It’s Time To RethinkIt’s Time To Rethink Modular ConstructionModular Construction

L ic . # 7 6 7 5 0 5

Page 2: School presentation

In the 50’s the term was “pre-fab,”

in the 70’s it was“modular”

and today it’s “systems-built.”

Page 3: School presentation

However, what you call us is not nearly as important as understanding when you choose to build with modular technology,

you benefit from fastconstruction and the superior quality

control only available in a systems-built unit.

Page 4: School presentation

Systems-builtSystems-built high standards high standards

Quality manufacturingQuality manufacturing Random inspections and testingRandom inspections and testing Quality controlQuality control Strict accordance with regulations and Strict accordance with regulations and

codescodes

Page 5: School presentation

The systems-built process produces less waste.

Systems-built construction is a safer alternative.

Conventional construction workers at the construction siteregularly work in less than ideal conditions, with temperature extremes, rain, wind, or any combination of natural conditions.

Because the systems-built structure is substantially completed in a factory- controlled setting using dry materials, the potential for

high levels of mold and contaminants is eliminated.

The systems-built structure is constructed off-site, reducing the

Time and impact on the surrounding site environment.

Page 6: School presentation

Can we design and construct a school environment based on the principles?

• High visibility into and out of all learning spaces

• Flexibility of spaces for different learning needs and interests

• Open spaces where teachers and students teach and learn together Project based

• School identity reflected in design Specialized spaces

Page 7: School presentation

The Design

Utilize district standards

Sustainability (30 years)

Flexibility of installation

Easily expanded

10% - 45% or more savings depending on designs and materials

Page 8: School presentation

Excavation begins. Modular constructionHas already commenced.

Excavation begins.

Page 9: School presentation

Foundation begins while module construction continues.

Foundation begins.

Page 10: School presentation

First complete modules come off the line. Site work continues.

Page 11: School presentation

Start setting modules. Site work continues.

Page 12: School presentation

Set top floor. Site work continues.

Page 13: School presentation

Interior work commences. Exterior work continues.

Page 14: School presentation

90% CompleteExterior work continues.

55% CompleteExterior work continues.

Interior work begins.

Page 15: School presentation

100% CompleteSchool opens within 8 months.

65% CompleteExterior work continues.

Page 16: School presentation

100% CompleteReady for instruction to begin.

85% CompleteSite work continues.

Page 17: School presentation

Opened in 8 months. Opened in 15 months.

Page 18: School presentation
Page 19: School presentation

S o if you have . . .

• have immediate space needs

• need for quality buildings comparable to site constructed buildings in function and aesthetics

• need to maximize purchasing dollars

Page 20: School presentation
Page 21: School presentation

Let’s get started today…Let’s get started today…