUCTION TYPE: TYPE V BUILDING DESCRIPTION: NEW SINGLE STORY MODULE DWELLING MAX BUILDING HT: 18'-0" DESIGN TEAM: SOUTHERN CALIFORNIA INSTITUTE OF ARCHITECTURE 960 EAST 3RD STREET LOS ANGELES, CA 90013 CALIFORNIA INSTITUTE OF TECHNOLOGY 1200 EAST CALIFORNIA BOULEVARD PASADENA, CA 91125 PROJECT MANAGER: REED FINLAY COMMUNICATIONS MANAGER: ELISABETH NEIGERT ELECTRICAL SYSTEMS DESIGN SUMMARY CHIP'S ELECTRICAL SYSTEM IS DESIGNED TO BE AS SIMPLE AS POSSIBLE WHILE STILL CARRYING OUT IMPORTANT HOUSE FUNCTIONS AT AS LOW OF A COST AS POSSIBLE. THE PHOTOVOLTAIC SYSTEM IS DESIGNED TO MEET OUR HOUSE'S ENERGY NEEDS DURING THE COMPETITION WITH A 90% CONFIDENCE INTERVAL, USING MODULES OVER THE ENTIRE STRUCTURE AND AT AN IDEAL TILT. WE ARE USING TIGO MODULE MAXIMIZERS TO COMBINE BOTH SEGMENTS OF OUR ROOF INTO 4 STRINGS AND A SINGLE SMA AMERICA 7000 W INVERTER TO COMBINE THE STRINGS WITH AN INTEGRATED DC DISCONNECT SWITCH, DRASTICALLY SIMPLIFYING THE WIRING PROCESS. WE COMPARED THE COST OF MANY MODULES AND PERFORMANCE METRICS FROM 15 YEARS OF WEATHER DATA TO PICK MODULES THAT WOULD DELIVER THE ELECTRICAL POWER WE NEED AT THE LOWEST POSSIBLE PRICE. OUR LIGHTING DESIGN IS BASED ON UNCOMPROMISED QUALITY WHILE USING AS LITTLE ENERGY AS POSSIBLE, LIGHTING THE HOUSE WITH 4 LAYERS OF LIGHT THAT CAN BE CONTROLLED FROM ANYWHERE IN THE HOUSE. OUR WIRELESS SWITCHES REMOVE THE NEED FOR COMPLICATED 3-WAY SWITCHING. COMPUTING SYSTEMS DESIGN SUMMARY THE COMPUTING SYSTEM IS MUCH LIKE THE CENTRAL NERVOUS SYSTEM OF THE HUMAN BODY; NOT ONLY CAN IT PROCESS AND MONITOR THE STATE OF THE HOUSE, BUT IT CAN REACT TO CHANGES IN THE ENVIRONMENT AS WELL. THE COMPUTING SYSTEM IS MADE UP OF 5 DISTINCT BUT INTERRELATED COMPONENTS: 1) ENERGY MONITORING-THE ENERGY USE OF THE HOUSE IS MONITORED AT A WHOLE HOUSE LEVEL AS WELL AS AT AN INDIVIDUAL CIRCUIT LEVEL. USING EGUAGE MONITORING HARDWARE, WE CAN DETERMINE WHERE THE ENERGY FROM OUR PV PANELS ARE BEING USED. 2) CONTROL4:HOME AUTOMATION-NEARLY ALL THE LIGHTS AND APPLIANCES IN THE HOUSE ARE HOOKED UP TO THE CONTROL4 VIA A ZIGBEE NETWORK. THIS ALLOWS FOR ONE CENTRALIZED LOCATION AT WHICH EVERY DEVICE CAN BE CONTROLLED. 3) PREDICTION AND PLANNING-DATA IS POLLED FROM INTERNET WEATHER FORECASTING SITES AS WELL AS SOLARANYWHERE TO DETERMINE THAT STATE OF ENERGY USAGE AND GENERATION BY THE HVAC AND PV ARRAY. THIS INFORMATION IS PASSED TO A PLANNING ALGORITHM, WHICH THEN CALCULATES THE MOST EFFECT USE OF THE ENERGY. 4) HOME INTERFACE- CUSTOM IPAD APPS ARE WRITTEN TO PROVIDE A “UNIVERSAL REMOTE” THAT NOT ONLY ALLOWS DEVICES TO BE CONTROLLED, BUT CAN DISPLAY THE STATE OF EACH DEVICE AND THE ENERGY DRAW OF THE HOUSE. A KINECT SYSTEM WITH A CUSTOM SOFTWARE PACKAGE THAT ALLOWS USERS TO CONTROL DEVICES IN THE HOME USING NATURAL GESTURES SUCH AS POINTING AND WAVING. PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT PRODUCED BY AN AUTODESK STUDENT PRODUCT

Transcript of SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

Page 1: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:1

9 PM

G-001

PROJECT COVER

PROJECT INFORMATION:

CHIP’S ARCHITECTURAL CONCEPT IS DRIVEN BY THE TWO SIDES OF THE SUSTAINABLE LIVING EQUATION:ENERGY PRODUCTION AND ENERGY CONSUMPTION. CHIP’S DESIGN IS BOTH RESPONSIVE TO THE SUN IN ITSORIENTATION AND MASSING, WHILE SIMULTANEOUSLY EXPRESSING THE PERFORMATIVE DUTIES OF ITSENVELOPE WITH RESPECT TO ENERGY CONSERVATION.

THE MOST SINGULAR FEATURE OF THE DESIGN IS CHIP’S UNIQUE EXTERIOR ENVELOPE STRATEGY: A SKINAND INSULATION ASSEMBLY WHICH TURNS CONVENTIONAL WISDOM ON ITS HEAD, WEARING ITS THERMALPERFORMANCE “ON ITS SLEEVE”. SEPARATING THE STRUCTURAL MEMBERS FROM THE INSULATING LAYER,AND WRAPPING THE INSULATION ASSEMBLY IN A FLEXIBLE VINYL MEMBRANE, GIVES CHIP A AN EXTERIORENVELOPE WITH THE EXTREMELY HIGH R-VALUES NECESSARY FOR A NET-ZERO HOUSE, AT A SIGNIFICANTLYREDUCED COST, WHILE INDEXING THIS PERFORMANCE IN ITS PHYSICAL APPEARANCE.

CHIP’S MASSING BEGINS AS A PRIMITIVE BOX, WHICH IS THEN FACETED IN SEVERAL DIMENSIONS: FIRST, INORDER TO NEGOTIATE BETWEEN AN OPTIMAL ROOF ANGLE FOR YEAR-ROUND SOLAR ENERGY COLLECTION,AND A COMFORTABLE, VAULTED INTERIOR SPACE. FURTHER FACETING OF THE PRIMITIVE SHAPE SHRINKSAND TORQUES THE PLAN TO MINIMIZE THE BUILDING’S FOOTPRINT ON THE EXTERIOR, WHILEACCOMMODATING THE PROGRAMMATIC NEEDS OF THE OCCUPANT ON THE INTERIOR.

CHIP’S FLEXIBLE, STEPPED INTERIOR ADOPTS THE ETHIC OF DOING-MORE-WITH-LESS, ALLOWING A SINGLE,CONTINUOUS VOLUME TO PERFORM IN A VARIETY OF DIFFERENT WAYS TO SERVE THE OCCUPANTS DAILYNEEDS. THE PROGRAM IS DIVIDED INTO A SERIES OF PLATFORMS WHICH ARE TERRACED UPWARDS ANDINWARDS, FROM MOST PUBLIC TO MOST PRIVATE. THE DISTRIBUTION OF PROGRAM FROM NORTH-TO-SOUTH,AND HIGH-TO-LOW, FACILITATES THE OCCUPANTS’ DAILY RHYTHMS: A PROGRESSION DOWNHILL IN THEMORNING, -BED/GROOM/DRESS/EAT/LIVE/WORK- AND VICE VERSA IN THE EVENING.

MECHANICAL SYSTEMS DESIGN SUMMARY

THE HVAC AND WATER SYSTEMS MAXIMIZE ENERGY SAVINGS OVER A TYPICAL YEAR OF OPERATION INCALIFORNIA WHILE LEVERAGING THERMAL SYNERGY BETWEEN THE TWO SYSTEMS. IN THE HOUSE’S DESIGNCLIMATE, THE LARGE MAJORITY OF HVAC LOADS ARE MANIFESTED IN COOLING LOADS. THE CORE OF THESYSTEM IS A THERMAL STORAGE WATER TANK THAT ACTS AS BOTH A THERMAL MASS AND A HEAT TRANSFERMEDIUM. BECAUSE OF THE HIGH HEAT CAPACITY OF WATER, THE THERMAL MASS EFFICIENTLY EXTRACTS HEATFROM THE HVAC SYSTEM WITH A MINIMUM OF ENERGY USE. IN ADDITION, THE HEATED THERMAL MASSPREHEATS THE DOMESTIC HOT WATER, THUS MAXIMIZING THE COMBINED EFFICIENCY OF THE TWO SYSTEMS.IN ADDITION, THE HVAC SYSTEM MAKES USE OF SIMPLE, CHEAP, YET COST-EFFECTIVE TECHNOLOGIES THATREDUCE ENERGY USE BY TAKING ADVANTAGE OF THE CALIFORNIA CLIMATE. ECONOMIZERS AND WHOLE-HOUSE FANS SUBSTANTIALLY REDUCE COOLING DEMAND IN THE SUMMER AND IMPROVE OCCUPANTCOMFORT AT MINIMAL COST AND ENERGY CONSUMPTION.

DESIGN NARRATIVE

CHIP'S STRUCTURAL DESIGN STRIKES A BALANCE BETWEEN THE UNIQUE GEOMETRIES OF CHIP'S MASSING AND THEDECATHLON'S AFFORDABILITY REQUIREMENTS. AS WITH OTHER DESIGN ELEMENTS IN THE PROJECT, THE STRUCTURALDESIGN SEEKS TO ACCOMPLISH ITS OBJECTIVES (A SIMPLE MODULAR ASSEMBLY WHICH ENABLES THE APPEARANCE OF ASEAMLESS UNIFORM BUILDING) IN A ROBUST, LOW-TECH FASHION, USING AS MANY ELEMENTS FROM TYPE VCONSTRUCTION AS POSSIBLE. ADDITIONALLY, WE HAVE WORKED IN CONJUNCTION WITH OUR CONSULTANTS AT BUROHAPPOLD TO REDUCE REDUNDANT AND UNNECESSARY STRUCTURE FROM TYPE V ASSEMBLIES WHERE POSSIBLE IN ORDERTO DELIVER A LIGHTER, MORE EFFICIENT BUILDING. THE RESULT IS A UNIQUE PROJECT WHICH USES EVERY-DAYCONSTRUCTION METHODS TO LOWER THE OVERALL COST OF CONSTRUCTION AND TRANSPORT, WHILE ENABLING A STABLEPLATFORM FOR THE PROJECT'S OTHER ENGINEERING AND DESIGN ELEMENTS.

STRUCTURAL DESIGN SUMMARY

SCI-ARC/CALTECH SOLAR DECATHLON 2011

PROJECT NAME: CHIP 2011

LOCATION: NATIONAL MALL, WEST POTOMAC PARKWASHINGTON DC

OCCUPANCY: R-RESIDENTIAL

CONSTRUCTION TYPE: TYPE V

BUILDING DESCRIPTION: NEW SINGLE STORY MODULE DWELLING

MAX BUILDING HT: 18'-0"

DESIGN TEAM: SOUTHERN CALIFORNIA INSTITUTEOF ARCHITECTURE960 EAST 3RD STREETLOS ANGELES, CA 90013

CALIFORNIA INSTITUTE OF TECHNOLOGY1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

PROJECT MANAGER: REED FINLAYCOMMUNICATIONS MANAGER: ELISABETH NEIGERT

ELECTRICAL SYSTEMS DESIGN SUMMARY

CHIP'S ELECTRICAL SYSTEM IS DESIGNED TO BE AS SIMPLE AS POSSIBLE WHILE STILL CARRYING OUTIMPORTANT HOUSE FUNCTIONS AT AS LOW OF A COST AS POSSIBLE. THE PHOTOVOLTAIC SYSTEM IS DESIGNEDTO MEET OUR HOUSE'S ENERGY NEEDS DURING THE COMPETITION WITH A 90% CONFIDENCE INTERVAL, USINGMODULES OVER THE ENTIRE STRUCTURE AND AT AN IDEAL TILT. WE ARE USING TIGO MODULE MAXIMIZERS TOCOMBINE BOTH SEGMENTS OF OUR ROOF INTO 4 STRINGS AND A SINGLE SMA AMERICA 7000 W INVERTER TOCOMBINE THE STRINGS WITH AN INTEGRATED DC DISCONNECT SWITCH, DRASTICALLY SIMPLIFYING THE WIRINGPROCESS. WE COMPARED THE COST OF MANY MODULES AND PERFORMANCE METRICS FROM 15 YEARS OFWEATHER DATA TO PICK MODULES THAT WOULD DELIVER THE ELECTRICAL POWER WE NEED AT THE LOWESTPOSSIBLE PRICE. OUR LIGHTING DESIGN IS BASED ON UNCOMPROMISED QUALITY WHILE USING AS LITTLEENERGY AS POSSIBLE, LIGHTING THE HOUSE WITH 4 LAYERS OF LIGHT THAT CAN BE CONTROLLED FROMANYWHERE IN THE HOUSE. OUR WIRELESS SWITCHES REMOVE THE NEED FOR COMPLICATED 3-WAYSWITCHING.

COMPUTING SYSTEMS DESIGN SUMMARY

THE COMPUTING SYSTEM IS MUCH LIKE THE CENTRAL NERVOUS SYSTEM OF THE HUMAN BODY; NOT ONLY CAN IT PROCESS ANDMONITOR THE STATE OF THE HOUSE, BUT IT CAN REACT TO CHANGES IN THE ENVIRONMENT AS WELL. THE COMPUTING SYSTEMIS MADE UP OF 5 DISTINCT BUT INTERRELATED COMPONENTS:1) ENERGY MONITORING-THE ENERGY USE OF THE HOUSE IS MONITORED AT A WHOLE HOUSE LEVEL AS WELL AS AT ANINDIVIDUAL CIRCUIT LEVEL. USING EGUAGE MONITORING HARDWARE, WE CAN DETERMINE WHERE THE ENERGY FROM OUR PVPANELS ARE BEING USED.2) CONTROL4:HOME AUTOMATION-NEARLY ALL THE LIGHTS AND APPLIANCES IN THE HOUSE ARE HOOKED UP TO THE CONTROL4VIA A ZIGBEE NETWORK. THIS ALLOWS FOR ONE CENTRALIZED LOCATION AT WHICH EVERY DEVICE CAN BE CONTROLLED.3) PREDICTION AND PLANNING-DATA IS POLLED FROM INTERNET WEATHER FORECASTING SITES AS WELL AS SO­LARANYWHERETO DETERMINE THAT STATE OF ENERGY USAGE AND GENERATION BY THE HVAC AND PV ARRAY. THIS INFORMATION IS PASSED TOA PLANNING ALGORITHM, WHICH THEN CALCULATES THE MOST EFFECT USE OF THE ENERGY.4) HOME INTERFACE- CUSTOM IPAD APPS ARE WRITTEN TO PROVIDE A “UNIVERSAL REMOTE” THAT NOT ONLY ALLOWS DEVICESTO BE CONTROLLED, BUT CAN DISPLAY THE STATE OF EACH DEVICE AND THE ENERGY DRAW OF THE HOUSE. A KINECT SYSTEMWITH A CUSTOM SOFTWARE PACKAGE THAT ALLOWS USERS TO CONTROL DEVIC­ES IN THE HOME USING NATURAL GESTURESSUCH AS POINTING AND WAVING.

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 2: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1. THE PROJECT SPECIFICATIONS FORM A PART OF THESE GENERAL NOTES.2. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO CONSTRUCTION, THE ARCHITECT

SHALL BE NOTIFIED OF ANY DISCREPANCIES OR INCONSISTENCIES.3. CONTRACTOR SHALL FOLLOW DRAWING DIMENSIONS. DRAWINGS SHALL NOT BE SCALLED. IN

CASE OF CONFLICT, DIMESNIONS ON ARCHITECTURAL DRAWINGS SHALL TAKE PRECEDENCEOVER STRUCTURAL DRAWINGS.

4. NOTES & DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES & TYPICALDETAILS. WHERE NOES & DETAILS ON DRAWINGS & THESE GENERAL NOTES & TYPICAL DETAILSARE IN CONFLICT WITH THE PROJECT SPECIFICATIONS, THE MOST STRINGENT SHALL APPLY

5. ALL WORK SHALL CONFORM TO THE STANDARDS OF THE INTERNATIONAL RESIDENTIAL CODE2009 EDITION, IN ADDITION, WORK SHALL CONFORM TO THE STANDARDS OF ANY PORTION OFTHE WORK, INCLUDING THE STATE OF CALIFORNIA DIVISION OF INDUSTRY SAFETY & THOSECODES & STANDARDS IN THE LISTED CONTRACT DOCUMENTS.

6. MANUFACTURED MATERIALS SHALL BE APPROVED BY THE ARCHITECT PRIOR TO THEIR USE. ALLREQUIREMENTS OF THOSE APPROVALS SHALL BE FOLLOWED

7. SEE ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:A. SIZE & LOCATION OF ALL DOOR & WINDOW OPENINGSB. SIZE & LOCATION OF ALL NON-BEARING PARTITIONSC. SIZE & LOCATIONS OF ALL CONCRETE CURBS, FLOOR DRAINS, SLOPES, DEPRESSED AREAS, CHANGES IN LEVEL, CHAMERS, GROOVES, INSERTS, ETC.D. SIZE & LOCATION OF ALL FLOOR & ROOF OPENINGSE. STAIR FRAMING & DETAILSF. DIMENSIONS NOT SHOWN OF STRUCTURAL DRAWINGS.

8. SEE MECHANICAL, PLUMBING & ELECTRICAL OR VENDOR DRAWINGS FOR THE FOLLOWING:A. PIPE RUNS, SLEEVES. HANGERS, TRENCHES, WALL, ROOF & FLOOR OPENINGS, ETC,

NOT SHOWN OR NOTED.B. ELECTRICAL CONDUIT RUNS, BOXES, OUTLETS IN WALLS & SLABS.C. ANCHORAGE & BRACING FOR ELECTRICAL, MECHANICAL OR PLUMBING EQUIIPMENT.D. ANCHOR BOLTS FOR MOTOR MOUNTS.E. SIZE & LOCATION OF MACHINE & EQUIPEMENT BASES.

9. THE CONTRACT DOCUMENTS REPRESENT THE FINISHED STRUCTURE. THEY DO NOT INDICATETHE METHOD OF CONSTRUCTION. THE CONTRACTOR SHALL PROVIDE ALL MEASURESNECESSARY TO PROTECT THE STRUCTURE DURING CONSTRUCTION SUCH MEASURES SHALLINCLUDE, BUT NOT BE LIMITED TO BRACING, SHORING FOR LOADS DUE TO CONSTRUCTIONEQUIPMENT, ETC.

10. OPENINGS, POCKETS, ETC. SHALL NOT BE PLACED IN STRUCTURAL MEMBERS UNLESSSPECIFICALLY DETAILED ON THE STRUCTURAL DRAWINGS, BUT WHICH ARE LOCATED INSTRUCTURAL MEMBERS.

11. SPECIFICATIONS, CODES & STANDARDS NOTED IN THE CONTRACT DOCUMENTS SHALL BE OFTHE LATEST A0PROVED ISSUE, INCLUDING SUPPLEMENTS, UNLESS OTHERWISE NOTED.MATERIAL SPECIFICATIONS ARE ASTM LATEST EDITION UNLESS NOTED OTHERWISE (U.N.O.).

12. CONSTRUCTION MATERIALS SHALL BE PLACED ON FRAMED FLOORS OR ROOFS. LOAD SHALLNOT EXCEED THE DESIGN LIVE LOAD PER SQUARE FOOT. PROVIDE ADEQUATE SHORING & ORBRACING WHERE STRUCTURE HAS NOT ATTAINED DESIGN STRENGTH OR WHERE OVERLOAD ISANTICIPATED

FRAMING LUMBER SHALL COMPLY WITH THE LATEST EDITION OF THE GRADING RULES OF THE WESTERNWOOD PRODUCTS ASSOCIATION OR WEST COAST LUMBER INSPECTIONS BUREAU. ALL SAWN LUMBERSHALL BE STAMPED WITH THE GRADE MARK OF AN APPROVED GRADING AGENCY. MOISTURE CONTENTSHALL NOT EXCEED 19%.

MACHINE NAILING:USE OF MACHINE NAILING IS SUBJECT TO A SATISFACTORY JOBSITE DEMONSTRATION FOR EACH PROJECT& THE APPROVAL OF THE PROJECT ARCHITECT OR STRUCTURAL ENGINEER & THE ENFORCEMENT AGENCY.THE APPROVAL IS SUBJECT TO CONTINUED SATISFACTORY PERFORMANCE. MACHINE NAILING IS NOTALLOWED FOR 5/16 INCH PLYWOOD. IF THE NAIL HEADS PENETRATE THE OUTER PLY MORE THAN NORMALFOR A HAND HELD HAMMER, OR IF THE MINIMUM ALLOWABLE EDGE DISTANCES ARE NOT MAINTAINED, THEPERFORMANCE WILL BE DEEMED UNSATISFACTORY & MACHINE NAILING SHALL BE DISCONTINUED.

UNLESS SPECIFICALLY SHOWN 0N THESE PLANS NO STRUCTURAL MEMBER SHALL BE CUT, NEITHERDRILLED NOR NOTCHED WITHOUT PRIOR WRITTEN AUTHRORIZATION FROM THE STRLCTURAL ENGINEER.

STRUCTURAL WOOD SHEATHING:

STRUCTURAL WOOD SHEATHING PROPERTIES & ATTACHMENT (MINIMUM, U.N.O.)

ALL STRUCTURAL WOOD SHEATHING IS TO BE DOUGLAS FIR CONFORMING TO PS-1-95, GROUP 1 OR 2 OR APAPERFORMANCE RATED PANELS. STRUCTURAL-1 SHEATHING INCLUDES ALL-VENEER PLYWOOD. COMPOSITE PANELSCONTAINING A CONBINATION OF VENEER & WOOD BASED MATERIALS & MAT-FORMED PANELS. SUCH PLYWOOD ISTO BE "EXTE'RIOR" TYPE, GRADED-MARKED BY THE AMERICAN PLYWOOD ASSOCIATION, GRADE STRUCTURAL-1UNLESS NOTED OTHERWISE, SHEATHING PANEL INDEX TO BE MIN. 32/16 FOR FLOOR SHEATHING. PLYWOOD WIDTHFOR FLOOR SHEATHING SHALL BE 24" WIDE.

SILL PLATES ON SOIL TO BE 2x PRESSURE TREARTEO LUMBER. WALL STUDS & BLOCKING AT ADJOINING PANELEDGES TO BE 2x OR LARGER. PLYWOOD JOINT & SILL PLATE NAILING TO BE STAGGERED IN ALL CASES.

ALL NAILS TO BE COMMON WIRE NAILS AS INDICATED IN THE NAILING SCHEDULE PER PLAN. DO NOT USE BOXTYPENAILS. ALL FIELD NAILNG TO BE 12" O.C. UNO. NAIL PLYWOOD AS SPECIFIED IN THE PLANS &/OR ON THEGENERAL NOTES, WITH PERIMETER NAILS NOT CLOSER THAN 1/2" FROM EDGES. DO NOT OVERDRIVE THE NAILSTHROUGH THE FACE GRAIN OF THE PLYWOOD. OVER DRIVEN NAILS MAY RESULT IN REJECTION & REPLACEMENT OFPLYWOOD BY THE INSPECTOR OR ENGINEER. EXCEPT FOR PLYWOOD, NAILS SHALL NOT BE LESS THAN 1/2 THEIRLENGTH NOR CLOSER TO THE EDGE OR END OF LUMBER THAN 1/4 THEIR LENGTH. THE PENETRATION OF NAILS ORSPIKES INTO PIECES RECIEVING THE POINT SHALL NOT BE LESS THAN 1/2 THE NAIL LENGTH, EXCEPT THAT A 16d MAYBE USED TO CONNECT PIECES OF 2" NOMINAL THICKNESS. USE 16d COMMONS THROUGH SILL.

ALL FRAMING CONNECTORS TO BE SIMPSON STRONG TIE COMPANY OR AS REQUIRED BY THE STRUCTURAL PLANS.PROVIDE THE TYPE OF NAILS SPECIFIED BY THE MANUFACTURER & FULLY DRIVE NAILS INTO ALL HOLES OF THECONNECTOR UNLESS NOTED OTHERWISE ON THE PLANS. All CONNECTORS SHALL BE GALVANIZED OR HAVEANOTHER FACTORY APPLIED FINISH. ALL STEEL FRAMING HANGERS TO BE TORSIONAL RESTRAINT SOLID BLOCKINGREQUIRED BETWEEN JOISTS WHERE TORSIONAL RESTRAINT HANGERS DO NOT OCCUR.

FOUNDATION:

1. FOOTINGS ARE DESIGNED BASED ON THE ALLOWABLE SOIL BEARING CAPACITY OF 1500 PSF WHICH CANBE INCRESED BY 1/3 DUE TO WIND OR SEISMIC LOADING

2. FOOTINGS ARE DESIGNED TO RESULT IN A BEARING PRESSURE OF MORE THAN 1000 PSF

LOADING:

SEISMIC

1. SEISMIC IMPORTANCE FACTOR, I = 12. OCCUPANCY CATEGORY= I OR II FOR SINGLE STORY BUILDING3. MAPPED SPECTRAL RESPONSE ACCELERATIONS, Ss = 1.940 AND S1 = 0.9884. SITE CLASS D5. SPECTRAL RESPONSE COEFFICIENTS, SDS = 1.293 AND SD1 = 0.9886. SEISMIC DESIGN CATEGORY D7. BASIC SEISMIC FORCE RESISTING SYSTEM, BEARING WALL SYSTEM WITH WOOD SHEAR WALL PANELS8. DESIGN BASE SHEAR = 1.3 Cs W = 6.8 kips, WHERE W = BUILDING WEIGHT = 26.3 kips9. SEISMIC RESPONSE COEFFICIENT, Cs = 0.19910. RESPONSE MODIFICATION FACTOR, R = 6.511. ANALYSIS PROCEDURE, EQUIVALENT LATERAL FORCE PROCEDURE,12. REDUNDANCY FACTOR = 1.3

WIND

1. BASIC WIND SPEED ( 3-MILE GUEST) = 85 mph2. WIND IMPORTANCE FACTOR, I = 13. WIND EXPOSURE = 18.6 psi4. DESIGN WIND PRESSURE FOR COMPONENTS AND CLADDING= 18.2 psi

GRAVITY

LIVE LOADING

1. ROOF 20 Psf2. FLOOR 40 Psf

BASE VALUES FOR DIMENTION LUMBER

MEMBER Fb (PSI) Fv (PSI) E (PSI) Fc11 (PSI) SPECIES AND GRADE

JOISTS 900 180 1,600,000 1350 DOUG FIR, ARCH #2BEAMS

4X MEMBERS 1000 170 1,700,000 1500 DOUG FIR, ARCH #16X MEMBERS 1350 170 1,600,000 925 DOUG FIR, ARCH #1

POSTS4X MEMBERS 1000 170 1,700,000 1500 DOUG FIR, ARCH #16X MEMBERS 1200 170 1,600,000 1000 DOUG FIR, ARCH #1

STUDS 900 180 1,600,000 1350 DOUG FIR, ARCH #2LEDGERS & TOP PLATES 900 180 1,600,000 1350 DOUG FIR, ARCH #2TREATED SILL PLATES DOUG FIR #2 MINIMUM.

EACH PIECE BEAR A STAMP OF APPROVED INDEPENDENT AGENCY OPERATING UNDER AITC.

ITEM THICKNESS SPAN/INDEX RATIO EDGE NAILING INTERMEDIATE NAILING

ROOF 15/32" 24/0 8D @ 6" O.C. 8D @ 12" O.C.FLOOR 19/32" 32/16 10D @ 6" O.C. 10D @ 10 O.C.

EQUIPMENT ANCHORAGE NOTES:

1. ALL EQUIPEMENT SHALL BE ANCHORED PER THE REQUIREMENTS OF THE CODE. FOR ANCHORAGEDETAILS & SPECIFICATIONS SEE VENDOR INSTALLATION DRAWINGS, UNLESS NOTED OTHERWISEHERIN.

