SBIR Quad Chart & Examples
-
Upload
texas-state-university-sbdc -
Category
Business
-
view
431 -
download
1
Transcript of SBIR Quad Chart & Examples
1
Project/technology titleOverall Risk: HIGH X MEDIUM LOW SBIR/STTR Topic Number: Date: mm/dd/yy
CONCEPT REQUIREMENT
REQUIREMENT/PAYOFF: Identify and describe the need
driving technology development as well as its benefit to the
target Agency
DELIVERABLE: Description of product to be developed for
use and how it meets customer requirement
OBJECTIVE: Short statement explaining the technology
and its principal features
TRANSITION(S): Succinct strategy/plan for this project
that addresses how the technology will transition into a
system or platform
CONTACTSCompany: name website email
Company lead: “ phone “
Technologist: “ “ “
Fiscal POC: “ “ “
Concept Picture
First item planned. Add more text as necessary.
Second item planned. Add more text as necessary.
•Add other points as necessary
Project/technology title
First key insight. Add more text as necessary.
Second key insight. Add more text as necessary.
•Add other points as necessary
Company name and website, your name/title and contact information
MAIN ACHIEVEMENT:
Placeholder explanatory text. Replace with text and diagrams as necessary.
HOW IT WORKS:
Placeholder explanatory text paragraph. Replace with text and diagrams as necessary.
ASSUMPTIONS AND LIMITATIONS:
• Limitation or assumption
• Another limitation or assumption
Primary answer here. Add more text as necessary.
•First bullet point
•Additional as necessary
Primary answer here. Add more text as necessary.
•First key point
•Additional as necessary
What is the state of the art and what are its limitations? (DELETE THIS BOX OF TEXT AND INSERT DIAGRAM(S)
What are the key new insights? (REPLACETHIS BOX AND INSERT DIAGRAM(S))
What is the impact of the project? (DELETE THIS BOX OF TEXT AND INSERT TABLE, GRAPH, OR OTHER SUITABLE VISUALIZATION)
What are the end-of-phase goals?(REPLACE WITH DIAGRAM/TEXT/THRESHOLD CRITERIA)
QU
AN
TITA
TIV
E IM
PA
CT
EN
D-O
F-P
HA
SE
G
OA
L
STA
TU
S Q
UO
NE
W IN
SIG
HT
S
RIF Commercialization: The Last Mile
4
Cloud Safety Systems TMThe Protection Cloud TM
Overall Risk: HIGH X MEDIUM LOW SBIR/STTR Topic Number: Date: 11/11/2014
CONCEPT REQUIREMENT
REQUIREMENT/PAYOFF:
• Wounded soldiers are most vulnerable to re-injury during rehab.
This device provides protection not previously available, to any
veteran who is at increased risk of injury from falls, significantly
reducing re-injuries.
• Additionally, there are large commercial markets for geriatric fall
protection and industrial fall protection that will save significant
medical cost for Medicare/Medicaid and in workers
compensation claims.
DELIVERABLE:
• Final fall detection algorithm analyzing accelerometer output
to initiate inflation of bladders
• Proof of concept, fully functional fall protection belt
• High resolution video of fall protection belt being deployed
OBJECTIVE:
Patent pending. Fall protection with circuitry that detects when a
fall is initiated and, using airbag technology, inflates a protective
cushion before a person reaches the floor or ground.
Substantially reducing injuries from falls.
TRANSITION(S):
• Contract with University of Texas at Arlington for development of
final algorithm and circuit integration.
• SSR&A to build 5 belts using current suppliers to provide ‘proof of
concept’ prototypes.
• Contract with Daicel Corp to use their test facility to test and video
the ‘proof of concept’ prototypes.
CONTACTS
Company: S.S. Richards & Associates LLC ssrichardsnassociates.com email
Company lead: Scott S. Richards PE, CSP 512 921-7067 [email protected]
Technologist: Scott S. Richards PE, CSP 512 921-7067 [email protected]
Fiscal POC: Scott S. Richards PE, CSP 512 921-7067 [email protected]