School Building Committee
Timothy Doyle (Chairman)Michael L. Brainerd
Tim LaRovereBrian Shaffer
Town ForumsSep 23rd and Oct14th LHS Auditorium @ 7:00PM
Add the Eight (8) Classrooms to end of Science Wing
Main Entrance
Possible Location for Proposed Addition (To be finalized by MSBA approved Feasibility Study)
Lynnfield High School Expansion Project
▶ 2010-2011 Actual Enrollment = 675 studentsActual and Projected LHS Student Enrollment from 2000 to 2025
Lynnfield High School Expansion Project
Level YR00 YR01 YR02 YR03 YR04 YR05 YR06 YR07 YR08 YR09
1.Kndrgrtn 114 121 156 147 160 161 163 145 162 144
2.Elem 612 634 630 651 675 706 739 752 734 741
3.Middle 618 622 648 674 664 708 704 715 760 7604. High School 511 485 497 514 552 590 629 660 648 662Grand Total 1,855 1,862 1,931 1,986 2,051 2,165 2,235 2,272 2,304 2,307
Lynnfield High School Expansion Project
Lynnfield High School Expansion Project
Lynnfield High School Expansion Project
Lynnfield High School Expansion Project
LHS is projected to be 220 students over capacity within 4 years Lynnfield High School was built to accommodate 590 Students The current High School population is 675 and is projected to be 815
by 2014 40-48% of the estimated $4.5 million cost will be reimbursed to
Lynnfield upon final approval by the MSBA. The net cost to Lynnfield would be approximately $2.6 million.
Voters at the October 18 Town meeting and then the November ballot vote will decide if this project moves forward
Approval this fall will mean this project can be completed in 2012.
Lynnfield High School Expansion Project
Vote YES for the
Lynnfield High School Expansion Project