TE PLOMIN C SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTI prema smjernicama: EUROPEAN COMMISSION Directorate General Regional Policy -Guide to COST-BENEFIT ANALYSIS of investment projects (July 2008.) -Guide to Cost-Benefit Analysis of Investment Projects Economic appraisal tool for Cohesion Policy 2014-2020 autor: prof.dr.sc. Enco Tireli Rev 1/ 26.02.2016.

Transcript of SAŽETAK REZULTATA STUDIJE...

Page 1: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

TE PLOMIN CSAŽETAK REZULTATA STUDIJE IZVODLJIVOSTIprema smjernicama:

EUROPEAN COMMISSIONDirectorate General Regional Policy-Guide to COST-BENEFIT ANALYSISof investment projects (July 2008.)-Guide to Cost-Benefit Analysis of Investment Projects Economic appraisal tool for Cohesion Policy 2014-2020

autor: prof.dr.sc. Enco Tireli

Rev 1/ 26.02.2016.

Page 2: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Planirana izgradnja termoelektrane Plomin C već duže vrijeme izaziva burne reakcije građana.

Investitori nisu izradili Studiju izvodljivosti prema preporukama EUROPEAN COMMISSION, Directorate General Regional Policy, Guide to COST-BENEFIT ANALYSIS of investment projects (July 2008.).Investitor umjesto izrade i prezentacije rezultata svoje Studije izvodljivosti javnosti se često obraćaju u njegovo ime osobe koje nikad nisu sudjelovale u planiranju, izgradnji i eksploataciji takvih projekata.

Zaprepašćuje činjenica da neke od tih osoba zagovaraju gradnju Plomina C uz isključivo korištenje ugljena, a u Slavonskom Brodu privatnom investitoru dokazuju da je ekonomski prihvatljivije graditi termoelektranu na prirodni plin.

Zašto se za sličan projekt mijenja ekonomska prihvatljivost na udaljenosti od nekoliko stotina kilometara u istoj državi?Da li samo zbog toga što je HEP u državnom vlasništvu ili zbog nekih drugih razloga?

2/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

UvodnoOsjećajući se pozvanim i prozvanim izradio sam ovu Studiju izvodljivosti, te ovim njezinim sažetkom želim doprinijeti rasvjetljavanju nekih činjenica koje su prešućene u krugovima koji izrađuju ovakve vrste studija po narudžbi investitora.

U ovu revidiranu Studiju izvodljivosti unesena je novo objavljena vrijednost diskontne stope od 3,57% umjesto do tada važeće 4,26%. Manja diskontna stopa poboljšava rezultate.

Za one kojima se moram predstaviti da bi ih uvjerio u moju kompetentnost, samo nekoliko navoda:

Prof.dr.sc. Enco Tireli - redoviti profesor u trajnom zvanju

Pomorski fakultet Rijeka: na prediplomskom i diplomskom studiju nositelj kolegija:

Goriva, Energetski sustavi i Toplinske turbineTehnički fakultet Rijeka: na doktorskom studiju nositelj kolegija:

Trajnost i pouzdanost termoenergetskih sustava

Ex.Ministar industrije i energetike (1991.-1992.)(danas MINGO)Ex.Direktor izgradnje TE Plomin 2 (1982.-1990.)Ex.Voditelj proizvodnje u TE Plomin 1(1974.-1982.) Ex.Zamjenik predsjednika NO HEP-a (2000.-2004.)Ex.Član NO NE Krško (2000.-2004.)Ex.Zastupnik u Saboru RH (prvi saziv 1990.)

Rev 1/ 26.02.2016.

Page 3: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Izračun u Studiji izvodljivosti izršen je u excelu s mogućnosću mjenjanja 80-tak ulaznih podataka. Svaka promjena podataka istovremeno se prikazuje u dijagramima. Takav način izračuna i prikaza rezultata omogućuje praćenje ekonomske prihvatljivosti po nekoliko bitnih kriterija kao što su interna stopa povrata (IRR), neto sadašnja vrijednost uloženog novca (NPV), tijek novca (cash flow), kumulirani dobitak za promatrano razdoblje. Izračun daje mogućnost praćenja i niz drugih pokazatelja.

U primjeru izgradnje termoelektrana u strukturi troškova najveći udjel imaju troškovi:A. GorivaB. Financiranja izgradnjeC. Otkupa emisija CO2

D. AmortizacijeE. Osoblja, održavanja i prerade iF. Externi troškovi

3/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Ulazni podaciNeki se podaci moraju prognozirati u dugom vremenskom razdoblju.Neki od takvih ulaznih padataka su:

a) Inflacijab) diskontna stopac) cijena gorivad) cijene otkupa emisija CO2

e) prodajna cijena električne energijef) sati rada godišnje

Izračun je izrađen za razdoblje od 30 godina i može se varirati. U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska razdoblja od 15 do 20 godina. Kraće razdoblje unosi manje rizika ali pogoršava ekonomsku isplativost projekta s obzirom da se troškovi financiranja povećavaju s povećanjem otplatnih rata.

Rev 1/ 26.02.2016.

Page 4: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

4/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Jedinična i ukupna vrijednost investicije

TE Plomin C na ugljenPočetno predviđena vrijednost investicije od 2 milijuna EUR-a po instaliranom MW potvrdili su istupi predstavnika ministarstava i predstavnika velikih europskih proizvođača električne enrgije (Privitak 2) .U analizi je izveden izračun za povećana ulaganja i eventualno smanjena ulaganja u odnosu na baznu varijantu od 2 milijuna EUR/MW.

TE Plomin C na prirodni plinZa ocijenu vrijednosti investicije Plomin C na prirodni plin s kombi-procesom korišteni su podaci upravo dovršene termoelektrane na plin u Francuskoj (Toulus) snage 420 MWe uključujući i spojni plinovod dužine 28 km.Investicijska ulaganja iznosila su, prema izvješću Europen Investment Bank, 450 milijuna EUR-a ili 0,9 milijuna EUR/MW.

S obzirom da se za PlominC na prirodni plin ne mora graditi tako dugi visokotlačni spoj plinovoda, jer plinovod prolazi na 3 km udaljenosti, i da je snaga termoelektrane 500 MW prediđa se ukupna vrijednost investicije na razini 450 milijuna EUR-a.U izračunu se može varirati vrijednost investicije.

Gradnja spomenute termoelektrane TOUL na plin snage 420 MWe trajala je svega 2 godine. Sinkronizirana je s mrežom u prosincu 2012. godine. Radi usporedbe, gradnja termoelektrana na ugljen traje od 4 do 5 godina.

Pogledati na:http://bit.ly/1cJQGsYhttp://bit.ly/17RZxkm

Komentar ulaznih podataka

Vrijednost investicije

Rev 1/ 26.02.2016.

Page 5: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Cijena ugljenaPočetna cijena kamenog ugljena određena je prema cijeni koja je postignuta pri uvozu za potrebe Plomin 1 i Plomin 2.Korištene su cijene na burzi energije EEX (www.eex.com).Prosječna mjesečna cijena kamenog ugljena u zadnjih 200 dana iznosila je 44,53 USD/toni. Cijena transporta iznosi 8% od nabavne cijene.

Pogledati na:http://bit.ly/17RRjbZ

5/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Komentar ulaznih podataka

Gorivo-ugljen

Rev 1/ 26.02.2016.

Page 6: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Cijena prirodnog plinaKorištene su cijene na burzi energije EEX (www.eex.com).Prosječna mjesečna cijena prirodnog plina iznosi 12,358 EUR/MWh. Cijena transporta uzima se 2% od nabavne cijene.

Pogledati na:http://bit.ly/15NLdYg

6/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Komentar ulaznih podataka

Gorivo-prirodni plin

Rev 1/ 26.02.2016.

Page 7: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

7/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Otkupna cijenaCijena otkupa emisija CO2 vrlo je nesiguran ulazni podatak. Zbog lako mogućeg porasta cijene otkupa emisija CO2 sa sadašnje 4,78 na 20 i više EUR/toni CO2

mnogi projekti termoelektrana u EU su stavljeni u stanje mirovanja. Ne smije se zaboraviti da je krajem 2012. godine cijena iznosila 8,5 EUR/toni CO2.

