School Application Portfolio.
-
Upload
daniel-navarro-gomez -
Category
Documents
-
view
229 -
download
1
description
Transcript of School Application Portfolio.
TABLE OF CONTENTS
OAKS BOTTOM INTERPRATIVE CENTER
THE CONWAY BLOCKS
GUIDING LIGHT THEATER
PERFORMANCE ART SCHOOL
URBAN LANDFILL
ARCH 381| 2009 | POTESTIO
URBAN DESIGN ELECTIVE | 2011 | READDY
ARCH 482| 2012 | WHELTON
ARCH 480 | 2011| JONES
ARCH 481 | 2011 | BARTON
| 2
3 |
THIS STUDIO FOCUSED ON EMPTY PARKING LOTS IN A PROMINENT NEIGHBORHOOD IN NORTHWEST PORTLAND. CREATING A BARREN ZONE WITHIN A THRIVING NEIGHBORHOOD RICH WITH COMMERCIAL AND HOUSING OPPORTUNITIES THE SITE OFFERED VARIOUS OPPORTUNITIES TO REINTEGRATE IT BACK INTO THE NEIGHBORHOOD. THE COURSE FOCUSED ON INTENSIVE SITE ANALYSIS THAT HELPED CREATE AN URBAN DESIGN CONCEPT PLAN WITH THE INTENTIONS OF REVITALIZING THE CURRENT CONDITIONS.
THE CONWAY BLOCKSURBAN DESIGN ELECTIVE | 2011 | READDY
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
COMMERICAL
FOOD + BEVERAGE
HOUSING
SITE
10 MINUTE WALKING CIRCLE
INDUSTRIAL
CULTURAL/INSTATUTIONAL
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLE
TRI MET BUS SERVICE
SITE
77
77
15
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLE
SECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
SITE
COMMERICAL
FOOD + BEVERAGE HOUSING
SITE
10 MINUTE WALKING CIRCLEINDUSTRIAL
CULTURAL/INSTATUTIONAL CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLETRI MET BUS SERVICE
SITE
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
SITE
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLESECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
COMMERICAL
FOOD + BEVERAGE HOUSING
SITE
10 MINUTE WALKING CIRCLEINDUSTRIAL
CULTURAL/INSTATUTIONAL CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLETRI MET BUS SERVICE
SITE
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
SITE
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLESECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
COMMERICAL
FOOD + BEVERAGE HOUSING
SITE
10 MINUTE WALKING CIRCLEINDUSTRIAL
CULTURAL/INSTATUTIONAL CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLETRI MET BUS SERVICE
SITE
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
SITE
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLESECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
COMMERICAL
FOOD + BEVERAGE HOUSING
SITE
10 MINUTE WALKING CIRCLEINDUSTRIAL
CULTURAL/INSTATUTIONAL CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLETRI MET BUS SERVICE
SITE
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
SITE
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLESECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
COMMERICAL
FOOD + BEVERAGE HOUSING
SITE
10 MINUTE WALKING CIRCLEINDUSTRIAL
CULTURAL/INSTATUTIONAL CM: MIXED COMMERICAL/RESIDENTIAL
CS: STOREFRONT COMMERIAL
RH: HIGH DENSITY RESIDENTIAL
EX: CENTRAL EMPLOYMENT
R1: RESIDENTIAL 1000
IH: HEAVY INDUSTRIAL
OS: OPEN SPACE
10 MINUTE WALKING CIRCLE
SITE
IG1: GENERAL INDUSTRIAL 1
PORTLAND STREET CAR LOOP
10 MINUTE WALKING CIRCLETRI MET BUS SERVICE
SITE
VEGETATION
10 MINUTE WALKING CIRCLE
SITE
SITE
DEDICATED BIKE LANE
10 MINUTE WALKING CIRCLESECONDARY VEHICLE ROUTES
PRIMARY VEHICLE ROUTES
SHARE BIKE LANE
Site Context
Circulation Transporation
Vegetation Zoning
Site AnalysisSite analysis focsed on finding disconnections between the site and neighborhood. Through carefuly analyses I was able to discover patterns of opporunties that would influnce my design.
| 4
| 5
Concept Sketches
Retail/Commercial Flagship Store
Neighborhood circulation
Potential neighborhood streetcar loop
Extending commercial zoning
High density mixed use, maximizing views
Interior site plaza
Interior green corridor
Green site boundary
Prominent neighborhood architecture
6 |
COMMERICALSINGLE FAMILY HOUSING
HIGH DENSITY MIXED USEOPEN SPACE
SITE CIRCULATION
MEDIUM DENSITY MIXED USE PEDESTRAIN ZONE
PEDESTRAIN ENTRANCE
RETAIL CORE
Green Street Corridor
Pedestrian Zone
Site Diagram
Commercial Site Circulation
High Density Mixed Use
Single Family Housing
Open Space
Retail Core
Pedestrian Zone
Site Access
Medium Density Mixed Use
Green Corridor
| 6
THIS STUDIO FOCUSED ON A SLIVER OF PROPERTY SURROUNDED BY MAJOR THROUGHFARES AND A FUTURE MAX LIGHT RAIL LINE. UNIQUE SURROUNDING CONDITIONES COUPLED WITH SPECIFIC SITE RESTRAINTS ALLOWED FOR INTENSIVE DESIGN STUDIES THAT HELPED MAXIMIZE THE LIMITED PROPERTY.
