Schedule & Cost Development
“Show Them the Money”
Topics
• The ART of Forecasting
• Project Forecasting
• Duration + Units = Units
• Scheduling - Using MS Project
Fixed Work
Fixed Units
Fixed Duration
• Cost Estimation – Cost Management Workbook
• Scope – Impact Analysis2
Forecasting
Forecasting is based on a number of assumptions:
• The past will repeat itself. In other words, what has happened in the past will happen again in the
future.
• As the forecast horizon shortens, forecast accuracy increases. A forecast for next year will be more accurate than a forecast five years
in the future.
3
Forecasting
• Forecasting in the aggregate is more accurate than forecasting individual items. The project manager can forecast the schedule and cost for the entire
project more accurately than individual tasks to develop a piece of the project deliverable.
• Forecasts are seldom accurate and are almost never totally accurate. While some are very close, few are "right on the money."
Therefore, it is wise to offer a forecast "range."
4
The Art of Forecasting
Accurate (as possible)
Some degree of accuracy should be determined and state ????????
Reliable (as possible)
The forecast method should consistently provide a good forecast to establish some degree of confidence.
Timely (as possible)
The forecasting horizon must allow for the time necessary to make changes.
Should be easy to understand.
5
Project Forecasting
Scheduling
Project Forecasting – Schedule (using MS Project)
Microsoft Project Terminology
Duration X Units = Work
• MS-Project expects two of the inputs and MS-Project will calculates the third.
• Can only be used when Auto Scheduling
7
Microsoft Work Duration X Units = Work
Work• amount of effort a resource must expend on a task, • usually measured in units such as hours per week. • the total work for a task is the sum of all those time
units
Example• A task to develop a report is estimated at 80 hours
with one team member assigned. • The amount of work is fixed at 80 hours and the
duration changes depending on the team members’ availability.
8
Units
The number of resources assigned to work on a task.
Example,• If a person is available 20 hours per week (assuming a
standard 40-hour week• The Units equal 50 percent.
Microsoft Units Duration X Units = Work
9
IT IS!
• the effort the activity requires
• plus the amount of time it takes to obtain materials to the labor time it takes to complete the tasks.
• the length of a task measured in business or calendar day.
Microsoft Duration Duration X Units = Work
10
DurationExercise: Starting at Kansas City, MO, how long will it take to drive to Orlando
Microsoft Estimates are predictions of task effort and duration using task Types.
• Fixed Duration
• Fixed Work
• Fixed Unit
Project Forecasting – Schedule (using MS Project)
11
Project Forecasting – Schedule (using MS Project)
REMEMBER!!!
Duration X Units = Work
• MS-Project expects two of the inputs and MS-Project will calculates the third.
• Can only be used if Auto Scheduling
12
Fixed Duration
Fixed Duration Tasks
Duration * Units = Work the Duration is fixed.
Use Fixed Duration tasks in situations such as:• When the duration is the first thing you estimate.
• If the duration stays the same when adding resources, such as training or backing up a computer system.
• When the deadline is so tight that it’s the primary driver for the duration of the task.
• When the workload isn’t your problem – Fixed Bids!!!!!!
13
Fixed Duration
To create a Fixed Duration task:
• Insert the Type field into the Gantt Chart view
• Enter the task name
• Change the Type field to Fixed Duration
• Enter the Duration
• Enter the Resources
• Effort will be calculated by MS-Project
14
Fixed Duration
Field Changed Field Calculated if task is Fixed Duration
Work Units are recalculated
Duration Work is recalculated
Units Work is recalculated
Fixed Units
Fixed Units Tasks
Fixed unit tasks means that in the formula Duration * Units = Work the Units are fixed.
Use Fixed Unit tasks in situations such as:• When you can’t get more resources to do the work —
your resources are fixed.• When you want to change the duration or the work on a
task while keeping the number of people working on the task the same (assignment units).
• When you want to keep the resource working on a task at a certain percentage of his or her available hours.
16
Fixed Units
Field Changed Field Calculated if task is Fixed UnitsWork Duration are recalculatedDuration Units is recalculatedUnits Duration is recalculated
17
• This Type usually isn’t used as much as fixed work and fixed duration.
Fixed Unit is Project’s Default
• Note! You should rarely, if ever use fixed units. Use fixed work and fixed duration.