Preporuka je EU da se u projektima koristi prognoza prema:http://bit.ly/14RrUkWPrema javnim istupima predstavnika velikih europskih proizvođača električne energije, indikativan je istup (Privitak 2) predstavnika RWE obrazlažući razlog nepodnošenja ponude za strateškog partnera u TE Plomin C. Zato se analiza izvela s promjenljivom cijenom otkupa emisija CO2 od 4 do 20 EUR/toni CO2, a u baznoj varijanti predviđeno je godišnje povećanje od samo 1 EUR/toni CO2 .Cijenu otkupa emisija CO2 pogledati na:http://bit.ly/18zOw9o

Komentar ulaznih podataka

Emisija ugljikdioksida CO2

Pogledati na:http://bit.ly/14RrUkW

Rev 1/ 26.02.2016.

Page 8: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

8/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Efikasnost procesa je omjer između proizvedene električne energije i uložene toplinske energije dovedene gorivom.

TE Plomin C na ugljenIz dostupnih podataka proizvođača električne energije za predviđenu tehnologiju nije dostignuta učinkovitost ili efikasnost procesa 42%. Za te vrste tehnologije dostignuta je vrijednost 38%. No, da ne bi bilo zamjerke, u baznoj varijanti korišten je ulazni podatak s efikasnošću 42%.

TE Plomin C na prirodni plinEfikasnost izvedene slične termoelektrane na plin sa 420 MWe (Toul u Francuskoj) iznosi 57%.

U Njemačkoj je već izgrađena i dvije godine u pogonu termoelektrana na prirodni plin s efikasnošću 60,75%. (The Irsching 4 Combined Cycle Power Plant has set a new world record in power plant efficiency with its new SGT5-8000H gas turbine. With an output of more than 578 MW and efficiency of 60.75% (net) achieved at a world record test run in May 2011,)http://bit.ly/1ddiTWJ

U ovom izračunu ekonomske prihvatljivosti efikasnost procesa je 60%. U modelu se može varirati efikasnost procesa.

Pogledati na:http://sie.ag/17S0bOzhttp://bit.ly/1cJQGsYhttp://bit.ly/17RZxkmhttp://bit.ly/16h4vZP

Komentar ulaznih podataka

Efikasnost procesa

Rev 1/ 26.02.2016.

Page 9: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Oko ovog se ulaznog podatka manipulira u javnosti te stručnim i znanstvenim krugovima, a evo činjenica:

Cijene goriva po jedinici topline (USD/MMBtu)Omjer cijene prirodnog plina i cijene kamenog ugljena (kolovoz 2013.) po jedinici topline iznosi 2,39 (omjer 10,36/4,33).

Efikasnosti procesaEfikasnost kombi-procesa u termoelektrani na prirodni plin postiže se od 57 do 60% a u termoelektranama na ugljen od 38 do 42%. Usporedbom ta dva važna ulazna podatka termoelektrana na plin troši značajno manje topline za istu prizvodnju električne energije.

Investicijska ulaganjaInvesticijska ulaganja u termoelektranu na plin je značajno manje u odnosu na ulaganja u termoelektranu s pogonom na ugljen (1 miljarda EUR-a za TE na ugljen – 450 milijuna EUR-a TE na plin).

Troškovi emisije CO2

Godišnja prosječna emisija CO2 iz termoelektrane na plin manja je za 1.919.951 tona od emisija CO2 iz termoelektrane na ugljen, što znači da bi trošak za otkup emisija CO2 u cijeni prodanog MWh bio znatno manji u termoelektrani na plin. Uz cijenu otkupa emisija od samo 4 EUR/toni CO2 u termoelektrani na plin povećavaju se troškovi za 4,72 a u termoelektrani na ugljen za 15,64 EUR/MWh.

9/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Komentar ulaznih podataka

Usporedbe najvažnijih ulaznih podataka

Dakle, istina je da je prirodni plin uvijek skuplji od 2 do 3 puta od ugljena po jedinici topline.Oni koji namjerno ili nenamjerno manipuliraju s tim podatkom završavaju riječima „plin je mngo skuplje gorivo i ekonomski je neprihvatljivo graditi termoelektranu na prirodni plin”.Oni koji razumiju izračun troškova proizvodnje električne energije u termoelektranama na ugljen i prirodni plin, a ne žele manipulirati, znaju da:Utjecaj spomenuta 4 ulazna podatka u konačnici dovode do ekonomski prihvatljivije izgradnje termoelektrane s pogonom na prirodni plin.U ovoj se Studiji izvodljivosti dokazuje izrečeno.

Za one koji se žele informirati, mogu ovu tvrdnju svjetske struke (objavljeno u srpnju 2012. godine) pogledati na:http://bit.ly/1ePakPY

Citirano iz gornjeg izvora:„Imported coal at the prevailing US$ 4,50 per MMBtu spot prices are now comparable with US$ 12+ per MMBtu natural gas prices in combined cycle power plant electricity generation with 60 percent efficiencies. „

Nažalost, ovo mnogi ne razumiju a još manje žele razumijeti.

Rev 1/ 26.02.2016.

Page 10: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Prodajna cijena Ako bi se prodajna cijena električne energije za TE Plomin C formirala na sličnom principu kao u slučaju TE Plomin 2, ona bi poprimila vrijednost koja bi uvijek pokrivala sve troškove proizvodnje, a svu električnu energiju bi preuzimao HEP d.d. ( Privitak 1).Malo je vjerovatno da će se primjeniti sličan model, jer je RWE odustao (barem privremeno) od ponude za strateškog partnera HEP-u u TE Plomin C.

Pretpostavlja se da će prodajna cijena električne energije biti između cijene na burzi energije EEX i one koja bi pokrivala sve troškove proizvodnje.S obzirom da je to najvažniji ulazni podatak čiju je veličinu teško predvidjeti u dužem razdoblju, on se u modelu izračuna varira u spomenutim rasponima. Cijena električne energije na burzi EEX iznosi danas 23 EUR/MWh.U baznoj varijanti izračuna predviđena je početna prodajna cijena električne energije 38 EUR/MWh (što predstavlja tržnu cijenu uvećanu za 65%).

Pogledati na: http://bit.ly/14FTz42

10/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Komentar ulaznih podataka

Električna energija

Rev 1/ 26.02.2016.

Page 11: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

11/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Za obje varijante termoelektrane Plomin C (kameni ugljen i prirodni plin) predviđeno je financiranje punog iznosa investiranja na 30 godina s počekom od 5 godina. Kamatna stopa određena prema diskontnoj stopi (u baznoj varijanti diskontna stopa d=3,57%).Naravno, vrijednost diskontne stope može se varirati.

Komentar ulaznih podataka

Financiranje izgradnje

Promjena cijene gorivaZa obje varijante termoelektrane Plomin C (kameni ugljen i prirodni plin) u baznoj varijanti predviđeno je povećanje cijene goriva 1% na godišnjoj razini.Modelom se može mijenjati veličinu godišnje promjene u cijelom razdoblju.

Za obje varijante termoelektrane Plomin C (kameni ugljen i prirodni plin) u baznoj varijanti predviđeno je 6.500 sati rada godišnje s nazivnom snagom 500 MW na pragu (uzeta u obzir vlastita potrošnja).

U Studiji izvodljivosti izvršeni su izračuni za godišnje od 5.000 do 8.000 sati rada. Model omogućava izračun i uz smanjene snage.

Za očekivati je da bi rad TE Plomin C mogao biti vrlo sličan satima rada TE Plomin 2 zbog sličnog utjecaja hidrologije, planiranih prekida rada, kvarova i slično.

Sati rada godišnje

Rev 1/ 26.02.2016.