WOODGENERAL:

1. DO NOT NOTCH OR DRILL JOISTS, BEAMS OR LOAD BEARING STUDS WITHOUT PRIOR APPROVAL OFTHE STRUCTURAL ENGINEER THROUGH THE ARCHITECT. DOUBLE UP FLOOR JOISTS UNDERPARTIONS. PROVIDE 1 X 3 OR METAL CROSS BRIDGING AT MIDSPAN OF ALL JOISTS. DOUBLE UPSTUDS AT JAMBS & UNDER BEAMS IN BEARING WALLS. PROVIDE 2 X SOLID BLOCKING AT MID-HEIGHT OF LOAD BEARING STUD WALLS. ALL NAILS SHALL BE COMMON NAILS. ALL NAILING NOTNOTED SHALL BE IN ACCORDANCE WITH THE 2006 EDITION OF THE INTERNATIONAL RESIDENTIALCODE. ALL FRAMING ANCHORS & CONNECTORS SHALL BE FILLED WITH NAILS PERMANUFACTURERS PUBLISHED NAIL SIZES. ALL BOLTS SHALL BE ASTM A307 BOLTS INSTALLED WITHSTEEL WASHERS. ALL EXPANSION BOLTS SHALL BE HILTI KWIK BOLT II OR AN APPROVED 1CBO/ICCRATED PRODUCT.

WOOD STUD WALLS:

1. USE 2 X 4 AT 16" O.C. TYPICAL UNLESS NOTED OTHERWISE ON PLANS. WOOD PLATE ANCHORBOLTS SHALL BE 5/8” DIAMETER PLACED NOT TO EXCEED 32" O.C. UNLESS NOTED OTHERWISE.ANCHOR BOLTS SHALL BE PLACED AT ALL JAMBS, CORNERS, INTERSECTIONS & WALL ENDS. ALLBOTTOM PLATES SHALL HAVE A MINIMUM OF 2 ANCHOR BOLTS. ALL FOUNDATION PLATES OR SILLS& SLEEPERS WHICH IS IN DIRECT CONTACT WITH THE EARTH & SOIL SHALL BE PRESSURE TREATEDWOOD IN ACCORDANCE WITH AWPB S0 ECIFICATION NO. LP-22 FOR ABOVE GROUND CONTACT.

FRAMING LUMBER:

1. VERIFY ALL DIMENSIONS PRIOR TO BEGINNING CONSTRUCTION.2. EXISTING HOUSE PLANS BASED ON DRAWINGS FROM ARCHITECTS, PROVIDED BY OWNER. VERIFY ALL DIMENSIONS IN

FIELD.3. PROVIDE ADEQUATE TEMPORARY SUPPORT AS NECESSARY TO ASSURE THE STRUCTURAL VALUE OR INTEGRITY OF ANY

PORTION OF THE BUILDING AFFECTED BY THE WORK.4. ALL PHASES OF CONSTRUCTION SHALL BE REGULATED BY CURRENT VERSIONS OF THE INTERNATIONAL BUILDING CODE

2009 (IBC), THE LOS ANGELES CITY BUILDING CODE, THE UNIFORM PLUMBING, ELECTRICAL AND MECHANICAL CODESAND ANY APPLICABLE LOCAL REGULATIONS.

5. STUD WALLS SHALL BE FIRE BLOCKED AT FLOOR, CEILING (INCLUDING FURRED AREAS), AND MID-HEIGHT OF STUDSPACES MORE THAN 8'-0" HIGH.

6. THE LONG DIMENSION OF PLYWOOD WALL BOARD SHALL SPAN PERPENDICULAR TO THE SUPPORTS.7. UPON COMPLETION OF THE INSULATION WORK, BOTH BUILDER AND INSULATION INSTALLER SHALL COMPLETE AND

CONSPICUOUSLY LOCATE A CARD CERTIFYING THAT THE INSTALLATION HAS BEEN INSTALLED IN ACCORDANCE WITHACT 5, CHAPTER1, TITLE 24 OF THE CALIFORNIA ADMINISTRATIVE CODE.

8. ALL FRAMING SHALL BE INSTALLED MEETING THE REQUIREMENTS OF BOTH THE STRUCTURAL AND LIGHTING DESIGN.THE CONTRACTOR SHALL SURPASS THE SPECIFIED STRUCTURAL AND ADDITIONAL FRAMING WHERE NECESSARYTO ACCOMODATE THE LOCATION OF THE ELECTRICAL AND LIGHTING FIXTURES AS LOCATED IN THE PLANS.

9. ALL WATER CLOSETS AND SHOWER HEADS SHALL BE LOW-FLOW.10. PROVIDE 70" MIN. HIGH NON-ABSORBANT WALL ADJACENT TO SHOWER.11. PROVIDE HARDWIRED SMOKE DETECTORS FOR ALL BEDROOMS AND ROOMS/HALLS LEADING TO BEDROOMS.12. ALL NEW WINDOWS SHALL BE DUAL GLAZED.13. SMOKE DETECTORS SHALL SOUND AN ALARM AUDIBLE IN ALL SLEEPING AREAS. SMOKE DETECTORS ALSO SHALL BE

HARD WIRED AND SHALL BE QUIPPED WITH BATTERY BACK-UP.14. MAXIMUM FLOW RATE STANDARDS SET BY THE CALIFORNA ENERGY COMMISSION:

A. WATER CLOSET: 1.6GPMB. SHOWERHEADS: 2.5GPMC. LAUNDRY FAUCETS: 2.2GPMD.SINK FAUCETS: 2.5GPM

15. SHOWERS AND TUB & SHOWERS TO BE INSTALL WITH ANTI-SCALDING VALVE.16. ALL HOSE BIBS MUST HAVE AN APPROVED ANTI-SIPHON DEVICE.17. LIGHTING IN BATHROOMS, LAUNDRY ROOMS, AND/OR UTILITY ROOMS MUST BE HIGH EFFICANCY OR MUST BE

CONTROLLED BY A MANUAL-ON SENSOR. A MANUAL-ON OCCUPANCY SENSOR MUST BE MANUALLY TURNED ON ANDAS LONG AS THE SENSOR DETECTS MOVEMENT STAYS ON. WHEN MOVEMENT IS NOT DETECTED, WHICH CANNOT BELONGER THAN 30 MINUTES, THE FIXTURE MUST AUTOMATICALLY TURNS OFF.

18. ALL PERMANENTLY INSTALLED LIGHTING IN OTHER ROOMS, INCLUDING HALLWAYS, DINING ROOMS, BEDROOMS,FAMILY ROOMS, MUST BE HIGH EFFICANCY; OR BE CONTROLLED BY A MANUAL-ON OCCUPANCY SENSOR; OR ADIMMER.

19. OUTDOOR LIGHTING THAT IS ATTACHED TO A BUILDING MUST BE HIGH EFFICACY; OR CONTROLLED BY A MOTIONSENSOR WITH AN INTEGRAL PHOTOCONTROL. LIGHTING AROUND SWIMMING POOLS, WATER FEATURES, OR OTHERLOCATIONS SUBJECT TO ARTICLE 680 OF THE CALIFORNIA ELECTRIC CODE ARE EXEMPT.

20. PROVIDE AT LEAST ONE OUTSIDE WEATHERPROOF 120V RECEPTAVLE AT FRONT AND BACK OF DWELLING UNIT.21. PROVIDE G.F.I. PROTECTION TO ALL 120V, 15A AND 20A RECEPTACLES INSTALLED OUTDOORS, IN BATHROOMS, IN

BASEMENT, AT COUNTER TOP RECEPTACLES(WITHIN 6 FEET OF SINK) AND GARAGE UTILIZED FOR A FIXED ORSTATIONARY APPLIANCE.

22. RECEPTACLE OUTLETS IN BEDROOMS SHALL BE PROTECTED BY AN ARC-FAULT CIRCUIT INTERRUPTER(S).23. IN THE KITCHEN AND DINING AREA, A RECEPTACLE SHALL BE PROVIDED FOR EACH COUNTERSPACE WIDER THAN 12"

SO THAT NO POINT IS MORE THAN 24" FROM THE OUTLET.24. WATER HEATERS HAVING NON-RIGID WATER CONNECTIONS AND OVER 4' IN HEIGHT SHALL BE ANCHORED OR

STRAPPED TO THE STRUCTURE.25. DRYER MOISTER EXHAUST DUCT MUST BE 4"DIAMETER MINIMUM TO THE OUTSIDE AND EQUIPPED WITH A BACK-DRAFT

DAMPER. EXHAUSE DUCT LENGTH IS LIMITED TO 14' WITH 2 ELBOW.26. WALLS 2 FEET WIDE OR GREATER SHALL HAVE AN OUTLET. OUTLETS SHALL BE SPACED NO MORE THAN 6' APART,

AND A MAXIMUM OF 6' FROM END OF WALLS OR OPENING.27. CONTRACTOR TO PROVIDE UFER GROUNDING PER CEC 250.

STRUCTURAL GENERAL NOTES ARCHITECTURAL GENERAL NOTES

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:2

0 PM

G-002

GENERAL NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 3: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:2

2 PM

G-101

SHEET INDEX ANDABBREVIATIONS

SHTNO SHEET NAME

G-001 PROJECT COVERG-002 GENERAL NOTESG-102 SYMBOLS LEGENDG-103 SYMBOLS LEGENDG-201 SITE MAPG-301 EGRESS PLANG-302 ADA TOUR ROUTEG-601 SHADING DIAGRAM

H-101 LIQUID LOCATION AND SPILL CONTAINMENT PLAN

S-101 FOUNDATION PLANS-102 FLOOR AND ROOF FRAMING PLANS-201 FRAMING ELEVATIONSS-301 FRAMING SECTIONS-501 STRUCTURAL ROOF DETAILSS-502 STRUCTURAL DETAILSS-503 SHEAR WALL DETAILS AND NAILING SCHEDULESS-504 TYPICAL STRUCTURAL DETAILSS-505 FLOOR DETAILSS-601 REINFORCING AND FRAMING SCHEDULESS-902 MODULE ISOMETRICS

A-101 SITE PLANA-111 FLOOR PLANA-112 ROOF PLANA-121 REFLECTED CEILING PLANA-201 EXTERIOR ELEVATIONSA-202 EXTERIOR ELEVATIONSA-203 FENESTRATION COLLAR ELEVATIONSA-211 INTERIOR ELEVATIONSA-212 KITCHEN PLAN & ELEVATIONA-213 BATHROOM PLAN & ELEVATIONA-301 BUILDING SECTIONSA-311 WALL SECTIONSA-312 WALL SECTIONSA-601 WINDOW/ DOOR SCHEDULEA-611 SCHEDULESA-701 TUFT DETAILA-702 TUFTING DETAILSA-703 TUFTING DETAILSA-711 WALL ASSEMBLYA-721 SKIN DETAILSA-731 RAMP DETAILSA-741 DECK DETAILSA-751 CASEWORK DETAILSA-761 STAIRS DETAILA-771 WATER UTILITY UNITG-101 SHEET INDEX AND ABBREVIATIONS

F-101 FIRE DETECTION AND SUPPRESSION

P-102 DOMESTIC WATER SUPPLYP-103 DOMESTIC WASTEWATER AND GREYWATER SYSTEMP-601 PLUMBING SCHEDULE

M-101 HVAC EQUIPMENT AND DISTRIBUTIONM-601 SCHEMATIC DIAGRAMM-602 SCHEDULESM-901 MECHANICAL ISOMETRIC

E-101 ELECTRICAL DISTRIBUTION PLANE-102 LIGHTING AND CONSUMER ELECTRONICS PLANE-103 EXTERIOR CONNECTION PLANE-601 ONE-LINE DIAGRAME-602 THREE-LINE DIAGRAME-603 PANEL SCHEDULE

T-101 TELECOMMUNICATIONS WIRING PLANT-601 BUILDING CONTROL OVERVIEW

O-101 OPERATIONAL SITE EQUIPMENT & TRUCK ROUTEO-102 EQUIPMENT SCHEDULE & CRANING ASSEMBLY PROCEDUREO-103 CRANING ASSEMBLY PROCEDURE

AC ALTERNATE CURRENTACCES. ACCESSORYACOUS. ACOUSTIC(AL)ADJ. ADJUSTABLEAFCI. ARC FAULT CIRCUIT INTERRUPTERAFF ABOVE FINISHED FLOORALUM. ALUMINUMALT. ALTERNATEANOD. ANODIZEDARCH. ARCHITECT(URAL)AUTO. AUTOMATICAVG. AVERAGEAWG. AMERICAN WIRE GAUGE& AND

BD. BOARDBLDG. BUILDINGBLKG BLOCKINGBOLLD BOLLARDBOT. BOTTOMBRDLM BROADLOOMB.U. BUILT UP

C COLDCAB. CABINETCD COMPRESSIBLE DUCTCEM. CEMENT(ITIOUS)CER. CERAMICCLG. CEILINGCMU CONCRETE MASONRY UNITCOL. COLUMN EQ.COILG COILINGCONC. CONCRETECONSTR. CONSTRUCTIONCONN. CONNECTIONCONT. CONTINUOUS(ATION)CONTR. CONTRACT(OR)COORD. COORDINATECOV. COVERCPT CARPETCTR. CENTERCW COLD WATER

DBL DOUBLEDC DIRECT CURRENTDEPT. DEPARTMENTDTL. DETAILDHW DOMESTIC HOT WATERDIA. DIAMETERDIFF. DIFFUSERDIM. DIMENSIONDISP. DISPENSERDN. DOWN$ DOLLAR (US CURRENCY)DR. DOORDRN. DRAINDS. DOWNSPOUTDW DRINKING WATERDWG. DRAWINGDWR. DRAWERDWS DRINKING WATER SUPPLY

ABBREVIATIONSTEMP. TEMPEREDTHWN THERMOPLASTIC HIGH WATER RESISTANT NYLON

COATEDTL THERMOCOUPLE DATA LOGGERTLT. TOILETT&G TONGUE AND GROOVETRTD. TREATEDTS TEMPERATURE SENSORTT-1 THERMAL STORAGE TANKTYP. TYPICAL

UNDRLAY. UNDERLAYMENTUTIL. UTILITYUNO UNLESS OTHERWISE NOTED

V VALVEVEH. VEHICLEVERT. VERTICALVIF VERIFY IN FIELDVOC VOLATILE ORGANIC COMPOUND

W WATTSW/ WITHW.C. WATER CLOSETWD. WOODWDW WINDOWWHF WHOLE HOUSE FANW/O WITHOUTWT. WEIGHTWP. WATER PROOFWP WATER PUMP

SHEET INDEXH HOTHD. HEADHDWD. HARDWOODHDWE. HARDWAREHEX HEAT EXCHANGERH.M. HOLLOW METALH.P. HEAT PUMPHT. HEIGHTHVAC HEATING, VENTILATING, AND AIR CONDITIONINGHW HOT WATERIIC IMPACT INSULATION CLASSINFO INFOMATIONINSTRUM. INSTRUMENT(ATION)INSUL. INSULATIONINTLK. INTERLOCK(ING)INT. INTERIORINFILTR. INFILTRATION

K KELVINKIT. KITCHENkW KILOWATT

LAV. LAVATORYLT. LIGHTLVLG. LEVELINGLVR. LOUVERMAX. MAXIMUMMFD. MANUFACTUREDMFR. MANUFACTURERMATL. MATERIALMECH. MECHANICALMEMB. MEMBRANEMEZZ. MEZZANINEMIN. MINIMUMMISC. MISCELLANEOUSMLWK. MILLWORKMTL. METALMOIST MOISTUREMPPT MAXIMUM POWER POINT TRACKERMTD. MOUNTED

NIC NOT IN CONTRACTNO. NUMBERNOTC NORMAL OPERATING CELL TEMPERATURENPT NATIONAL PIPE THREADN. NEWNR NPT REDUCERNTS NOT TO SCALE

ORNA. ORNAMENTALO/ OVEROA. OVERALL S.F.OVFL. OVERFLOWOVHD OVERHEADOC ON CENTEROPNG. OPENINGOPP. OPPOSITEOPR. OPERABLE

PTN. PARTITIONPC COPPER FITTINGPED. PEDESTRIANPBD PARTICAL BOARDPI PIPING INSULATIONPNF HEX-NPT FEMALE ADAPTERPNL. PANELPNM HEX-NPT MALE ADAPTERP.LAM PLASTIC LAMINATEPLY. PLYWOODPLAS. PLASTERPLSTC. PLASTICPOLYST. POLYSTYRENEPORT. PORTABLEPREFIN PREFINISHEDPREFAB PREFABRICATEDPVC POLYVINYL CHLORIDEPX HEX WATER PIPING

RAD. RADIUSRD. REFRIGERANT DISCHARGER.W.L. RAIN WATER LEADERREFL. REFLECTEDREF. REFERENCEREFR. REFRIGERATORREQD. REQUIREDRESIS RESIST(ANT)(IVE)REINF. REINFORCE(D)(ING)(MENT)RFG. ROOFINGRFL REFRIGERANT LINE SETRD. ROOF DRAINRL. REFRIGERANT LIQUIDRM. ROOMRNG. RANGER.O. ROUGH OPENING

S SOLENOIDSCR. SCRIBESCHED. SCHEDULESECUR. SECURITYSECT. SECTIONS.S.D. SEE STRUCTURAL DRAWINGSSHORG. SHORINGSGL SINGLESIM SIMILARS.F. SQUARE FOOT (FEET)SF SPRINKLER FOOTINGSSST STAINLESS STEELSTC SOUND TRANSMISSION CLASSSTD. STANDARDSTL. STEELSTOR. STORAGESTRUCT. STRUCTURALSURF. SURFACESUSP. SUSPENDEDSW SPRINKLER SYSTEMSYS. SYSTEM

EA. EACHEF EXHAUST FANELEV. ELEVATIONELAST. ELASTOMERICELEC. ELECTRICALEMBED EMBEDD(ED)(ING)EMT ELECTRICAL METALLIC TUBINGEQ. EQUALEQUIP. EQUIPMENTERV ENERGY RECOVERY VENTILATOREXIST. EXISTINGEXP JT. EXPANSION JOINTEXPS. EXPOSE(D)EXT. EXTERIOR

FAB. FABRICATIONFOF FACE OF FINISHFOS FACE OF STUDFCU. FAN COIL UNITF.D. FLOOR DRAINF.E. FIRE EXTINGUISHERFIN. FINISHF.R. FIRE RATINGFXD. FIXEDFXTR. FIXTUREFL. FLOORFL FLANGEFLR. FLOORINGFLASH. FLASHINGFLDG. FOLDING.FT. FOOT OR FEETFTG. FOOTINGFURN. FURNITURE

GAL GALLONGALV. GALVANIZED GLASSGA GAUGEGFCI GROUND FAULT CIRCUIT INTERRUPTERGFRC GLASS FIBER REINFORCED CONCRETEGFRG GLASS FIBER REINFORCED GYPSUMGFRP GLASS FIBER REINFORCED PLASTERGL. GLASSGR. GRADE(ING)GND. GROUNDGYP. GYPSUM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 4: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1

1

ROOMNAME

101

0

A4

A101

A4

A101

A101

1

A4

A101

4' 8'0 2'

A101

1

2

3

4

101

2

GRAPHIC SCALE1/4IN TO 1 FT (EXAMPLE)

ROOM NAME &NUMBER

SPOT ELEVATION

NORTH ARROW

WINDOW NUMBERKEY

ELEVATION

BUILDING SECTION

GRID LINE

DRAWING NUMBERSHEET NUMBER

WALL SECTION

DRAWING NUMBERSHEET NUMBER

SECTION NUMBERSHEET NUMBER

DRAWING NUMBERSHEET NUMBER

SHEET NUMBER

AREA OF DETAIL

ELEVATION NUMBER

INTERIOR ELEVATION

DETAIL

DOOR NUMBER KEY

SHEET NOTE

KEYNOTES

CABINET TAG

CENTER LINE

PROPERTY LINE

ROTATION ANGLE

WALL TYPE

!

!18'-0"

A4

A-311

1

S

S

DIRECTIONAL CHANGE

EMERGENCY MEETING AREA

EGRESS/ADA SYMBOLS

EGRESS PATH

1.4 1.5 1.6*1

*1

*** 1

*** 1

FLAMMABLE LIQUID,GAS, AEROSOL(RED)

FLAMMABLE SOLIDSELF-REACTIVESUBSTANCES(WHITE WITH REDSTRIPES)

PYROPHORICS,SELF-HEATINGSUBSTANCES(WHITE OVER RED)

SUBSTANCES, WHICHIN CONTACT WITHWATER, EMITFLAMMABLE GASES(BLUE)

OXIDIZING GASES,LIQUIDS, SOLIDS(YELLOW)

EXPLOSIVEDIVISIONS 1.1,1.2,1.3(ORANGE)

EXPLOSIVEDIVISION 1.4(ORANGE)

EXPLOSIVEDIVISION 1.5(ORANGE)

EXPLOSIVEDIVISION 1.6(ORANGE)

COMPRESSEDGASES (GREEN)

ACUTE TOXICITY:ORAL,DERMAL,INHALATION (WHITE)

CORROSIVES(WHITE OVER BLACK)

MARINEPOLLUTANT(WHITE WITH BLACK)

ORGANIC PEROXIDES(RED OVER YELLOW)

OXIDIZERS(WHITE WITHRED BORDER)

-EXPLOSIVES-SELF REACTIVES-ORGANICPEROXIDES(WHITE WITH REDBORDER)

-FLAMMABLES-SELF REACTIVES-PYROPHORICS-SELF-HEATING-EMITSFLAMMABLE GAS-ORGANIC

PEROXIDES(WHITE WITH REDBORDER)

ACUTE TOXICITY(WHITE WITH REDBORDER)

CORROSIVES(WHITE WITH REDBORDER)

GAS UNDERPRESSURE (WHITEWITH RED BORDER)

ENVIRONMENTALTOXICTY(WHITE WITH REDBORDER)

-CARCINOGEN-RESPIRATORYSENSITIZER-REPRODUCTIVETOXICITY-TARGET ORGAN TOXICITY-ASPIRATIONTOXICITY-MUTAGENICITY(WHITE WITH REDBORDER)

-IRRITANT-ACUTE TOXICITY-NARCOTIC EFFECTS(WHITE WITH REDBORDER)

TRANSPORT PICTOGRAM SYMBOLS

GHS PICTOGRAM/HAZARD SYMBOLS

CATEGORY 1 CATEGORY 2 CATEGORY 3 CATEGORY 4

ACUTE ORAL TOXICITY SYMBOLS

5 MG/KGDANDERFATAL IFSWALLOWED(WHITE WITH REDBORDER)

>5<50 MG/KGDANDERFATAL IFSWALLOWED(WHITE WITH REDBORDER)

50-300 MG/KGDANGERTOXIC IFSWALLOWED(WHITE WITH REDBORDER)

2000-5000 MG/KGWARNINGMAY BE HARMFULIF SWALLOWED(WHITE WITH REDBORDER)

CHEMICAL SYMBOLS

ARCHITECTURAL SYMBOLS

SOLAR ENVELOPE

(GFCI)

AFCI RECEPTABLE

GFCI RECEPTABLE

EXHAUST FAN

LIGHT FIXTURE

WATER PUMP

SMOKE DETECTOR

TWO-POLE CIRCUIT BREAKER

SINGLE-POLE CIRCUIT BREAKER

DC TO AC INVERTER

PV JUNCTION BOX

PHOTOVOLTAIC MODULE

LOAD CENTER

ELECTRICAL SYMBOLS

J JUNCTION BOX

3-WAY VALVE

DIMMER SWITCH

6-KEY SWITCH

D

6

M ELECTRICAL METER

S ELECTRICAL SUBSTATION

S

2

5.2

APPLIANCES

GROUNDING ROD

BLUE= HEALTH HAZARDRED= FLAMMABILITYYELLOW= REACTIVITYWHITE= OTHER HAZARDSEXAMPLE. CHEMICAL REACTSVIOLENTLY WITH WATEROR IS AN OXIDIZER

0= NO OR MINIMAL HAZARD1= SLIGHT HAZARD2= MODERATE HAZARD3= SERIOUS HAZARD4= EXTREME HAZARD

FIRE EXTINGUISHER

SMOKE DETECTOR

12 34 56

139

S

N

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:2

4 PM

G-102

SYMBOLS LEGEND

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 5: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

DOMESTIC HOTWATER HEAT PUMP

2-WAY BALL VALVE

FIRE SPRINKLER HEAD

IN-LINE CIRCULATING PUMP

PRESSURE REGULATOR

BACKFLOW PREVENTER

SOLENOID VALVE

DRINKING COLD WATER

DRINKING HOT WATER

WASTE LINE AND VENT

WASTE WATER TANK

DRAIN

FLOOR DRAIN

IN-LINE CIRCULATING PUMP

DRINKING WATER SUPPLY

S

T

DIMMER SWITCH

SIX BUTTON KEYPAD

S

S

REFLECTED CEILINGSYMBOLS

SCREEN, PROJECTIONCEILING MOUNTED

CEILING MOUNTED SPEAKER

PROJECTOR

PLUMBING SYMBOLS

LIGHTING/EXTERIOR BUILDING

WALL MOUNTED LIGHT

RECESSED DOWNLIGHT

PENDANT LIGHT

TASK LIGHT/LED

LINEAR LED FIXTURE

SOLAR TUBE

LIGHTING SYMBOLS TELECOMMUNICATIONS SYMBOLS

MECHANICAL SYMBOLS

DIMMER SWITCHD

CONTACT SENSORSC

FIBER OPTICS LINE

BUILDING CONTROL HARDWARE

INTERCOM LINE

TELEPHONE LINE

THERMOCOUPLE

TEMPERATURE ANDHUMIDITY SENSOR

TH

ETHERNET OUTPUT AND JACK

CP

FO

I

T

T

XS

COMPRESSOR

EXPANSION VALVE

REFRIGERANT CONDENSER

MUNICIPAL WATER SUPPLYTANK

FAN

THERMOCOUPLE

4-WAY VALVE

DRINKING COLD WATER

DRINKING HOT WATER

REFRIGERANT DISCHARGE LINE

REFRIGERANT LIQUID LINE

REFRIGERANT SUCTION LINE

RD

RL

RS

REFRIGERANT TO WATERHEAT EXCHANGER

WATER TO WATERHEAT EXCHANGER

FAN COIL UNIT

DOMESTIC HOT WATERHEAT PUMP

DRINKING WATER STORAGE TANK

C

H

C H

DRINKING SUPPLY

CW

HW

DWS

POTABLE WATER

THERMAL STORAGE TANK

SOLENOID VALVE

S

WI

D

6

THERMAL STORAGE TANK

MUNICIPAL WATER SUPPLYTANK

WI

CENTRIFUGAL PUMPCW

WATER TO WATERHEAT EXCHANGER

CW-1

CW

HW

SV

ST

C

H

s

STRAIGHT SIZE TEE JOINT

D

FD

CENTRIFUGAL PUMPCW

CW-1

DRINKING WATER STORAGE TANKPOTABLE WATER

DWS

LED LIGHT POST

SWITCH

LED EXTERIOR FLOOD LIGHT

LED EXTERIOR MUSHROOM LIGHT

S

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:2

6 PM

G-103

SYMBOLS LEGEND

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 6: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

0 1000' 2000' 0 100' 200'1"=1000'VICINITY MAP

1"=100'LOCAL SITE MAP

CONSTITUTION GARDENS POND

WASHINGTON MONUMENT17TH

ST S

W

TIDAL BASIN

KUTZ BRIDGE

POTOMAC RIVER

INDEPENDENCE AVE

JEFFERSON MEMORIAL

MLK MEMORIAL

14T

H S

T SW

OHIO DRIVE

FDR MEMORIAL

ARLINGTON

MEMORIAL

BRIDGE

23R

D S

T S

W

REFLECTING POOL

TIDAL BASIN

LINCOLN MEMORIAL

OHIO

DRIVE

OHIO DRIVE

CHIP

FDR MEMORIAL

401MASS

403NY

402CA

104NJ

205APPST

302GHENT

202TENN

204PARS

101NZ

103VA

102FLA

206FIU

404OSU

301CALG

203MIDD

305UIUC

303TONG

201PUR

304UMD

EXIT 4

100 DECATHLETE WAY

200 DECATHLETE WAY

300 DECATHLETE WAY

400 DECATHLETE WAY

EXIT 1

EXIT 3

VILLAGE DRIVE EAST

VILLAGE D

RIVE W.

UTILITY SPUR

WELCO

ME W

AY WEST

MAINTENT

EXIT 2

ENTR

AN

CE

POTOMAC RIVER

A1

1.

