Project name : YKK INDIA BAWAL FACTORY RENOVATION WORKS 20thMay2013
5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30
Manufactureing
Drawing Manufacturing
PH-1
1 Step 1 (S2 shft to PH-1)
Piping Work Connection to Existing Main Piping
Installation
Machine Shifting by YKK GR1
GR2, GR3, GR15
GR5, GR8
2 STEP 2 (N2 shift to PH-1)
Machine Shifting by YKK GR4, GR6, GR7
GR9, GR10
GR12, GR13, GR14
3 STEP 3 (S1 to Shift to S2)
Piping Work Connection to Existing Main Piping
Machine Shifting by YKK GR10, GR8
4 STEP 4 (S1 shft to N2 Temp)
Machine Shifting by YKK GR1
5 STEP 5 (N1 shft to S1)
Piping Work Connection to Existing Main Piping
Piping Work
Machine Shifting by YKK GR4, GR2, GR3
GR5, GR6
6 STEP 6 (N1 shift to S2)
Machine Shifting by YKK GR7
7 STEP 7 (N2 shft S1)
Machine Shifting by YKK GR1
5)
1)
4)
2)
Shop Drawing
N1 N2
S1 S2
3)Compressed AirBranch Piping Dismantling for N2 Area
1)New Main Compressed AirPipingfor N2, S2 Area
Drawing Approval
4 Make Quotation
Shop Drawing
Sep-14
PH-1 AHU Dismantling
B Excution Work
by YKK
Aug-14
Existing Facility Servey
Collection of Existing Drawings
Design
Desing/Equipment Order
5
7
Compressed AirBranch Piping Dismantling for S2 Area
PH-1 New Compressed Air Piping
1)
1)
Quotation Assesment
5)
4)
3)
6)
2)
1)
EVENT
New Main Compressed AirPipingfor N1, S1 Area
New Branch Compressed AirPipingfor N2, S2 Area
Electrical Distribution Panel
Air Condtioning Work
PH-1 Electrical Dismantling
PH-1 Electrical Installation
Material Order
Jul-14
▼Order
Jun-13 Jul-13 Aug-13
PH-2
1)
Apr-14Mar-14Feb-14May-13 Jan-14
Shop Drawing Material Order
Shop Drawing
2)Compressed AirBranch Piping Dismantling for S1 AreaNew Branch Compressed AirPipingfor S1 Area
3)
4)
Oct-13 Nov-13 Dec-13
Material Order
1)
1
6
2
3
A
2014
Approval
Material Order
Air Conditioning Unit
2013May-14 Jun-14Sep-13
Project name : YKK INDIA BAWAL FACTORY RENOVATION WORKS 20thMay2013
5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30 5 10 15 20 25 30
Sep-14Aug-14Jul-14Jun-13 Jul-13 Aug-13 Apr-14Mar-14Feb-14May-13 Jan-14Oct-13 Nov-13 Dec-1320142013
May-14 Jun-14Sep-13
8 STEP 8 (PH-2 PFC shift to N2)
Machine Shifting by YKK GR4, GR2, GR3
GR5, GR6
9 STEP 9 (PH-2 PFC shift to N1)
Piping Work
Machine Shifting by YKK GR5, GR6, GR7, GR8
GR9
10 Dismantle Existing Main Pipe Line
Compressed AirBranch Piping Dismantling for N1 AreaNew Branch Compressed AirPipingfor N1 Area
Material OrderShop Drawing
3)
1)
2)