Page 12: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Komentar ulaznih podataka

Inflacija

12/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Za obje varijante termoelektrane Plomin C (kameni ugljen; prirodni plin) u baznoj varijanti predviđena je inflacija na godišnjoj razini 3%. Modelom se može mijenjati veličinu godišnje inflacije u cijelom razdoblju.

http://bit.ly/1d0yESu

Referentna i diskontna stopaU izračunu pokazatelja ekonomske prihvatljivosti (NPV i IRR) diskontna stopa d varira se od 1 do 6%.

U baznoj varijanti diskontna stopa iznosi d=3,57%. Prema podacima HNB, osnovna referentna i diskontna stopa iznosi:

http://bit.ly/1cUVifQ

Razdoblje Osnovna referentna

stopa[1]

Diskontna stopa[2]Od Do

1.7.2013. … 2,49%1.4.2013. 30.6.2013. 2,57% 3,57%1.1.2013. 31.3.2013. 3,26% 4,26%

Posljednje dostupne harmonizirane dugoročne kamatne stope za ocjenu konvergencije među zemljama članica EU za RH iznose 4,91%.Kad bi se uzela u izračunu kamatna stopa 4,91% ekonomska prihvatljivost bila bi značajno smanjena za termoelektranu na ugljen jer je vrijednost investicije 2,2 puta veća u odnosu na vrijednost investicije termoelektrane na prirodni plin.

Rev 1/ 26.02.2016.

Page 13: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

13/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Izbor ulaznih podataka za Plomin C

Rev 1/ 26.02.2016.

termoelektrana Plomin C studija izvodljivosti

pogonsko gorivo: UGLJEN veljača 2016.

OPIS mjerna jedinica vrijednost

invecticijska ulaganja po jedinici snage mil.EUR/MW 2,000

investicijska ulaganja EUR 1.000.000.000

učinkovitost tehniloškog procesa % 42%

ukupna cijena ugljena fco Plomin (thermal coal EEX) EUR/toni 44,12

ukupna cijena ugljena fco Plomin (thermal coal EEX) USD/MMBtu 2,03

nazivna snaga MW 500

prodajna cjena električne energije na početku perioda rada EUR/MWh 38,00

faktor godišnjeg povećanja cijene pogonskog goriva (prognoza) 1,010

cjena otkupa emisije CO2 (EEX-start) EUR/toni CO2 4,78

vrijednost zemljišta EUR 70.000.000

omjer EUR/USD EUR/USD 1,09

troškovi osoblja, održavanja i prerade u prodajnoj cijeni el.enrgije % 12,00%

vlastita potrošnja električne energije % 8,00%

vrijeme trajanja pogona godina 30

diskontna stopa (d) % 3,57%

externi troškovi EUR/godina 4.160.000

inflacija (prosječno) 1,01

faktor promjene sati rada godišnje (prosječno) 1,00

sati rada godišnje h/god 6.500

porez na bruto dobit % 20%

porez na neto dobit % 12%

cijena ugljena

izvor: www.eex.com

EUR/toni USD/toni

nabavna cijena 40,85 44,53

transport 3,27 3,56

ukupna cijena 44,12 48,09

cijena prirodnog plina

izvor: www.eex.com

prirodni plin EUR/m3 EUR/MWh

nabavna cijena 0,1201 12,358

transport 0,0024 0,2472

ukupna cijena 0,1226 12,605

omjer cijena goriva plin/ugljen po jedinici energije: 1,984

ukupna cijena prirodnog plina fco Plomin EUR/m3 0,1226

ukupna cijena prirodnog plina fco Plomin USD/MMBtu 4,03

Page 14: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

14/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Skupni prikaz rezultata Studije izvodljivosti

Rev 1/ 26.02.2016.

ulazni podaci

veljača 2016. EUR/toni USD/toni

OPIS mjerna jedinica vrijednost cijena ugljena 40,85 44,53

invecticijska ulaganja po jedinici snage mil.EUR/MW 2,000 transport 3,27 3,56

investicijska ulaganja EUR 1.000.000.000 ukupna cijena 44,12 48,09

učinkovitost tehniloškog procesa % 42%

ukupna cijena ugljena fco Plomin (thermal coal EEX) EUR/toni 44,12

ukupna cijena ugljena fco Plomin (thermal coal EEX) USD/MMBtu 2,03

nazivna snaga MW 500

prodajna cjena električne energije na početku perioda rada EUR/MWh 38,00

faktor godišnjeg povećanja cijene pogonskog goriva (prognoza) 1,010

cjena otkupa emisije CO2 (EEX-start) EUR/toni CO2 4,78

vrijednost zemljišta EUR 70.000.000

omjer EUR/USD EUR/USD 1,09

troškovi osoblja, održavanja i prerade u prodajnoj cijeni el.enrgije % 12,00%

vlastita potrošnja električne energije % 8,00%

vrijeme trajanja pogona godina 30

diskontna stopa (d) % 3,57%

externi troškovi EUR/godina 4.160.000

inflacija (prosječno) 1,01

faktor promjene sati rada godišnje (prosječno) 1,00

sati rada godišnje h/god 6.500

porez na bruto dobit % 20%

porez na neto dobit % 12%

prosječno godišnje isporučena (prodana) električna energija TWh 3,25

prosječno godišnje proizvedena električna energija TWh 3,53

godišnja prosječna potrošnja ugljena tona/god 1.211.170

emisija CO2 tona/god (uz 2,2692 tona CO2/toni goriva) tona/god 2.748.388

pokazatelji isplativosti projekta

interna stopa povrata IRR u % % -0,3531%

neto sadašnja vrijednost novca NPV EUR -774.998.458

ukupna neto dobit u periodu 30 godina (+ dobitak, - gubitak) EUR -1.050.488.415

faktor povrata kapitala (CR) 0,054849

otplatna rata (R) EUR 54.849.225 za IRR<d projekt je ekonomski neprihvatljiv

razdoblje god 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 average

cijena otkupa emisija CO2 EUR/toni CO24,78 5,78 6,78 7,78 8,78 9,78 10,78 11,78 12,78 13,78 14,78 15,78 16,78 17,78 18,78 19,78 20,78 21,78 22,78 23,78 24,78 25,78 26,78 27,78 28,78 29,78 30,78 31,78 32,78 33,78

inflacija 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030 1,030

faktor promjene sati rada godišnje (prosječno) 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00 1,00

prodajna cjena električne energije EUR/MWh 38,00 39,14 40,31 41,52 42,77 44,05 45,37 46,74 48,14 49,58 51,07 52,60 54,18 55,80 57,48 59,20 60,98 62,81 64,69 66,63 68,63 70,69 72,81 75,00 77,25 79,56 81,95 84,41 86,94 89,55 60,26

godišnji sati rada prema statistici h/god 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500 6.500

isporučena (prodana) električna energija TWh 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25 3,25

PRIHOD OD PRODAJE ELEKTRIČNE ENERGIJE EUR 123.500.000 127.205.000 131.021.150 134.951.785 139.000.338 143.170.348 147.465.459 151.889.422 156.446.105 161.139.488 165.973.673 170.952.883 176.081.470 181.363.914 186.804.831 192.408.976 198.181.245 204.126.683 210.250.483 216.557.998 223.054.737 229.746.380 236.638.771 243.737.934 251.050.072 258.581.574 266.339.022 274.329.192 282.559.068 291.035.840 195.852.128

razdoblje god 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 average

ukupna cijena ugljena fco Plomin EUR/toni 44 45 45 45 46 46 47 47 48 48 49 49 50 50 51 51 52 52 53 53 54 54 55 55 56 57 57 58 58 59 51

proizvedena električna energija TWh 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53 3,53

potrošnja ugljena tona/god 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170 1.211.170

emisija CO2 tona/god (uz 2,2692 tona CO2/toni goriva) tona/god 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388 2.748.388