A4

REFER TO O-101 FOR SITE OPERATIONS

N N

SOLARDECATHLONSITE

HIGHMEDIAPLATFORM

WATERFOUNTAIN

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:4

1 PM

G-201

SITE MAP

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 7: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

S

S

S

202

101

201

1/4" = 1'-0"EGRESS PLAN

4' 8'0 2'

31 2

FO

S

FO

S

31 2

A

C

FOF

C.1

FOS

A

C

FOF

C.1 FOS

BFOFB FOF

MO

DU

LA

R S

PLIT

1.

1.

A1

DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

N

UP

UP

1

401

DRESSING

402

LAUNDRYROOM

202

KITCHEN

201

302

GROOMING

DINING

501

BED LEVEL

301

PL

PL

301

BATHROOM

2. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

101

LIVINGROOM

LEGEND

EGRESS PATH

FIRE EXTINGUSHER LOCATION

EMERGENCY MEETING AREA

LEGENDLEGEND

SMOKE DETECTOR

LEGEND

EGRESS PATH

LEGENDLEGENDLEGEND

EMERGENCYMEETING AREA

EXIT

EXIT

SQUARE FOOTAGE = 715 S.F.CALCULATION OF S.F. MADE BY USING FURTHESTEXTENT OF EXTERIOR DIM.

FINISHED S.F. CALCULATIONS FOR THIS HOUSEWERE MADE BASED ON PLAN DIM. ONLY ANDMAY VARY FROM THE FINISHED S.F. OF THEHOUSE AS BUILT.

FINISHED S.F. CALCULATIONS FOR THIS HOUSEWERE MADE BASED ON ESTIMATED DIM. ONLYAND MAY INCLUDE UNFINISHED AREAS, ORIN FLR. NOT ASSOCIATED WITH STAIRS, ORASSOCIATED STAIRS.

FOOTPRINT OF FINISHED FLR.

OR

GA

NIZ

ER

UTIL

ITY

PA

NE

L

FIRE EXTINGUSHER LOCATION

21 05 00

28 31 46

2

2. PV PANEL ARRAY ABOVE

DIVISION 21 - FIRE SUPPRESSION21 05 00 FIRE EXTNGUISHER

DIVISION 28 - ELECTRONIC SAFETY

28 31 46 SMOKE DETECTORAND SECURITY

3

3

3. DECKING BOARDPROVIDED BY EVENT ORGANIZERS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:5

4 PM

G-301

EGRESS PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 8: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

S

S

1/4" = 1'-0"ADA TOUR ROUTE

202

101

201

4' 8'0 2'

31 2

FO

S

FO

S

31 2

A

C

FOF

C.1

FOS

A

C

FOF

C.1 FOS

BFOFB FOF

MO

DU

LA

R S

PLIT

1'-6

3_4 "

1'-5

1_4 "

2'-7

1_2 "

1'-21_4"

1.

1.

A1

DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

N

UP

UP

401

DRESSING

402

LAUNDRYROOM

202

KITCHEN

201

302

GROOMING

DINING

501

BED LEVEL

301

PL

PL

301

BATHROOM

2. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

101

LIVINGROOM

EXIT

ENTRANCE

OR

GA

NIZ

ER

UTIL

ITY

PA

NE

L

28 31 461

1

1

DECKING BOARDPROVIDED BY EVENT ORGANIZERS

RAMPUP

RAMPDOWN

SLO

PE

1:12

SLO

PE

1:12

DN

60"DIA.

60"DIA.

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

25:0

0 PM

G-302

ADA TOUR ROUTE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 9: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

NTSA1 FALL EQUINOX

NTSD1 SPRING EQUINOX NTSD4 SUMMER SOLSTICE

NTSB1 WINTER SOLSTICE

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

25:0

4 PM

G-601

SHADING DIAGRAM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 10: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/8" = 1'-0"HAZAROUS LIQUID & SPILL CONTAINMENT SITE PLAN

DECATHLETE WAY

GENERATOR SPILL CONTAINMENT

REAR VIEWSIDE VIEW

TOP VIEW

SIDE VIEWFRONT VIEW

TOP VIEW

1/2" = 1'-0"HAZARDOUS LIQUID CONTAINER

1/2" = 1'-0"

HAZARDOUS LIQUID SHEDULELIQUID USE LOCATION / STORAGE

0 4' 8' 16'

0 1' 2' 4' 0 1' 2' 4'

30

'-0

"

8'-0" 4'-0"

8"

4'-0

"

4"18'-11"

4"

8'-0

"4

"8

'-0

"4

"8

'-0

"4

"8

'-0

"

5'-5

"1

'-6

"

3'-7" 1'-6"

1. TEMPORARY OSHA APPROVED HAZARDOUS

A4

N 38˚ 52' 53.07"

W 77˚ 2' 32.04" TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

ENTRYEXIT

TO REMAIN UNDISTURBED

PL

PL

PLPL

RAMPDOWN

TEMP. STL. DECKINGBY OTHERS

LIQUIDS CONTAINERS (AS NEEDED)

2. MOVABLE OSHA APPROVED HAZARDOUSCOLLAPSIBLE VINYL LIQUIDS SPILL CONTAINMENT(FOR TEMP. CONST. GENERATOR DWG O-101)

RAMPDOWN

TEMP. 8'X10' METAL SHIPPING CONTAINER(FOR CONST. DURATION ONLY DWG O-101)

3.

3

3

3

3

11

11

D4

EXISTING GRASS/TURF

COLLAPSIBLE FOLDING SIDES

D1

FIRE RATED STEEL CONSTRUCTION

MOVABLE SHELVES

2" MIN SPILL RESERVOIR

LOCKABLE LATCH

1. ALL HAZARDOUS LIQUID CONTAINMENT &CABINETS SHALL BE OSHA AND NFPA APPROVED

2

2

1

1

2

2. FIRE EXTIGUISHERS SHALL BE INSTALLED AS PERCABINETS SHALL BE OSHA AND NFPA APPROVED

3. ALL FUELS ARE TO BE PROPERLY STORED &LABELED IN AN OSHA & NFPA APPROVEDCONTAINER

4. ALL HAZARDOUS LIQUID SHALL HAVE A MSDS

SHEET AVAILABLE ON SITE

DIESEL TEMP POWER FUEL GENERATOR / HAZAROUS LIQUID CABINET #1

CONST. ADHEASIVES CONSTRUCTION VARIOUS / HAZAROUS LIQUID CABINET #2

CLEANING SOLVENTS CLEANING VARIOUS / HAZAROUS LIQUID CABINET #3

TBD TBD TBD/HAZAROUS LIQUID CABINET #3 (IF NEEDED

SUPPLY WASTE

12

'-1

"

5'-0"

41'-0"

113_4"

78'-0"

13

'-5

3 _ 4"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

25:0

5 PM

H-101

LIQUID LOCATIONAND SPILL

CONTAINMENTPLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 11: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

21 3

A

A3

S-201

A4

S-201

A1S-201

C1

S-2

01

C5

S-201

C3

S-201

C1

S-301

19'-5

11/1

6"

B

C

11'-1"

18'-10 13/16" 10'-7 7/16"

13'-3 1

1/1

6"

WORKING POINT

18'-5 3

/8"

1

2

4'-10" T

YP

7" TYP

5'-1 1/2" 11'-3 5/8"

38'-0 15/16"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

31:0

8 PM

S-101

FOUNDATION PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

1/4" = 1'-0"A1 FOUNDATION0 2' 4' 8'

4X4 BUILDING POST OR GREATER

SHEET NOTES1 19" X 23" 3/8" THICK FOOTING PLATE2 12" X 12" 1/4" THICK FOOTING PLATE

DEAD AND LIVE WEIGHTSHOUSE WEIGHT - 50 000 lb.DECK WEIGHT - 9 000 lb.RAMP WEIGHT - 14 000 lb. EACH

FOOTING AREASHOUSE - 47 SQ. FEETDECK - 12 SQ. FEETRAMP - 15 SQ. FEET EACH

AVERAGE FOOTING PRESSUREHOUSE - 1063 psfDECK - 1000 psfRAMP - 1150 psf

FOR WORST CASE CONDITIONS SEESTRUCTURAL CALCULATIONS IN PROJECTMANUAL

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 12: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

2

2'-0" TY

P.

5'-10 15/16"

3'-0"1'-8 3/8"

2X

8 T

YP

. @

2' O

.C.

2'-0" T

YP.

5

06 11 00.L606 11 00.L6

4" X 8" TYP. U.N.O.

06 11 00.G7

06 18 13.A9

06 11 00.L6

06 11 00.L6

06 11 00.L6

06 11 00.L6

06 11 00.L6

06 11 00.L606 11 00.L6

06 11 00.G7

06 11 00.L6

06 11 00.L6

06 18 13.A9

S-505

T

S-505

S

5

5

5

40

40

37

37

2

E

S-504

S-301

A1

A4

S-301

C

S-501

2X

8 R

AFTE

RS

TY

P. @

24" O

.C.

10'-10 5/8"

10'-2 1/4"

06 18 13.A12

06 18 13.A12

06 11 00.L7

06 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 11 00.G13

2X8 R

AFTE

RS TY

P. @

24" O.C

.

06 11 00.G14

06 11 00.G1TYP. RIM JOISTS

06 11 00.L1

06 11 00.L6

(RB4)

(RB4)

(RB1)

(RB2)

(RB1)

(RB2)

(RB5)

(RB3)

(RB3)

06 11 00.L6

06 11 00.L6

D

S-504

D

S-504

2

K

S-502

J

S-502

H

06 05 23.L2

S-502

H

2

1

1

1

1

1

1

1

06 11 00.L11

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 05 23.L2

06 11 00.L10

06 05 23.L2

06 05 23.L2

06 05 23.L206 11 00.L10

06 05 23.L2

06 05 23.L2

06 11 00.L2

K

S-502

K

S-502

K

S-502

K

S-502

K

06 05 23.L2

10'-10 3/4"

12'-3 1

/4"

2

2

06 11 00.L6

06 11 00.L6

37

37

37

37

37

37

38

39

GENERAL SHEET NOTES

REFERENCE KEYNOTES06 05 23.L2 HDU506 11 00.G1 2X806 11 00.G7 2X8 JOISTS @ 24" O.C.06 11 00.G13 2X8 RAFTERS @ 16" O.C.06 11 00.G14 2X8 RAFTERS @ 24" O.C.06 11 00.L1 4X406 11 00.L2 4X4 POST06 11 00.L6 4X8 BEAM06 11 00.L7 4X10 BEAM06 11 00.L10 4X6 POST06 11 00.L11 4X8 POST06 18 13.A9 4X8 LAMINATE VENEER LUMBER06 18 13.A10 4X10 LAMINATE VENEER LUMBER06 18 13.A12 6X10 LAMINATE VENEER LUMBER

1/4" = 1'-0"A5 FLOOR FRAMING 1/4" = 1'-0"A1 ROOF FRAMING

1/4" = 1'-0"A3 SHEAR WALLS

1 SHEAR WALL PER STRUCTURAL DETAILS (S503)

4X4 POST (06 11 00.L02) OR GREATER

0 2' 4' 8'0 2' 4' 8' 0 2' 4' 8'

SHEET NOTES5 TWIN MEMBERS

37 15/32" PLY BOTH SIDES STR 1 W/ 10d @ 3", 12"38 2'6" TALL WALL39 2'4" TALL WALL40 TYP HU5 HANGER @ EACH END

D

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 13: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

BOTTOM OFFRAMING

9 1/2"

SOLAR ENVELOPE18'-0"

GRADE LEVEL0"

MODULE SPLIT10'-1 1/4"

S-501

G

E

S-504

06 05 23.R7

30

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.D8

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L2

BOTTOM OFFRAMING

9 1/2"

SOLAR ENVELOPE18'-0"

GRADE LEVEL0"

MODULE SPLIT10'-1 1/4"

S-501

F

30

06 05 23.R2606 11 00.L11

06 11 00.L206 11 00.L11

06 11 00.L206 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.D8

C

06 11 00.L2 06 11 00.L2 06 11 00.L2

06 11 00.D8

06 11 00.L2

06 11 00.L2

S-505

R

A B

S-504

I

N

S-502

P

S-502

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L2

06 11 00.L11

06 11 00.L2

06 11 00.D8

06 11 00.L11

21 3

S-501

B

(RB4)

(RB4)

HS-503

06 11 00.L6

06 11 00.L1

10'-4"

6'-0 1

1/1

6"

06 18 13.A9

06 18 13.A9

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

31:4

1 PM

S-201

FRAMINGELEVATIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES06 05 23.R7 MST4806 05 23.R26 CMST1406 11 00.D8 2X4 STUDS @ 16" O.C.06 11 00.L1 4X406 11 00.L2 4X4 POST06 11 00.L6 4X8 BEAM06 11 00.L11 4X8 POST06 18 13.A9 4X8 LAMINATE VENEER LUMBER

1/4" = 1'-0"C5 NORTH EAST ELEVATION

1/4" = 1'-0"A4 SOUTH WEST ELEVATION 1/4" = 1'-0"A3 WEST ELEVATION

1/4" = 1'-0"C3 EAST ELEVATION 1/4" = 1'-0"C1 SOUTH ELEVATION

1/4" = 1'-0"A1 NORTH ELEVATION

0 2' 4' 8'

0 2' 4' 8'

SHEET NOTES30 4X BLOCKING

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 14: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

BOTTOM OFFRAMING

9 1/2"

SOLAR ENVELOPE18'-0"

GRADE LEVEL0"

MODULE SPLIT10'-1 1/4"

A

S-301

A4

H

S-503

BC

06 11 00.G7

06 11 00.G14

06 11 00.G14

06 18 13.A8

06 11 00.L1

06 18 13.A7

06 18 13.A10

06 11 00.L1

06 18 13.A8

11

11

11

2

06 18 13.A10

05 05 23.I0

06 18 13.A12

05 05 23.A3

05 50 00

23

05 05 23.I0

05 05 23.I0

06 18 13.A10

05 05 23.A3

06 18 13.A12

05 05 23.I0

05 05 23.I0

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

31:4

7 PM

S-301

FRAMING SECTION

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 05 23.A3 3/4" A307 BOLT05 05 23.I0 1/4" STEEL PLATE05 50 00 METAL FABRICATIONS06 11 00.G7 2X8 JOISTS @ 24" O.C.06 11 00.G14 2X8 RAFTERS @ 24" O.C.06 11 00.L1 4X406 18 13.A7 4X4 LAMINATE VENEER LUMBER06 18 13.A8 4X6 LAMINATE VENEER LUMBER06 18 13.A10 4X10 LAMINATE VENEER LUMBER06 18 13.A12 6X10 LAMINATE VENEER LUMBER

3/8" = 1'-0"C1 SECTION FACING EAST

1 1/2" = 1'-0"A1 MODULE CONNECTION AT RIDGE BEAM 1 1/2" = 1'-0"A4 RIDGE BEAM CONNECTION TO WALL

0 4' 6'2'

0 1' 1 1/2'1/2" 0 1' 1 1/2'1/2"

SHEET NOTES11 SHEETED23 3/4" WELDED STUD

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 15: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

06 11 00.A1

06 18 13.A12

06 11 00.G9

06 05 23.F2

06 11 00.A8

06 05 23.F2

06 11 00.D8

06 11 00.L2

06 11 00.L6

06 11 00.A1 06 16 00.D1006 18 13.A12

06 05 23.F2

06 05 23.F2

06 11 00.A8

06 05 23.F2

06 11 00.L2 PER PLAN

12" O.C.

06 11 00.D7

MODULE SPLIT10'-1 1/4"

05 05 23.A2

05 05 23.I0

06 11 00.L706 11 00.L3

05 05 23.I005 05 23.I0

2

06 16 00.D10

06 11 00.G9

06 18 13.A10

7

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

31:5

0 PM

S-501

STRUCTURAL ROOFDETAILS

1 1/2" = 1'-0"F WOOD BEAM TO STUDWALL CONNECTION 1 1/2" = 1'-0"G WOOD BEAM TO STUDWALL CONNECTION

1 1/2" = 1'-0"B SOUTH FACE MODULE CONNECTION 1 1/2" = 1'-0"C MODULE CONNECTION ROOF BEAM TYP.

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 05 23.A2 5/8" A307 BOLT05 05 23.I0 1/4" STEEL PLATE06 05 23.F2 A3506 11 00.A1 BLOCKING06 11 00.A8 DOUBLE TOP PLATE06 11 00.D7 2X4 STUDS06 11 00.D8 2X4 STUDS @ 16" O.C.06 11 00.G9 2X8 CEILING JOISTS @ 16" O.C.06 11 00.L2 4X4 POST06 11 00.L3 4X4 HEADER06 11 00.L6 4X8 BEAM06 11 00.L7 4X10 BEAM06 16 00.D10 5/8" EXTERIOR GRADE PLYWOOD06 18 13.A10 4X10 LAMINATE VENEER LUMBER06 18 13.A12 6X10 LAMINATE VENEER LUMBER

0 1' 1 1/2'1/2" 0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2"0 1' 1 1/2'1/2"

SHEET NOTES7 3/4" THRU BOLT @ 32" OC w/ 12" AT EA. END

VIEW NAMING CONVENTION PER STRUCTURALCALCULATIONS IN PROJECT MANUAL

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 16: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

PLATE LINE

PLA

TE L

INE

PLATE LINE

PLA

TE L

INE

PLATE LINE

PLA

TE L

INE

PLA

TE L

INE

PLATE LINE

06 11 00.L2

06 05 23.L2

06 16 00.D6

06 11 00.L6

06 05 23.B7

06 11 00.L606 05 23.B205 12 73.L63

06 16 00.E4

31 48 33

06 11 00.D8

06 16 00.D6

06 11 00.L6

06 11 00.G7

06 05 23.B7

36

06 05 23.B205 12 73.L63

31 48 33

MODULE SPLIT10'-1 1/4"

06 16 00.D10

06 11 00.G4

05 12 23.M1

06 05 23.F2

06 11 00.D8

8

06 16 00.D7

05 05 23.A1

06 05 23.R6

06 11 00.K1

06 11 00.L1

06 11 00.D7

9

06 11 00.A1

06 11 00.L2

06 11 00.K1

06 05 23.B2

10

05 12 23.M1

06 16 00.D6

06 05 23.M306 11 00.A1

06 05 23.A11

06 11 00.F9

06 16 00.E4

06 11 00.D8

25

LOW POINT

HIGH POINT

1'-6"

31 48 33

05 12 73.L63

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

31:5

4 PM

S-502

STRUCTURALDETAILS

1 1/2" = 1'-0"N FOOTING DETAIL SHEAR WALL SPECIAL 1 1/2" = 1'-0"P FOOTING DETAIL

1 1/2" = 1'-0"K SHEAR WALL DETAIL

1 1/2" = 1'-0"J SHEAR WALL FLOOR

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 05 23.A1 1/2" A307 BOLT05 12 23.M1 LPT405 12 73.L63 TS3X3X0.312506 05 23.A11 16 PENNY NAIL06 05 23.B2 1/2" LAG SCREW06 05 23.B7 1/4" LAG SCREW06 05 23.F2 A3506 05 23.L2 HDU506 05 23.M3 H2.506 05 23.R6 MST3706 11 00.A1 BLOCKING06 11 00.D7 2X4 STUDS06 11 00.D8 2X4 STUDS @ 16" O.C.06 11 00.F9 2X6 JOISTS06 11 00.G4 2X8 JOISTS06 11 00.G7 2X8 JOISTS @ 24" O.C.06 11 00.K1 3X406 11 00.L1 4X406 11 00.L2 4X4 POST06 11 00.L6 4X8 BEAM06 16 00.D6 1/2" PLYWOOD06 16 00.D7 1/2" EXTERIOR GRADE PLYWOOD06 16 00.D10 5/8" EXTERIOR GRADE PLYWOOD06 16 00.E4 3/4" T&G STRAND BOARD DECKING31 48 33 STEEL LEVELLING JACK

0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2" 0 1' 1 1/2'1/2"

SHEET NOTES8 4X4 @ SLENDER WALL (PER PLAN)9 10D @ 3" O.C. STAGGERED W/ 15/32" OSB STR

110 WOOD BEAM (PER PLAN)25 BLOCK NAILING36 2-10d TO EACH JOIST

1" = 1'-0"Q FOOTING TRAVEL DETAIL0 1 2

VIEW NAMING CONVENTION PER STRUCTURALCALCULATIONS IN PROJECT MANUAL

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 17: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

PLYWOOD SHEAR WALL

MARK

PLYWOOD PANEL SILL SILL PLATE ANCHORTO

WOOD BEAM

ALLOWABLESHEAR

SHEARTRANSFERAPA RATED PLYWOOD PANEL NAILING

THK.THK TYPE

SIZE EDGE(EN) FIELD (FN) SIZE AND SPACING PLF

1 15/32" OSB STRUCT I 10d @ 6", 12" 2x 5/8" DIAM LAG SCREW @ 16 O.C. 340 A35 @ 16" O.C.

2 19/32" OSB STRUCT I W/ 3x BLKG & 3x STUDS AT PANEL JOINTS 10d @ 4", 12" 3x 5/8" DIAM LAG SCREW @ 16 O.C. 510 A35 @ 16" O.C.

PLA

TE LIN

E

PLATE LINEPLATE LINE

PLA

TE LIN

E

PLA

TE LIN

E

PLATE LINE

13

14

15

MODULE SPLIT10'-1 1/4"

06 16 00.D7

06 11 00.L2

06 16 00.E4

06 11 00.L6

24

31 48 33

06 05 23.R5

06 05 23.R25

27 28

05 05 23.A2

05 12 23.M1

06 05 23.B7

16

06 11 00.L2

06 11 00.A8

06 11 00.G9

06 16 00.D10

06 05 23.R5

06 05 23.F2

05 05 23.A1

17

18

19

20

06 11 00.D8

06 05 23.L2

06 05 23.B3

21

06 16 00.E4

06 16 00.D7

06 18 13.A9

22

1'-4" TYP.

05 05 23.A2

29

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:0

0 PM

S-503

SHEAR WALLDETAILS AND

NAILINGSCHEDULES

3/4" = 1'-0"L FLOOR & ROOF PLYWOOD TYP.

1 1/2" = 1'-0"H SIMPSON 24" STRONG WALL

3/4" = 1'-0"M SHEAR WALL PLYWOOD SHEATHING

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 05 23.A1 1/2" A307 BOLT05 05 23.A2 5/8" A307 BOLT05 12 23.M1 LPT406 05 23.B3 5/8" LAG SCREW06 05 23.B7 1/4" LAG SCREW06 05 23.F2 A3506 05 23.L2 HDU506 05 23.R5 MST2706 05 23.R25 MSTI2606 11 00.A8 DOUBLE TOP PLATE06 11 00.D8 2X4 STUDS @ 16" O.C.06 11 00.G9 2X8 CEILING JOISTS @ 16" O.C.06 11 00.L2 4X4 POST06 11 00.L6 4X8 BEAM06 16 00.D7 1/2" EXTERIOR GRADE PLYWOOD06 16 00.D10 5/8" EXTERIOR GRADE PLYWOOD06 16 00.E4 3/4" T&G STRAND BOARD DECKING06 18 13.A9 4X8 LAMINATE VENEER LUMBER31 48 33 STEEL LEVELLING JACK

SHEET NOTES13 STAGGERED END NAILING AT SUPPORTED

PANELS EDGES14 BOUNDARY NAILING 8D @ 6" @ ROOF

BOUNDARY NAILING 10D @ 6" @ FLOOR15 INTERMEDIATE NAILS 8D @ 12" O.C. @ ROOF

INTERMEDIATE NAILS 10D @ 10" O.C. @FLOOR

16 BOUNDARY WALL B.N.17 2X OR 3X STUDS PER SHEAR WALL

SCHEDULE18 2X OR 3X BLOCKING PER SCHEDULE19 EDGE NAILING PER SCHEDULE20 INTERMEDIATE NAILING @ 12"21 2X OR 3X SILL PLATE (PER SCEDULE)22 (CONTINUOUS W/ HU5 HANGERS AT EACH

END)24 COUNTERSUNK 2.75"X2.75" 1/4" PLT27 5 ON EACH SIDE28 3"X3" 1/8" PLT29 3 X PLATE

1. BLOCK ALL PANEL EDGES PER SCHEDULE2. SHEET MIN WIDTH IS 2'-0"3. 4' SIDE OF PLYWOOD SHEETS TO BESPLICED JOISTS4. HOLD DOWN CONNECTORS SHALL BE RETIGHTENEDJUST PRIOR TO ENCLOSURE5. SHEATH ENTIRE WALL BETWEEN CROSS WALLS TOPROVIDE FLUSH SURFACE6. ALL ANCHOR BOLTS SHALL HAVE 3" SQ PLATEWASHERS7. ALL PLYWOOD NAILING TO BE COMMON NAILS8. OSB STR I MAY BE REPLACED WITH CDX STR IPLYWOOD9. MIN EDGE DISTANCE FOR NAILS SHALL BE 3/8"10. PLYWOOD FACE GRAIN MAY BE VERTICAL ORHORIZONTAL11. SEE PLAN FOR LOCATION OF PLYWOOD SHEATING12. FLOOR INDEX 32/1613. ROOF INDEX 24/014. VIEW NAMING CONVENTION PER STRUCTURALCALCULATIONS IN PROJECT MANUAL

0 1' 1 1/2'1/2"

0 2' 3'1'

0 2' 3'1'

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 18: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

PLA

TE L

INE

PLATE LINE

PLA

TE L

INE

PLATE LINEPLATE LINE

PLA

TE L

INE

06 16 00.D10

06 11 00.G1

06 11 00.G9

06 05 23.F2

06 16 00.D7

25

06 16 00.D10

06 05 23.R6

06 11 00.L2

12

1'-4" TYP.

05 12 23.M1

06 11 00.L2

06 05 23.L2

06 11 00.D1

06 16 00.E4

06 16 00.D6

26

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:0

3 PM

S-504

TYPICALSTRUCTURAL

DETAILS

1 1/2" = 1'-0"E WALL STUD TO RAFTER CONNECTION TYP. 1 1/2" = 1'-0"D DRAG DETAIL TYP.

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 12 23.M1 LPT406 05 23.F2 A3506 05 23.L2 HDU506 05 23.R6 MST3706 11 00.D1 2X406 11 00.G1 2X806 11 00.G9 2X8 CEILING JOISTS @ 16" O.C.06 11 00.L2 4X4 POST06 16 00.D6 1/2" PLYWOOD06 16 00.D7 1/2" EXTERIOR GRADE PLYWOOD06 16 00.D10 5/8" EXTERIOR GRADE PLYWOOD06 16 00.E4 3/4" T&G STRAND BOARD DECKING

SHEET NOTES12 TYP. SHEAR WALL PER PLAN25 BLOCK NAILING26 2 3/4" sq. 1/4 STEEL WASHER PL.

1 1/2" = 1'-0"I HDU5 CONNECTION TYP.

0 1' 1 1/2'1/2" 0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2"

VIEW NAMING CONVENTION PER STRUCTURALCALCULATIONS IN PROJECT MANUAL

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 19: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

06 16 00.D7

06 11 00.L6

06 11 00.L11

05 05 23.I0

05 05 23.A2

06 16 23 (3/4" T&G)

06 11 00.D1

06 11 00.D8

40

40

05 05 23.A3 4X @EACH CONNECTION TYP.

06 11 00.L6

06 11 00.L6

05 05 23.I0

05 05 23.I0

05 05 23.I0

05 05 23.I0

05 05 23.A3 6X MIN. 3" APART TYP.

41

41

5

06 11 00.L6

06 11 00.L6

06 11 00.L6

5

06 11 00.L6

05 05 23.I0

05 05 23.A3 4X @ EACH CONNECTION TYP.

TYP.

