Page 2: SCCL Corporate safety accident analysis 2006   2011 may

ACCIDENT ANALYSIS FROM 1-JAN,2006 TO 31-05-2011.

&CAUSES AND STEPS TO CONTROL ROOF &

SIDE FALL ACCIDENTS.

BY

ISO CORPORATE

Page 3: SCCL Corporate safety accident analysis 2006   2011 may

THE CAUSE WISE ANALYSIS OF ACCIDENTS Jan.06-May.11.Cause

BELOW GROUND OPENCAST ABOVE GROUND Total

F S R F S R F S R F S R

FALL OF ROOF 21 85 143             21 85 143

FALL OF SIDES 9 102 294             9 102 294

OTHER FALLS OF GROUND   1 19 2         1 2 1 20

OVER WINDING OF CAGES/SKIPS ETC                        

OTHER ACCIDENTS/DANGEROUS OCCURANCES DUE TO WINDING                        

ROPE HAULAGE 14 226 146           1 14 226 147

CONVEYORS 1 20 10 1 2   2 12 7 4 34 17

DUMPERS       7 16 11       7 16 11

OTHER WHEELED TRACKLESS   1   3 3 1 3 5 4 6 9 5

OTHER NON-WINDING MACHINERY     1   1           1 1

HEMM other than dumpers       7 6 9   1   7 7 9

OTHER MACHINERY   27 30   2     10 3   39 33

EXPLOSIVES   4 4   3           7 4

ELECTRICITY 2 2 4 1   10   1 2 3 3 16

SPONTANEOUS HEATING                        

OTHER ACCIDENTS/DANGEROUS OCCURRANCES DUE TO DUST/GAS/FIRES     1     1           2

FALL OF PERSONS 1 551 1267   37 33   83 87 1 671 1387

FALL OF OBJECTS   435 1474 1 13 12   80 117 1 528 1603

OTHERS (FALLS OTHER THAN GROUND MOVEMENT)   4 7               4 7

OTHER THAN ABOVE 1 562 1174 1 29 33 3 135 174 5 726 1381

Total 49 2020 4574 23 112 110 8 327 396 80 2459 5080

Page 4: SCCL Corporate safety accident analysis 2006   2011 may

PLACE WISE FATALITIES/INJURIES UNDER GROUND

FATALITIES- 49, SERIOUS-2022, REPORTABLE-4576

OPENCASTFATALITIES-23, SERIOUS-112,

REPORTABLE-112ABOVE GROUND

FATALITIES-8, SERIOUS-327, REPORTABLE-397

Page 5: SCCL Corporate safety accident analysis 2006   2011 may

CAUSE WISE UNDERGROUND ACCIDENTS

CAUSE F S RFALL OF ROOF 21 85 143FALL OF SIDES 9 102 294ROPE HAULAGE 14 226 146CONVEYOURS 1 20 10ELECTRICITY 2 2 4FALL OF PERSONS 1 552 1268OTHER THAN THE ABOVE 1 562 1174

TOTAL 49 2022 4576

Page 6: SCCL Corporate safety accident analysis 2006   2011 may

PERCENTAGE OF CAUSE WISE FATALITIES & SEROUS ACCIDENTS IN

BELOW GROUND CAUSE FATAL SERIOUS

FALL OF ROOF&SIDES 30 61.23% 187 9.25%

ROPE HAULAGE+CONV 15 30.51% 246 12.17%

ELECTRICITY 2 4.08% 2 0.10%

OTHERS 2 4.08% 1289 78.48%

Page 7: SCCL Corporate safety accident analysis 2006   2011 may

FALL OF ROOF AND SIDES PLACE WISE ANALYSIS

FATAL SERIOUSDEVELOPMENT 4 60DEPILLARING 23 106LONGWALL --- 10OTHER PLACES 3 11 TOTAL 30 187

Page 8: SCCL Corporate safety accident analysis 2006   2011 may

DESIGNATION WISE ANALYSIS

1. SUPERVISORS/MANAGEMENT 32. LOADERS/COAL FILLERS 83. SUPPORT/TIMBERMEN 94. DRESSORS 15. OTHER BG FACE WORKERS 16. FITTERS 17. OTHER OPERATORS 18. OTHER DESIGNATIONS 6 TOTAL 30