TROŠKOVI

troškovi osoblja, održavanja i prerade EUR 14.820.000 15.264.600 15.722.538 16.194.214 16.680.041 17.180.442 17.695.855 18.226.731 18.773.533 19.336.739 19.916.841 20.514.346 21.129.776 21.763.670 22.416.580 23.089.077 23.781.749 24.495.202 25.230.058 25.986.960 26.766.568 27.569.566 28.396.653 29.248.552 30.126.009 31.029.789 31.960.683 32.919.503 33.907.088 34.924.301 23.502.255

troškovi goriva (ugljen) EUR 53.438.617 53.973.004 54.512.734 55.057.861 55.608.440 56.164.524 56.726.169 57.293.431 57.866.365 58.445.029 59.029.479 59.619.774 60.215.972 60.818.131 61.426.313 62.040.576 62.660.982 63.287.591 63.920.467 64.559.672 65.205.269 65.857.321 66.515.895 67.181.054 67.852.864 68.531.393 69.216.707 69.908.874 70.607.963 71.314.042 61.961.884

troškovi amortizacije (3,33% od investicije izuzev zemljišta i infrastrukture) EUR 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000 30.969.000

troškovi financiranja izgradnje (30 g, 5 g grace period) EUR 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225 54.849.225

troškovi emisije CO2 EUR 13.137.294 15.885.682 18.634.070 21.382.458 24.130.846 26.879.234 29.627.622 32.376.010 35.124.398 37.872.786 40.621.174 43.369.562 46.117.950 48.866.338 51.614.726 54.363.114 57.111.502 59.859.890 62.608.278 65.356.665 68.105.053 70.853.441 73.601.829 76.350.217 79.098.605 81.846.993 84.595.381 87.343.769 90.092.157 92.840.545 52.988.920

externi troškovi EUR 4.160.000 4.284.800 4.413.344 4.545.744 4.682.117 4.822.580 4.967.258 5.116.275 5.269.764 5.427.856 5.590.692 5.758.413 5.931.165 6.109.100 6.292.373 6.481.144 6.675.579 6.875.846 7.082.122 7.294.585 7.513.423 7.738.825 7.970.990 8.210.120 8.456.423 8.710.116 8.971.420 9.240.562 9.517.779 9.803.313 6.597.124

UKUPNI TROŠKOVI EUR 171.374.137 175.226.311 179.100.911 182.998.503 186.919.668 190.865.006 194.835.129 198.830.672 202.852.285 206.900.635 210.976.411 215.080.320 219.213.089 223.375.464 227.568.217 231.792.137 236.048.037 240.336.754 244.659.150 249.016.108 253.408.539 257.837.379 262.303.592 266.808.168 271.352.127 275.936.516 280.562.416 285.230.934 289.943.212 294.700.426 230.868.408

udio troškova osoblja, održavanja i prerade EUR/MWh 4,56 4,70 4,84 4,98 5,13 5,29 5,44 5,61 5,78 5,95 6,13 6,31 6,50 6,70 6,90 7,10 7,32 7,54 7,76 8,00 8,24 8,48 8,74 9,00 9,27 9,55 9,83 10,13 10,43 10,75 7,23

udio troškova goriva (ugljen) EUR/MWh 16,44 16,61 16,77 16,94 17,11 17,28 17,45 17,63 17,81 17,98 18,16 18,34 18,53 18,71 18,90 19,09 19,28 19,47 19,67 19,86 20,06 20,26 20,47 20,67 20,88 21,09 21,30 21,51 21,73 21,94 19,07

udio troškova amortizacije EUR/MWh 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53 9,53

udio troškova financiranja EUR/MWh 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88 16,88

udio troškova emisije CO2EUR/MWh 4,04 4,89 5,73 6,58 7,42 8,27 9,12 9,96 10,81 11,65 12,50 13,34 14,19 15,04 15,88 16,73 17,57 18,42 19,26 20,11 20,96 21,80 22,65 23,49 24,34 25,18 26,03 26,88 27,72 28,57 16,30

udio externih troškova EUR/MWh 1,28 1,32 1,36 1,40 1,44 1,48 1,53 1,57 1,62 1,67 1,72 1,77 1,82 1,88 1,94 1,99 2,05 2,12 2,18 2,24 2,31 2,38 2,45 2,53 2,60 2,68 2,76 2,84 2,93 3,02 2,03

UKUPNI TROŠKOVI PO PRODANOM MWh EUR/MWh 52,73 53,92 55,11 56,31 57,51 58,73 59,95 61,18 62,42 63,66 64,92 66,18 67,45 68,73 70,02 71,32 72,63 73,95 75,28 76,62 77,97 79,33 80,71 82,09 83,49 84,90 86,33 87,76 89,21 90,68 71,04

total

BRUTO DOBIT EUR - 47.874.137 - 48.021.311 - 48.079.761 - 48.046.719 - 47.919.330 - 47.694.657 - 47.369.671 - 46.941.250 - 46.406.180 - 45.761.147 - 45.002.739 - 44.127.437 - 43.131.619 - 42.011.551 - 40.763.386 - 39.383.161 - 37.866.792 - 36.210.072 - 34.408.667 - 32.458.110 - 30.353.801 - 28.091.000 - 25.664.821 - 23.070.234 - 20.302.055 - 17.354.942 - 14.223.394 - 10.901.741 - 7.384.144 - 3.664.586 142

porez na bruto dobit 20% EUR - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -

netto dobit prije oporezivanja EUR - 47.874.137 - 48.021.311 - 48.079.761 - 48.046.719 - 47.919.330 - 47.694.657 - 47.369.671 - 46.941.250 - 46.406.180 - 45.761.147 - 45.002.739 - 44.127.437 - 43.131.619 - 42.011.551 - 40.763.386 - 39.383.161 - 37.866.792 - 36.210.072 - 34.408.667 - 32.458.110 - 30.353.801 - 28.091.000 - 25.664.821 - 23.070.234 - 20.302.055 - 17.354.942 - 14.223.394 - 10.901.741 - 7.384.144 - 3.664.586 - 1.050.488.415

porez na neto dobit 12% EUR 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 -

NETO DOBIT EUR - 47.874.137 - 48.021.311 - 48.079.761 - 48.046.719 - 47.919.330 - 47.694.657 - 47.369.671 - 46.941.250 - 46.406.180 - 45.761.147 - 45.002.739 - 44.127.437 - 43.131.619 - 42.011.551 - 40.763.386 - 39.383.161 - 37.866.792 - 36.210.072 - 34.408.667 - 32.458.110 - 30.353.801 - 28.091.000 - 25.664.821 - 23.070.234 - 20.302.055 - 17.354.942 - 14.223.394 - 10.901.741 - 7.384.144 - 3.664.586 - 1.050.488.415

UKUPNI DOBITAK EUR - 47.874.137 - 95.895.449 - 143.975.210 - 192.021.929 - 239.941.259 - 287.635.916 - 335.005.587 - 381.946.837 - 428.353.017 - 474.114.164 - 519.116.903 - 563.244.340 - 606.375.959 - 648.387.510 - 689.150.895 - 728.534.056 - 766.400.848 - 802.610.920 - 837.019.586 - 869.477.696 - 899.831.498 - 927.922.497 - 953.587.319 - 976.657.553 - 996.959.607 - 1.014.314.550 - 1.028.537.944 - 1.039.439.685 - 1.046.823.829 - 1.050.488.415

AKUMULACIJA - 16.905.137 - 17.052.311 - 17.110.761 - 17.077.719 - 16.950.330 - 16.725.657 - 16.400.671 - 15.972.250 - 15.437.180 - 14.792.147 - 14.033.739 - 13.158.437 - 12.162.619 - 11.042.551 - 9.794.386 - 8.414.161 - 6.897.792 - 5.241.072 - 3.439.667 - 1.489.110 615.199 2.878.000 5.304.179 7.898.766 10.666.945 13.614.058 16.745.606 20.067.259 23.584.856 27.304.414

CASH FLOW - 1.000.000.000 - 16.905.137 - 17.052.311 - 17.110.761 - 17.077.719 - 16.950.330 - 16.725.657 - 16.400.671 - 15.972.250 - 15.437.180 - 14.792.147 - 14.033.739 - 13.158.437 - 12.162.619 - 11.042.551 - 9.794.386 - 8.414.161 - 6.897.792 - 5.241.072 - 3.439.667 - 1.489.110 615.199 2.878.000 5.304.179 7.898.766 10.666.945 13.614.058 16.745.606 20.067.259 23.584.856 27.304.414 1.000.000.000

UKUPNI CASH FLOW - 1.000.000.000 - 1.016.905.137 - 1.033.957.449 - 1.051.068.210 - 1.068.145.929 - 1.085.096.259 - 1.101.821.916 - 1.118.222.587 - 1.134.194.837 - 1.149.632.017 - 1.164.424.164 - 1.178.457.903 - 1.191.616.340 - 1.203.778.959 - 1.214.821.510 - 1.224.615.895 - 1.233.030.056 - 1.239.927.848 - 1.245.168.920 - 1.248.608.586 - 1.250.097.696 - 1.249.482.498 - 1.246.604.497 - 1.241.300.319 - 1.233.401.553 - 1.222.734.607 - 1.209.120.550 - 1.192.374.944 - 1.172.307.685 - 1.148.722.829 - 1.121.418.415

veljača 2016.