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:0

5 PM

S-505

FLOOR DETAILS

1 1/2" = 1'-0"R WEST WALL CANTILEVER CONNECTION 1 1/2" = 1'-0"S FLOOR DETAIL EAST WALL

1 1/2" = 1'-0"T FLOOR DETAIL WEST WALL

GENERAL SHEET NOTES

REFERENCE KEYNOTES05 05 23.A2 5/8" A307 BOLT05 05 23.A3 3/4" A307 BOLT05 05 23.I0 1/4" STEEL PLATE06 11 00.D1 2X406 11 00.D8 2X4 STUDS @ 16" O.C.06 11 00.L6 4X8 BEAM06 11 00.L11 4X8 POST06 16 00.D7 1/2" EXTERIOR GRADE PLYWOOD06 16 23 SUBFLOORING

SHEET NOTES5 TWIN MEMBERS

40 TYP HU5 HANGER @ EACH END41 BLOCKING

0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2"

0 1' 1 1/2'1/2"

VIEW NAMING CONVENTION PER STRUCTURALCALCULATIONS IN PROJECT MANUAL

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 20: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

MATERIALS BY DISCRETE LENGTHMEMBER TYPE QUANTITY LENGTH (LF)

2x4

97 8

123 10

24 12

10 14

8 16

7 20

11 22

2x6

35 8

4 10

3 16

3X4 6 10

2x8

44 8

62 10

47 12

7 14

2 20

2 24

2 26

2x1215 12

3 14

4x4

46 8

23 10

1 12

1 14

1 22

1 24

1 26

4x6

4 16

1 18

2 20

4x8

2 8

2 12

2 14

3 16

3 18

1 20

1 24

3 26

4x10 2 16

LVL 3.5x9.5

1 14

2 18

2 26

LVL 3.5x7.5 1 14

LVL 5.25x9.55 10

1 26

SHEATING SCHEDULETYPE LOCATION NUMBER OF SHEETS

5/8 CDX ROOF, CANTILEVER 35

1/2 CDX UNDER MODULE 20

1/2 BCX PERIMETER WALL 78

1/2 OSB PLATFORM FACE 10

3/4 T&G SUBFLOOR 52

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:0

6 PM

S-601

REINFORCING ANDFRAMING

SCHEDULES

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 21: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

EAST BOTTOM MODULE

EAST TOP MODULEWEST TOP MODULE

WEST BOTTOM MODULE

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:0

7 PM

S-902

MODULEISOMETRICS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

A1 A4

C1 C4

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 22: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

S-1

S-2

P-1

P-2

S-1S-1

S-1 S-1 S-1

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

S-2

P-2 P-2

P-2 P-2 P-2

P-2

P-2

P-2 P-2 P-2

P-2

P-2

P-2 P-2 P-2

P-2P-2

P-2P-2P-2

P-2

P-2

P-2P-2P-2P-1

P-1P-1

P-2

P-2

P-2P-2

P-1

P-1P-1

P-1

P-1P-1

P-1

P-1P-1

P-2

P-2

P-2P-2

P-2

P-2

P-2P-2

P-2

P-2P-2

P-2

7'-0"

1'-0"

1/4" = 1'-0"SITE PLAN

202

101

S

SS

S+7'-6" AFF +7'-6" AFF

201

A-741

A-741

B5

L103

A4

A2

4' 8'0 2'

31 2

FO

S

FO

S

31 2

A

C

B

FOF

FOF

C.1

FOS

FOF

A

C

B

FOF

FOF

FOF

C.1 FOS

MO

DU

LA

R S

PLIT

CANTILEVER

ROOF PROFILE

ARCOSTAPHYLOS MANZANITA 'DR.HURD'SALVIA LEUCOPHYLLA

AEONIUM ARBOREUM 'ATROPURUREM'

FESTUCA GLAUCA

SENECIO MANDRALISAE

3'-0"

3'-0

"

TYP.

TY

P.

RAINWATER COLLECTOR BELOW

27'-9" 10'-33_4" 11'-01_

4" 19'-41_2" 6'-63_

4" 8'-0"

78'-0"

13

'-3

1 _ 4"

18

'-9

"1

8'-5

"9

'-7

"

60

'-0

"

11

'-10

1 _ 4"

1'-4"

3'-23_4"

12

'-6

1 _ 4"

3. REFER TO SHEET A-731 FOR RAMP DETAILS

2. MUN. WATER / WASTE TANKS LOCATION VARIES.NOT TO EXTEND BEYOND SOLAR ENVELOPE.

4. REFER TO SHEET A-741 FOR DECK DETAILS

DIVISION 22 - PLUMBING22 01 10 PVC PIPE FOR DRAIN & WASTE

1. DECKING BOARDPROVIDED BY EVENT ORGANIZERS

VIF.RAMPDOWN

ENTER

RAMPDOWN

EXIT

A-202

A1A-202

D1

A-201

A1

PL

P L

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

PR

OP

. LIN

ETH

E O

HIO

STA

TE

UN

IVE

RS

ITY

PR

OP

. LIN

E

RAMP AT ENTRY+2'-7"

M

OR

GA

NIZ

ER

UTIL

ITY

PA

NE

L

RAMP AT EXIT+2'-7"

EXPANDED METAL GRATING

FINISHED FLOOR LEGEND

FINISHED CEDAR PLANKS

A1

EXISTING GRASS/TURFTO REMAIN UNDISTURBED

EXISTING GRASS/TURFTO REMAIN UNDISTURBED

SLO

PE

1:12

SLO

PE

1:12

5

6

5.PRINTED VINYL ON BATT INSULATION W/FINISHED 1/2" PLY BACKING. 6' x 1' x 4", TYP.

6.

INFORMATION BOARD

UMBRELLA STAND (WHEN NEEDED)

1

1

WI

ST

M ELECTRICAL METER

ELECTRICAL SUBSTATION

MUNICIPAL WATER SUPPLY TANK

WASTE WATER TANK

LEGEND

LED EXTERIOR FLOOD LIGHT

LED EXTERIOR WALL SCONCE

1. DRAWING OF EXTERIOR SKIN IS NOTIONALNOT ACTUAL.

7. EXTENT OF PV PANEL ARRAY ABOVE

8. EXTENT OF FENESTRATION COLLAR ABOVE.

9. EXTENT OF BLDG. ENVELOPE ABOVE.

10. EXTENT OF AIR CONDENSER CANTILEVERUNIT ABOVE.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

3. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

5. ELEVATION DATUM MEASURES FROM THEHIGHEST POINT OF GRADE WITHIN PROPERTYLINE.

4. GRID "2" DENOTES THE AXIS OF MODULARSPLIT.

6. LOCATION AND DATUM ON GRADE ARE

POWER CABLE RUN

9

10

7

8

7

RAMP AT EXIT+2'-7"

TOP OF SITE0'-0" ENTRANCE

-0'-2"

7. DIMENSIONS SHOWN TO FOF U.O.N.

APPROXIMATED. TO BE V.I.F.

1

PLANT LEGEND

SUPPLY WASTE

05 53 00

05 73 00

06 15 13.A1

S

SS

8'-6

"

13'-41_2"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

21:2

6 PM

A-101

SITE PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 23: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

7'-0"

1'-0"

A3

C4

101

201

2

202

1/4" = 1'-0"FLOOR PLAN

4' 8'0 2'

31 2

FO

S

FO

S

31 2

A

C

C.1

FOS

A

C

C.1 FOS

BFOFB FOF

MO

DU

LA

R S

PLIT

CANTILEVER

ROOF PROFILE

21'-2 1_4 "

5'-1

1 _ 2"

6'-9

1 _ 4"

℄℄

1'-111_2"

2'-33_4"

11'-0"2'-10"

11'-01_4"10'-33_

4"

18

'-6

3 _ 4"

18

'-5

"

1'-7"

9'-11"

1'-4"

12'-10"

2'-4

"3

'-1

01 _ 2"

3'-1

3 _ 4"

4'-1

03_4 "

4'-1

1_4 "

1'-6

"

4'-2

"2

'-7

1 _ 4"

16'-61_4"

18

'-8

"

9'-1

13 _ 4"

5'-1"

2'-8 1_2 "

3'-0"

3'-0"

5'-111_4 "

13

'-3

1 _ 4"

4'-1

03 _ 4"

6'-6 1_2 "

5'-9"

3'-0"

℄℄

14'-7

1_4 "

1. SEE SHEET A-741 FOR DECK DETAILS

1.

A1

2. SEE SHEET A-731 FOR RAMP DETAILS

DRAWING OF EXTERIOR SKIN IS NOTIONALNOT ACTUAL.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

3. OVERHANG CABINETS ABOVE, TYP.

4. REMOVABLE CABINETS & SOFT FURNITURE, TYP.

N

UP

UP

1

401

DRESSING

402

LAUNDRYROOM

202

KITCHEN201

101

LIVINGROOM

302

MEZZANINE

DINING

BED PLATFORM

A-213

A-301

A2

A-202

A1

A-202

D1

A-201

A1

A-301

A2

A-302

C3

A-302

301

A1

A3

A-212

C1

A1C3

C5

A-213

A2C2 A-211

2

3

4

1

5

5. WINDOW 2 INSTALLED WITH VENT LOCKALLOWING FOR 4" MAX OPENING.

PL

PL

301

BATHROOM

A-201

C1

FOF +1'-3"

FOF +2'-3"

FOF +4'-9 1/4"

FOF +7'-3 1/4"

FOF +9'-9 1/4"

C3

FINISHED CDX PLYWOOD

FINISHED FLOOR LEGEND

FINISHED CEDAR PLANKS4R

@71_2 "=

30"

3T@10"=

30"

4R@

71_2 "=

30"

3T@10"=

30"

3. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

6

6. EXTENT OF PV PANEL ARRAY ABOVE.

5. ELEVATION DATUM MEASURES FROM THEHIGHEST POINT OF GRADE WITHIN PROPERTYLINE.

4. GRID "2" DENOTES THE AXIS OF MODULARSPLIT.

6. DIMENSIONS SHOWN TO FOF U.O.N.

7. EXTENT OF FENESTRATION COLLAR ABOVE.

8. EXTENT OF BLDG. ENVELOPE ABOVE.

9. EXTENT OF AIR CONDENSER CANTILEVERUNIT ABOVE.

8

7

6

9

A-212

P L

SUPPLY WASTE

EASTRAMPSEE A-101

WESTRAMPSEE A-101

DECKAREASEE A-101

8'-6

"

13'-41_2"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

21:3

2 PM

A-111

FLOOR PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 24: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/4" = 1'-0"ROOF PLAN - PV PANELS ROOF PLAN - PV STRUCTURE

1/4" = 1'-0"

1 2 3

64

7 8 9

121110

13 14 15

181716

19 20 21

242322

25 26 27

302928

31 32 33

3635

37 38 39

424140

34

5

4' 8'0 2' 4' 8'0 2'

2 2

31 2

FO

S

FO

S

31 2

C.1

FOS

C.1 FOS

MO

DU

LA

R S

PLIT

A

C

A

C

FOF

C.1

FOS

C.1 FOS

31 2

FO

S

FO

S

MO

DU

LA

R S

PLIT

1 2

BFOFB FOF

CANTILEVER

ROOF PROFILE

CANTILEVER

101_2"

2'-91_2"

1'-61_4"

2'-91_2" 2'-41_

2"2'-10"℄ ℄ ℄ ℄ ℄ ℄

13

'-7

"

25

'-11

"

3'-11

"3

'-0

"3

'-0

"3

'-8

"℄

℄℄

1'-1

13 _ 4"

2'-3

"

1'-113_4"

2'-4

3 _ 4"

1'-113_4"

2'-1

03 _ 4"

1'-111_4"

4'-8

1 _ 4"

1'-113_4"

DIVISION 05 - METALS05 14 13 IRON RIDGE PV MOUNT RAIL

2" STEEL PIPE BENEATH05 12 69.K6VINYL FOR CLIP MOUNTING

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33 CONTINUOUS VINYL COATED

DIVISION 26 - ELECTRICAL26 31 00 PV PANELS

A1 A4

POLYESTER MEMBRANE

1. EXTENT OF WOOD STRUCTURE

4. 2" DIAMETER PIPE GRID DIMENSIONED REL. TOREFERENCE GRID LINES "B" AND "3"

2. HORIZONTAL PV RAIL DIMENSIONEDREL. TO REFERENCE BASE LINES "A" AND "2"

3. VERTICAL PV RAIL DIMENSIONEDREL. TO REFERENCE BASE LINES "C" AND "2"

26 31 00

1. DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

ELEV.H.P. ROOF16' 6"

ROOF ELEV.17' 3"

13 31 33

05 15 19

WOVEN GALVANIZED05 15 19STEEL CABLE CLEAR VINYL COATED

05 14 13

05 12 69.K6

ELEV.L.P. ROOF9' 6"

1

SLO

PE

SLO

PE

1:1

00

7:2

5

2. EXTENT OF PV PANEL ARRAY ABOVE

2

3. AIR CONDENSER CANTILEVER UNIT

3 3

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

21:4

1 PM

A-112

ROOF PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 25: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/4" = 1'-0"REFLECTIVE CEILING PLAN

4' 8'0 2'

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#120

DATE: 06.02.2011

REVISIONS:

05.22.2011 CDL

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIESCHIP 2011

31 2

FO

S

FO

S

31 2

A

C

C.1

FOS

A

C

FOF

C.1 FOS

MO

DU

LA

R S

PLIT

BFOFB FOF

26 51 00 2.C.3

26 51 00 2.A.2

26 51 00 1.A.1

26 51 00 1.A.3

26 51 00 2.1.A.2

26 51 00 2.C.2

26 51 00 2.C.1

26 51 00 2.B.2

26 51 00 2.C.3

26 51 00 2.C.1

26 51 00 2.C.2

26 51 00 2.C.1

26 51 00 2.C.2

2"

2"

2"

2"

2"

2"

2"

2"

6"

1'-6"

1'-6"

1'-6"

1'-0"

1'-0" 1'-6"

1'-0"

6"

6"

6"

1'-41_2"

1'-71_2"

2'-11_

4"

1'-41_4"

3"

3"

53_4" 53_

4"

LED STRIP LIGHT

SHEAR WALL AMBIENT

OVER CABINET LED

UNDER CABINET LED

BEAM SHELF TASK

EXTERIOR WALL LIGHT

SHEAR WALL TASK

T8 LIGHT FIXTURE

LEGEND

1.

1.

A1

DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

N

3. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

2

3

4 REFER TO SHEET F-101 FOR FIRE DETECTIONAND SUPRESSION DEVICE LOCATIONS.

CL

CL

CL

CL

CL

CL

CL

CL

CL

CL

105

105

105

114

105

105

105

114

101101 101

101 101 101

101101 101

101 101 101

101

101

101

101

101 101 101101 104

+13'-8" AFF

1. REFER TO SHEET A-711 ON CASEWORK DETAILS.

2. EXPOSED MODULAR BEAMS.

3. PV PANEL ARRAY

4. AIR CONDENSER CANTILEVER UNIT

4

2

1

+6'-5 1/2 " AFF

+9'-6" AFF

+7'-6 1/4 " AFF

+7'-2" AFF

REFERENCE KEYNOTES

GENERAL SHEET NOTES

SHEET KEYNOTES

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

21:4

9 PM

A-121

REFLECTEDCEILING PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 26: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

SOUTH ELEVATION1/4" = 1'-0"

NORTH ELEVATION1/4" = 1'-0"

C4

101

T.O. GRADE

T.O. GRADE

4' 8'0 2'

4' 8'0 2'

31 2

F0

S

MO

DU

LE

SP

LIT

F0

S

3 12

FO

S

FO

S

MO

DU

LA

R S

PLIT

13 31 33 1_8" THK. VINYL COATED POLYESTER

MEMBRANE

26 31 00 PV PANELS

ELEVATION DATUM REFERS TO F.O.F.

WATER UTILITY UNIT

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

RAMP - SEE SHEET 731 FOR RAMP DETAILSDECK - SEE SHEET 741 FOR DECK DETAILS

AIR CONDENSER CANTILEVER UNIT

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

1.

DIVISION 05 - METALS1/8" DIA. WOVEN GALVANIZED05 15 19

DIVISION 13- SPECIAL CONSTRUCTION

DIVISION 26 - ELECTRICAL

A1

A-301

C4

A-301

13 31 3313 31 33

26 31 00

05 58 16

1

1.

C1

A-301

C4

A-301

C4

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"

1

1

A-203

A1

A1

203

05 15 19

STEEL CABLE CLEAR VINYL COATED

2.3.

4.

4

2

3

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"

52°

52°

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

21:5

2 PM

A-201

EXTERIORELEVATIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 27: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

202

C5

A-302

C5

A-302

C5

A-203

C5

A-302

A-203

C4

C1A-203

T.O. GRADE

T.O. GRADE

4' 8'0 2'

4' 8'0 2'

1

05 15 19 1/8" DIA. WOVEN GALVANIZEDSTEEL CABLE CLEAR VINYL COATED

1. RAMP - SEE SHEET A-731 FOR RAMP DETAILS

2. DECK - SEE SHEET A-741 FOR DECK DETAILS

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

3. AIR CONDENSER CANTILEVER UNIT

4. WATER UTILITY UNIT

DIVISION 05 - METALS

DIVISION 26 - ELECTRICAL26 31 00 PV PANELS

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"

26 31 00

D1 1/4" = 1'-0"EAST ELEVATION

A1 1/4" = 1'-0"WEST ELEVATION

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33 1/8" THK. VINYL COATED POLYESTER

MEMBRANE

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"06 05 23.B0

13 31 33

06 05 23.B0

1. DRAWING OF EXTERIOR SKIN IS NOTIONALNOT ACTUAL.

3

3

1

2

3

4

4

SO

LA

R E

NV

ELO

PE

SO

LA

R E

NV

ELO

PE

202

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:0

0 PM

A-202

EXTERIORELEVATIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 28: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

101

201202

2' 4'0 1' 2' 4'0 1'

2' 4'0 1' 2' 4'0 1'

1

1/2" = 1'-0"

NORTH FENESTRATION ELEVATION1/2" = 1'-0"

SOUTH FENESTRATION ELEVATION

1/2" = 1'-0"

NORTH FENESTRATION ELEVATION1/2" = 1'-0"

SOUTH FENESTRATION ELEVATION

A1 A4

DIVISION 07 - THERMAL AND MOISTURE

BATT INSULATION07 21 16.A10METAL GRATINGS05 53 00

DIVISION 05 - METALSALUMINUM RAILNG

SHEET METAL (FALSE PANELS)METAL GRATINGS

DIVISION 26 - ELECTRICAL26 31 00 PV PANELS

2" ALMINIUM TEE, 2" ALMINIUM ANGLE

SRAY FOAM INSULATION

DIVISION 06 - WOODS, PLASTICS, AND

FRAMING- RAFTERS

PLYWOOD- EXTERIOR WALL SHEATINGPLYWOOD- UNDERSIDE AND

EXTERIOR GRADE FINISH PLYWOOD

PLYWOOD- EXTERIOR WALL SHEATING

4X10 LAMINATE VENEER LUMBER

DIVISION 32 - EXTERIOR IMPROVEMENTS32 05 19.13 GEO-TEXTILE GROUND COVER

DIVISION 09 - FINISHES

NORTH WINDOW ASSEMBLY08 52 00

FRAMING-4x8 BEAM

2X8 HANGERADJUSTABLE HANGER

1/4" STEEL PLATE

FRAMING- FLOOR JOSITS

1-1/2" ROUND RAIL

DIVISION 08 - OPENING

FLOORING MATERIALS09 64 19

SOUTH BI-FOLD (4 PANEL) DOOR:08 35 13.13

3/8" 3.5" LAG SCREW

3/8" 3.5" LAG SCREW

6X10 LAMINATE VENEER LUMBER

10" LAG SCREW

COMPOSITIONS

ROOF SHEATING

PROTECTION

NANAWALL

DIVISION 13 - SPECIAL CONSTRUCTION13 31 00.A1 CONTINUOUS PTFE COATED

GLASS POLYESTER MEMBRANE

C1 C4

A1

A-202

12 34 5612 34 56

12 34 5612 34 56

12 34 56

12 34 56

12 34 5612 34 56

26 51 0012 34 5612 34 56

12 34 56

EXTERIOR LUMINAIRE26 51 00

12 34 56

12 34 56

12 34 56

INVERTER48 19 00

METER HOUSING26 28 16

MAIN LOADCENTER26 28 16

AC DISCONNECTSWITCH26 28 16

ORGANIZERENCLOSURE

2

1. WOOD PANEL NORTH WINDOWSEE SHEET A-601 FOR DOOR SCHEDULE

2. HOUSE EXHAUST VENTS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:0

6 PM

A-203

FENESTRATIONCOLLAR

ELEVATIONS

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 29: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/4" = 1'-0"INTERIOR ELEVATION WEST

1/4" = 1'-0"INTERIOR ELEVATION EAST

4' 8'0 2'

4'

8'

0 2'

FO

S

B

FO

S

AC

FO

S

C

FO

S

A B

7'-6

1 _ 4"

1'-6

1 _ 2"

2'-2

1 _ 4"

7'-2

"

6'-9

3 _ 4"

6'-6

3 _ 4"

103_4"

71_2"

6'-6

3 _ 4"

103_4"

71_2"

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

30°

16°

202

301

05 52 00 METAL RAILINGDIVISION 05- METAL

DIVISION 06- WOOD, PLASTICS, ANDCOMPOSITES06 16 00.D6

DIVISION 09- FINISHES09 93 23 INTERIOR STAIN

DIVISION 11- EQUIPMENT11 31 00 CLOTHS WASHER

PLYWOOD- EXTERIOR WALL SHEATHING

06 11 00.D1 2X4 STUDS @ 16" O.C.

06 16 00.D11 1/2 " PLYWOOD

11 31 00 CLOTHS DRYER

201

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

A2

C2

1. REFER TO SHEET A-711 FOR CASEWORKSCHEDULE AND DETAILS

1. DASHED LINE INDICATES CONDITIONALCABINET LAYOUT

2. REFER TO SHEET A-213 FOR INT. KITCHENELEVATION NORTH AND SOUTH

3. REFER TO SHEET A-212 FOR INT. BATHROOM ELEVATION NORTH, SOUTH, EAST, & WEST

4. VIEW ROTATION AXIS

5. REFER TO SHEET A-121 REFLECTED CEILINGPLAN FOR BEAM SHELF CABINET TAGS

2. ALL CABINETS ARE ORDERED AS STOCKSIZES

3. CABINETRY ON EAST WALL ISRECONFIGURABLE

6.STORAGE.TO BE COMPLIANT TO STATE AND FEDERALREGULATIONS INCLUDING BUT NOT LIMITED TOSTANDARDS ESTABLISHED BY CPSC,IRC R302/R314, NFPA 701/256, ASTM e84, ANDUL 725.

5

5

5 1

107

102

107

102

102 102

103 103

105

103103

103 109 110

103 105

102

7

6

610 06 11 00.D1, TYP

06 16 00.D6, TYP.

7

7. STORAGE CRAWLSPACE

8

8. ROLLING STORAGE CABINET

11 31 00

6

8

11 31 23

7

2

5

5

06 1600.D1109 93 23.13

7

11 31 00

7

9. CEDAR WD FLOOR GRATING W/ STAINLESSSTEEL PAN BELOW.

06 1600.D1109 93 23.13

AREA RESERVED FOR LOOSE FOAM FURNITURE

103

102

4

4

10. AREA RESERVED FOR DEPLOYABLE INSULATINGPANELS STORAGE.

10

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:1

7 PM

A-211

INTERIORELEVATIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 30: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/2" = 1'-0"KITCHEN ELEVATION-NORTH

1/2" = 1'-0"KITCHEN ELEVATION-SOUTH

1/2" = 1'-0"KITCHEN ENLARGED PLAN

202

0 1'0 1'

0 1'

10

1 _ 4"

A-212

4'-61_

2"

1'-10"

1'-51_

2"

2'-61_4"

3_4"

3'-01_4"

2'-5

1 _ 4"

8'-6

"

53_4"

2'-0 1_4 "

2'-7

"

5"4"

2'-8

"

4"

1'-8

"1

'-8

"

7'-6

1 _ 4"

5"4"

2'-8

"1

'-6

"1

'-1

"1

'-1

11 _ 4"

7'-6

1 _ 4"

DIVISION 22 - PLUMBING

WOOD DECKING06 15 13

DIVISION 11 - EQUIPMENT11 31 13.A1 REFRIGIRATOR11 31 13.A2 COOKTOP11 31 13.A4 EXHAUST HOOD11 31 13.A5 OVEN11 31 13.A7 DISHWASHER

DIVISION 12 - FURNISHINGS

22 41 39 RESIDENTIAL FAUCETS22 41 16 KITCHEN SINK

DIVISION 06 - WOOD, PLASTICS,AND COMPOSITES

KITCHEN2'-3"

MODULE SPLIT9'-9 1/4" DIVISION 7 - THERMAL / MOISTURE

STAINLESS STEEL SHEET METAL07 60 30

1. DINING TABLE

06 46 00.L0 THRESHOLD

12 36 00 KITCHEN CABINETRYKITCHEN CASEWORK12 35 30.3

DW

REF

A1

B1

12 36 00

22 41 3922 41 16

11 31 13.A7

12 36 00

11 31 13.A1

11 31 13.A1

10 35 00

06 15 13

07 60 30

09 64 29

11 31 13.A5

11 31 13.A7

11 31 13.A5

22 41 39

07 60 30

11 31 13.A4

202

202

12 36 00

12 36 00

12 36 00

12

12 36 0012 36 00

12 36 00

1

1

12 35 30.3

11 31 13.A1

12 35 30.3

12 36 00

12 36 00

09 64 29

12 36 0012 36 00

07 60 30

4'-2

"

3'-1

1"

A3A1

C4

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:2

9 PM

A-212

KITCHEN PLAN &ELEVATION

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 31: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

301

301 301

1 1

1/2" = 1'-0"N. BATHROOM ELEV.

1/2" = 1'-0"S. BATHROOM ELEV.

1/2" = 1'-0"E. BATHROOM ELEV.

1/2" = 1'-0"W. BATHROOM ELEV.

1/2" = 1'-0"BATHROOM - ENLARGED PLAN

0 1' 2' 4' 1' 2' 4' 0 1' 2' 4'

0 1' 2' 4' 0 1' 2' 4'

2

22

C1 C3 C5

A1

A-213

5"

4'-91_

4"

1'-71_

4"

6'-91_

2"

EQ

.

EQ

.

2'-8"

2'-8 1_2 "

3'-113_

4"

2'-13_

4"

113_

4"

EQ.EQ.

7'-11_

4"

2"

2'-9

"3

'-6

1 _ 2"

2"

1'-7

1 _ 2"

1'-5

1 _ 4"

2'-3

1 _ 2"

1'-10

"

9'-8

1 _ 2"

1'-9

1 _ 4"

31_2"

2'-1

11 _ 4"

1'-6

3 _ 4"

1'-2

1 _ 4"

1'-0

1 _ 4"

1'-6

"

6'-8

1 _ 4"

1'-6

1 _ 2"

3"

4'-1

13 _ 4"

1'-8

1 _ 4"

1'-6

"1

'-6

1 _ 4"

1'-9

1 _ 4"

31_2"

11

'-9

1 _ 4"

21_4"

2'-9

"3

'-7

3 _ 4"

11_2"

1'-6

1 _ 2"

3" 1

3 _ 4"

2'-9

"3

'-7

3 _ 4"

11 _ 2"

1'-6

"1

'-6

1 _ 4"

1'-9

1 _ 4"

31 _ 2"

11

'-9

1 _ 4"

22 41 16.A5 UNDER COUNTER LAVATORY SINK

DIVISION 22 - PLUMBING22 41 13.A1 WATER CLOSET - ELONGATED BOWL

TOILET

22 41 19.D2 BATHTUB - DROP IN INSTALL22 41 39 SINGLE-HANDLE LAVATORY FAUCET22 41 39 SINGLE HANDLE TUB/SHOWER KIT

DIVISION 09 - FINISHESMARINE PLANK FLOORS05 64 29

DIVISION 12 - FURNISHINGS

22 41 39 RESIDENTIAL FAUCETS

DIVISION 06 - WOOD, PLASTICS,AND COMPOSITES

DIVISION 07 - THERMAL / MOISTURESTAINLESS STEEL SHEET METAL07 60 30

MODULE SPLIT10'-1 1/4"

BATHROOM5'-1 1/4"

301

22 41 16.A5

22 41 19.D2

10 28 16

10 28 16

22 41 19.D2

22 41 39

09 64 29

22 41 16.A5

07 60 30

22 41 39

10 28 16

22 41 19.D2

22 41 19.D2

22 41 19.D2

22 41 39

22 41 19.D2

22 41 39

22 41 39

22 41 19.D2

22 41 39

xx xx xx

22 41 39

12 36 00

07 60 3022 41 19.D2

22 41 16.A5

22 41 13.A1

09 64 29

xx xx xx

1

MODULE SPLIT10'-1 1/4"

BATHROOM5'-1 1/4"

07 60 3022 41 19.D2

22 41 16.A5

12 35 30.23

22 41 19.D2

22 41 39

A3

1. REFER TO SHEET A-711 FOR CASEWORKSCHEDULE AND DETAILS

1. SHELF BEAM CASEWORK W/ SHELF SPACE &

06 15 13 WOOD DECKING

DIVISION 10 - SPECIALTIES10 28 16 BATH ACCESSORIES

22 41 19.D2 BATHTUB

12 35 30.23 BATHROOM CASEWORK

06 42 00

MEP DUCTS & CONDUITS

C1

A1C3

C5

N

108

113

113

06 20 00 FINISHED CARPENTRY

1'-9 1_4 "

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:3

2 PM

A-213

BATHROOM PLAN &ELEVATION

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 32: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

C.1C B A

1 2 3

1/4" = 1'-0"BLDG. SECTION FACING EAST

1/4" = 1'-0"BLDG. SECTION FACING NORTH

A1

A-311

A1

A301

A1

A301

A1

A-311

A4

A-311

A1

A-312

C1

A-312

D3

A-312

A3

A-312

T.O. GRADE

T.O. GRADE

BEDLEVEL

501

DRESSING401

MEZZANINE301

DININGROOM

201

LIVINGROOM

101

202

4' 8'0 2'

101

1

201

ELEVATION DATUM REFERS TO F.O.F.