Page 9: SCCL Corporate safety accident analysis 2006   2011 may

BODY WISE INJURIES ANALYSISHEAD INJURIES 13EYES 1BACK 2CHEST 5SPINAL COLUMNS 1UPPER LIMBS 1LOWER LIMBS 1OTHER PARTS OF BODY 6

TOTAL 30

Page 10: SCCL Corporate safety accident analysis 2006   2011 may

REASONS FOR ROOF & SIDE FALL

ACCIDENTS.

Page 11: SCCL Corporate safety accident analysis 2006   2011 may

PLANNING ISSUES IN DEVELOPMENT

DEVLOPMET WITH OUT CONSIDERING FLOOR CONTOURS.

NOT FRAMING SSR IN SCIENTIFIC WAY. WIDER GALLARIES & INADEQUATE SUPPORTS. STABILITY OF SIDES & SUPPORT DESIGN. VALIDATION OF RMR & SUPPORT PLANS. DESIGN OF SUPPORT SYSTEMS FOR

GEOLOGICALLY DISTURBED AREAS. TRAINING & SKILL IMPROVEMENT.

Page 12: SCCL Corporate safety accident analysis 2006   2011 may

2.PLANNING ISSUES IN DEPILLARING PANELS

WIDER PANELS /LONGER DIAGONAL LENGTHS. WIDER GALLERIES. MORE HEIGHT OF EXTRACTION. LONGER DURATION OF SLICING /SLOW RATE OF EXTRACTION. INDUCED BLASTING TO PREVENT HANGING GOAF. IMPROPER STOWING SYSTEMS. INFERENCING THE DATA COLLECTED FROM INSTRUMENTATION. NON COMPLAINCE OF PERMISSION CONDITIONS.

Page 13: SCCL Corporate safety accident analysis 2006   2011 may

3.IMPLEMENTATION ISSUES TESTING AND DRESSING OF ROOF & SIDES

BEFORE & WHILE WORKING. INSPECTION,TESTING,DRESSING & SUPPORT

OF TRAVELLING AND HAULAGE ROADS. INADEQUATE TEMPORARY SUPPORTS. MISS JUDGEMENT BY MINE OFFICIALS. TESTING OF ROOF BOLTS & ROPES. TIGHTNESS OF SUPPORTS. SUPPORT CYCLE IN MINES. MEETINGS WITH MINE OFFICIALS. INTERACTION WITH SUPPORTMEN etc.

Page 14: SCCL Corporate safety accident analysis 2006   2011 may

CORRECTIVE ACTIONS SUGGESTED

103 CIRCULARS WERE ISSUED TO CONTROL ACCIDENTS FROM ROOF & SIDE FALLS,METHOD OF WORKING etc.

STANDARDIZING ROOF BOLTING METHODS. MECHANIZED DRILLING FOR BOLTING. SWITCHING OVER TO RESIN GROUT IN ALL

PLACES. TESTING GROUT MATERIALS & BOLTS. CALCULATING FRESH RMR OF ROOF AND RE-

DESIGNING SSR SCIENTIFICALLY.

Page 15: SCCL Corporate safety accident analysis 2006   2011 may

CORRECTIVE ACTIONS SUGGESTED.

SUPPORT REQUIREMENTS OF SIDES. FRAMING OF EFFECTIVE SAFETY

MANAGEMENT PLAN FOR EVERY ACTIVITY IN THE MINE & IT’S IMPLEMENTATION.

REVIEW SOPs PERIODICALLY AND UP-DATE AS SUTUIATION WARENTS.

STANDERDIZATION OF MONITORIG INSTRUMENTS.

UTILIZING THE INFORMATION FROM PREVIOUS EXPERIENCES.

Page 16: SCCL Corporate safety accident analysis 2006   2011 may

Concern for man and his fate must always form the chief interest of all technical endeavors. Never forget this in the midst of your diagrams and equations. Albert Einstein

Page 17: SCCL Corporate safety accident analysis 2006   2011 may

Thank you