Sl No Ref No Description of work Rate Per Amount
1 Earth work in excavation in
foundation, trenches etc. including
dressing of sides and ramming of
bottoms, including getting out the
excavated material, refilling after
laying pipe/ foundation and disposal
of surplus excavated material at a
lead upto 50m suitable site as per
direction of Engineer for following
depths, below atural
ground / Road top level.
a Depth upto 1.5m
4.10.1.1 90638.50 m3 In all soils upto 1.5m 164.00 1 m3 14864714.00
b 4.10.1.2 69462.68 m3 Depth above 1.5m 175.50 1 m3 12190701.00
2 21.1.5 6846.00 m³ Providing and laying in position
cement concrete of specified grade
excluding the cost of centring and
shuttering - All work upto plinth level
:1:3:6 (1 Cement : 3 coarse sand : 6
graded stone aggregate 20 mm
nominal size). (Drain Foundation)
3750.00 1 m³ 25672500.00
3 21.1.3 2191.90 m3 Providing and laying in position
cement concrete of specified grade
excluding the cost of centring and
shuttering - All work upto plinth level :
1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm
nominal size) (Benching)
4280.00 1 m3 9381332.00
4 25.7 &
25.7.1
43633.00 m3 Coursed rubble masonry (Second
sort) with hard stone in foundation
and plinth with :Cement mortar 1:6 (1
cement : 6 coarse sand)
3650.00 1 m3 159260450.00
Drain Side walls with Stone Masonry
5 32.22.2 0.00 m2 Pointing on stone work with cement
mortar 1:3 (1 cement : 3 fine sand) :
Raised and cut pointing
221.00 1 m2 0.00
5 Providing and laying in position
cement concrete of specified grade
excluding the cost of centring and
shuttering - All work upto plinth level
:1:3:6 (1 Cement : 3 coarse sand : 6
graded stone aggregate 20 mm
nominal size). (Open Channel with
CC lining)1639.00 m3 For Open Channel 3750.00 1 m3 6146250.00
6 32.3
&
32.3.2
51811.40 m2 Cement plastering including T&P,
scaffolding, material and complete
labpour, including cost of water,
curing, racking of joints etc. CM 1:4
with 20 mm cement plaster of mix :
(on top of Stone masonry wall)
210.00 1 m2 10880394.00
PART (A) - FOR DRAIN
JODHPUR MUNICIPAL CORPORATION
STORM WATER DRAINAGE MASTER PLAN FOR THE CITY OF JODHPUR
NAME OF WORK : EXTENSION OF UNIVERSITY CAMPUS DRAIN 10-10 FROM CAMPUS GATE TO
ABSTRACT ESTIMATE - CH 4470 TO 11400
Quantity
NIT No. Date Sr No.
Last Date of Sale :- Earnest Money : Rs. ………..
Date of Receipt :- CR No. …………… Dated. …….
Copy issued to M/s ……
G-SCHDULE
7 23.3.4 6766.13 m3 Reinforced cement concrete work in
beams, suspended floors roofs
having slope upto 15° landings,
balconies, shelves, chajjas lintels,
bands, plain window sills, staircases
and spiral stair cases upto two stories
excluding the cost of centring,
shuttering, finishing and
reinforcement: for Drain Cover Slab
(RCC M30grade with 20mm metal)
5620.00 1 Cum 38025634.00
8 23.19.4 541290.16 Kgs Reinforcement for R.C.C. work at all
levels including straightening, cutting,
bending, placing in position and
binding all complete. with Hot rolled
deformed bars
51.50 1 Kg 27876444.00
9 4.25 13860.00 Rmt Providing Barricading for Trenches
using 80 - 100 mm dia Wooden
Ballies as vertical post, atleast 1.5m
above ground level and atleast 30-45
cm below ground level at a spacing of
3 m. Two rows of PVC Tape
(preferabley red in colour) strip
barricading horizontal strip securely
tied by the vertical members. Vertical
members shall be
painted in red and white colour. Rate
is inclusive removal and cleaning of
site complete in all respect.
76.50 1 mt 1060290.00
11 14.8.1 1436.00 Rmt Providing weep holes in brick/ stone
masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with
following dia AC pipe, extending
through the full width of the structure
with slope of 1V : 20H towards
drawing face complete as per
drawing, technical specifications and
clause 2205 of MoRT&H Specification
including
all scaffolding, material, labour,
machinery etc. (100mm dia)
99.00 1 Rmt 142164.00
13 22.1.1 Centring and shuttering with plywood
or steel sheet upto two stories or
height upto 7.5 metre above plinth
level including strutting, propping etc.
and removal of form for :
26890.00 SQm Foundations, footings, bases of
columns, etc. for mass concrete
162.00 1 Sqm 4356180.00
14 12.6.4 665.60 SQm Providing and fixing of reinforced
Ferro-Cement drain covers designed
for 'AA' class loading duly marked on
cover with adequate steel
reinforcement having thickness
75mm to 150mm anti corrosive
bitumen painted M.S. plate , Rim and
M.S. lifting hooks, Admixtures like
plasticizer, bond improving
compound, shrinkage, resistance
compound, abrasion resistant
complete as per approved design
etc.Standard Size 2100x500mm
3450.00 1 sqm 2296320.00
15 2.1.1 200.00 Nos Cutting of trees, including cutting of
trunks, branches and removal of
stumps, roots, stacking of serviceable
material with all lifts and up to a lead
of 1000 mtrs and earth filling in the
depression/pit to required compaction
as per MoRT&H specification clause
201. (Measurment of girth to be done
at height of 1 m above ground level -
Girth from 300 mm to 600 mm )
284.00 1 no 56800.00
From Ch 7000 to 10140
16 2.3.2 1.30 hec Clearing and grubbing road land
including uprooting rank vegetation,
grass, bushes, shrubs, saplings and
trees girth up to 300 mm, removal of
stumps of trees cut earlier and
disposal of unserviceable materials
and stacking of serviceable material
to a lead of 50 metres from road
boundary including removal and
disposal of top organic soil not
exceeding 150 mm in thickness as
directed by Engineer.