4' 8'0 2'

FO

S

FO

S

FO

F

MO

DU

LA

R S

PLIT

CA

NTIL

EV

ER

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

MODULE SPLIT9'-9 1/4"

KITCHEN2'-3"

BATHROOM4'-9 1/4"

LAUNDRY7'-3 1/4"

LIVING ROOM1'-3"

5. RAMP - SEE SHEET A-731 FOR RAMP DETAILS

6. DECK - SEE SHEET A-741 FOR DECK DETAILS

7. AIR CONDENSER CANTILEVER UNIT

C1

12

2

2

2

2.

DIVISION 05 - METALSSTEEL DECK RAILINGS05 73 00STEEL GRATINGS05 53 00

DIVISION 06 - WOODS06 15 13 WOOD FLOOR DECKING

DIVISION 26 - ELECTRICAL26 31 10 PV PANELS

SHEET METAL05 58 16

26 31 10

26 31 10

A1

403

4

3

JOG

IN

SE

CTIO

N

05 58 16 26 31 10

1. DASHED LINE INDICATES A CONDITIONALCABINET LAYOUT, REFER TO SHEET A-211

2.

FOR CABINET LAYOUT AND A-711 FORCABINET DETAIL. TYP.

OVERHEAD CASE WORK, REFER TO SHEETA-112 RCP FOR CABINET TAG, SEET A-711FOR CABINET DETAIL

3. REFER TO A-213 FOR INT KITCHEN ELEVATIONS

4. MECHANICAL SPACE ABOVE KITCHEN

KITCHEN

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"

SOLAR ENVELOPE18'-0"

0'-0"

T.O.PLYWOOD16'-11 3/4"

1. DRAWING OF EXTERIOR SKIN IS NOTIONALNOT ACTUAL.

6

55

7

2

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:4

4 PM

A-301

BUILDINGSECTIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 33: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

11/2" = 1'-0"

NORTH WALL SECTION11/2" = 1'-0"

SOUTH WALL SECTION0 1' 1

1/2'1/2" 0 1' 1

1/2'1/2"

1

101

101

06 16 00.D1006 11 00.G14LU28 JOIST HANGER07 21 26

06 18 13.A10

32 05 19.13

07 21 13.B4

06 16 00.D6

06 48 13

09 64 1906 16 23

07 21 16 A1006 16 00.D10

06 19 13

1% SLOPE ROOF

06 16 2307 21 16.A1006 11 00.G3

LU28

06 11 00.L6LSSU210

05 05 2306 11 00L.6

06 11 00.G7

06 43 00.C2

26 31 00

05 50 00

06 16 00.D10LU2806 11 00.G14

05 40 00

07 21 16.A1013 31 00.A1

13 31 33

06 16 00.D606 16 2309 64 19

06 11 00.G7LU2807 21 16.A10

06 11 00.G7

06 15 13

05 05 23.A3

06 05 23.B1

13 31 00.A1

13 31 00.A1

ROOF16'-11 3/4"

PV PANEL17'-6 3/4"

BED LEVEL9'-9 1/4"

MODULE SPLIT9'-9 1/2"

06 48 13

06 48 1306 48 13

06 48 13

06 11 00.G7

06 80 00

06 16 00.D606 16 00.D6

06 18 13.A1206 18 13.A12

06 18 13.A12

13 31 00.A1

1% SLOPE ROOF

06 16 00.D606 16 00.D606 16 00.D606 16 00.D606 16 00.D6

06 18 13.A1206 18 13.A1206 18 13.A12

06 18 13.A12

A1

FIRST LEVEL1'-3"

A4

DIVISION 07 - THERMAL AND MOISTURE

BATT INSULATION07 21 16.A10

DIVISION 05 - METALS05 05 00 ALUMINUM RAILNG

SHEET METAL (FALSE PANELS)05 50 00METAL GRATINGS05 53 00

DIVISION 26 - ELECTRICAL26 31 00 PV PANELS

2" ALMINIUM TEE, 2" ALMINIUM ANGLE05 14 13

SRAY FOAM INSULATION07 21 26

DIVISION 06 - WOODS, PLASTICS, AND

FRAMING- RAFTERS06 11 00.G14

PLYWOOD- EXTERIOR WALL SHEATING06 16 00.D6PLYWOOD- UNDERSIDE AND06 16 00.D10

EXTERIOR GRADE FINISH PLYWOOD06 48 13

PLYWOOD- EXTERIOR WALL SHEATING06 19 00.D6

4X10 LAMINATE VENEER LUMBER06 18 13.A10

DIVISION 32 - EXTERIOR IMPROVEMENTS32 05 19.13 GEO-TEXTILE GROUND COVER

-06 11 00.F1-06 11 00.F2

-06 19 13

DIVISION 09 - FINISHES

NORTH WINDOW ASSEMBLY08 52 00

-06 16 23

FRAMING-4x8 BEAM06 11 00.L6

2X8 HANGERLU28ADJUSTABLE HANGERLSSU210

05 05 23 1/4" STEEL PLATE

FRAMING- FLOOR JOSITS06 11 00.G7

1-1/2" ROUND RAIL06 43 00.C2

DIVISION 08 - OPENING

FLOORING MATERIALS09 64 19

SOUTH BI-FOLD (4 PANEL) DOOR:08 35 13.13

3/8" 3.5" LAG SCREW06 05 23.B1

WOOD DECKING06 15 13

6X10 LAMINATE VENEER LUMBER06 18 13.A12

10" LAG SCREW06 05 23 B0

COMPOSITIONS

ROOF SHEATING

PROTECTION

NANAWALL

DIVISION 13 - SPECIAL CONSTRUCTION13 31 00.A1 CONTINUOUS PTFE COATED

GLASS POLYESTER MEMBRANE

MODULE SPLIT9'-9 1/2"

COLD FORMED METAL FRAMING05 40 00

COMPOSITE FABRICATIONS06 80 00

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

22:5

3 PM

A-311

WALL SECTIONS

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 34: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1" = 1'-0"

EAST WALL SECTION1" = 1'-0"

WEST WALL SECTION

32

0 1/2' 1' 2'0 1/2' 1' 2'

202

202

1.

DIVISION 07 - THERMAL / MOISTURE

05 LU 28 2X8 HANGER

BATT INSULATION07 21 16.A10

2" ALUMINUM TEE AND ANGLE05 14 13

SPRAY FOAM INSULATION07 21 26

05 16 69.K6 2" STEEL PIPE2" STEEL HALF BATTEN PIPE CLAMP05 50 00

05 05 00 ALUMINUM RAILNG

2X4 FRAMING - SOLID WOOD WALLS06 11 00.D05

06 16 00.D6 1/2" PLYWOOD06 16 00 1/2" PLYWOOD - OSB

06 16 00.D10 5/8" PLYWOOD - UNDERSIDE / ROOF

06 11 00.F12 2X6 FRAMING - FLOOR JOIST

DIVISION 08 - OPENINGSWEST DOOR ENTRY08 14 00

06 11 00.G13 2X8 RAFTERS @ 12" O.C.

TUBE SHAPE05 12 73.L263

VINYL COATED POLYESTER13 31 33MEMBRANE

DIVISION 13 - SPECIAL CONSTRUCTION

PV PANELS26 31 00DIVISION 26 - ELECTRICAL

MODULE SPLIT9'-9 1/2"

KITCHEN LEVEL2'-3"

GRADE LEVEL

LIVING ROOM LEVEL1'-3"

T.O.PLYT.O.PLY

GRADE LEVEL

MODULE SPLIT9' 9 1/2" 06 18 13.A10

06 18 13.A1006 18 13.A1006 18 13.A1006 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A1006 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A10

06 18 13.A1006 18 13.A10

06 18 13.A10

COMPOSITEDIVISION 06 - WOODS, PLASTICS, AND

DIVISION 05 - METALS

1. MODULE SPLITS OCCUR IN FOUR PLACESREFER TO EACH SPLIT FOR SPECIFIC DETAILS

2. MECHANICAL CRAWL SPACE ABOVE KITCHEN

3. WOOD PANEL SINGLE LIGHT DOOR TYPICAL ATWEST AND EAST DOORS SHEET A-601 FORDOOR SCHEDULE

4. FLOOR LEVEL OF EAST WALL IS CUT AT LOWERLIVING ROOM LEVEL

5. 1/2" GRADE 8 MOUNTING BOLT

6. 3/4" PTD PLYWOOD DOOR TRIM ASSEMBLY W/ CLAD SHEET METAL DRIP

7. 1/2" STEEL HANG BRACKET WITH STEEL PIPE

8. FOUNDATION

SECTIONS INDICATE COMPONENTS OF ACOMPLETE TRANSVERSE SECTION

2. ANNOTATION DENOTES INDIVIDUAL ELEMENTSONLY ONCE YET INDICATES TYP. REPEATEDCONDITIONS IN OTHER AREAS OF THE SECTIONU.O.N.

A4A2

4

A1

A-731

F.O

.S

F.O

.S

A5

A-701

1

3

2

1

7

8

5

6

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:0

2 PM

A-312

WALL SECTIONS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 35: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

T T T T

101201

T

202

T

301

T TT

T

2

A312

A312

A2

A311

A1 A1

A311

A311

A312A312

A312 A312

A311

A2

A2

A1 A1

A2A2

A2

A311

A1

A311

A1

A311

A1

A311

A1

WINDOW SCHEDULEMARK

ROUGH OPENINGTYPE MANUFACTURER MODEL MATERIAL FINISH

GLAZING HEADHEIGHT

HARDWAREWIDTH HEIGHT HEAD SILL THICKNESS TYPE

70 1/2" 119 1/2" FIXED CASEMENTW/ 2-WAY OPERABLE PANEL

6'-0"

18 5/8" 33 1/2"

WOOD STAINED TEMPEREDLOW-E

ARGON GAS

TEMPEREDLOW-E

ARGON GASFIXED CASEMENT SKYLIGHT

METAL METAL

MARK DR TYPE DR SIZE MANUFACTURER MODELFRAMETYPE

FIRERATING

DETAILSDESCRIPTION

FINISHHEAD THRESHOLD DOOR FRAME HARDWARE

201 2 36" x 93"BOTTOM-MOUNTINWARD SWING

301 4 30" x 78"

101 1 NANAWALLSYSTEMS, INC.

WD 66CONFIG: 01L3R

202 3 36" x 93"

84" x 132" WDMULTI POINT LOCKING WITH LATCH, DEADBOLT AND

LEVER HANDLES ON BOTH SIDES ON PRIMARY SWINGPANEL ONLY

ROUGHOPENING

36 1/2" x 93 1/2"

83 1/2" x 132 1/2"

DOOR SCHEDULENOTES

TEMPEREDARGON FILLED,LOW E GLASS

COMMENTS

WD 68TTCONFIG: 1F 1F 1R

DETAILS

PAINT PAINTWOOD

WINDOW VENT LOCK. 4"MAX OPENING

GLAZEDCLEAR

BOTTOM-MOUNTSINGLE TRACK

OUTWARD SWING

STAINED

GLAZEDCLEAR

STAINED

GLAZEDCLEAR

STAINED

CUSTOM 1 1/2"LAMINATED

PLY.SLIDING

BOTTOM-MOUNTOUTWARD SWING

MULTI POINT LOCKING WITH LATCH, DEADBOLT ANDLEVER HANDLES ON BOTH SIDES

MULTI POINT LOCKING WITH LATCH, DEADBOLT ANDLEVER HANDLES ON BOTH SIDES

TEMPEREDARGON FILLED,LOW E GLASS

TEMPEREDARGON FILLED,LOW E GLASS

WD

WD

WD 66CONFIG: i1R

WD 66CONFIG: o1R

NANAWALLSYSTEMS, INC.

NANAWALLSYSTEMS, INC.

36 1/2" x 93 1/2"

I-BEAM ROLLER TRACK, TWO WHEEL HANGER

NANAWALLSYSTEMS, INC.

DUALLAYER

OLD CASTLEBUILDINGENVELOPE

WINDOW SIZE: 70" x 119"

WINDOW SIZE: 18 1/8" x 33"

N/A

N/A

N/A

N/AN/ATO MATCHROUGH

OPENING

SUN GLASS N/ADUALLAYER

2'-6"

6'-6

"

11'-0"

7'-0

"

3'-0"

6'-9

"

3'-0"

6'-9

"9'-11"

5'-10

"

1'-6

"

2'-83_4"

3'-3" 3'-3" 3'-5"

1

1

2

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:1

1 PM

A-601

WINDOW/ DOORSCHEDULE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 36: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

APPLIANCE SCHEDULEROOM

NUMBERROOMNAME MANUFACTURER MODEL FINISH DESCRIPTION

202 KITCHEN

APPLICANCE

REFRIGERATOR/FREEZER

RANGEHOOD

COOKTOP

CONVECTIONOVEN

DISHWASHER

CLOTHES WASHER

CLOTHES DRYER

202 KITCHEN

202 KITCHEN

202 KITCHEN

202 KITCHEN

402 LAUNDRY

402 LAUNDRY

GE GTH18ISXSS STAINLESS

GE

GE

JV930SCBR

PP912SMSS

GE JTP70DPWW

BOSCH SHV4313UC

LG

LG

WM2140CW

DLE2140W

STAINLESS

STAINLESS

WHITE

WHITE

WHITE

LIGHTING SCHEDULELIGHT

SOURCEDESCRIPTIONROOM

NAMEMANUFACTURER

101 LIVINGROOM

201 DININGROOM

202

301

302

401

KITCHEN

BATHROOM

MEZZ.

DRESSING

SLEEPING501

MODEL

LED

LED

FINELITE

LIGHTING SCIENCE GROUP

LED

LED

LED

LED

LED

FLUORESCENT

LED

LED

PROGRESS LIGHTING

LIGHTING SCIENCE GROUP

ELITE

LED

LED

LED

LED

LED

ROOMNUMBER

ICON TYPE

MR16-GU10

LED COVE

LED STRIP

LED STRIP

T8 F. TUBE

FINELITE

ELITE

LED

LED SYLVANIA

PHILIPS

PHILIPS

LED SYLVANIA

PHILIPS

ELITE

LED

SYLVANIA

ELITE

PHILIPS

PHILIPS

ELITE

LED

LED PHILIPS

PHILIPS

ELITE

PAR38

R20

PAR38

MR16-GU10

LED COVE

LED STRIP

LED STRIP

LED COVE

R20

LED COVE

PAR38

MR16-GU10

LED COVE

MR16-GU10

LED COVE

R20

STAINLESS

FINISH SCHEDULEROOM

NUMBERROOMNAME NORTH SOUTH

CEILINGFINISHEAST WESTFLOOR

WALLS

101

201

202

301

302

401

KITCHEN

BATHROOM

GROOMING

DRESSING

LAUNDRY

SLEEPING

402

501

COUNTER BACKSPLASH

09 93 23.1309 61 00

09 61 00

natura N/A N/A

09 93 00

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

FLOORFINISH

06 20 00

06 20 00

06 15 13

N/A

09 93 0006 15 13

06 15 13

N/A

09 93 00

natura

natura

N/A

N/A

N/A

N/A

N/A

N/A

N/A

N/A

natura

natura

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.1309 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

09 93 23.13

06 20 00

06 20 00

09 61 00

09 61 00

natura

natura

natura natura N/A

09 93 23.1309 93 23.13

09 93 23.1309 93 23.1309 93 23.13 N/A

N/A

N/A

N/A

N/A

3GU10-E

SL2-LED

UCE-21"-S

CRD-WW-A-MTL-W48-DFF-NTL

TASK LIGHT

AMBIENT STRIP LIGHT

UNDERCABINET DESK LIGHT

ABOVE CABINET WASH LIGHT

VANITY LIGHT

18 CU FT, TOP FREEZER REFRIGERATOR

30" SLIDE OUT VENT - HOOD

30" BUILT-IN ELECTRIC COOKTOP

29 3/4" WIDE

24" WIDE

STACKING

STACKING

06 15 13. A2 INTERIOR WOOD DECKING:KITCHEN, BATHROOM, LAUNDRY ROOM FLOOR06 16 00. D11 3/4" PLYWOOD: FLOORING06 61 16 CORIAN: COUNTER, BACKSPLASH06 64 00 POLY PLASTIC PEGBOARD: BACKSPLASH09 93 23 13 OLD MASTERS WHITE PICKLING: STAIN09 93 23 53 DEFT POLYURETHANE, MATTE FINISH

DIVISION 09 - FINISHES

ULTRA PAR38 DIMMABLE

227249

LED FLOOD, DIMMABLE

LED FLOOD, DIMMABLE

ULTRA PAR38 DIMMABLE

3GU10-E TASK LIGHT

LED FLOOD, DIMMABLE

SL2-LED AMBIENT STRIP LIGHT

UCE-21"-S UNDERCABINET DESK LIGHT

CRD-WW-A-MTL-W48-DFF-NTL ABOVE CABINET WASH LIGHT

SL2-LED AMBIENT STRIP LIGHT

227249 LED FLOOD, DIMMABLE

SL2-LED AMBIENT STRIP LIGHT

ULTRA PAR38 DIMMABLE LED FLOOD, DIMMABLE

3GU10-E TASK LIGHT

SL2-LED AMBIENT STRIP LIGHT

3GU10-E TASK LIGHT

SL2-LED AMBIENT STRIP LIGHT

227249 LED FLOOD, DIMMABLE

LIVINGROOMDININGROOM

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:1

2 PM

A-611

SCHEDULES

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 37: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

3" = 1'-0"TUFT DETAIL

NTSTUFT ASSEMBLY

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#120

DATE: 06.02.2011

REVISIONS:

05.22.2011 CDL

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIESCHIP 2011

0 6" 1'3"

1.

DIVISION 07 - THERMAL / MOISTURE

05 15 19 1/8" DIA. WOVEN GALVANIZED

BATT INSULATION07 21 16.A10

STEEL CABLE CLEAR VINYL COATED

2X4 FRAMING - SOLID WOOD WALLS06 11 00.D05

DIVISION 13 - SPECIAL CONSTRUCTION1/8" THK. VINYL COATED POLYESTER13 31 33MEMBRANE

1/2" EXTERIOR GRADE PLYWOOD06 16 00.D63/16" X 1-1/4" NEOPRENE WASHER06 05 231/4" PLAS. SPACER TYP.06 05 23

#4 X 1/2" PAN HEAD PHILLIPS SCREWS13 31 33.A13 31 33.B

1/4-IP HEX NUTS (LOCK NUTS)13 31 33.C1/4-IP THREAD STEEL NIPPLES13 31 33.D5/16"-18 NUT13 31 33.E3/8" X 1-1/2" WASHER13 31 33.F1/2" ID 1-1/2" OD FENDER WASHERS13 31 33.G

5/16"-18 SCREW-MOUNT NUTS

FINE THREAD GR5 1/2"-20 HEX NUTS13 31 33.H

5/16"-18 ALL-THREAD13 31 33.J

3/8" X 1-1/2" NEOPRENE WASHER13 31 33.K

AIR BARRIER BUILDING WRAP07 27 00

TAPPED ALUMINIUM CONE13 31 33.L

1/4" ACORN NUT13 31 33.MGASKET RING13 31 33.N

DIVISION 06 - WOODS, PLASTICS, ANDCOMPOSITE

DIVISION 05 - METALS

ANNOTATION DENOTES INDIVIDUAL ELEMENTSONLY ONCE YET INDICATES TYP. REPEATEDCONDITIONS IN OTHER AREAS OF THE SECTIONU.O.N.

A5

B1

13 31 33.M

13 31 33.N13 31 33.F

13 31 33.E

13 31 33.F

13 31 33.K

13 31 33.K

13 31 33.F

13 31 33.E

13 31 33.J

05 15 19

13 31 33.L13 31 33.C

13 31 33.B

13 31 33.A07 27 000707 27 00

07 21 16.A10

13 31 33

13 31 33.M13 31 33.N

05 15 19

13 31 33.F

13 31 33.G

13 31 33.E

13 31 33.E

13 31 33.B

13 31 33.L

06 16 00.D6

06 16 00.D6

13 31 33.J

07 21 16.A10

13 31 33

07 21 0007 27 00

REFERENCE KEYNOTES

GENERAL SHEET NOTES

SHEET KEYNOTES

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:1

4 PM

A-701

TUFT DETAIL

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 38: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

A1

A2

A3

A4

A5

A6

A7

A8

A9

A10

A11

A12

A13

A14

A15

A16

A17

A18A22

A21

A20

A19A23

A24

A25

A26

B1B2

B3

B6

B5

B4

B8

B7B11

B12

B9

B10

B13

C16

C14

C15

C10

C11

C6

C5

C2

C1

C3C7

C12

C8

C13

C9

C17

C4D1

D2

D3

D4

D5

D6

D7

D8

D9

D10

D11

D12

D13

D14

D15

D16

D17

D18

D19

D21

D22

D23

D24

D25

D26

D27D28 D30

D31

D32 D33

D34

D35

D36

D37

D38

D39

D40

D41

D42

D43

D44

D45

D46

D47

D48

1/4" = 1'-0"TUFTING ELEVATION

1/4" = 1'-0"TUFTING ELEVATION

1/4" = 1'-0"TUFTING ELEVATION

1/4" = 1'-0"TUFTING ELEVATION

KEY PLAN1/8" = 1'-0"

A3

A-7

01

A1

A-7

01

D3

A-7

01

D1

A-7

01

A4

A-702

4' 8'0 2'

4' 8'0 2' 4' 8'0 2'

4' 8'0 2'

4'0 2'

A

B

A

BA

B

A

B

DIVISION 05 - METALS05 15 19

DIVISION 06 - WOODS, PLASTICS,

A1

D1 D3

A3

AND COMPOSITES06 05 23.B0 10" LAG SCREW

2. TO LOCATE TUFT POINTS:

C5

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33 CONTINUOUS VINYL COATED

POLYESTER MEMBRANE

TUFT MARK

EDGE OF PLYWOOD

POINT TO DISTANCE (A)A.

POINT TO DISTANCE (A)B.

1

2

1.

2.

START POINT

TUFT MARK

06 05 23.B0

13 31 33.A

13 31 33

3

3. EDGE OF EAST COLLAR

4. EDGE OF WEST COLLAR

05 15 2013 31 33.A

13 31 33

05 15 20

13 31 33

13 31 33.A

5

5. PORTHOLE ACCESS TO MODULARCONNECTION BOLTS

05 15 20

13 31 33

13 31 33.A

4

5

3. DASHED LINE INDICATES PATH OF CABLE

MEASURE DOWN TOP EDGE FROM START

STRIKE VERTICAL LINE DOWN DISTANCE (B)

LOCATION VARIES: VERTICALLY ALIGNED WITH

START POINT: MEASURE FROM EXTERIOR

WOVEN GALVANIZED STEEL STEEL

1. DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

LAYOUT. DOES NOT REPRESENT ACUTALCABLE LOCATION.

13 31 33.A CONTINUOUS VINYL COATEDPOLYESTER MEMBRANE FASTENERASSEMBLY

CABLE

D20

SIDE A TUFT SCHEDULE

MARK A B MARK A B

A1 2'-3 1/4" 2'-10" A14 14'-2 1/2" 11'-0 3/4"

A2 6'-1" 2'-7 3/4" A15 18'-6 3/4" 2'-8 1/2"

A3 9'-6 3/4" 2'-7 3/4" A16 17'-6 1/2" 5'-7 3/4"

A4 8'-11 1/4" 5'-6" A17 16'-10" 8'-3"

A5 8'-7 1/2" 9'-1 1/4" A18 16'-4 3/4" 10'-7 1/2"

A6 8'-7" 12'-7 1/4" A19 20'-7 1/2" 2'-10 1/4"

A7 12'-10 1/2" 11'-9 1/2" A20 19'-5 3/4" 5'-9"

A8 12'-1 1/4" 8'-8 1/4" A21 18'-8 1/4" 8'-2 1/2"

A9 11'-9" 5'-6 1/4" A22 18'-2 1/4" 10'-3 1/2"

A10 11'-7 3/4" 2'-7 1/4" A23 22'-5 1/2" 3'-0"

A11 15'-11" 2'-3" A24 21'-2 1/4" 5'-11"

A12 15'-0 1/2" 5'-6" A25 20'-1 3/4" 8'-4 3/4"

A13 14'-6 3/4" 8'-5 1/4" A26 19'- 6 3/4" 10'-1 1/4"

SIDE B TUFT SCHEDULE

MARK A B MARK A B

B1 2'-1" 4'-0 3/4" B8 16'-2" 7'-6"

B2 7'-5 1/2" 3'-6 3/4" B9 15'-6 1/2" 11'-8 1/2"

B3 5'-8 3/4" 7'-10 1/4" B10 15'-0 1/4" 15'-5 1/4"

B4 12'-3" 3'-6 3/4" B11 20'-6 1/4" 3'-2 1/2"

B5 11'-3 1/2" 7'-6 1/2" B12 19'-5 3/4" 10'-10"

B6 10'-0 3/4" 11'-5 1/2" B13 18'-11 1/2" 14'-7 1/4"

B7 16'-6 1/2" 3'-3"

SIDE C TUFT SCHEDULE

MARK A B

C1 3'-1" 1'-3 1/2"

C2 1'-4 1/4" 2' 10 1/2"

C3 6'-5 1/2" 1'-11 3/4"

C4 4'-9 1/2" 3'-11 1/2"

C5 3'-1 1/2" 5'-5 3/4"

C6 1'-6 1/4" 6'-8 3/4"

C7 9-8 1/2" 2'-5 1/2"

C8 8'-0" 4'-8 3/4"

C9 6'-2" 6'-7 3/4"

C10 4'-8" 8'-2 3/4"

C11 2'-9 1/4" 9'-7 1/2"

C12 11'-5 1/2" 6'-0 3/4"

C13 9'-8 1/2" 8'-4 1/2"

C14 7'-11 1/4" 10'-0 1/2"

C15 6'-2" 11'-5"

C16 11'-2 1/4" 12'-0"

C17 9'-5" 13'-7 1/2"

SIDE D TUFT SCHEDULE

MARK A B MARK A B

D1 0'-6 1/2" 3'-1" D25 10'-1" 2'-4 1/2"

D2 4'-7" 1'-3 1/4" D26 12'-7 1/2" 0-7 3/4"

D3 3'-11 1/4" 2'-8 1/2" D27 11'-8 3/4" 2'-1 3/4"

D4 2'-3 3/4" 6'-0 3/4" D28 13'-6 1/2" 1'-5 1/4"

D5 0'-4 1/2" 9'-6 3/4" D29 15'-9" 1'-0 1/4"

D6 6'-2 1/2" 0'-10" D30 17'-5 1/2" 2'-0 3/4"

D7 5'-5" 2'-4" D31 16'-9 1/2" 0'-10"

D8 4'-7 3/4" 3'-9 3/4" D32 18'-4 1/4" 1'-10"

D9 7'-0 1/2" 1'-8 1/2" D33 17'-8 1/2" 2'-11 3/4"

D10 6'-2 3/4" 3'-4 1/2" D34 17'-0" 4'-3"

D11 5'-5" 4'-11 3/4" D35 17'-8 1/4" 6'-6 1/2"

D12 4'-7" 6'-10" D36 17'-0 1/4" 5'-2 1/2"

D13 3'-9 1/2" 8'-8 1/4" D37 21'-6" 1'-8 3/4"

D14 1'-11 1/4" 12'-2 1/4" D38 19'-8 1/2" 3'-11 3/4"

D15 0'-2 1/2" 15'-9" D39 18'-4 1/4" 6'-1 1/2"

D16 5'-5 1/2" 8'-2" D40 17'-7 3/4" 7'-6 1/4"

D17 4'-7 1/4" 9'-11 3/4" D41 17'-0 1/2" 8'-8 3/4"

D18 5'-4 1/2" 14'-9 1/2" D42 17'-8" 9'-7 3/4"

D19 4'-7 1/4" 12'-9 1/4" D43 16'-11 1/4" 10'-10"

D20 3'-8" 11'-2" D44 22'-10 3/4" 3'-10 3/4"

D21 5'-4 1/4" 13'-11 1/4" D45 21'-1 1/4" 6'-1 1/4"

D22 9'-0" 1'-0 1/4" D46 19'-6 3/4" 8'-3 3/4"

D23 8'-0 1/2" 2'-9 1/4" D47 18'-3" 10'-5 3/4"

D24 10'-10" 1'-1 1/2"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:1

6 PM

A-702

TUFTING DETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 39: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

202202

101

1/2" = 1'-0"TUFT LOCATIONS @ DOOR 402

1/2" = 1'-0"TUFT LOCATIONS @ DOOR 201

1/2" = 1'-0"TUFT LOCATIONS @ DOOR 202

1/2" = 1'-0"TUFT LOCATIONS @ NORTH WINDOW

1/2" = 1'-0"TUFT LOCATIONS @ UNDERSIDE OF CANTILEVER

2' 4'0 1'

2' 4'0 1' 2' 4'0 1' 2' 4'0 1'

4' 8'0 2'

06 05 23.BO, TYP.