Fixed Units
18
Fixed Work
Fixed Work Tasks
In the formula Duration * Units = Work, the Work is fixed.
Use Fixed Work tasks in situations such as:• When the effort required is the first thing you estimate.
• When the effort required is the easiest thing to estimate.
• When your resources give you task estimates in work hours.
19
Fixed Work
To create a Fixed Work task:
• Insert the Type field into the Gantt Chart view
• Enter the task name
• Change the Type field to Fixed Work
• Enter the Effort in the Work field
• Enter the Resources
• Duration will be calculated by MS-Project
20
Fixed Work
Field Changed Field Calculated if task is Fixed WorkWork Duration are recalculatedDuration Units is recalculatedUnits Duration is recalculated
21
Fixed Type Guidelines
Guideline #1:
• Enter the duration estimate or work estimate
• Fix that number by setting the Task Type accordingly.
• Fixing it prevents Project from changing it.
22
Guideline #2:
• Provide the second value in the formula Duration * Units = Work and
• Let Project calculate the third value.
• Enter fixed duration task, assign the resources you need and let Project calculate the work.
• Enter fixed work task, assign the resources and let duration be calculated.
• If you entered the duration and work, Project only needs to know who will do the task and it will calculate the number of resources needed (units).
Fixed Typed Guidelines
23
Summary of Task Types Calculations
In a If you revise unitsIf you revise
durationIf you revise work
Fixed units taskDuration is recalculated.
Work is recalculated.Duration is recalculated.
Fixed work taskDuration is recalculated.
Units are recalculated.
Duration is recalculated.
Fixed duration task Work is recalculated. Work is recalculated.Units are recalculated.
24
Cheryl’s Guideline #3
Guideline #3:
• Don’t use the Resource (Units) column Use a Text Field instead to list your resources
• Don’t use the Work column Use my Cost Workbook or a facsimile
• Use Fixed Duration most of the time. You will be soooooomuch happier!!!
Task Name DurationScheduled
StartScheduled
FinishType Work Resource Names
Units Task 1 10 days Mon 9/14/15 Fri 9/25/15 Fixed Duration 80 hrs Person 125
Schedule Example
Fixed Duration Schedule
27
Task Name Duration Scheduled StartScheduled Finish
Type My Resource
KC Mid-America PMI PDD 263 days Tue 1/5/16 Thu 1/5/17 Fixed Duration
Planning 12 days Tue 1/5/16 Wed 1/20/16 Fixed DurationEstablish Planning Deliverables 9 days Tue 1/5/16 Fri 1/15/16 Fixed Duration
Scope Document Complete 6 days Tue 1/5/16 Tue 1/12/16 Fixed Duration PM, BAInitial Resource Obtained 6 days Tue 1/5/16 Tue 1/12/16 Fixed DurationCost Mangement Workbook Started 6 days Tue 1/5/16 Tue 1/12/16 Fixed DurationProject Management Plan Complete 3 days Wed 1/13/16 Fri 1/15/16 Fixed Duration
RAID Log 2 days Wed 1/13/16 Thu 1/14/16 Fixed Duration
Communication Plan 1 day Fri 1/15/16 Fri 1/15/16 Fixed DurationStakeholder Register 1 day Fri 1/15/16 Fri 1/15/16 Fixed Duration
Conduct Project Kick-off Meeting 3 days Mon 1/18/16 Wed 1/20/16 Fixed Duration
Initial Planning Complete 0 days Wed 1/20/16 Wed 1/20/16 Fixed DurationAnalysis 50 days Thu 1/21/16 Wed 3/30/16 Fixed Duration
Define Detailed Business Requirements 20 days Thu 1/21/16 Wed 2/17/16 Fixed DurationOptimize / Document Business Process 10 days Thu 1/21/16 Wed 2/3/16 Fixed DurationIdentify Functional Requirements 0 days Thu 1/21/16 Thu 1/21/16 Fixed DurationConduct Business Requirements Walk Through 10 days Thu 1/21/16 Wed 2/3/16 Fixed DurationGain Approval on Business Requirements 1 day Thu 2/4/16 Thu 2/4/16 Fixed Units