51200.00 1 hec 66560.00
From Ch 10140 to 11400
17 1.1.1 54189.18 Cum Carriage of materials by Mechanical
transport including loading, unloading
and stacking of Earth.Lead up-to 3Km
137.00 1 Cum 7423917.66
18 4.1 11718.00 Sqm Dressing of earth work in surface
excavation including cutting and filling
upto 30cm depth including disposal of
excavated earth upto 50m and lift
upto 1.5 m.
27.00 1 Sqm 316386.00
TOTAL PART (A) Rs 320017036.66
1 Earth work in excavation in
foundation, trenches etc. including
dressing of sides and ramming of
bottoms, including getting out the
excavated material, refilling after
laying pipe/ foundation and disposal
of surplus excavated material at a
lead upto 50m suitable site as per
direction of Engineer for following
depths, below atural ground / Road
top level.
For upto 1.5m depth
For Drain Portion
6219.600 Cum 164 1 Cum 1020014.40
For above 1.5m depth
For Drain Portion
11073.450 Cum 175.5 1 Cum 1943390.48
2 Cum Providing and laying in position
cement concrete of specified grade
excluding the cost of centring and
shuttering - All work upto plinth level
:1:3:6 (1 Cement : 3 coarse sand : 6
graded stone aggregate 20 mm
nominal size). For bed
858.320 Cum For Drain Portion 3750 1 CUm 3218700.00
3 211.20 Cum Providing and laying in position
cement concrete of specified grade
excluding the cost of centring and
shuttering - All work upto plinth level :
1:2:4 (1 cement : 2 coarse sand : 4
graded stone aggregate 20 mm
nominal size) (Benching)
4280 1 CUm 903936.00
4 Cum Coursed rubble masonry (second
sort) with hard stone in foundation
and plinth with :Cement mortar 1:3 (1
cement : 3 coarse sand)
5671.85 Cum 3650 1 Cum 20702252.50
5 Cement plastering including T&P,
scaffolding, material and complete
labpour, including cost of water,
curing, racking of joints etc. CM 1:4
with 20 mm cement plaster of mix :
2820.17 Sqm 210 1 Sqm 592235.70
PART (B) - FOR CULVERT
6 663.101 cum Reinforced cement concrete work in
beams, suspended floors roofs
having slope upto 15° landings,
balconies, shelves, chajjas lintels,
bands, plain window sills, staircases
and spiral stair cases upto two stories
excluding the cost of centring,
shuttering, finishing and
reinforcement: for Drain Cover Slab
(RCC M30grade with 20mm metal)
5620 1 Cum 3726627.62
7 Cum Providing and laying upto two stories
reinforced cement concrete in kerbs,
steps and the like excluding the cost
of centring, shuttering, finishing and
reinforcement with 1:2:4 (1 cement : 2
coarse sand : 4 graded stone
aggregate 20 mm nominal size). (for
Bed Blocks0
283.239 cum 4280 1 Cum 1212262.92
8 Reinforcement for R.C.C. work at all
levels including straightening, cutting,
bending, placing in position and
binding all complete. with Hot rolled
deformed barsFor Bed Blocks
102231.16 Kg 51.5 1 Kg 5264904.74
9 181.5 Rmt Providing weep holes in brick/ stone
masonry/ Plain/ Reinforced concrete
abutment, wing wall/ return wall with
following dia AC pipe, extending
through the full width of the structure
with slope of 1V : 20H towards
drawing face complete as per
drawing, technical specifications and
clause 2205 of MoRT&H Specification
including
all scaffolding, material, labour,
machinery etc. (100mm dia)
99 1 Rmt 17968.50
10 Centring and shuttering with plywood
or steel sheet upto two stories or
height upto 7.5 metre above plinth
level including strutting, propping etc.
and removal of form for :
2363.62 Sqm Foundations, footings, bases of
columns, etc. for mass concrete
162 1 Sqm 382906.44
TOTAL PART (B) 38985199.3
TOTAL PART (A+B) 359002235.96
SAY 3590.02
15.00
35.00
10.00
10.00
10.00
3670.02
110.10
110.10
3890.22
39.00 CroresSAY
PART (C) Provision towards Traffic diversion
PART (D) Provision for Road Restoration
PART (E) Shifting of Utilities Electric poles,
PART (G) Provision towards Permission from R & B Dept, Electrical Dept etc
GRAND TOTAL IN LACS
PART (F) Shifting of Utilities Transformers -(7 to 9 nos)
TOTAL PART ( A+B+C+D+E+F) IN LACS(+) Contingencies @ 3 %
(+) Price Contingencies @ 3 %