13 31 00, TYP.

05 15 19, TYP.

71_4"

1'-111_4" 1'-9" 1'-6" 2'-2"

1'-8

3 _ 4"

2'-9

3 _ 4"

2'-1

11 _ 2"

1'-4

"2

'-2

3 _ 4"

2'-3

1 _ 2"

2'-5

3 _ 4"

1'-21_2"2'-01_

2"2'-01_4"2'-01_

2"2'-0"

21_4"

9" 2'-101_4"

41_2"

2'-111_2"

1'-3

"3

'-9

3 _ 4"

3'-5

1 _ 4"

21_4"

1'-103_4" 101_

4" 1'-61_4" 2'-8"

3'-3

3 _ 4"

4'-4

1 _ 4"

31_2"

2'-0

"6

'-2"

1'-03_4"12'-03_

4"

4'-6

"3

'-0

"

DIVISION 06 - WOODS, PLASTICS,

06 05 23.B0 2" LAG SCREWS1" WOOD BLOCKING06 48 13

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33 CONTINUOUS VINYL COATED

A1

C1 C3 C5

A4

AND COMPOSITES

POLYESTER MEMBRANE

DIVISION 05 - METALS05 15 19 WOVEN GALVANIZED STEEL

CABLE

MEASURED FROM EXTERIOR EDGE OF PLY.

1

1

2. DASHED LINE INDICATES PATH OF CABLE

1. DRAWING OF EXTERIOR SKIN DOES NOTREPRESENT ACTUAL SHAPE.

LAYOUT. DOES NOT REPRESENT ACUTALCABLE LOCATION.

05 15 20

13 31 33

13 31 33.A

13 31 33.A CONTINUOUS VINYL COATEDPOLYESTER MEMBRANE FASTENERASSEMBLY

11_4"

1'-03_4" 10'-91_

4" 81_4"

21 _ 4"

2'-2

1 _ 2"

1'-6

3 _ 4"

3'-21_4"

1'-6

1_4 "

4'-1

3_4 "

4'-3

1_4 "

53_4"

5'-61_2"

4'-11_2"

4'-5

1 _ 4"

6'-0

1 _ 4"

91_2"3'-73_

4"6'-0"

103_4"

3'-8"

4'-91_4"

6'-91_2"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:1

7 PM

A-703

TUFTING DETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 40: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

NTSNORTH EAST CORNER ASSEMBLY

NTSEAST WALL ASSEMBLY

07 21 16.A1013 31 33

05 15 19

06 05 23.B0

06 16 2306 11 00.G14

06 16 00.D1006 11 00.A1

05 12 00.K6

05 50 0005 14 13

06 16 00

06 11 00.G7

06 16 00.D10

06 14 00

05 12 69.K6

06 16 00.D1106 11 00.G7

06 16 00.D1106 11 00.G7

06 16 00.D6

06 11 00.D5

13 31 3305 15 1906 05 23.B0

06 48 13

07 21 16.A1006 11 00.A1

06 11 00.G14

06 16 00.D10

06 11 00.A1

05 12 69.K6

05 50 0005 14 1326 31 00

07 21 13.B406 11 00.G1406 16 00.D10

06 11 00.D5

06 16 00.D1006 16 00

06 11 00.D5

06 16 00.D6

06 16 00.D1006 17 13.A1006 11 00.G7

06 17 13.A1006 17 13.A906 17 13.A7

06 17 13.A10

06 16 00.D6

08 52 00

26 31 00

DIVISION 05 - METALS05 12 69.K9 2" STEEL PIPE

WOVEN GALVANIZED STEEL CABLE05 15 19

ARCH. EXPOSED STRUCT. ALUMINUM05 14 13

A1

DIVISION 06 - WOODS, PLASTICS,

06 05 23.B0 10" LAG SCREW

PLYWOOD - OSB06 16 00

1/2" EXTERIOR GRADE PLYWOOD06 16 23

AND COMPOSITES

DIVISION 07 - THERMAL AND

BATT INSULATION07 21 16.A10MOISTURE PROTECTION

DIVISION 08 - OPENINGS06 52 00 NORTH WINDOW ASSEMBLY

CLEAR VINYL COATED

3/4" PLYWOOD06 16 00.D115/8" EXTERIOR GRADE PLYWOOD06 16 00.D10

WOOD BLOCKING06 11 00.A12X4 STUDS @ 16" O.C.06 11 00.D52X8 JOISTS @ 24" O.C.06 11 00.G7

2X12 JOISTS @ 24" O.C.06 11 00.I52X8 RAFTERS @ 24" O.C.06 11 00.G14

A4

FRAMING PV2" STEEL HALF BATTEN PIPE CLAMP05 50 00

4X4 LAMINATE VENEER LUMBER06 17 13.A7

4X10 LAMINATE VENEER LUMBER06 17 13.A104X8 LAMINATE VENEER LUMBER06 17 13.A9

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33 CONTINUOUS VINYL COATED

DIVISION 26 - ELECTRICAL26 31 00 PHOTOVOLTAIC PANEL

POLYESTER MEMBRANE

ROOF ASSEMBLY

UPPER PLATFORMASSEMBLY

FLOOR ANDFOUNDATIONASSEMBLY

FIRST FLOORASSEMBLY

WALL ASSEMBLY

NORTH OPENINGASSEMBLY

ROOF ASSEMBLY

COMPLETEASSEMBLY

REVERSE VIEWCOMPLETEASSEMBLY

REVERSE VIEW

EAST BOTTOMMODULE ASSEMBLY

EAST TOPMODULE ASSEMBLY

WEST TOPMODULE ASSEMBLY

WEST BOTTOMMODULE ASSEMBLY

2X8 FOUNDATION FRAMING06 14 00

1/2" EXTERIOR GRADE PLYWOOD06 16 00.D6

3/4" EXTERIOR GRADE FINISH06 48 13PLYWOOD

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:2

1 PM

A-711

WALL ASSEMBLY

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 41: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

SCALE: NTS

PV MOUNT POCKET DETAIL

SCALE: NTS

GROMMET FLAP DETAIL

SCALE: NTS

WEST DOOR ASSEMBLY1/8" = 1'-0"

SKIN TEMPLATE0 4' 8' 16'

1.

5'-8 1_4 "

11'-9"

11'

8'-1 3_4 "

9'-10 3_4 "

10'-1 3_4 "

11'-51_2"11'-83_

4"11'-2"

25'-7

1_ 2"

29'

15'

9'-10 1_4 "

8'-5 3_4 "

24'-5

1_4 "

26'-1

1"

6'-01_4"

13'-3

3_4 "

9'-01_2"

14'-0

1_2 "

14'-2"

36'-9

"

22'-7

3_4 "

14'-21_4"

10'-5"

10'-23_4"

18'-6

1_4 "

24'-33_4"

27'-5

1_2 "

3'-11_2"

27'-81_4"

3'-8

"

12'-6

1_4 "

10'-11"

23'

-71_ 2"

13 31 00.A1

13 31 00.A2

DIVISION 13 - SPECIAL CONSTRUCTION13 31 33.A1 1/8" THK. VINYL COATED

POLYESTER MEMBRANE

1. TUFT LOCATION: INSERT GROMMETTO RECEIVE ALL-THREAD THROUGH BOLT

2. INSERT GROMMET ALONG FLAP @ 12" O.C.

3. ALIGNMENT POINTS FOR VINYL PIECES

ALL SEAMS HEAT SEALED UNLESSOTHERWISE NOTED

A1

4. INSERT GROMMETS ALONG FLAP @ 4" O.C.

A1

A1A1

2

2

2

2

3

3

3

1

A5

B5

D5

4

WHITE FINISH13 31 33.A2 1/8" THK. VINYL COATED

POLYESTER MEMBRANECLEAR FINISH

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

REVISIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

BURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

8/12

/201

1 6:

23:2

7 PM

A-721

SKIN DETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 42: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/4" = 1'-0"RAMP SECTION

3" = 1'-0"RAMP DETAIL

1" = 1'-0"RAMP SECTION

3" = 1'-0"RAMP DETAIL

1/4" = 1'-0"WEST RAMP 1/4" = 1'-0"EAST RAMP

A4

A-731

A4

A-741

A1A-731

A1A-731

0 1' 11/2'

1/2" 0 1' 11/2'

1/2"

0 1' 11/2'

1/2"

0 1' 11/2'

1/2"

0 1' 11/2'

1/2"0 1' 11/2'

1/2"

05 12 00.T1

05 53 00.A2

05 73 00

05 12 35.F2

05 12 23.B1

05 12 73.L70

05 12 36.A127

05 05 23.10

05 12 36.A128

05 53 00.A3

05 12 35.F2

05 53 00

05 12 35.F3

05 05 23.A405 12 35.F005 12 35.F2

05 12 36.A130

05 12 73.L68

06 1100.D1

06 15 13.A2

06 16 00.D6

05 58 16

05 12 35.F3

05 05 23.A2

05 12 73.L69

05 12 73.L263

05 12 35.F3

06 14 0006 15 13.A2

05 53 00

08 35 13.13

05 12 36.A130

A4

B5

A1

D5

C1 C3

1

2

2

DIVISION 05 - METALS

SHEET METAL05 58 16METAL GRATINGS05 53 00

DIVISION 06 - WOODS, PLASTICS, AND

PLYWOOD- EXTERIOR WALL SHEATING06 16 00.D6

05 05 23.10 1/4" STEEL PLATE

3/8" 3.5" LAG SCREW06 05 23.B1

COMPOSITIONS

05 05 23.A2 1/2" A307 BOLT05 05 23.A3 3/8" A307 BOLT05 05 23.A4 3/16" A307 BOLT05 05 23.A5 1-1/4" SHEET METAL SCREW05 12 00.T1 STEEL WT 5-1/4"x3-1/2"x1/4"05 12 23.B0 STEEL CHANNEL 4" X 4.5LBS.05 12 35.F0 STEEL FLATSTOCK 1"X1/8"05 12 35.F1 STEEL FLATSTOCK 1-1/2"X3/16"05 12 35.F2 STEEL FLATSTOCK 1-1/2"X1/4"

05 12 36.A129 STEEL ANGLE 1-1/2"X1-1/2"X1/8"05 12 36.A128 STEEL ANGLE 1-1/2"X1-1/2"X3/16"05 12 36.A127 STEEL ANGLE 2"X-2"X1/4"

05 12 73.L69 STEEL TUBE 2"X2"X1/4"05 12 73.L263 STEEL TUBE 2"X3"X1/4"

DECK RAILING05 73 00

2X6 PRESSURE TREATED06 14 002X4 PRESSURE TREATED06 11 00

CEDAR DECK BOARDS06 15 13.A2

DIVISION 08 - OPENING

SOUTH BI-FOLD (4 PANEL) DOOR:08 35 13.13

05 12 35.F3 STEEL FLATSTOCK 3"X1/4"STEEL ANGLE 1"X"X1/8"

05 12 73.L70 STEEL TUBE 2"X2"X1/4"

2X6 REDWOOD06 15 13.A1

D5

A-7312

B5

A-731

1.

2.

GRATE SUNKEN INTO RAMP STRUCTUREALLOWS CHANNEL TO FORM CONTINUOUS

2" X 1/4" FLAT BAR STEEL FASTENED TO EDGEOF DECK TO FORM 2" ADA WHEEL CHAIR GUARD

GUARD RAIL

5'-0"

2'-8 1_2 "

2'-9 3_4 "

2'-8 1_2 "

2'-8 1_2 "

1'-5"

1'-5"2'-8 1_2 "

2'-8 1_2 "

1'-21_4"

1'-71_2"

2'-0 1_2 "2'-6"

27'-0 1_4 "

3'-8 3_4 "

3'-11"

6'-11"

4'-101_2"

103_4"

91_2"

91_2"

91_2"

91_2"

9"

8'-8

"

5'-0"

4'-1

1_ 4"

4'-1

1_ 4"

4'-4

"

4'-1

1_ 2"

4'-4

"

4'-1

1_ 2"

2'-1

1_ 2"

27'

-71_ 2"

4'-103_4"

4'-4

"2'-83_

4"

5'-1 3_4 "

5'-1

1_ 2"

8"8"8"

8"8"

8"

5'-13_4" 4'-1"

4'-11_4" 4'-31_

2" 4'-1"

4'-31_2" 4'-1" 2'-1"

2'-5

1 _ 4"

5'-4

"

2'-1

0"

11_2" 3"5'-21_

4"

1_2" O.C. TYP

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:3

2 PM

A-731

RAMP DETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 43: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

3" = 1'-0"DECK DETAIL

1/2" = 1'-0"DECK PLANKING

1/2" = 1'-0"DECK SECTION

3" = 1'-0"DECK DETAIL

3" = 1'-0"DECK DETAIL

A731

A731

A1

A3

A1

A731

0 1' 11/2'

1/2" 0 1' 11/2'

1/2" 0 1' 11/2'

1/2"

0 1' 11/2'

1/2"

0 1' 11/2'

1/2"

2 X 4 TREATED WOOD

TS 2 X 2

05 12 23.B005 12 35.F0

05 53 00

05 12 73.L69

05 05 23.A5

05 58 16

05 53 0005 12 00.T1

05 12 36.A127

05 05 23.10

06 15 13

05 05 23.A4

06 15 13.A1

05 12 36.A12805 12 35.F1

05 12 73.L263

05 12 35.F0

06 15 13

08 35 13.13

05 12 37 05 12 37

06 14 00

05 12 73.L263

06 16 00.D6

05 58 16

05 05 23.A4

06 05 23.B1

05 12 73.L69

05 12 35.F0

05 53 00

05 12 00.T105 53 00.A1

05 12 36.A128

05 05 23.10

05 12 36.A128

05 12 35.F2

05 05 23.A0

05 12 35.F2

05 05 23.A4

05 12 35.F2

05 12 35.F0

05 73 00

A3

DIVISION 05 - METALS

SHEET METAL05 58 16METAL GRATINGS05 53 00

DIVISION 06 - WOODS, PLASTICS, AND

PLYWOOD- EXTERIOR WALL SHEATING06 16 00.D6

05 05 23.10 1/4" STEEL PLATE

3/8" 3.5" LAG SCREW06 05 23.B1

COMPOSITIONS

C1

C4

A5A1

A1

A731

A1

A731

A3

A731

05 05 23.A2 1/2" A307 BOLT05 05 23.A3 3/8" A307 BOLT05 05 23.A4 3/16" A307 BOLT05 05 23.A5 1-1/4" SHEET METAL SCREW05 12 00.T1 STEEL WT 5-1/4"x3-1/2"x1/4"05 12 23.B0 STEEL CHANNEL 4" X 4.5LBS.05 12 35.F0 STEEL FLATSTOCK 1"X1/8"05 12 35.F1 STEEL FLATSTOCK 1-1/2"X3/16"05 12 35.F2 STEEL FLATSTOCK 1-1/2"X1/4"05 12 36.A129 STEEL ANGLE 1-1/2"X1-1/2"X1/8"05 12 36.A128 STEEL ANGLE 1-1/2"X1-1/2"X3/16"05 12 36.A127 STEEL ANGLE 2"X-2"X1/4"05 12 73.L69 STEEL TUBE 2"X2"X1/4"05 12 73.L263 STEEL TUBE 2"X3"X1/4"

DECK RAILING05 73 00

2X6 PRESSURE TREATED06 14 002X6 REDWOOD06 15 13.A1CEDAR DECK BOARDS06 15 13.A2

8"

11

'-11

1 _ 4"

13'-101_2"

1'-2

"

1'-6

1 _ 2"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:3

9 PM

A-741

DECK DETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 44: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

CASEWORK SCHEDULE

MARK COUNT MANUFACTURER MODEL DESCRIPTIONFINISH

DOOR FRAME COMPONENTSSIZE

WIDTH(W) HEIGHT(H) DEPTH(D)

CABPARTS

CABPARTS

CABPARTS

CABPARTS

CABPARTS

104

105

106

107

108

109

110

111

112

113

9

2

2

9

W3030

W3015

W2115

W421522101

102

103

30" 30" 11-3/4"

30" 15" 11-3/4"

21" 15" 11-3/4"

45" 15" 11-3/4"

42" 15" 11-3/4"

BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGE

BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGE

BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGE

BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGE

BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGE

STOCK DOUBLE DOOR

STOCK DOUBLE DOOR

STOCK DOUBLE DOOR

STOCK DOUBLE DOOR

STOCK DOUBLE DOOR

TYPE

2

1

2

1

2

TYPE 1 TYPE 2 TYPE 3

3/4" PLYWOOD 3/4" PLYWOOD

3/4" PLYWOOD 3/4" PLYWOOD

3/4" PLYWOOD 3/4" PLYWOOD

3/4" PLYWOOD 3/4" PLYWOOD

3/4" PLYWOOD 3/4" PLYWOODW4515

CABPARTS7 33" 15" 11-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOODW3315

CABPARTS2 30" 84" 11-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR3 3/4" PLYWOOD 3/4" PLYWOODTS3084-21

CABPARTS1 33" 12" 20-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

customCABPARTS1 33" 22" 20-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

CABPARTS1 42" 22" 11-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

CABPARTS3 26-1/2"" 10-1/4"" 11-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

CABPARTS1 23" 10-1/4"" 11-3/4" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

CABPARTS2 33" 12" 6" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR2 3/4" PLYWOOD 3/4" PLYWOOD

W3312

custom

custom

custom

custom

114 CABPARTS3 33" 15" BLUM SOFT-CLOSE 110 ° BLUMOTION CLIP TOP HINGESTOCK DOUBLE DOOR1 3/4" PLYWOOD 3/4" PLYWOODW3615 11-3/4"

W

H

D

H

W D

H

W D

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:4

1 PM

A-751

CASEWORKDETAILS

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 45: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1" = 1'-0"

INTERIOR STAIR ELEVATION

1-1/2" = 1'-0"

STAIR SECTION1-1/2" = 1'-0"

STAIR PLAN

0 1" 2"

0 1' 2'6"0 1' 2'6"

FOF 7'-3 1/4"DRESSING LEVEL

FOF 4'-9 1/4"GROOMING LEVEL

FOF 2'-3"DINING LEVEL

05 73 00

05 55 00

05 53 00

05 05 23

05 05 2305 55 00

05 73 00

05 05 23

05 53 00

05 55 00

C1

DIVISION 05 - METALS

METAL GRATINGS

1. STEEL STAIRCASE SAME FOR BOTH LEVELS

A4A1

1

05 53 00METAL FABRICATIONS05 55 00METAL RAILINGS05 73 00

METAL FASTENING05 05 23

2'-10"

71 _ 2"

11"

2'-6

"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

REVISIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

BURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

8/12

/201

1 6:

23:4

2 PM

A-761

STAIRS DETAIL

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 46: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1" = 1'-0"SECTION

1/2" = 1'-0"SECTION

1/2" = 1'-0"PLAN

1/2" = 1'-0"OVERHEAD PLAN

4' 8'0 2' 4' 8'0 2'

4' 8'0 2'

4' 8'0 2'

1 2

3 3

1. GREYWATER TANK

1.

2. MUNICIPAL SUPPLY TANK

DRAWING OF EXTERIOR SKIN IS NOTIONALNOT ACTUAL.

2. GRID "B" DENOTES CHANGE IN SLOPE OFROOF.

3. ACCESS HATCH

3. GRID "C.1" DENOTES THE AXIS OF ROTATIONFOR CANTILEVER EXTERIOR ENVELOPE.

5. ELEVATION DATUM MEASURES FROM THEHIGHEST POINT OF GRADE WITHIN PROPERTYLINE.

4. GRID "2" DENOTES THE AXIS OF MODULARSPLIT.

6. DIMENSIONS SHOWN TO FOF U.O.N.

A1 A4

B4

D4

07 21 13.B4

06 18 13.A10

06 18 13.A10

06 16 00.D6

06 16 23

8"

1'-101_2"

1'-2

1 _ 4"

6"

6'-0

3 _ 4"

8'-6"

6'-0

3 _ 4"

8'-6

"

13'-41_2"

13'-41_2"

2'-101_2" 1'-71_

2" 4'-41_2" 1'-71_

2" 2'-101_2"

ACCESS HATCH

FILL HOLE

WATER LINE

ORGANIZER FILL/DRAW ACCESS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 03.22.2011

REVISIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HOUSE, INFINITE POSSIBILITIES

CHIP 2011

BURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

8/12

/201

1 6:

23:4

4 PM

A-771

WATER UTILITYUNIT

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 47: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

21 05 00FIRE EXTINGUISHER LOCATION

28 31 46SMOKE DETECTOR

4'0 2' 8' 4'0 2' 8'

0 1" 2" 4"3" 0 1" 2" 4"3"

1/4" = 1'-0"B1 SPRINKLER PLAN 1/4" = 1'-0"B3 SMOKE DETECTOR PLAN

6" = 1'-0"D1 SPRINKLER DETAIL (PENDANT)6" = 1'-0"D3 SPRINKLER DETAIL (SIDEWALL)

LEGEND

WP-4

CWDIVISION 05 - METALS05 12 69.K6 2" STEEL PIPE

2" ALUMINUM TEE, 2" ALUMINUM05 14 13

DIVISION 06 - WOODS, PLASTICS,

06 11 00.G14 FRAMING- RAFTERS

DIVISION 07 - THERMAL AND

BATT INSULATION07 21 16.A10

1. SPRINKLER SHOULD BE COORDINATED ANDINSTALLED SUCH THAT THERE IS NO OBSTRUC-

DIVISION 21 - FIRE SUPPRESSION21 13 13.A1

06 16 00.D6 1/2" PLYWOOD06 16 00.D10 PLYWOOD- UNDERSIDE AND ROOF

AND COMPOSITES

MOISTURE PROTECTION

ANGLE

SHEATHING

HORIZONTAL SIDEWALL SPRINKLERS

RELIABLE F1-R49F1-R49 RECESSED21 13 13.A2

SIMPSON HU28 JOIST HANGER06 05 23.J29

N N

1

1. SMOKE DETECTOR LOCATED IN MECHANICALROOM ABOVE.

R49-16

SPRINKLER HEAD DEMAND: 13GPM @ 7.04

R44-12

R49-16

R49-16

R44-16

R49-16

R44-14

R44-14

R44-12

2

3

2. S.1 FIRE SPRINKLER MAIN SHUT-OFF VALVE.

3. 1" SUPPLY TO FIRE LOOP

TION IN ITS SPRAY PATTERN. OTHERWISE ADD-

4

5

4. 1" LOOP

5. 3/4" LOOP

06 16 00.D10

06 11 00.G14

21 13 13.B1

07 21 16.A10

06 16 00.D6

21 13 29

06 16 00.D6

21 13 13.B2

06 11 00.D05

21 13 13.C421 13 13.C2

12 33 33

21 13 13.C2

21 13 13.A2 HORIZONTAL PENDANT SPRINKLERS21 13 13.B1 3/4" PIPE FOR SPRINKLER SYSTEM21 13 13.B2 1" PIPE FOR SPRINKLER SYSTEM21 13 13.A2 HORIZONTAL PENDANT SPRINKLERS21 13 13.C2 FIRE SPRINKLER ADAPTER

2. SPACING NOT TO EXCEED 20'

TIONAL SPRINKLERS ARE REQUIRED.

WI

PENDANT SPRINKLER K=4.9, 155F°,7/16" ORIFICE, MAX. SPACING 16' x 16'

RELIABLE F1-R44-<F1-R44 RECESSED21 13 13.A1

SPRINKLER HEAD DEMAND: 12GPM @ 7.05

SIDEWALL SPRINKLER K=4.4, 155F°,3/8" ORIFICE, MAX. SPACING 12' x 12'

4'-6" DEFLECTOR

R44-16

SPRINKLER HEAD DEMAND: 16GPM @ 13.3

RELIABLE F1-R44-<F1-R44 RECESSED21 13 13.A1

SIDEWALL SPRINKLER K=4.4, 155F°,3/8" ORIFICE, MAX. SPACING 16' x 16'

4'-6" DEFLECTOR

R44-14

SPRINKLER HEAD DEMAND: 14.1GPM @ 70.2

RELIABLE F1-R44-<F1-R44 RECESSED21 13 13.A1

SIDEWALL SPRINKLER K=4.4, 155F°,3/8" ORIFICE, MAX. SPACING 14' x 14'

4'-6" DEFLECTOR

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:1

1 PM

F-101

FIRE DETECTIONAND SUPPRESSION

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 48: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

4'0 2' 8' 4'0 2' 8'

AIR ADMITANCEVALVE

DRINKING HOTWATER

OUTDOOR UNIT

DRINKING WATERSUPPLY

DRINKING COLDWATER

REFRIGERANT LINE

2-WAY BALL VALVE

THERMOWELL

IN-LINECIRCULATING PUMP

DOMESTIC HOT WATERHEAT PUMP

MODULE SPLITFITTING

SIDEWALL UPRIGHTHEAD SPRINKLERS

DRAIN FLOOR

INDOOR UNIT

PENDANT HEADSPRINKLERS

SUPPLY WATER SCHEMATICA3

1/4" = 1'-0"C1 DOMESTIC COLD WATER 1/4" = 1'-0"C4 DOMESTIC HOT WATER

NTS

AAV

MS

OU

FD

R

CW

IU

C

HEAT EXCHANGER

WIMUNICIPAL WATERSUPPLY TANK

H

HW

THERMALSTORAGE TANK

TW

3/4

" C

W

WP-2

3/4" W

EX

TE

RIO

R

MS

MS

MS

3/8" R

3/4" HW

3/4" CW

1" CW

3/8" R

WP-1

1/2

" C

W

1/4" R

LA

UN

DR

Y

FR

IDG

E

SH

OW

ER

3/4" W

TO

ILE

T

OU

3/4" HW

WI 1" CW

3/8" R

1/2

" H

W

DIS

HW

AS

HE

R

1" CW

3/4" CW

KIT

CH

EN

1/4" R

LA

VA

TO

RY

TW

TW

TW

HEX-2

C

H

POTABLE WATER

HEX-1

HP-1

DWH-T

3/4" CW

1/2

" C

W

1/2

" C

W

1/2

" C

W

1/2

" C

W

1/2

" C

W

1/2

" C

W

1/2

" H

W

1/2

" H

W

1/2

" H

W

1/2

" H

W

PT-1

P-1

FCU-1

FCU-2

TT-1

SYMBOLS

N

C

H

N

1. THE CENTRIFUGAL PUMP PROVIDESPRESSURIZED MUNICIPAL WATER TO THEHOUSE AS WELL AS THE FIRE SPRINKLER

2. COLD SUPPLY WATER GOES THROUGH THE

WATER TO WATER HEAT EXCHANGER AND GETPREHEATED BY WASTE HEAT FROM THE OUTDOOR

3. PREHEATED WATER THEN GOES INTO THEDOMESTIC WATER TANK WHICH IS FURTHERHEATED TO THE DESIRED TEMPERATURE BYA HEAT PUMP BEFORE THE HOUSE SUPPLIED.