Develop User Test Scenarios 10 days Thu 2/4/16 Wed 2/17/16 Fixed DurationDefine Enterprise Architecture Approach 5 days Thu 2/18/16 Wed 2/24/16 Fixed DurationDevelop Technical Requirements Package (Logical) 3 days Thu 2/25/16 Mon 2/29/16 Fixed Duration
Conduct High Level Design Walk Through 1 day Tue 3/1/16 Tue 3/1/16 Fixed DurationRequirements Package Complete 0 days Tue 3/1/16 Tue 3/1/16 Fixed DurationGain Approval on Requirements Package 0 days Tue 3/1/16 Tue 3/1/16 Fixed Duration
Cost Estimation
Project Forecasting – Estimation (Cost Management Workbook)
It Starts with Metrics
Summary DataTotal Project
Approved BaselineActuals to Date
(ATD)Est. at Complete
(EAC) Est. to Complete
(ETC)Variance
EAC - Baseline
Percent Complete(ATD/EAC)
Total Cost $545,000 $0 $81,245 $0 ($463,755) 0%
Internal Labor Cost $50,000 $0 $6,750 $0 ($43,250) 0%
External Labor Cost $300,000 $0 $24,495 $0 -$275,505 0%
Hardware Cost $45,000 $0 $25,000 $0 ($20,000) 0%
Software Cost $150,000 $0 $25,000 $0 -$125,000 0%
Contingency 0.00 $0 $0 $0 $0 0%
Project Hours 303.00 - 303.00 - - 0%
Project Summary
29
Tracking Original and Revised Budget
CapEx
Enter Years====> 2016 Total
Internal Labor External Labor Hardware Software Internal Labor External Labor Hardware Software Grand Total Contingency Cumulative Total
Original Budget $ 50,000 $ 300,000 $ 45,000 $ 150,000 $ 50,000 $ 300,000 $ 45,000 $ 150,000 $ 545,000 $ 54,500 $ 599,500
PCR-01 $ - $ - $ - $ - $ - $ 599,500
PCR-02 $ - $ - $ - $ - $ - $ 599,500
PCR-03 $ - $ - $ - $ - $ - $ 599,500
PCR-04 $ - $ - $ - $ - $ - $ 599,500
PCR-15 $ - $ - $ - $ - $ - $ 599,500
PCR-16 $ - $ - $ - $ - $ - $ 599,500
PCR-17 $ - $ - $ - $ - $ - $ 599,500
PCR-18 $ - $ - $ - $ - $ - $ 599,500
PCR-19 $ - $ - $ - $ - $ - $ 599,500
PCR-20 $ - $ - $ - $ - $ - $ 599,500
PCR Total $ - $ - $ - $ - $ - $ - $ - $ - $ -
With
Contingency
Revised Budget $ 50,000 $ 300,000 $ 45,000 $ 150,000 $ 50,000 $ 300,000 $ 45,000 $ 150,000 $ 545,000 $ 54,500 $ 599,500
Baseline Tracking
30
Establish Units Based on Project Schedule
(Auto-
Populated)
Project Name
(Auto-Populated)
Resource Role
(Select from
Dropdown)
Named
Resource
Team
(Auto-populated
based on Resource
Role)
Resource Manager
(Auto-populated
based on Resource
Role)
Resource
Status
(Active /
Inactive)
(Select)
Comment Expense
Type
(Select)
Resource
Type
(Select)
Bill Rate
(See
Blended
Rate)
PRJ-00100 KC Mid-America PMI PDD PM Cheryl Randle PMO Sharon Dester - CapEx Internal $ 75
PRJ-00100 KC Mid-America PMI PDD BA Business Analysis Sheila Watson - CapEx External $ 115
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
PRJ-00100 KC Mid-America PMI PDD _ _ _ - $ -
Resource Labor Entry
31
Establish the Work
Named Resource
Cheryl Randle
Month 1 Hours MTD Dollars YTD Dollars
PL PL PL ANCapEx OpEx
CapEx OpEx CapEx OpEx
1/4/2016 1/11/20161/18/20161/25/2016 WEEK5 Total Total Internal External Internal External Internal External Internal External
10 10 10 10 - 40 -3,000 - - - 3,000 - - -
7 7 7 32 53 -- 6,095 - - - 6,095 - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
- - - - - - -- - - - - - - -
Resource Labor Entry
32
Establish Hardware & Software Units/Costs
Software
/ Hardware
Expense Type
(Select)
Unit Price
QtyMTD
HardwareMTD
SoftwareMTDOther
MTDHardware
MTDSoftware
MTDOther
YTDHardware
YTDSoftware
YTDOther
YTDHardware
YTDSoftware
YTDOther
Hardware CapEx $ 25,000.00 - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ - - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -$ -
- $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
$ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ - $ -
Hardware Software Entry
33
Record Actuals – Monthly
CapEx Actuals
H/W S/W Internal Labor External Labor Total Hours
January $ - $ - $ 1,500 $ 5,000 $ 6,500 -
