SC C2 Strategic Plan

2
9th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012 SC C2 Strategic Plan New SC C2 structure: Within SC C2 a new structure was introduced. A new Strategic Advisory Group was created. Members of this AG include the SC Chairman and Secretary, the three former AG conveners and all current WG conveners. This Strategic AG plans to hold meetings approx. twice a year. Advantages are faster reaction possibilities and an intensified horizontal dialogue between the WGs of the three main areas of SC C2. The former AGs were disbanded. With the new structure, the study committee is in line with the SC reference model decided by the TC: “Advisory Groups with only one person should be avoided.” The Strategic Plan for SC C2 will be reviewed within the next months. The review will take into account the TC Strategic Plan, to which the revised C2 plan will be aligned.

description

SC C2 Strategic Plan. New SC C2 structure: Within SC C2 a new structure was introduced. A new Strategic Advisory Group was created. Members of this AG include the SC Chairman and Secretary , the three former AG conveners and all current WG conveners . - PowerPoint PPT Presentation

Transcript of SC C2 Strategic Plan

Page 1: SC C2 Strategic Plan

59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012

SC C2 Strategic Plan

New SC C2 structure:

• Within SC C2 a new structure was introduced.• A new Strategic Advisory Group was created. • Members of this AG include the SC Chairman and Secretary, the three former AG

conveners and all current WG conveners. • This Strategic AG plans to hold meetings approx. twice a year. • Advantages are faster reaction possibilities and an intensified horizontal dialogue

between the WGs of the three main areas of SC C2. • The former AGs were disbanded. • With the new structure, the study committee is in line with the SC reference model decided

by the TC: “Advisory Groups with only one person should be avoided.”

• The Strategic Plan for SC C2 will be reviewed within the next months. • The review will take into account the TC Strategic Plan, to which the revised C2 plan will

be aligned.

Page 2: SC C2 Strategic Plan

59th Technical Committee Meeting, Barcelona (ES), March 26-27, 2012

WG C2.21Lessons learnt from recent Emergencies

and Blackout Incidents

Ben Li (CA)

2

WG C2.13Voltage and Var support in System

Operation

Thales Papazoglou (GR)

WG C2.22Application of resilience engineering to

safety management principles in Control Centers, ensuring and enhancing power

system reliability Teresa Carolin (ZA)

JWG C2/C5.05Developments and changes in the

Business of System Operators

Ole Gjerde (NO)

SC Secretary Christoph Schneiders (DE)

SC C2 Organization Chart

WG C2.33Control centre operator Requirements,

Selection, Training

Ninel Cukalevski (RS)

WG C2.34Capabilities and requirements of a control centre in the 21st century- Functional and

Human Resources view

Udo Spanel (DE)

JWG C1/C2/C6Coping with Limits for High Penetration of

Renewable Energy

C2 Representative: Hugh Jones (IE)

Publication Advisor Anjan Bose (US)

Ian Welch (UK)

SC ChairmanJoachim Vanzetta (DE)

Real time System Operation and Control

System Operational Planning andPerformance Analysis

Control Centre Infrastructure andHuman Resources for System Operation

Joint Working Groups

Strategic Advisory GroupJoachim Vanzetta (DE)

WG C2.16Challenges in the control centre

(EMS) due to distributed Generation and Renewables

Michael Power (IE)