OPIS mjerna jedinica vrijednost

učinkovitost tehniloškog procesa % 60%

vlastita potrošnja električne energije % 6,00% prirodni plin EUR/m3 EUR/MWh

troškovi osoblja, održavanja i prerade u prodajnoj cijeni el.enrgije % 8,00% cijena 0,1201 12,358

invecticijska ulaganja po jedinici snage mil.EUR/MW 0,900 transport 0,0024 0,2472

investicijska ulaganja EUR 450.000.000 ukupna cjijena 0,1226 12,605

ukupna cijena prirodnog plina fco Plomin EUR/m3 0,1226

ukupna cijena prirodnog plina fco Plomin USD/MMBtu 4,03 1,984

externi troškovi EUR/god 3.407.868

razdoblje god 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 average

ukupna cijena prirodnog plina fco Plomin EUR/m3 0,123 0,124 0,125 0,126 0,128 0,129 0,130 0,131 0,133 0,134 0,135 0,137 0,138 0,139 0,141 0,142 0,144 0,145 0,147 0,148 0,150 0,151 0,153 0,154 0,156 0,157 0,159 0,160 0,162 0,164 4,263

proizvedena električna energija TWh 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,46 3,457

potrošnja prirodnog plina m3/god 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426 592.700.426

emisija CO2 tona/god (uz 1,859 tona CO2/toni prirodnog plina) tona/god 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015 787.015

TROŠKOVI

troškovi osoblja, održavanja i prerade EUR 9.880.000 10.176.400 10.481.692 10.796.143 11.120.027 11.453.628 11.797.237 12.151.154 12.515.688 12.891.159 13.277.894 13.676.231 14.086.518 14.509.113 14.944.386 15.392.718 15.854.500 16.330.135 16.820.039 17.324.640 17.844.379 18.379.710 18.931.102 19.499.035 20.084.006 20.686.526 21.307.122 21.946.335 22.604.725 23.282.867 15.668.170

troškovi goriva (prirodni plin) EUR 72.635.637 73.361.993 74.095.613 74.836.569 75.584.935 76.340.784 77.104.192 77.875.234 78.653.986 79.440.526 80.234.932 81.037.281 81.847.654 82.666.130 83.492.791 84.327.719 85.170.997 86.022.707 86.882.934 87.751.763 88.629.281 89.515.573 90.410.729 91.314.836 92.227.985 93.150.265 94.081.767 95.022.585 95.972.811 96.932.539 84.220.758

troškovi amortizacije (3,33% od investicije izuzev zemljišta i infrastrukture) EUR 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000 12.654.000

troškovi financiranja izgradnje (30 g, 5 g grace period) EUR 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151 24.682.151

troškovi emisije CO2 EUR 3.761.933 4.548.948 5.335.963 6.122.978 6.909.993 7.697.009 8.484.024 9.271.039 10.058.054 10.845.069 11.632.085 12.419.100 13.206.115 13.993.130 14.780.145 15.567.161 16.354.176 17.141.191 17.928.206 18.715.221 19.502.237 20.289.252 21.076.267 21.863.282 22.650.297 23.437.313 24.224.328 25.011.343 25.798.358 26.585.373 15.173.653

externi troškovi EUR 3.510.104 3.615.407 3.723.869 3.835.585 3.950.653 4.069.172 4.191.247 4.316.985 4.446.494 4.579.889 4.717.286 4.858.804 5.004.569 5.154.706 5.309.347 5.468.627 5.632.686 5.801.667 5.975.717 6.154.988 6.339.638 6.529.827 6.725.722 6.927.493 7.135.318 7.349.378 7.569.859 7.796.955 8.030.863 8.271.789 5.566.488

UKUPNI TROŠKOVI EUR 127.123.825 129.038.899 130.973.289 132.927.427 134.901.759 136.896.744 138.912.851 140.950.563 143.010.375 145.092.795 147.198.347 149.327.567 151.481.006 153.659.231 155.862.822 158.092.377 160.348.509 162.631.850 164.943.046 167.282.764 169.651.685 172.050.514 174.479.971 176.940.798 179.433.757 181.959.632 184.519.227 187.113.369 189.742.909 192.408.720 157.965.221

udio troškova osoblja, održavanja i prerade EUR/MWh 3,04 3,13 3,23 3,32 3,42 3,52 3,63 3,74 3,85 3,97 4,09 4,21 4,33 4,46 4,60 4,74 4,88 5,02 5,18 5,33 5,49 5,66 5,82 6,00 6,18 6,37 6,56 6,75 6,96 7,16 4,82

udio troškova goriva (prirodni plin) EUR/MWh 22,35 22,57 22,80 23,03 23,26 23,49 23,72 23,96 24,20 24,44 24,69 24,93 25,18 25,44 25,69 25,95 26,21 26,47 26,73 27,00 27,27 27,54 27,82 28,10 28,38 28,66 28,95 29,24 29,53 29,83 25,91

udio troškova amortizacije EUR/MWh 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89 3,89

udio troškova financiranja EUR/MWh 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59 7,59

udio troškova emisije CO2EUR/MWh 1,16 1,40 1,64 1,88 2,13 2,37 2,61 2,85 3,09 3,34 3,58 3,82 4,06 4,31 4,55 4,79 5,03 5,27 5,52 5,76 6,00 6,24 6,49 6,73 6,97 7,21 7,45 7,70 7,94 8,18 4,67

udio externih troškova EUR/MWh 1,08 1,11 1,15 1,18 1,22 1,25 1,29 1,33 1,37 1,41 1,45 1,50 1,54 1,59 1,63 1,68 1,73 1,79 1,84 1,89 1,95 2,01 2,07 2,13 2,20 2,26 2,33 2,40 2,47 2,55 1,71

UKUPNI TROŠkOVI PO PRODANOM MWh EUR/MWh 39,12 39,70 40,30 40,90 41,51 42,12 42,74 43,37 44,00 44,64 45,29 45,95 46,61 47,28 47,96 48,64 49,34 50,04 50,75 51,47 52,20 52,94 53,69 54,44 55,21 55,99 56,78 57,57 58,38 59,20 48,60

total

BRUTO DOBIT EUR - 3.623.825 - 1.833.899 47.861 2.024.358 4.098.579 6.273.604 8.552.607 10.938.859 13.435.730 16.046.693 18.775.326 21.625.316 24.600.463 27.704.683 30.942.009 34.316.599 37.832.736 41.494.832 45.307.437 49.275.234 53.403.052 57.695.866 62.158.800 66.797.136 71.616.315 76.621.942 81.819.794 87.215.823 92.816.159 98.627.120 1.136.607.209

porez na bruto dobit 20% EUR 0 0 9572,280552 404871,5488 819715,7108 1254720,752 1710521,432 2187771,856 2687146,051 3209338,573 3755065,12 4325063,177 4920092,664 5540936,617 6.188.402 6.863.320 7.566.547 8.298.966 9.061.487 9.855.047 10.680.610 11.539.173 12.431.760 13.359.427 14.323.263 15.324.388 16.363.959 17.443.165 18.563.232 19.725.424 228.412.987

netto dobit prije oporezivanja EUR - 3.623.825 - 1.833.899 38.289 1.619.486 3.278.863 5.018.883 6.842.086 8.751.087 10.748.584 12.837.354 15.020.260 17.300.253 19.680.371 22.163.746 24.753.608 27.453.279 30.266.189 33.195.866 36.245.949 39.420.187 42.722.442 46.156.693 49.727.040 53.437.709 57.293.052 61.297.554 65.455.835 69.772.658 74.252.927 78.901.696 908.194.222

porez na neto dobit 12% EUR 0 0 4.595 194.338 393.464 602.266 821.050 1.050.130 1.289.830 1.540.483 1.802.431 2.076.030 2.361.644 2.659.650 2.970.433 3.294.394 3.631.943 3.983.504 4.349.514 4.730.422 5.126.693 5.538.803 5.967.245 6.412.525 6.875.166 7.355.706 7.854.700 8.372.719 8.910.351 9.468.204 109.638.234