February $ - $ - $ - $ - $ - -
March $ - $ - $ - $ - $ - -
April $ - $ - $ - $ - $ - -
May $ - $ - $ - $ - $ - -
June $ - $ - $ - $ - $ - -
July $ - $ - $ - $ - $ - -
August $ - $ - $ - $ - $ - -
September $ - $ - $ - $ - $ - -
October $ - $ - $ - $ - $ - -
November $ - $ - $ - $ - $ - -
December $ - $ - $ - $ - $ - -
Actuals $ - $ - $ 1,500 $ 5,000 $ 6,500 -
34
Summary DataTotal Project
Approved BaselineActuals to Date
(ATD)Est. at Complete
(EAC) Est. to Complete
(ETC)Variance
EAC - Baseline
Percent Complete(ATD/EAC)
Total Cost $545,000 $6,500 $70,650 $14,150 ($474,350) 9%
Internal Labor Cost $50,000 $1,500 $5,250 $3,750 ($44,750) 29%
External Labor Cost $300,000 $5,000 $15,400 $10,400 ($284,600) 32%
Hardware Cost $45,000 $0 $25,000 $0 ($20,000) 0%
Software Cost $150,000 $0 $25,000 $0 ($125,000) 0%
Contingency 0.00 $0 $0 $0 $0 0%
Project Hours 303.00- 303.00 - -
0%
It Ends with Metrics
Fruits of Your Labor
35
Scope & the Organizational Impact
Project Forecasting Scope, Schedule, Financials
What Is the Impact Analysis
Impact Analysis:
• Capture and evaluate the impacts, both positive and negative, of a given solution or change on a project.
• Understanding how a solution will impact
the business areas,
IT departments and
Affected systems
• Starts identification of the change management
37
Why is it Useful?
Helps understand
• If there are other options
• More favorable solution.
• The impact of any changes
• Whether or not the change is feasible
• Whether or not it should be approved.
38
How to Use It
• The Impact Analysis is performed in order to validate the (break out by phase: Analysis and Design) Requirements,
High Level Design,
Technical Alternatives
Recommended solution
• Each impacted group should substantiate the solution SMEs introduce any technical considerations not already
specified in the requirements,
Provide cost and schedule information.
Business stakeholders may identify business process change
39
How to Use It
Requirements are the Baseline for the Impact Analysis
• Business Processes
• Business Functional Requirements, etc
• Enterprise Architectural Approach
• High Level Requirement
• Detailed Design
40
How to Use It
• Conduct the analysis
• Evaluate the results.
• Assess and execute a Risk Assessment
• Finally, summarize your findings and develop a recommendation
Restate the scope Prepare Detailed Project Schedule Prepare Detailed Financial Forecast Prepare a Change Request as needed
(Review the Organizational Impact Analysis Example)
41
Summary
Forecasting Schedule – Estimations- Scope
Schedule• In the Project Options = Schedule
• Change default Task Type = DURATION
• Change the default “New Tasks Created” = Auto Schedule
• Set “New task are effort driven” = Uncheck it
• Create your own “Resources” column so you don’t affect calculations
• Ignore the “Work” column use an equivalent of Cost Management Workbook. (see me if interested)
Cost Estimations• Know the metrics you need to track to stay
on budget
• Use an equivalent of the Cost Management Work and align with your project schedule.
• Focus on deliverable oriented cost forecasting
Scope• Perform an Organizational Impact Analysis at
the end of Analysis and Design
• Know the affect your project Solution will have on the Business, IT, Customers, Processes, etc.
• Perform a Risk Assessment
• Modify the Schedule and Cost Estimations with a deeper level of detail.
The Art of Forecasting
Accurate
• Some degree of accuracy should be determined and state
Reliable
• The forecast method should consistently provide a good forecast to establish some degree of confidence.
Timely
• The forecasting horizon must allow for the time necessary to make changes.
43