4. THE PRESSURE REGULATORS ON THE SUPPLYLINES MAKE SURE THAT WE HAVE THE SAMEHOT/COLD WATER PRESSURE WHEN

1. WATERSUPPLY DISTRIBUTION IS ACHIEVED BYTHE USE OF A MANIFOLD.

DIVISION 21 - FIRE SUPPRESSION21 13 13 FIRE SPRINKLER HEAD21 13 29 BACKFLOW PREVENTER

3/4" 2-WAY BALL VALVE22 11 16 TYPPEX LINE (1/2", 3/4", 1")22 11 16.A

DIVISION 22 - PLUMBING

23 57 19.A LIQUID-LIQUID HEAT EXCHANGER23 71 13.A THERMAL STORAGE TANK

DIVISION 23 - HVAC

CENTRIFUGAL PUMP22 11 23.A22 11 23 CIRCULATING PUMP22 12 23 MUNICIPAL WATER SUPPLY TANK22 33 30.A DOMESTIC WATER TANK22 33 30.B HEAT PUMP

23 57 16.A DESUPERHEATER COIL

23 81 26.21 OUTDOOR HVAC UNIT23 81 26.22 INDOOR FANCOIL UNIT

UNIT, WHICH IS STORED IN THE THERMALSTORAGE TANK UNTIL HOT WATER DRAWN.

SYSTEM.

COMES OUT.

2. WATERSUPPLY DISTRIBUTION IS ACHIEVED BYTHE USE OF A MANIFOLD.

2

WI

T

T

TT

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:4

6 PM

P-102

DOMESTIC WATERSUPPLY

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 49: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

4' 8'0 2'

AIR ADMITTANCEVALVE

WATER

REFRIGERANT LINE

WASTE LINE AND VENT

WASTE WATER TANK

IN-LINECIRCULATING PUMP

DOMESTIC HOT WATERHEAT PUMP

MODULE SPLITFITTING

DRAIN FLOOR

INDOOR UNIT

3-WAY DIVERTERVALVE

NORMALLY OPENFLOAT SWITCH

DRIP IRRIGATION

Y MESH FILTER

RAINWATER TANK

MANUAL AIR VENT

DRAIN LINE

GARBAGE DISPOSAL

PIPE MANIFOLD

PLANTERS

CHECK VALVE

DRIP IRRIGATION

A3 RAINWATER WATER SCHEMATIC

C3 WASTEWATER / GREYWATER SCHEMATIC

A1 WASTEWATER WATER AND VENT 1/4" = 1'-0"

KITCHENSINK

HEAT PUMP

ST

LAVATORY

SMP-1

MECHANICAL ROOM

LAUNDRY

DISHWASHER

BATHTUBBATHROOM

TOILET

KITCHEN FLOOR

AAV

GREYWATER SYSTEM

DRAIN PANUNDER SOUTH DECK

AAV

ST

SMP-1

3.5" D

AAV

MS

FD

R

IU

ST

C

W

H

SV

FD

FD

2" SV

2" SV

2" SV

2" S

V

2" D

2" D

3.5" D

1.5

" S

V

SV

1.5

" D

3.5

" D

1.5

" D

DI

DI

3/4" W

N

RWP-1

RT

RT

FD

IU

IU

IU

C

H

FD

1. ALL THE AVS CONNECTIONS ARE ACHIEVED

1. THE CLOTHES WASHER, SHOWER, KITCHEN/

DIVISION 21 - FIRE SUPPRESSION21 13 13 FIRE SPRINKLER HEAD21 13 29 BACKFLOW PREVENTER

RAINWATER PUMP32 82 00.A

DIVISION 22 - PLUMBING

CHECK VALVE32 84 00.B3-WAY DIVERTER VALVE32 84 00.CFLOAT SWITCH32 84 00.DY MESH FILTER32 84 00.E

32 84 13 DRIP IRRIGATION

CENTRIFUGAL PUMP22 11 23.A22 12 23.A MUNICIPAL WATER SUPPLY TANK

WATER RETURN STORAGE TANK22 13 53.A22 13 53.B RAINWATER TANK22 14 29.A SUMP PUMP WITHHOLDING TANK

WITH APPROPRIATE AVS FITTINGS.

BATHROOM SINKS AND DISH WASHER HAVEDRAINS CONNECT TO THE MAIN 3.5" DRAINWHICH TAKES WASTE WATER TO THE WATERRETURN STORAGE TANK BY A SUMP PUMP.

2. THE DISH WASHER DRAIN MERGES INTO THEKITCHEN SINK DRAIN BEFORE GOING TO THEMAIN DRAIN.

3. THE MECHANICAL ROOM HAS A FLOOR DRAINTO REMOVE ANY CONDENSATION FROM THEMECHANICAL ROOM TO THE WATER RETURNSTORAGE TANK.

4. THE FIRE SPRINKLER SYSTEM HAS A VALVE THATCAN DRAIN THE SYSTEM TO THE WATER RETURNSTORAGE TANK FOLLOWING THE REGULATIONS.

2 STORAGE TANK SHALL NOT BE USED FORLANDSCAPE WATERING

MAX

MAX

MAX

IU

7/8

" D

2" D

1.5" D

1/2" W

PMF

1" W

1" W

3.5" D

3.5" D1.5" D

5/8

" D

5/8

" D

5/8

" D

1.5" D

2" D

3/4

" W

3/4" W

D

GDP

GD-1

1.5" D

GDP

2" D

3/4

" W

1/2" W

PMF

1/4" W

PLT

PLT

PLT

PLT

PLT

PLT LEGEND

DIVISION 32 - EXTERIOR IMPROVEMENTS

22 33 30.B HEAT PUMP22 33 30.A DOMESTIC WATER TANK

FD

GDP

2

2

DI

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:5

4 PM

P-103

DOMESTICWASTEWATER AND

GREYWATERSYSTEM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 50: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

PLUMBING PIPING AND PUMPS NAME TYPE MAKE MODEL MASTER FORMATCODE

PI-1 PIPING INSULATION K-FLEX USA 6RXL048058 22 07 19

PI-2 PIPING INSULATION K-FLEX USA 6RXL048078 22 07 19

PX-1 UPONOR F1040500 22 11 16

PX-2 3/4" WHITE PEX UPONOR F1040750 22 11 16

PX-3 1/2" RED PEX UPONOR F2040500 22 11 16

PX-4 3/4" RED PEX UPONOR F2040750 22 11 16

P-1 CENTRIFUGAL PUMP GRUNDFOS MQ3 -45 22 11 23

P-2 CIRCULAR PUMP GRUNDFOS 59896832 22 11 23

1/2" WHITE PEX

SMP-1 SUMP PUMP TANK LITTLE GIANT 505055 22 14 29

FACILITY POTABLE WATER STORAGE NAME TYPE MAKE MODEL MASTER FORMATCODE

PT-1 WATER SUPPLY TANK ACE A-VT0625-64 22 12 23

PT-2 WASTEWATER TANK ACE A-VT0625-64 22 13 53

PLUMBING EQUIPMENT NAME TYPE MAKE MODEL MASTER FORMATCODE

PE-1 HEAT PUMP RETROFIT AIRGENERATE A7 22 33 30

E-2 DOMESTIC WATER HEATER RHEEM RHES PRO 40-2 22 33 30

PLUMBING FIXTURESMARK TYPE MAKE MODEL MASTER FORMATCODE

PF-1 TOILET CAROMA 609151AW/ABI 22 41 13

22 41 16PF-3 LAVATORY BASIN K-2388

PF-4 LAVATORY FAUCET 293-XXRCF 22 41 39

PF-5 KITCHE SINK FAUCET 445-DJ13E1CP 22 41 39

PF-6 KITCHEN SINK BASIN

151-CP

22 41 16

PF-7 SHOWER HEAD

KOHLER

22 41 39

PF-8 SCALDING PREVENTION VALVE

OATEY

K-304-UX 22 41 39

PF-10 BATH DRAIN

CUSTOMPF-11 BATH TUB

293-XKRCF

22 41 19

22 41 19

22 41 39

22 41 39

22 41 19

22 41 19

22 41 19

42150

629-LESSSPTCP

821-2APK

WB79220CP

MINI-VENT

CHICAGO

SIOUX CHIEF

WESTBRASS

STUDOR

CHICAGO

CHICAGO

CUSTOM

CHICAGO

CHICAGO

KOHLER

TUB SPOUT

SHOWER SPOUT

KITCHEN DRAIN

BATH OVERFLOW DRAIN

AIR ADMITTANCE VALVE

PF-12

PF-13

PF-14

PF-15

AAV-1

WATER-BASED FIRE SUPPRESSION SYSTEMSMARK DESCRIPTION MAKE MODEL MASTER FORMAT CODESW-1 PIPE FOR SPRINKLER SYSTEM UPONOR F1040750

SW-2 UPONOR F1041000 21 13 13

S-1 SPRINKLER HEAD UPONOR Q74900WH

S-2 UPONOR

S-3 UPONOR

S-4

S-5

S-6

S-7

SF-1

SF-2

MB-1

PIPE FOR SPRINKLER SYSTEM

SPRINKLER HEAD

SPRINKLER HEAD

SPRINKLER HEAD

SPRINKLER HEAD

SPRINKLER HEAD

SPRINKLER HEAD

SPRINKLER FITTINGS

SPRINKLER FITTINGS

MOUNTING BRACKET

UPONOR

UPONOR

UPONOR

UPONOR

UPONOR

UPONOR

UPONOR A7750700

LF7701010

LF7707575

Q74400WH

Q74400WH

Q74400WH

Q74400WH

Q74900WH

Q74900WH

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

21 13 13

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:5

6 PM

P-601

PLUMBINGSCHEDULE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 51: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

21

3

ABC

A2

M-1

01

SOLAR ENVELOPE18'-0"

GRADE LEVEL0"

MODULE SPLIT10'-1 1/4"

ABC

23 31 16 COMPRESSIBLE DUCT

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

28:5

8 PM

M-101

HVAC EQUIPMENTAND DISTRIBUTION

1/4" = 1'-0"A2 ELEVATION

23 81 26 HVAC INDOOR UNIT

23 81 26 HVAC INDOOR UNIT

23 34 13 WHOLEHOUSE FAN

23 34 16 BATHROOM FAN

23 34 13 MECHANICAL ROOM FAN

23 34 23 ENERGY RECOVERY VENTILATOR

23 71 13 THERMAL STORAGE TANK

23 81 26 HVAC OUTDOOR UNIT

23 31 16 REFRIGERANT LINE

23 31 16 NONMETAL DUCTS23 34 13 AXIAL HVAC FANS23 34 16 CENTRIFUGAL HVAC FANS23 34 23 HVAC POWER VENTILATORS23 71 13 THERMAL HEAT STORAGE23 81 26 SPLIT SYSTEM AIR-CONDITIONERS

1. REFER TO M-601 FOR THE SCHEMATICDIAGRAM.

2. REFER TO M-602 FOR EQUIPMENTSCHEDULES.

3. REFER TO M-901 FOR ISOMETRIC DRAWINGS.

4. FAN COIL UNITS, SUPPLY AIR DUCTS ANDFANS, EXHAUST DUCTS AND FANS, AND HOTWATER EQUIPMENT ARE STORED INREINFORCED SOFFITS ABOVE THE LIVING AREA.

1. THE ERV (ENERGY RECOVERY VENTILATOR)DRAWS IN FRESH AIR AND EXHAUSTS STALE AIRWHILE EXCHANGING HEAT AND HUMIDITYBETWEEN THE TWO STREAMS.

2. THE WHOLE HOUSE FAN FORCES WARMHUMID AIR OUT OF THE HOUSE, IMPROVINGINDOOR AIR QUALITY AND REDUCING COOLINGLOADS.

3. A HEAT PUMP DUMPS EXCESS HEAT INTO THETHERMAL STORAGE TANK, WHICH IS USED TOPREHEAT DOMESTIC HOT WATER.

4. REFRIGERANT LINES CONNECT THE HVACINDOOR UNITS TO THE OUTDOOR UNIT,ALLOWING REFRIGERANT TO FLOW BOTH TOAND FROM THE INDOOR UNITS.

5. RIGID DUCTS EXHAUST LINT AND GREASEFROM THE LAUNDRY AND KITCHEN,RESPECTIVELY.

6. ONE HVAC INDOOR UNIT IS MOUNTED ON THEEAST SIDE OF THE HOUSE TO PROMOTE EVEN AIRCIRCULATION THROUGHOUT THE ENTIRE SOUTHEND OF THE HOUSE. REFRIGERANT ANDELECTRICAL LINES BETWEEN THE INDOOR ANDOUTDOOR UNITS RUN INSIDE A BOX BEAMACROSS THE CEILING.

7. LARGE APERTURES ON THE NORTH ANDSOUTH SIDES OF THE HOUSE PROMOTE NATURALVENTILATION THROUGH THE HOUSE. THEUPWARD-SLOPING SPACES OF THE HOUSEENCOURAGE NATURAL CONVECTION AS ARESULT OF THE THERMAL CHIMNEY EFFECT.

14

5

5

2

0 2' 4' 8'

0 2' 4' 8'

6

7

7

3

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 52: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

HVAC/DHW SCHEMATIC DIAGRAMVENTILATION SCHEMATIC DIAGRAM

HVAC/DHW HEAT EXCHANGE DIAGRAM HVAC/DHW LEGEND

IN-LINE CIRCULATING PUMP

FCU-2

FCU-1

LX

EF-2

EF-1

EF-3

WHF-1

OUTDOOR AIR

ERVEXHAUST

BATHROOMEXHAUST

MECHANICALCLOSET EXHAUST

RANGE HOODEXHAUST

LAUNDRYEXHAUST

WHOLE-HOUSEEXHAUST

RETURN

RETURN

CONDITIONED AIR

CONDITIONED AIR

HP-1

TT-1

DHW-T

MWT

DOMESTIC WATER

HEX-2

ERV SUPPLYERV

HEX-1

INDOOR AIR

T

1. DURING HVAC OPERATION, SUPERHEATEDREFRIGERANT COMING OUT OF COMPRESSOR

2. HOT WATER FROM THE THERMAL STORAGETANK IS CIRCULATED THROUGH A BRAZED

3. A BACKUP ELECTRIC HEAT PUMP HOT WATERTANK IS USED TO MAINTAIN TEMP. STABILITY

4. AN OFF THE SHELF DUCTLESS MULTIZONECONDENSER UNIT IS CUSTOMIZED BY CUTTING

WP-1

WP-2

HEX-1TT-1

120 GAL

HP-1

FCU-1

FCU-2

DHW-T38 GAL

WP-4

HEX-2

TS-1

TS-3

TS-4

TS-5 TS-6

TS-2

1/4"

3/8"

1/4"

3/8"

3/8"

1/2"

3/4"

1/2" 1/2"

3/4"

1"

3/4"

3/4"

3/4"

3/4"

3/4"

TS-7

WI CW

C

H

POTABLE WATER

CW

HW

DWS

RSRS

RD

RD

RD

RLRL

C H

3/8"

1.

2.

REFER TO M-602 FOR EQUIPMENT SCHEDULES

3.

REFER TO M-101 FOR HVAC EQUIPMENTAND DISTRIBUTION PLAN/ELEVATION

EQUIPMENT IS NOT DRAWN TO SCALE

IS COOLED DOWN USING A DESUPERHEATERCOIL WITH WATER CIRCULATING FROM THETHERMAL STORAGE TANK.

PLATE HEAT EXCHANGER TO PREHEAT DHW.

OF DHW.

THE COPPER PIPE COMING OUT OF THE COM-PRESSOR AND BRAZING NEW PIPING TO CON-NECT A DESUPERHEATER COIL IN LINE WITH THESTANDARD REFRIGERANT LOOP.

CW

-1

COMPRESSOR

EXPANSION VALVE

REFRIGERANT CONDENSER

MUNICIPAL WATER SUPPLYTANK

FANTHERMOCOUPLE

4-WAY VALVE

DRINKING COLD WATER

DRINKING HOT WATER

REFRIGERANT DISCHARGE LINE

REFRIGERANT LIQUID LINE

REFRIGERANT SUCTION LINE

RD

RL

RS

REFRIGERANT TO WATERHEAT EXCHANGER

WATER TO WATERHEAT EXCHANGERFAN COIL UNIT

DOMESTIC HOT WATERHEAT PUMP

DRINKING WATER STORAGE TANK

C

H

C HDRINKING WATER SUPPLY

CW

HW

DWS

POTABLE WATERTHERMAL STORAGE TANK

WICENTRIFUGAL PUMP

CW

CW-1

T

T

TT

TT

1

4

3

2

A4A1

D1 D4

T

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

29:0

0 PM

M-601

SCHEMATICDIAGRAM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 53: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

CENTRAL HEATING EQUIPMENTNAME TYPE MAKE MODEL MASTER FORMAT CODE HEX-1 STEAM-TO-WATER HEAT EXCHANGER PACKLESS CDAX-5030-H 23 57 16

HEX-2 LIQUID-TO-LIQUID HEAT EXCHANGER BRAZETEK BT3X8-30 23 57 19

CENTRAL HVAC EQUIPMENT NAME TYPE MAKE MODEL MASTER FORMATCODE

TT-1 THERMAL STORAGE TANK CHEM-TAINER NW120MINI 23 71 13

DECENTRALIZED HVAC EQUIPMENT NAME TYPE MAKE MODEL MASTER FORMAT CODE

HP-1 DUCTLESS MINI-SPLIT HEAT PUMP MITSUBISHI MXZ-2B20NA 23 81 26

FCU-1 FAN COIL UNIT MITSUBISHI MSZ-FE09NA 23 81 26

FCU-2 FAN COIL UNIT MITSUBISHI MSZ-FE09NA 23 81 26

RESIDENTIAL APPLIANCESMARK DESCRIPTION MAKE MODEL MASTER FORMAT CODE

EK-1 REFRIGERATOR/FREEZER GE GTH18ISXSS 11 31 13

EK-2 RANGE HOOD GE JV930SCBR 11 31 13

EK-3 COOKTOP GE PP912SMSS 11 31 13

GD-1 GARBAGE DISPOSAL KITCHEN AID KCDB250G 11 82 26

EK-4 CONVECTION OVEN GE JTP70DPWW 11 31 13

EK-5 DISHWASHER BOSCH SHV4313UC 11 31 13

EL-1 CLOTHESWASHER LG WM2140CW 11 13 23

EL-2 CLOTHESDRYER LG DLE2140W 11 13 23

EXPLODE NAME TYPE MAKE MODEL MASTER FORMAT CODE

TS-1 TEMPERATURE SENSOR OMEGA TC-PVC-K 23 09 13

TS-2 TEMPERATURE SENSOR 23 09 13

TS-3 TEMPERATURE SENSOR 23 09 13

TS-4 TEMPERATURE SENSOR 23 09 13

TS-5 TEMPERATURE SENSOR 23 09 13

TS-6 TEMPERATURE SENSOR 23 09 13

TS-7 TEMPERATURE SENSOR 23 09 13

TS-8 TEMPERATURE SENSOR OMEGA 23 09 13

TS-9 TEMPERATURE SENSOR RAPHNET USBTENKI-T-RH-SHT 23 09 13

TL-1 THERMOCOUPLE DATA LOGGER PICO TC-08 23 09 13

OMEGA

OMEGA

OMEGA

OMEGA

OMEGA

OMEGA

TC-PVC-K

TC-PVC-K

TC-PVC-K

TC-PVC-K

HSTC-TT-K

HSTC-TT-K

HSTC-TT-K

TM-1 THERMOCOUPLE DATA LOGGER LUX LV-1 23 09 13

TM-2 THERMOCOUPLE DATA LOGGER LUX LV-3 23 09 13

DEHUMIDISTAT HONEYWELL H46C1166 23 09 13DM-2

HVAC PIPING AND PUMPS NAME TYPE MAKE MODEL MASTER FORMAT CODE

WP-1 WATER PUMP GRUNDFOS ALPHA 15-55 F/LC 23 21 23

WP-2 WATER PUMP GRUNDFOS ALPHA 15-55 F/LC 23 21 23

FL FLANGE MCMASTER-CARR 4596K154 23 21 13

NR-1 NPT REDUCER MCMASTER-CARR 4880K349 23 21 13

NR-2 NPT REDUCER MCMASTER-CARR 4880K348 23 21 13

PX-1 PEX WATER PIPING UPONOR F2040500 23 21 13

PX-2 PEX WATER PIPING UPONOR F2040750 23 21 13

PX-3 PEX WATER PIPING UPONOR F1040500 23 21 13

PX-4 PEX WATER PIPING UPONOR F1040750 23 21 13

23 23 23 RF-1 REFRIGERANT HONEYWELL R-410A

RFL-1 REFRIGERANT LINE SET GENERIC LS143850F 23 23 16

HVAC AIR DISTRIBUTIONNAME TYPE MAKE MODEL MASTER FORMAT CODE

WHF-1 WHOLE-HOUSE FAN BROAN L700 23 34 16

EF-1 MECHANICAL ROOM EXHAUST FAN PANASONIC FV-10NLF1 23 34 16

EF-2 BATHROOM EXHAUST FAN PANASONIC FV-08VKS3 23 34 16

EF-3 RANGE HOOD GENERAL ELECTRIC JV930SCBR 11 31 13

ERV ENERGY RECOVERY VENTILATOR PANASONIC FV-04VE1 23 34 23

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

29:0

1 PM

M-602

SCHEDULES

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 54: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:2

5 PM

M-901

MECHANICALISOMETRIC

A1 ISOMETRIC

23 81 26 HVAC INDOOR UNIT

23 81 26 HVAC INDOOR UNIT

23 81 26 HVAC OUTDOOR UNIT

23 71 13 THERMAL STORAGE TANK

23 34 13 WHOLE HOUSE FAN

23 34 16 BATHROOM FAN23 34 13 MECHANICAL ROOM FAN

WHOLE HOUSE FAN

MECHANICAL ROOM FAN

KITCHEN RANGE HOOD

ENERGY RECOVERY VENTILATOR

BATHROOM FAN

LANDRY EXHAUST

23 31 16 NONMETAL DUCTS23 34 13 AXIAL HVAC FANS23 34 16 CENTRIFUGAL HVAC FANS23 34 23 HVAC POWER VENTILATORS23 71 13 THERMAL HEAT STORAGE23 81 26 SPLIT SYSTEM AIR-CONDITIONERS

1. REFER TO M-101 FOR THE PLAN AND ELEVATIONVIEWS.

2. REFER TO M-601 FOR THE SCHEMATIC DIAGRAM.

3. REFER TO M-602 FOR EQUIPMENT SCHEDULES.

23 34 23 ENERGY RECOVERY VENTILATOR

1. THE VENTILATION SYSTEM DRAWS IN FRESH AIRFROM THE SOUTH END OF THE HOUSE TO MAINTAININDOOR AIR QUAILITY.

2. THE VENTILATION SYSTEM EXHAUSTS STALE AIRFROM A SERIES OF REGISTERS ON THE NORTH ENDOF THE HOUSE. THIS PREVENTS CONTAMINATION OFFRESH AIR AND DIRECTS EXHAUST UPWARDS ANDAWAY FROM THE HOUSE.

3. THE THERMAL STORAGE TANK IS STORED IN ASTRUCTURALLY REINFORCED SOFFIT ABOVE THEKITCHEN AREA.

1

3

2

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 55: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

3

4

5

6

7

IN-LINE CIRCULATING PUMP

4' 8'0 2' 4' 8'0 2'

240V

240V

1/4" = 1'-0"A1 MAIN LEVEL DISTRIBUTION PLAN 1/4" = 1'-0"A4 UPPER LEVEL DISTRIBUTION PLAN

(GFCI)

(GFCI)

(GFCI)

(GFCI)

44

(GFCI)

8

6

6

6

15

17

17

19

31

33(GFCI)

(GFCI)17

23

(GFCI)

21

21

6

6

8

11

11

10

(GFCI)

8 8

6

11

11

4

(GFCI)

8

240V

22

22

16

14

16

(GFCI)

14

22

14

(GFCI)

36

16

16

30

16

14

(GFCI)

16

27

H

16

8

36

16

8

13

13

13

CW

RSRL

C

H

REFRIGERANT CONDENSER

FAN

FAN COIL UNIT

DOMESTIC HOT WATERHEAT PUMP

NON-ELECTRICAL EQUIPMENTLEGEND

CENTRIFUGAL PUMP

6

N N

2

2

DIVISION 26 - ELECTRICAL26 05 00 COMMON WORK RESULTS FOR

LOW VOLTAGE ELECTRICAL26 20 00

ELECTRICAL

DISTRIBUTION

ENCLOSED SWITCHES AND26 28 16CIRCUIT BREAKERS

1. FOR MECHANICAL EQUIPMENT DESCRIPTIONREFER TO M-601

1. ALL WIRES EXPOSED SHALL BE ENCLOSED INEMC 1/2" CONDUIT OR LARGER AS NECESSARY.

2 ALL MECHANICAL COMPONENTS AREPOWERED BY AN ADJACENT JUNCTION BOXAND CONNECTED BY ROMEX 1/2" OR 3/4"FLEXIBLE CONDUIT, AS NECESSARY.