NETO DOBIT EUR - 3.623.825 - 1.833.899 33.694 1.425.148 2.885.399 4.416.617 6.021.035 7.700.957 9.458.754 11.296.872 13.217.829 15.224.222 17.318.726 19.504.097 21.783.175 24.158.886 26.634.246 29.212.362 31.896.435 34.689.765 37.595.749 40.617.890 43.759.795 47.025.184 50.417.886 53.941.847 57.601.135 61.399.939 65.342.576 69.433.492 798.555.989

UKUPNI DOBITAK EUR - 3.623.825 - 5.457.724 - 5.424.029 - 3.998.882 - 1.113.482 3.303.135 9.324.170 17.025.127 26.483.881 37.780.753 50.998.582 66.222.805 83.541.531 103.045.628 124.828.802 148.987.688 175.621.934 204.834.296 236.730.732 271.420.496 309.016.245 349.634.134 393.393.930 440.419.114 490.836.999 544.778.846 602.379.982 663.779.921 729.122.496 798.555.989

AKUMULACIJA 9.030.175 10.820.101 12.692.289 14.273.486 15.932.863 17.672.883 19.496.086 21.405.087 23.402.584 25.491.354 27.674.260 29.954.253 32.334.371 34.817.746 37.407.608 40.107.279 42.920.189 45.849.866 48.899.949 52.074.187 55.376.442 58.810.693 62.381.040 66.091.709 69.947.052 73.951.554 78.109.835 82.426.658 86.906.927 91.555.696

CASH FLOW - 450.000.000 9.030.175 10.820.101 12.692.289 14.273.486 15.932.863 17.672.883 19.496.086 21.405.087 23.402.584 25.491.354 27.674.260 29.954.253 32.334.371 34.817.746 37.407.608 40.107.279 42.920.189 45.849.866 48.899.949 52.074.187 55.376.442 58.810.693 62.381.040 66.091.709 69.947.052 73.951.554 78.109.835 82.426.658 86.906.927 91.555.696 450.000.000

UKUPNI CASH FLOW - 450.000.000 - 440.969.825 - 430.149.724 - 417.457.435 - 403.183.949 - 387.251.086 - 369.578.203 - 350.082.117 - 328.677.030 - 305.274.445 - 279.783.091 - 252.108.831 - 222.154.578 - 189.820.207 - 155.002.461 - 117.594.853 - 77.487.574 - 34.567.385 11.282.481 60.182.430 112.256.617 167.633.059 226.443.752 288.824.792 354.916.500 424.863.552 498.815.106 576.924.941 659.351.600 746.258.526 837.814.222

pokazatelji isplativosti projekta

interna stopa povrata IRR % 6,732% IRR>d projekt je ekonomski prihvatljivneto sadašnja vrijednost novca NPV EUR 343.774.160

ukupna neto dobit u periodu 30 godina (+ dobitak, - gubitak) EUR 798.555.989

faktor povrata kapitala (CR) 0,054849

otplatna rata (R) EUR 24.682.151

termoelektrana Plomin C studija izvodljivosticijena ugljena

izvor: www.eex.com

termoelektrana Plomin C studija izvodljivosti

pogonsko gorivo: PRIRODNI PLIN

izvor: www.eex.com

pogonsko gorivo: UGLJEN

odnos cijena plin/ugljen po jedinici energije

-1.500

-1.000

-500

-

500

1.000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

uku

pn

ia d

ob

it m

iliju

na E

UR

godina

ukupna dobit

ugljen prirodni plin

-

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

uku

pn

i ro

šak p

o p

rod

an

om

MW

H E

UR

/MW

h

godina

ukupni trošak po prodanom MWh

ugljen prirodni plin

-4,000

-2,000

0,000

2,000

4,000

6,000

8,000

10,000

0

10

20

30

40

50

60

70

80

90

8.000 7.500 7.000 6.500 6.000 5.500 5000

inte

rna s

top

a p

ov

rata

IRR

u %

uku

pn

i tr

oško

vi p

o p

rod

an

om

MW

h

EU

R/M

Wh

godišnje sati rada h/god

ukupni troškovi (EUR/MWh) i interna stopa povrata (IRR %) u ovisnosti o satima rada i diskontnoj stopi (d%)

EUR/MWh ugljen EUR/MWh prirodni plin IRR ugljen IRR prirodni plin diskontna stopa (d) %

-

10,00

20,00

30,00

40,00

50,00

60,00

70,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

EU

R/M

Wh

GODINA

STRUKTURA I UKUPNI TROŠAK PO PRODANOM MWh (za prirodni plin)

udio troškova osoblja, održavanja i prerade EUR/MWhudio troškova goriva (prirodni plin) EUR/MWhudio troškova amortizacije EUR/MWhudio troškova financiranja EUR/MWhudio troškova emisije CO2 EUR/MWh

-

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

EU

R/M

Wh

godina

STRUKTURA I UKUPNI TROŠAK PO PRODANOM MWh (za ugljen)

udio troškova osoblja, održavanja i prerade EUR/MWhudio troškova goriva (ugljen) EUR/MWhudio troškova amortizacije EUR/MWhudio troškova financiranja EUR/MWhudio troškova emisije CO2 EUR/MWh

1 2 3 4 5 6

troškovi (EUR/MWh); 6.500 h/god 82,93 84,75 86,71 88,80 91,02 93,36

troškovi (EUR/MWh); 7.500 h/god 79,80 81,37 83,07 84,89 86,81 88,84

troškovi (EUR/MWh); 5.000 h/god 89,98 92,34 94,88 97,61 100,50 103,54

troškovi (EUR/MWh); 5.500 h/god 87,20 89,35 91,66 94,14 96,77 99,53

troškovi (EUR/MWh); 6.000 h/god 84,89 86,86 88,98 91,25 93,66 96,19

troškovi (EUR/MWh); 7.000 h/god 81,25 82,94 84,76 86,71 88,77 90,94

troškovi (EUR/MWh); 8.000 h/god 78,53 80,00 81,60 83,30 85,10 87,00

IRR % ugljen; 6.500 h/god 3,380 2,928 2,439 1,918 1,366 0,787

IRR % ugljen; 7.500 h/god 4,290 3,852 3,377 2,868 2,329 1,764

Interna stopa povrata IRR = d 1 2 3 4 5 6

IRR % ugljen; 5.000 h/god 1,913 1,439 0,928 0,382 -0,197 -0,806

IRR % ugljen; 5.500 h/god 2,417 1,951 1,448 0,911 0,343 -0,254

IRR % ugljen; 6.000 h/god 2,905 2,446 1,951 1,422 0,863 0,275

IRR % ugljen; 7.000 h/god 3,842 3,396 2,914 2,399 1,854 1,282

IRR % ugljen; 7.500 h/god 4,290 3,852 3,377 2,868 2,329 1,764

IRR % ugljen; 8.000 h/god 4,727 4,297 3,829 3,326 2,793 2,234

1,913

1,439

0,928

0,382

-0,197

-0,806

4,727

4,297

3,829

3,326

2,793

2,234

-2,000

-1,000

0,000

1,000

2,000

3,000

4,000

5,000

6,000

7,000

0,00

20,00

40,00

60,00

80,00

100,00

120,00

Inte

rna

sto

pa

po

vra

ta IR

R (%

)

tro

šk

ovi

EU

R /

MW

h(p

rod

an

om

)

diskontna stopa d (%)

dijagram za očitavanje pokazatelja ekonomske prihvatljivosti TE Plomin C na ugljen

