School presentation
Transcript of School presentation
It’s Time To RethinkIt’s Time To Rethink Modular ConstructionModular Construction
L ic . # 7 6 7 5 0 5
In the 50’s the term was “pre-fab,”
in the 70’s it was“modular”
and today it’s “systems-built.”
However, what you call us is not nearly as important as understanding when you choose to build with modular technology,
you benefit from fastconstruction and the superior quality
control only available in a systems-built unit.
Systems-builtSystems-built high standards high standards
Quality manufacturingQuality manufacturing Random inspections and testingRandom inspections and testing Quality controlQuality control Strict accordance with regulations and Strict accordance with regulations and
codescodes
The systems-built process produces less waste.
Systems-built construction is a safer alternative.
Conventional construction workers at the construction siteregularly work in less than ideal conditions, with temperature extremes, rain, wind, or any combination of natural conditions.
Because the systems-built structure is substantially completed in a factory- controlled setting using dry materials, the potential for
high levels of mold and contaminants is eliminated.
The systems-built structure is constructed off-site, reducing the
Time and impact on the surrounding site environment.
Can we design and construct a school environment based on the principles?
• High visibility into and out of all learning spaces
• Flexibility of spaces for different learning needs and interests
• Open spaces where teachers and students teach and learn together Project based
• School identity reflected in design Specialized spaces
The Design
Utilize district standards
Sustainability (30 years)
Flexibility of installation
Easily expanded
10% - 45% or more savings depending on designs and materials
Excavation begins. Modular constructionHas already commenced.
Excavation begins.
Foundation begins while module construction continues.
Foundation begins.
First complete modules come off the line. Site work continues.
Start setting modules. Site work continues.
Set top floor. Site work continues.
Interior work commences. Exterior work continues.
90% CompleteExterior work continues.
55% CompleteExterior work continues.
Interior work begins.
100% CompleteSchool opens within 8 months.
65% CompleteExterior work continues.
100% CompleteReady for instruction to begin.
85% CompleteSite work continues.
Opened in 8 months. Opened in 15 months.
S o if you have . . .
• have immediate space needs
• need for quality buildings comparable to site constructed buildings in function and aesthetics
• need to maximize purchasing dollars
Let’s get started today…Let’s get started today…
Lic.# 767505
2206 Alpine Blvd. Ste. B – Alpine CA 91901 619.722.7179
Enriching the neighborhood we live in – one building at a time