3 REFER TO E-601 ONE-LINE DISTRIBUTIONDIAGRAM AND E-603 LOAD DIAGRAM FORMORE INFORMATION.

4 REFER TO A-202 FOR EXTERIOR WALLELEVATION SCHEMATIC INCLUDINGORGANIZER ENCLOSURE LOCATION

5 WALL LENGTH ALONG NORTH WINDOWDOES NOT EXCEED 11 FEET, ENSURINGCOMPLIANCE WITH NEC 210.52(A)(1)

C

H

RSRL

CW

2. 30A 4W RECEPTACLE

2

3. 15A 3W RECEPTACLE

4. 15A TAMPER-PROOF GFCI RECEPTACLE

5. 15A TAMPER-PROOF RECEPTACLE

6. 15A WEATHERPROOF GFCI RECEPTACLE

DIVISION 28 - ELECTRONIC SAFETY

28 31 46 SMOKE DETECTORAND SECURITY

7. 20 A TAMPER-PROOF GFCI RECEPTACLE

8 JUNCTION BOX

9. SMOKE DETECTOR

8

9

10

10. NEC 210.52(A). WINDOW EXTENDS TO FLOORLEVEL, OUTLETS ARE FLOOR MOUNTED, ANDTHE FLOOR IS A BED

10'-7"

12"

14"

JJ

J JTT

S

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:4

9 PM

E-101

ELECTRICALDISTRIBUTION

PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 56: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

SD

S6

Sx

SF

25 14 00.B1

25 14 00.B1

25 14 00.B1

27 41 16.C2

27 41 16.B

27 41 16.C3

25 13 00.B

27 22 00.A1

26 51 00 2.1.A.3

26 51 00 2.2.A.1

26 51 00 2.2.A.1

26 51 00 1.1.C.2

26 51 00 2.1.A.1

26 51 00 2.2.A2

27 21 00.B1

4' 8'0 2' 4' 8'0 2'

25 14 00.A1

27 41 16.D1

27 41 16.C1

27 41 16.B4

1/4" = 1'-0"B1 CONSUMER ELECTRONIC PLACEMENT 1/4" = 1'-0"B4 LIGHT SWITCH

LIGHTING/EXTERIORBUILDING

TASK LIGHT/LED

LINEAR LED FIXTURE

LEGEND

DIMMER SWITCH

SIX BUTTON KEYPAD

WIRELESS LIGHT SWITCH CONTROL

TASK LIGHT

D

D

D

D

C

C

C

C

CP

TV

ATV

SW

ODL

OE

SW

TDL

TV

ATV

BRP

C

RCVR

I/O

IPAD

IPA

D

TDL

LED STRIP LIGHT

SHEAR WALL AMBIENT

OVER CABINET LED

UNDER CABINET LED

BEAM SHELF TASK

EXTERIOR WALL LIGHT

SHEAR WALL TASK

T8 LIGHT FIXTURE

C

D

D

N N

DIVISION 25-INTEGRATED AUTOMATION

25 14 00.A1 HOME CONTROLLER

SIX BUTTON KEYPAD

25 14 00.B1WIRELESS OUTLET SWITCH

27 41 16.B4

DIVISION 27- DATA COMMUNICATION

27 41 16.C2 PROJECTORPROJECTOR SCREEN27 41 16.C3

SPEAKERS27 41 16.B

25 14 00.B2

SUB WOOFER

27 21 00.B1 I/O EXTENDER27 22 00.A1 WALL MOUNT IPAD27 41 16.A1 RECEIVER

25 14 00.B3

DIMMER SWITCH

25 13 00.B DOOR AND WINDOW SENSOR

27 41 16.D1 APPLE TV (VIDEO SOURCE)

27 41 16.C1 LED HDTV

1. EXTERIOR LIGHTING PLAN REFERS TO A-101

8

8

10

9

9 9

9

2

2

9

9

2

2

2

8 88

8 8

8 8

8

8

8

10

10

10

8

9

9 99

9

9

8

9

SF

SC

SR

SPEAKER, FRONT

SPEAKER, CENTER

SPEAKER, REAR

SC

9

SR

SR

ORGANIZER DATA LOGGER

ORGANIZER ENCLOSURE

SUBWOOFER

THERMOCOUPLE DATA LOGGER

LED HDTV

APPLE TV

BLUE RAY PLAYER

DOOR AND WINDOW SENSOR

A/V RECEIVER

APPLE IPAD

AUTOMATED SHADE

99 9

9

2

2

DIVISION 26- ELECTRICAL

AND LUMINAIRES26 51 00 INDOOR AND OUTDOOR LIGHTS

8

8

8

1

1

22

2

9

9

SD

SD

2

SS

S

S

S

S

S

S

S

S

S

S

S

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

23:5

7 PM

E-102

LIGHTING ANDCONSUMER

ELECTRONICSPLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 57: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1 2 3

654

7 8 9

121110

13 14 15

181716

19 20 21

242322

25 26 27

302928

31 32 33

3635

37 38 39

424140

34

4' 8'0 2'

1. TIGO MODULES ARE ATTACHED IN SERIES WITH EACH PHOTOVOLTAIC MODULE, WITH ATTACHMENTS MADE AT THE PHOTOVOLTAIC JUNCTION BOX

2. WIRES IN FREE AIR ARE COMBINED AT JUNCTION BOXES MOUNTED UNDER FAUX MODULES

3. REFER TO SHEET A-101 FOR UTILITY CONNECTION POINT LOCATION

4. REFER TO SHEET A-202 FOR EXTERIOR WALL ELEVATION SCHEMATIC

1/2" = 1'-0"A1 PV WIRING PLAN

3_4" CONDUIT EMT

26 05 00

TIGO MODULE MAXIMIZERATTACHED TO SOLAR

MODULE JUNCTION BOX48 14 00

HANWHA SOLARONE MODULE26 31 00

SMA SB7000US48 14 00

M

MAIN LOAD CENTER26 28 16 B.2

ORGANIZER SUPPLIED METER

S

SOUTHEASTGROUNDING ROD

ORGANIZER UTILITY PANEL

NORTHWESTGROUNDING ROD

DIVISION 26 - ELECTRICAL26 05 00 COMMON WORK RESULTS FOR

LOW VOLTAGE ELECTRICAL26 20 00

ENCLOSED SWITCHES AND26 28 16

PHOTOVOLTAIC SYSTEMS26 31 00

N

ELECTRICAL

DISTRIBUTION

CIRCUIT BREAKERS

DIVISION 48 -48 14 00 SOLAR ENERGY ELECTRICAL

POWER GENERATION EQUIPMENT

48 14 00 ELECTRICAL POWER GENERATIONINVERTERS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:0

2 PM

E-103

EXTERIORCONNECTION PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 58: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

IN-LINE CIRCULATING PUMP

SUPPLY PUMP

1 15A AFCI SINGLE POLE

2 15A GFCI SINGLEPOLE3 20A GFCI SINGLE POLE

4 15A GFCI TWO POLE

5 20A GFCI TWO POLE

6 30A GFCI TWO POLE

8 40A GFCI TWO POLE

9 45A TWO POLE

AWG #103_4" CONDUIT

AWG #103_4" CONDUIT

AWG #63_4" EMT CONDUIT

TO AC DISCONNECT SWITCH AND INVERTERREFER TO SHEET E-602

AWG #2/0 COPPERCABLE2" CONDUIT

ORGANIZER SUPPLIED METER

BARE ARMORED GROUND CABLEAWG #4

WIRE TYPE LEGEND

AWG #83_4" CONDUIT

REFRIGERANT CONDENSER

FAN

DOMESTIC HOT WATERHEAT PUMP

C

H

RSRL

CW-1

NON-ELECTRICAL EQUIPMENT LEGEND

NEUTRAL

GROUND

10 200A TWO POLE MAIN SERVICE DISCONNECT

6

7 30A TWO POLE

7 8

9 10

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

29 30

31 32

33 34

35 36

37 38

39 40

41 42

1 2

3 4

5 6

1

1

1

1

1

3

2

2

2

2

3

3

3

7

6

6

6

8

9

(GFC

I)

CW-1

CW-1

J

SSS

FRDG

DW

OVEN

RNG

W

D

C

H

RSRL

M

DIVISION 23 - HVAC

DIVISION 22 - PLUMBING

23 09 00 INSTRUMENTATION AND CONTROLHYDRONIC PIPING AND PUMPS23 21 00

22 01 00 OPERATION AND MAINTENANCEELECTRIC DOMESTIC WATER HEATER22 33 00

HVAC FANS23 34 00DECENTRALIZED UNITARY HVAC23 81 00EQUIPMENT

DIVISION 26 - ELECTRICAL26 05 00 COMMON WORK RESULTS

LOW VOLTAGE ELECTRICAL26 20 00

ENCLOSED SWITCHES AND26 28 16

PHOTOVOLTAIC SYSTEMS26 31 00LIGHTING26 51 00

CIRCUIT BREAKERS

DISTRIBUTION

FOR ELECTICAL

DD

1. ALL WIRES SIZE #12 AWG NM-B ROMEX, U.O.N.

RNGHOOD

3

(GFCI)

SDS

(GFCI)

240V

(GFCI)

(GFCI)

(GFCI)

4

(GFCI)

SD

S

(GFC

I)

(GFCI)

S

240V

(GFCI)

(GFCI)

SD(GFCI)

S SD S

(GFC

I)

S

SDSDSDS

(GFCI)

(GFCI)

1

2

10

(GFCI)

(GFCI)

CW-1

(GFCI)

(GFC

I)

(GFC

I)(G

FC

I)

(GFC

I)

H

CW

CW

T

S

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:0

4 PM

E-601

ONE-LINEDIAGRAM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 59: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

STRING VOC*1.14 = 561.8 V DCSTRING ISC*1.56 = 8.86 A AWG #10STRING VMP = 393.8 V DCSTRING IMP = 5.33 A

TIGO OUTPUT

TIGO STRING VOC*1.14 = 561.8 V DCTIGO STRING ISC*1.56 = 8.86 ATIGO STRING IMP = 5.33 A

MAX CURRENT INPUT TO INVERTER5.33 A *4 = 21.32 A

INVERTER OUTPUT CURRENT

IMP*1.25 = 36.25 A AWG #6

HANWHA SOLARONE SF-160-M190 MODULES

TIGO MM-ES50

MAXIMUM VOC 52VVMP RANGE: 16-48 VMAXIMUM IMP: 9.5 AMAXIMUM ISC: 10 AMAXIMUM OUTPUT POWER 300WMAXIMUM ISC 9.5A

STC NOCT*PMP 190 W 137 WVMP 35.8 V 32.2 VIMP 5.33 A 4.26VOC 44.8 V 41.2 VISC 5.78 A 4.68 A

TEMPERATURE COEFFICIENTS

PMPP -0.44%/KV -0.33%/KI -0.03%/KMAXIMUM SYSTEM VOLTAGE 600 VSERIES FUSE RATING 10 A

*NOCT: 45 °C, 800W/M^2, 1 M/S WIND SPEED

MODULE OUTPUT:

NEUTRAL

GROUND

PHOTOVOLTAIC ARRAY STRINGS 3, 410 HANWHA SOLARONE SF-160-M190 MODULES PER STRING 26 31 0010 TILTEDATTACHED BY MC-4 CABLE TO TIGO MM-ES50 UNITS 48 14 00ISC 5.68 AVOC 448.0 VNOMINAL ARRAY POWER 1900 W PER STRING

PHOTOVOLTAIC ARRAY STRINGS 1, 211 HANWHA SOLARONE SF-160-M190 MODULES PER STRING 26 31 006 FLAT, 5 TILTEDATTACHED BY MC-4 CABLE TO TIGO MM-ES50 UNITS 48 14 00ISC 5.68 AVOC 492.8 VNOMINAL ARRAY POWER 2090 W PER STRING

SMA AMERICA SB7000USTIGO MODULE MAXIMIZER

SUNNY BOY SB7000US

MAX INPUT CURRENT 30 AMAX INPUT VOLTAGE 300 VSTRING FUSE RATING 15 ASTART VOLTAGE 300 VMPPT VOLTAGE RANGE 250 - 480 V

MAX OUTPUT CURRENT 29 AOUTPUT VOLTAGE 240 V

AWG #10 THWN-2IN ¾” EMT CONDUITPOSITIVE = BLACKNEGATIVE = REDGROUND= GREEN

AWG #6 THWN-2IN ¾” EMT CONDUITL1 = REDL2 = BLUENEUTRAL = WHITEGROUND= GREEN

SQUARE D QO142L225GRBMAIN LOAD CENTER225 A65 KA SHORT CIRCUIT CURRENT RATING26 28 16

WEATHERPROOFJUNCTION BOX

SQUARE D QO200RTAC DISCONNECT SWITCH60A26 28 16

SMA AMERICA SB7000US INVERTER7000 WINTEGRATED DC DISCONNECT48 14 00

7 8

9 10

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

29 30

31 32

33 34

35 36

37 38

39 40

41 42

1 2

3 4

5 6

9

G DC

DC -

DC +

DC -

DC +

DC -

DC +

DC -

DC +

L1

L2

N

G AC

L1

L2

N

G AC

L1

L2

N

G AC

DIVISION 26 - ELECTRICAL

26 31 00 COMMON WORK RESULTS FOR

ENCLOSED SWITCHES AND26 28 16CIRCUIT BREAKERS

SOLAR ENERGY ELECTRICAL POWER48 14 00GENERATION EQUIPMENT

ELECTRICAL POWER GENERATION48 19 00INVERTERS

AWG #10 USE-2 WIREIN FREE AIRPOSITIVE = BLACKNEGATIVE = BLACK WITH WHITESTRIPESGROUND= BARE

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:0

5 PM

E-602

THREE-LINEDIAGRAM

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 60: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

CIRCUITNUMBER

CIRCUITNUMBER

1 2

3 4

5 6

7 8

9 10

11 12

13 14

15 16

17 18

19 20

21 22

23 24

25 26

27 28

29 30

31 32

33 34

35 36

37 38

39 40

41 42

PANEL SCHEDULE

DESCRIPTION

SOUTHEAST LIGHTS

SOUTHEAST RECEPTACLES

SMOKE DETECTORS

KITCHEN RECEPTACLES 1

DISHWASHER, RANGE HOOD

OVEN

RANGE

WASHER

DRYER

KITCHEN RECEPTACLES 2

FRIDGE

SPARE

SPARE

SPARE

DESCRIPTION

NORTHWEST RECEPTACLES

SOUTHWEST RECEPTACLES

NORTHEAST RECEPTACLES

EXTERIOR RECEPTACLES, LIGHTS

BATHROOM RECEPTACLES, LIGHT

PUMP RECEPTACLES

FANS

SPARE

SPARE

SPARE

SPARE

COMPRESSOR AND FAN COILS

AIRTAP RECEPTACLE

HOT WATER TANK RECEPTACLE

SUPPLY PUMP RECEPTACLE

WIRETYPE

WIRESIZE

12

BREAKERTRIP

BREAKERTYPE POLES VA PHASE A VA PHASE B WIRE

TYPEBREAKER

TRIPBREAKER

TYPEPOLESVA PHASE BVA PHASE A

ROMEX NM-B 15 AFCI 1 1080+lighting

WIRESIZE

12ROMEX NM-B15AFCI1

12 ROMEX NM-B 15 AFCI 1

ROMEX NM-B 15 AFCI 1

ROMEX NM-B 20 1

ROMEX NM-B 20 1

ROMEX NM-B 15 1

ROMEX NM-B 20 1

10 ROMEX NM-B 30 2

8 ROMEX NM-B 40 2

ROMEX NM-B 20 GFCI 1

10 ROMEX NM-B 30 2

ROMEX NM-B15AFCI1

ROMEX NM-B15AFCI1

ROMEX NM-B201

ROMEX NM-B201

ROMEX NM-B15GFCI1

ROMEX NM-B15GFCI1

ROMEX NM-B15GFCI1

10ROMEX NM-B301

10ROMEX NM-B301

12ROMEX NM-B151

12

12

12

12

12

12

12

12

12

12

12

12

12

1080

29

180

360

1440

1894

2250

2250

3800

3800

180

2500

2500

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

GFCI

900+lighting

1080

180+lighting

1440

1440

825

335

335

825

1440

410

540+lighting

540

SPARE

GFCI

GFCI

GFCI

GFCI

SOLAR FEED

MAIN SERVICE FEED 2/0 200 2

MAIN SERVICE FEED

OVEN

RANGE

DRYER

COMPRESSOR AND FAN COILS

HOT WATER TANK RECEPTACLE

SUPPLY PUMP RECEPTACLE

SOLAR FEED

6THHN, 3_4" EMT452

MAIN SERVICE FEED

MAIN SERVICE FEED

MAIN PANELTEAM CA 2011

RATING: 225 A

SERVICE: 240 V, 2P, 3W

ENCLOSURE TYPE: NEMA 3R WEATHERPROOF, SURFACE MOUNTED

MODEL NO.: SQ. D QO142L225GRB

AIC: 65K

BREAKER SPACES: 42

FEEDER SIZE CALC

GENERAL LIGHTING LOAD

SMALL APPLIANCE LOAD

BATHROOM LOAD

TOTAL LOAD - LIGHTING LOAD

LINE A

1800 VA

3000 VA

1500 VA

1500 VA

7800 VA

LAUNDRY

DEMAND FACTOR

DEMAND FACTOR

600 SQ FT x 3 VA/FT

3000 VA x 1.0

(7800-3000=) 4800 VA x 0.35

3000 VA

1680 VA

NET GENERAL LOAD 4680 VA

NEUTRAL LINE B

4680 VA 4680 VA

RANGE

DRYER

OVEN

COMPRESSOR - HEATING MODE

WATER HEATER - AIRTAP

FANS

1250 VA 1250 VA

1900 VA 1900 VA

2250 VA 2250 VA

825 VA 0 825 VA

1440 VA

0 410 VA 410 VA

0.70 NEUTRAL DEMAND FACTOR

0.70 NEUTRAL DEMAND FACTOR

0.70 NEUTRAL DEMAND FACTOR

SUPPLY PUMP

WATER HEATER TANK

FRIDGE

NOT TO BE INSTALLED

335 VA 0 335 VA

0 0 0

0 1440 VA 1440 VA

12680 VA 12870 13090 VA

0

106 A 107 A 109 A

TOTAL VA

TOTAL A

SERVICE FEED BREAKER = 200 AINVERTER FEED BREAKER = 45 A

SUM = 245 A225 x 1.20 270 A; 690.64(B)(2) IS SATISFIED

POWER SUPPLY CALC

THE REQUIRED SERVICE CONDUCTORS AND DISCONNECTING MEANS SHALL BE RATED FOR NOT LESS THAN 110AMPERES

1750 VA

0

3150 VA

540

1440 VA

1. REFER TO SHEET A-112 FOR SOLAR PANELLAYOUT

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

24:0

6 PM

E-603

PANEL SCHEDULE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 61: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

27 41 16.C3

4' 8'0 2' 4' 8'0 2'

27 15 00.C1

27 15 00.C4

27 21 00.B1 27 15 00.B1

25 14 00.A1

23 09 13.C1

27 41 16.B

27 41 16.C2

27 41 16.B4

27 41 16.A1

27 15 00.A3

27 15 00.A1

25 13 00.B

27 15 00.A2

27 15 00.B1

27 41 16.D1

27 41 16.C1

1/4" = 1'-0"A1 COMMUNICATIONS WIRING 1/4" = 1'-0"A4 A/V AND SENSOR WIRING

I/O

C

C

C

C

CP

I/O

OD

L

OE

ODL

OE

SW

SW

TDL

TDL

TV

TV

ATV

ATV

BR

PR

CV

R

CP

BRP

C

RCVR

TDL

C

EM

EM

RF

RF

N N

1. HVAC MECHANICAL SYSTEM LOCATED ABOVE

2.

KITCHEN. CONTAINS TEMP. SENSORS, RELAYSFOR CONTROL PUMPS, FANS AND 3-WAYVALVES. REFER TO HVAC SECTION SHEET.

ALL CABLES RUNNING THROUGH OPEN CONDI-TIONED SPACE WILL BE RUN BENEATH THEFLOOR OR THROUGH THE RAFTERS.

DIVISION 23-INSTRUMENTATION AND

23 09 13.C1 THERMOCOUPLE DATA LOGGER

DIVISION 27-DATA COMMUNICATION

27 41 16.A1 BLUE RAY PLAYER27 41 16.B1 A/V RECEIVER27 41 16.B4 SUBWOOFER

27 41 16.D1 LED HDTV

27 15 00.C1 2-PORT ETHERNET WALL PLATE27 15 00.C4 ETHERNET PATCH PANEL27 21 00.B1 I/O EXTENDER

27 15 00.A3 COAXIAL AUDIO CABLE27 15 00.A2 HDMI CABLE27 15 00.A1 TWO-WIRE SPEAKER CABLE

27 15 00.B1 CAT6 CABLE

DIVISION 25-INTEGRATED AUTOMATION25 13 00.B DOOR AND WINDOW SENSOR25 14 00.A1 HOME CONTROLLER

CONTROL FOR HVAC

1. COMMUNICATIONS EQUIPMENT IN CUPBOARD

2. CONDUIT FOR DATA UPLINK AND LOGGERCABLE

1

2

SC

SF

SF

SR

SR

SF

SC

SR

SPEAKER, FRONT

SPEAKER, CENTER

SPEAKER, REAR

ORGANIZER DATA LOGGER

ORGANIZER ENCLOSURE

SUBWOOFER

NORMALLY OPEN RELAY CONTACT

THERMOCOUPLE DATA LOGGER

27 41 16.D2 PROJECTOR

27 41 16.C SPEAKERS

LED HDTV

APPLE TV

27 41 16.E1 APPLE TV (VIDEO SOURCE)

AUTOMATED SHADE

BLUE RAY PLAYER

DOOR AND WINDOW SENSOR

RECEIVER

AUTOMATED SHADE

MOTION SENSOR

ENERGY MONITORING SENSOR

RADIO FREQUENCY HUB

LEGEND

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:1

3 PM

T-101

TELECOMMUNICATIONSWIRING PLAN

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 62: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

IRIR IR

IR

IR

IR

MECHANICALEQUIPMENT

DATA INPUTSUSER INTERFACE

HOME CONTROL

HOME THEATER

ZIGBEE

WIFI USB

WIRELESS OUTLET

AUTOMATED SHADES

APPLE TV A/V RECEIVER

SPEAKERSLED HDTV PROJECTOR

LANHC300 HOMECONTROLLER

I/O EXTENDER

PUMPS

HVAC INDOOR UNITS

HUMIDITY SENSOR

WEATHER DATA(INTERNET)

THERMOCOUPLEDATA LOGGER

PC INTERFACEIPAD APP

2

1

CONTACT SENSORS

FANS

BLUE RAY PLAYER

FIT-PC2I

USB

RELAY

RELAY

ENERGY MONITORINGEQUIPMENT

WIRELESS DIMMER

SERIALRF HUB

KINECT SENSOR

MOTION SENSORS

1. IR CONNECTIONS ARE WIRES WITH IR EMITTERS

2. THE HOME CONTROLLER IS RESPONSIBLE FOR ESTABLISHING THE ZIGBEE NETWORK, BUT REQUIRES AN EXTERNAL WIFI NETWORK

B3 CONTROL SYSTEM SCHEMATIC NTS

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

32:1

8 PM

T-601

BUILDINGCONTROLOVERVIEW

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 63: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

1/16"=1'OPERATION SITE EQUIPMENT & TRUCK ROUTE

0 8' 16' 32'

8'-0

"

1.

A1

TEMP. CONST. GENERATOR

2.

O.S.U.

N.Y.MASS.

1

1. TRUCK ROUTE PENDING APPROVAL

2. CRANING OPERATION SUBJECT TO CHANGEAWAITING SITE CONDITION INFORMATION

N

2

3

4

5

6

10'-0"

3. CONTAINER C1 CONTENTS:-LIGHTING-TOOLS & SAFETY EQUIPMENT-TENTS AND WEATHER PROTECTION-GENERATOR-FOOD PREPARATION

4. CONTAINER C2 CONTENTS:-ADDITIONAL LIGHTING-TOOLS & SAFETY EQUIPMENT-FABRIC ASSEMBLY-EXTERIOR FRAMING-GENERAL HARDWARE

5. CONTAINER C3 CONTENTS:-P.V. MODULES-P.V. RAILS AND MOUNTS-INTERIOR DESIGN ITEM-NORTH WINDOWS-EAST, WEST, & SOUTH DOORS

6. CONTAINER C4 CONTENTS:-DECKING MODULES & FOOTING-RAMP MODULES-LANDSCAPING-3 HAZ-MAT CONTAINERS-PUBLIC TOUR ITEMS

REFER TO H-101 FOR SPILL CONTAINMENTDETAILS.GENERATOR NOISE AT FULL LOAD NOT TOEXCEED 60dB @ 50'. VIF.

TEMP. OSHA APPROVED HAZARDOUSCONTAINERS (REFER TO H-101 FOR DETAILS)

OPERATIONS AND REFUELING OF GENERATORLIMITED TO APPROVED TIME BY ORGANIZERS.

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:2

6 PM

O-101

OPERATIONAL SITEEQUIPMENT &TRUCK ROUTE

GENERAL SHEET NOTES

SHEET NOTES

REFERENCE KEYNOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 64: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

10'-0"

49'-11 1_2"

1/16" = 1'-0"SECOND CRANE PICK

1/16" = 1'-0"FIRST CRANE PICK

1/16" = 1'-0"CRANING ELEVATION

16' 32'0 8'16' 32'0 8'

16' 32'0 8'

SPREADER BEAM

DECATHLETE WAY ENTRY

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

DECATHLETE WAY ENTRY

O-101-O-103

PLANNO.

PROJECT ARTICLENAME

PARTNUMBER

ARTICLEMANUFACTURER

ARTICLENUMBER

SIZE QTY. NOTES

L W H

O-102-O-103

O-101-O-103

O-101-O-103

O-101-

O-101-O-103

O-101-O-103

O-101-O-103

O-101-O-103

DIV 34

DIV 34ARTICULATINGBOOM LIFT40FT REACH

Z-40/23N GENIE 102-001 - 59" 78" 1 UP&OVERH21'3"PLATFORMCAPACITY500lbs.

CRANE - - 101-001 - - - 1

DIV 34

DIV 34 COMPRESSOR - - 101-003 2' 3' 3' 1

PORTABLEHALIDEWORK LIGHT

20330 ALLMAND 101-004 2' 2' 12' 4

DIV 34

DIV 34 STEP DECKTRAILER

- - 101-002 64' 11.5' 13.5' 438FTLOWER DECK10FTUPPER DECK

LASER LEVEL LL300 SPECTRA 101-005 1' 1' 1' 1 -

DIV 34

DIV 34 GENERATOR DCA25USI WHISPERWATT 101-007 70" 31" 50" 1

SPREADERBEAM

- - 101-006 22' 17' 1' 1

DIV 34 10'CONTAINER

MM-10 MOBILE MINI 101-008 10' 8.5' 8.5' 8

C1 OPERATIONSSCHEDULE

MANUALMASTERFORMAT

60' MAXIMUMREACH

1000WATT

WILL SATISFYNPS NOISE REG.

60' MAXIMUMREACH

SPEC. FORSPREADER TBD

53°

41'-0"

78'-0"

41'-0"

78'-0"

4"

18'-11"

78'-0"

1.

A4

N

PL

PL

PLPL

3

3

3

3

11

11

PL

PL

PLPL

3

3

3

3

11

11

TEMPORARY OSHA APPROVED HAZARDOUSLIQUIDS CONTAINERS (AS NEEDED)

2. MOVABLE OSHA APPROVED HAZARDOUSCOLLAPSIBLE VINYL LIQUIDS SPILL CONTAINMENT(FOR TEMP. CONST. GENERATOR DWG O-101)

TEMP. 8'X10' METAL SHIPPING CONTAINER(FOR CONST. DURATION ONLY DWG O-101)

3.

A1

C4

1. DISASSEMBLY PROCEDURE IS SAME ASASSEMBLY IN REVERSE ORDER STARTINGIN FOURTH CRAIN PICK IN SHT. O-103.

12

'-1

"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:2

9 PM

O-102

EQUIPMENTSCHEDULE &

CRANINGASSEMBLY

PROCEDURE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T

Page 65: SCI-Arc/Caltech Solar Decathlon 2011 Construction Drawings

78'-0"

1/16" = 1'-0"(OPTIONAL) FOURTH CRANE PICK

1/16" = 1'-0"FOURTH CRANE PICK

1/16" = 1'-0"(OPTIONAL) THIRD CRANE PICK

1/16" = 1'-0"THIRD CRANE PICK

16' 32'0 8'

16' 32'0 8'

16' 32'0 8'

16' 32'0 8'

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

DECATHLETE WAY ENTRYDECATHLETE WAY ENTRY

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

DECATHLETE WAY ENTRY

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

DECATHLETE WAY ENTRY

TH

E O

HIO

STA

TE

UN

IVE

RS

ITY

4"

18'-11"

4"8

'-0

"4

"8

'-0

"4

"8

'-0

"4

"8

'-0

"

4" 41'-0" 4"18'-11"18'-11"

PL

PL

PLPL

3

3

3

3

11

11

PL

PL

PLPL

3

3

3

3

11

11

PL

PL

PLPL

3

3

3

3

11

11

PL

PL

PLPL

3

3

3

3

11

11

1. TEMPORARY OSHA APPROVED HAZARDOUSLIQUIDS CONTAINERS (AS NEEDED)

2. MOVABLE OSHA APPROVED HAZARDOUSCOLLAPSIBLE VINYL LIQUIDS SPILL CONTAINMENT(FOR TEMP. CONST. GENERATOR DWG O-101)

TEMP. 8'X10' METAL SHIPPING CONTAINER(FOR CONST. DURATION ONLY DWG O-101)

3.

ROTATION ROTATION

A4

N

C4

N

A1

N

C1

N

1. DISASSEMBLY PROCEDURE IS SAME ASASSEMBLY IN REVERSE ORDER.

12

'-1

"

41'-0"

78'-0"

41'-0"

78'-0"

41'-0"

78'-0"

1 2 3 4 5 6 7

A

B

C

D

E

LOT NUMBER:

DRAWN BY:

CHECKED BY:

COPYRIGHT:

CONSULTANTS

NONE

U.S. DEPARTMENT OF ENERGYSOLAR DECATHLON 2011

SOUTHERN CALIFORNIA INSTITUTE OFARCHITECTURE

[email protected]://solardecathlon.sciarc.caltech.eduwww.chip2011.com

SCI-ARC / CALTECH

RF

#402

DATE: 08.11.2011

SUBMISSIONS:

CALIFORNIA INSTITUTE OF TECHNOLOGY

TEAM SCI-ARC / CALTECH

960 EAST 3RD STREETLOS ANGELES, CA 90013

1200 EAST CALIFORNIA BOULEVARDPASADENA, CA 91125

COMPACT HYPER-INSULATED PROTOTYPE

CHIP 2011

STRUCTURAL ENGINEERSBURO HAPPOLD CONSULTINGENGINEERS, INC.9601 JEFFERSON BLVD. STE BCULVER CITY, CA 90232.TEL: 310.945.4800

EXTERIOR SKINTHE VINYL INSTITUTE1737 KING ST, STE 390ALEXANDRIA, VA 22314.TEL: 571.970.3400

BUILDING CONSTRUCTIONRJC BUILDERS, INC.3509 W 6TH ST.LOS ANGELES, CA 90020TEL: 213.388.9327

REVISIONS:

AS-BUILT DRAWING SET 08/11/2011

CONSTRUCTION DRAWING SET 03/22/2011

CD SET REVISION 05/02/2011 1

DESIGN DOCUMENTATION SET 11/23/2010

8/12

/201

1 6:

30:3

5 PM

O-103

CRANINGASSEMBLY

PROCEDURE

GENERAL SHEET NOTES

REFERENCE KEYNOTES

SHEET NOTES

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT P

RO

DU

CT

PRODUCED BY AN AUTODESK STUDENT PRODUCTP

RO

DU

CE

D B

Y A

N A

UTO

DE

SK

STU

DE

NT

PR

OD

UC

T