URBAN LANDFILLARCH 481 | 2011 | BARTON
Diagramtic StudiesProcess Sketches
Create a courtyard
Define the site
Passage through courtyard
Divide the site
Pull form maximizing views
Create form along N/S Axis
Merge forms creating separate spaces
Morph to maximize views
Site typography Form opposite of MAX Light Rail Move along up typography Form morphs to typologies
| 8
| 9
Rendered Site Plan
Exterior Circulation Private Housing Private Housing
Interior CirculationCommerical Property Commerical Property
Public Space Public Space
Access to potential off site development
Public gathering space
Future MAX location
Public space
Section A Section B Section C
Access to neighborhood street car
Longitudal Section Model
Site Model
Section A
Section B
Section C
| 10
Concept Models
The models focused on exploring the tension between the bendind hinges and the protrusion of the bolt. Held in place the planes ‘guide’ movement, light and sounds.
THIS STUDIO PROJECT WAS DRIVEN BY CONCEPTUAL MODELS DERIVED FROM A LOCAL RECLAIMING CENTER. WE THEN INTERPRETED THESE ARTIFACTS INTO ARCHITECTURE THAT REPRESENTED FILM. THE PROGRAM ENTAILED A BREWERY AND THEATER IN A NARROW LOT IN A BUSY NEIGHBORHOOD. THE FINAL DESIGN CAME FROM AN INTERPRETATION OF BENDING DOOR HINGES THAT WERE HELD IN PLACE BY NAILS. THE TENSION & PROTRUSION RESEMBLE LIGHT PENETRATING FILM IN ORDER TO PROJECT A MOVIE.
GUIDING LIGHT THEATERARCH 482| 2012 | WHELTON
Longitudal Section
Study ModelBar Rendering
| 12
| 13
Brewery Staging Area
Elevator
Brewery Vaults
Standing Dinning
Bar
Box Office
Waiting space
Sitting Dinning
Kitchen
Restrooms
Administration Space
Theater
Conceptual Light Rendering
WHERE A ONCE A THRIVING CHINESE COMMUNITY LIVE NOW SITS AN EMPTY PARKING LOT SURROUNDED BY CRIME AND POVERTY. THROUGH HISTORIC CONTEXTUAL STUDYING AND SITE ANALYSIS, A DESIGN WAS DERIVED TO TAKE ADVANTAGE OF AN EMPTY LOT. CREATING CLASSROOM SPACES, A LIBRARY & PERFORMANCE SPACE THE SCHOOL WILL PROVIDE A SPACE FOR COMMUNITY INTERACTION AND REFLECTION ON THE HISTORY OF THE AREA
PERFORMANCE ART SCHOOLARCH 480 | 2011| JONES
| 15
Process Sketches
Performance Space
Student lounge
Main EntryNorth Elevation Section
Gallery Space1
1
2
2
3
6
6
4
4
44
4
7
7 7
5
Class Rooms
Performance Space
Section ASection A
Administration Office
Auditorium
Library
Look Out Decks
| 17
Section A Rendering
SITUATED ON THE EDGE OF A WETLAND THIS STUDIO’S PROGRAM WAS TO CREATE AN INTERPRETATIVE LEARNING CENTER FOR THE OAKS BOTTOM WILDLIFE REFUGE. AS ONE WALKS ALONG THE EDGE OF THE WATER ONE EXPERIENCES SPECIFC MOMENTS FRAMED BY THE VEGETATION ALONG THE SHORE LINE THESE EXPERIENCES WHERE THEN REFLECTED INTO A STUDIO PROJECT. THE FINAL DESIGN CONSISTS OF A SERIES OF RAISED BUILDINGS EXTENDING ONTO THE WATER. ORIENTED IN VARIOUS DIRECTIONS. EACH SPACE FRAMES A SERIOUS OF VIEWS ALONG THE HORIZON
OAKS BOTTOM INTERPRATIVE CENTER
ARCH 381| 2009 | POTESTIO
| 19
Platform View 1
Platform View 2
Conceptual Forest Collage
Process Sketches
Gallery Space1
1
2
2
3
3
4
4
4
5
5
5
Class Rooms
Administration Office
Auditorium
Look Out Decks
North Elevation
West Elevation
South Elevation
East Elevation
| 20