1 2 3 4 5 6

troškovi (EUR/MWh); 6.500 h/god 77,14 77,96 78,84 79,78 80,78 81,83

troškovi (EUR/MWh); 7.500 h/god 75,68 76,38 77,15 77,97 78,83 79,74

troškovi (EUR/MWh); 5.000 h/god 80,43 81,49 82,64 83,86 85,16 86,53

troškovi (EUR/MWh); 5.500 h/god 79,13 80,10 81,14 82,26 83,44 84,68

troškovi (EUR/MWh); 6.000 h/god 78,05 78,94 79,89 80,92 82,00 83,14

troškovi (EUR/MWh); 7.000 h/god 76,35 77,11 77,93 78,81 79,74 80,71

troškovi (EUR/MWh); 8.000 h/god 75,08 75,75 76,46 77,23 78,04 78,90

IRR % ; plin; 6.500 h/god 5,174 4,834 4,470 4,084 3,677 3,253

Interna stopa povrata IRR = d 1 2 3 4 5 6

IRR % ; plin; 5.500 h/god 4,196 3,842 3,463 3,060 2,636 2,194

IRR % ; plin; 6.000 h/god 4,697 4,351 3,979 3,585 3,170 2,738

IRR % ; plin; 7.000 h/god 5,630 5,296 4,939 4,559 4,159 3,743

IRR % ; plin; 5.000 h/god 3,668 3,306 2,918 2,506 2,072 1,619

IRR % ; plin; 7.500 h/god 6,067 5,739 5,386 5,013 4,621 4,211

IRR % ; plin; 8.000 h/god 6,486 6,163 5,817 5,448 5,062 4,659

3,668

3,306

2,918

2,506

2,072

1,619

6,486

6,163

5,817

5,448

5,062

4,659

0,000

1,000

2,000

3,000

4,000

5,000

6,000

7,000

68,00

70,00

72,00

74,00

76,00

78,00

80,00

82,00

84,00

86,00

88,00

Inte

rna

sto

pa

po

vra

ta IR

R (%

)

tro

šk

ovi

EU

R /

MW

h(p

rod

an

om

)

diskontna stopa d (%)

dijagram za očitavanje pokazatelja ekonomske prihvatljivosti TE Plomin C na prirodni plin

Page 15: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

15/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Ukupni troškovi po prodanom MWh- bazna varijanta

Rev 1/ 26.02.2016.

-

10,00

20,00

30,00

40,00

50,00

60,00

70,00

80,00

90,00

100,00

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

uku

pn

i ro

šak

po

pro

da

no

m M

WH

EU

R/M

Wh

godina

ugljen prirodni plin

Page 16: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

16/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Ukupna dobit - bazna varijanta

Rev 1/ 26.02.2016.

-1.500

-1.000

-500

-

500

1.000

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30u

ku

pn

ia d

ob

it m

iliju

na

EU

R

godina

ugljen prirodni plin

Page 17: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

17/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Struktura i ukupni trošak po prodanom MWh - bazna varijanta

Rev 1/ 26.02.2016.

Page 18: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

termoelektrana na ugljen ne bi bila ekonomski prihvatljiva i kad bi radila bez prekida 8.760 sati rada godišnje.U baznoj varijanti sa samo 6.500 sati rada godišnje ostvarila bi ukupni gubitak: -1.050.488.415 EUR

Plomin C nije ekonomski prihvatljiv!

termoelektrana na prirodni plin s kombi procesom bila bi ekonomski prihvatljiva već od 5.000 sati rada godišnje.U baznoj varijanti sa samo 6.500 sati rada godišnje ostvarila bi ukupni neto dobitak: +798.555.989 EURU varijanti s 7.500 sati rada godišnje ostvarila bi ukupni neto dobitak: + 1.062.675.355 EURPlomin C je ekonomski prihvatljiv!

18/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

termoelektrana na ugljen ne bi bila ekonomski prihvatljiva i kad bi radila bez prekida 8.760 sati rada godišnje. U baznoj varijanti sa samo 6.500 sati rada godišnje ostvarila bi ukupni gubitak: -2.305.402.353 EUR

Projekt nije ekonomski neprihvatljiv!

termoelektrana na prirodni plin s kombi procesom bila bi ekonomski prihvatljiva već od 5.250 sati rada godišnje.U baznoj varijanti s 6.500 sati rada godišnje ostvarila bi ukupni dobitak: + 526.661.020 EURU baznoj varijanti s 7.500 sati rada godišnje ostvarila bi ukupni dobitak: + 759.846.759 EURProjekt je ekonomski prihvatljiv!

Granice ekonomske prihvatljivosti s promjenom sati rada i cijene otkupa emisija CO2-bazna varijanta

Granica ekonomske prihvatljivosti uz početnu cijenu otkupa emisije 20 EUR/toni CO2

Rev 1/ 26.02.2016.

Granica ekonomske prihvatljivosti uz početnu cijenu otkupa emisije 4,78 EUR/toni CO2

Page 19: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

19/27E. Tireli; rezultati Studije izvodljivosti TE Plomin CRev 1/ 26.02.2016.

Page 20: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

ZAKLJUČAK

20/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

4. termoelektrana pogonjena ugljenom u baznoj varijanti s 7.500 sati rada godišnje ne bi bila ekonomski prihvatljiva jer je IRR<d i NPV<0 i imala bi slijedeće pokazatelje ekonomske prihvatljivosti:

Iz prikaza ulaznih podataka, modela izračuna i izračuna moguće je zaključiti:

1) Projekt Plomin C s ugljenom kao pogonskim gorivom neće biti ekonomski prihvatljiv, čak ni u slučaju da početna cijena otkupa emisija CO2 bude 4,78 EUR/toni CO2 s godišnjim porastom od 1 EUR/toni CO2

2) Projekt Plomin C s prirodnim plinom kao pogonskim gorivom ekonomski je prihvatljiv, čak i u slučaju da početna cijena otkupa emisija CO2 bude 20 EUR/toni CO2 s s godišnjim porastom od 1 EUR/toni CO2

3. U usporedbama najbolje pokazatelje ekonomske prihvatljivosti, uz današnje početne ulazne podatke, imala bi termoelektrana pogonjena prirodnim plinom uz ostvarivih prosječno 7.500 sati rada godišnje:

Rev 1/ 26.02.2016.

interna stopa povrata IRR % 8,041%

neto sadašnja vrijednost novca NPV EUR 499.922.296

ukupna neto dobit u periodu 30 godina (+ dobitak, - gubitak) EUR 1.062.675.355

interna stopa povrata IRR % 0,402%

neto sadašnja vrijednost novca NPV EUR -631.957.501

ukupna neto dobit u periodu 30 godina (+ dobitak, - gubitak) EUR -791.097.448

Page 21: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

21/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Usporedba emisija i nastalih produkata zatečenog stanja i planiranog stanja s Plominom C na ugljen

Rev 1/ 26.02.2016.

0,800

h 0,0401 0,0458 0,950

c 0,6060 0,6927 0,999

s 0,0076 0,0087

o 0,0934 0,1068

n 0,0126 0,0144

w 0,1227 0,1313

a 0,1176

ukupno 1,0000 0,9996

bez denoxa i bez desulf. bez denoxa sa desulf. sa denox i desulf. sadašnje stanje planirano stanje

faktor pretička zraka 1,2 Plomin 1 Plomin 2 Plomin C Plomin (1+2) Plomin (2+C)razlika

(planirano-sadašnje)omjer (planirano/sadašnje) razlika u %

kg/god 257.435.380 562.238.065 1.397.504.200 819.673.445 1.959.742.265 1.140.068.820 2,39 139%

h/god 5.000 6.500 7.500

tona/god 30.274 66.119 164.346 96.394 230.466 134.072 2,39 139%

tona/god 21 46 118 67 165 97 2,44 144%

tona/god 30.253 66.073 164.228 96.326 230.301 133.975 2,39 139%

tona/god 0 31.710 78.819 31.710 110.529 78.819 3,49 249%

tona/god 584.172 1.275.831 3.171.217 1.860.003 4.447.047 2.587.044 2,39 139%

tona/god 2.236 4.884 12.140 7.120 17.024 9.904 2,39 139%

tona/god 4.473 488 1.214 4.961 1.702 - 3.259 0,34 -66%

tona/god 2.155.092 4.706.714 11.699.051 6.861.805 16.405.765 9.543.960 2,39 139%

tona/god 751 1.640 857 2.391 2.497 106 1,04 4%

kmol /kgg nm3/kgg nm3/god nm3/god nm3/god nm3/god nm3/god nm3/god produkti izgaranja(g/nm3pl.)

ugljikdioksid VCO2 0,0577 1,2930 332.854.061 726.952.228 1.806.919.266 1.059.806.289 2.533.871.495 1.474.065.206 306,28

sumpordioksid VSO2 0,0003 0,0061 1.565.403 3.418.835 8.497.888 4.984.237 11.916.722 6.932.485 2,10

kisik VO2 0,0132 0,2962 76.251.592 166.533.239 413.936.579 242.784.832 580.469.819 337.684.987 51,03

dušik VN2 0,2990 6,6971 1.724.073.398 3.765.370.910 9.359.241.198 5.489.444.307 13.124.612.107 7.635.167.800 1.009,53

vodena para VH2O 0,0302 0,6767 174.213.222 380.481.132 945.727.465 554.694.354 1.326.208.596 771.514.243 65,58

vol. suhih plinova Vs 0,3702 8,2924 2.134.744.454 4.662.275.212 11.588.594.931 6.797.019.666 16.250.870.143 9.453.850.478

vol. vlažnih plinova Vvl 0,4004 8,9691 2.308.957.675 5.042.756.344 12.534.322.396 7.351.714.019 17.577.078.739 10.225.364.720

tona NOx/god tona NOx/god tona NOx/god tona NOx/god tona NOx/god tona NOx/god

iz goriva NOx gNOx/nm3 0,3211 742 1.619 805 2.361 2.425 64

iz zraka Nox gNOx/nm3 0,0207 10 21 52 30 73 42

Ukupni NOx gNOx/nm3 0,3419 751 1.640 857 2.391 2.497 106

Iz izračuna je vidljivo: Ako bi se izgradio Plomin C i ako bi energent bio kameni ugljen, onda se povećavaju

sve emisije u apsolutnom iznosu osim emisije SO2 koja bi iznosila 34% od sadašnje emisije

emisije NOx bez denoxa

emisija nastalog NOx iz goriva i zraka

emisija CO2

potrošnja ugljena

prosječno sati rada

emisija čestica pepela (99% odvajanja u EF+gips)

zadržan pepeo (na deponiji ili u gipsu) (uz 99% odvajanja)

nastala količina pepela, šljake i krutog ostatka iz EF

količina sumpora iz goriva

usporedba stanja

nastali plinovi izgaranja

nastali gips iz desulfurizacije (5,64% od potrošnje ugljena)

emisija sumpordioksida SO2

produkt izgaranja N2 (n=1,44%)

efikasnost denox-a

efikasnost desulfurizacije

efikasnost odvajanja krutih čestica

sastav ugljena kg/kg

Page 22: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

22/27E. Tireli; rezultati Studije izvodljivosti TE Plomin CRev 1/ 26.02.2016.

Usporedba emisija pepela, šljake i krutog otpada zatečenog stanja i planiranog stanja s Plominom C na ugljen

Page 23: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

23/27E. Tireli; rezultati Studije izvodljivosti TE Plomin CRev 1/ 26.02.2016.

Usporedba emisija pepela i gipsa zatečenog stanja i planiranog stanja s Plominom C na ugljen

Page 24: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

24/27E. Tireli; rezultati Studije izvodljivosti TE Plomin CRev 1/ 26.02.2016.

Usporedba emisija CO2 i SO2 zatečenog stanja i planiranog stanja s Plominom C na ugljen

Page 25: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

25/27E. Tireli; rezultati Studije izvodljivosti TE Plomin CRev 1/ 26.02.2016.

Usporedba emisija NOx zatečenog stanja i planiranog stanja s Plominom C na ugljen

Page 26: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

Privitak 1

26/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Indikativan je podatak iz Izvješća HEP-a o poslovanju za 2012. godinu, u dijelu koji govori o TE Plomin 2Citirano:„HEP d.d. je obvezan kupovati svu energiju proizvedenu u Plominu (Plomin 2 op.a) prema cijenama točno definiranim formulama u navedenom ugovoru, koje su kalkulirane tako da pokriju sve troškove proizvodnje u Plominu te da osiguraju garantirani iznos povrata na kapital RWE-u.”

Pogledati nahttp://www.hep.hr/hep/publikacije/godisnje/2012godisnje.pdf Stranica 128.

Uz takvu klauzulu u ugovoru i TE Plomin C u svim varijantama i s bilo kojim gorivom bio bi prihvatljiv svakom strateškom partneru.

Rev 1/ 26.02.2016.

Page 27: SAŽETAK REZULTATA STUDIJE IZVODLJIVOSTItireli.weebly.com/uploads/4/6/9/8/46986387/sažetak_rezultata... · U EU-Guide2008 preporučuje se izrada studija izvodljivosti za vremenska

27/27E. Tireli; rezultati Studije izvodljivosti TE Plomin C

Privitak 2Ingo BLOCK, član Uprave RWE-a Hrvatska

"RWE je zainteresiran za razvoj TE Plomin C jer ima vrlo dobra iskustva s partnerom HEP-om, no RWE trenutačno u svojem srednjoročnom planu nema predviđena financijska sredstva za takav projekt i u ovom trenutku vrlo teško im se odlučiti za takvu investiciju", potvrdio je za naš portal Ingo BLOCK, Član Uprave RWE Hrvatska. "Ekonomska isplativost elektrane na kameni ugljen još uvijek nije dokazana. S obzirom da Hrvatska pristupa EU-u, od samog početka će sudjelovati u sustavu trgovanja emisijama. To stavlja veliki teret na proizvodnju struje iz ugljena u novoj elektrani u Plominu - ne prema trenutačnim cijenama od oko 8,50 EUR/(MW h), već u slučaju povišenja cijene do 20 EUR/(MW h) i više. Što se tiče tehnologije, razvili smo vlastitu konstrukciju koja omogućuje snižavanje troškova, optimalnu integraciju novih postrojenja u postojeću infrastrukturu i visoku konkurentnost kod proizvođača opreme. Počeli smo s preliminarnim upitima kod proizvođača opreme kako bismo dobili potvrdu isplativosti naše konstrukcije u cjelini te dobili uvid u to koliko će iznositi troškovi investicije. Što se tiče komercijalnog aspekta, od ključne je važnosti takozvani 'clean dark spread', tj. razlika između veleprodajnih cijena električne energije i cijena goriva, uključujući trošak CO2-certifikata - sve su to troškovi vrlo neizvjesni i teško ih je predvidjeti, kao i troškove ulaganja. Trošak investicije je, prema HEP-ovim procjenama, oko 800 mil. eura, što je po našem mišljenju u razumnom rasponu od 1500 do 2000 EUR/ kW, ovisno o veličini i konstrukciji nove elektrane. Prvenstveno je ekonomsko pitanje kupiti CO2-kvote ili s druge strane izgraditi postrojenje osposobljeno za zahvaćanje emisija CO2. Skladištenje uhvaćenog CO2, prema mojim spoznajama, trenutačno košta 60 - 90 EUR/t, no ta cijena će zbog istraživanja i razvoja na tom polju vjerojatno do 2020. godine pasti na 30 EUR/t", zaključuje Block.

Pogledati na:

http://bit.ly/12jA1Wt

Rev 1/ 26.02.2016.