SATR-X-3101 Rev 3

3
Page 1 of 3 SAUDI ARAMCO ID/PID -18-MAY-05 -REV 0 (Standard C!toff -"U#E $008% REV 3 30-"!n-08 SAUDI ARAMCO TEST REPORT SA&R #UM'ER DA&E APPROVED R #UM'ER Galvanic CP Testing SATR-X-3101 CP- PRO"EC& &I&)E *'S /'I/"O #UM'ER CO#&RAC&OR /SU'CO#&RAC&OR E UIPME#& ID #UM'ER S E UIPME#& DESCRIP&IO# E P& CODE SYS&EM ID+ P)A#& #O+ )AYOU& DRA*I#, #UM'ER REV+ #O+ PURC ASE ORDER #UM'ER EC /PMCC /MCC #O+ SC EDU)ED &ES& DA&E . &IME AC&UA) &ES& DA&E . &IME UA#&I&Y I#SP+ M SPE#& &RAVE) &IME SAUDI ARAMCO USE ONL SAUDI ARAMCO &IP #UM'ER SAUDI ARAMCO AC&IVI&Y #UM'ER *OR PERMI& RE UIRED TEST PROCEDURE ACCEPTANCE CRITERIA RE!ERENCE PASS !AIL N"A RE-TEST DATE A# PROCEDURE A1 A$ A3 En!re t2at a 4eter a 6a 7 rated+ A% A& A' A( A) *# TEST E+UIPMENT AND MATERIALS CRITERIA '1+ M! t74eter C# TEST RESULTS E+UIPMENT IDENTI!ICATION TEST POINTS LOCATION REMAR,S ITEM N# En!re t2at t2e 9ro9er :o t4eter and a44eter and !7ta e referen6e e e6trode a !ed for CP tet7ng+ SAES-;-<00 Se6+ 3+1 C2e6= t2e 4eter atter7e 9er7od76a > to en!re t2e> t7 f!n6t7on 9ro9er >+ ,enera >? t2e> 2o! d e re9 a6ed e:er> >ear+ SAES-;-<00 Se6+ 3+1 SAES-;-<00 Se6+ 3+1 En!re t2at 27g2 7n9!t 749edan6e 4eter for tr!6t!re-to-e e6tro >te 9otent7a 4ea!re4ent? e9e67a > 7n area of 27g2 re7t7:7t> a !ed+ In9!t 749edan6e 2o! d e $0 4ego24 or greater+ SAES-;-<00 Se6+ 3+1 Ue a 6 a49-on-a44eter for t2e d7re6t 4ea!re4ent of DC 6!rrent+ Meter 2a:7ng 6!rrent 4ea!r7ng 6a9a67t> !9 to $00 a49 and a :ar7et> of 6 a49 7@e are 9referred+ SAES-;-<00 Se6+ 3+1 En!re t2at t2e 6o99er-6o99er ! fate and 7 :er-7 :er 62 or7de referen6e e e6trode a 9ro9er > 4a7nta7ned+ SAES-;-<00 Se6+ 3+1 C2e6= tet ead of :o t4eter !ed for tr!6t!re-to-e e6tro >te 4ea!re4ent 9er7od76a >? for 6ont7n!7t> and 7ntegr7t>+ Re9a7r or re9 a6e fa! t> ead or 6onne6t7on efore 4a=7ng 4ea!re4ent+ SAES-;-<00 Se6+ 3+1 &2e 47n74!4 de7gn 7fe for ga :an76 or 749reed 6!rrent anode >te4 2a e e7t2er >ear? or t2e tet7ng and 7n9e6t7on (&.I% 9er7od? 2762e:er 7 greater+ SAES-;-500 Se6+ <+3+1 GAL.ANIC ANODE TPE STRUCTURE TO ELECTROLTE POTENTIAL / . POLARI2ATION CURRENT /A . lt Mete4 *4an56 77777777777777 S"N6 77777777777777 Cali8# Date677777777777 A ete4 *4an56 77777777777777

description

SATR-X-3101 Rev 3

Transcript of SATR-X-3101 Rev 3

Multipage SATR Page 1SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)REV 330-Jun-08SAUDI ARAMCO TEST REPORTSATR NUMBERDATE APPROVEDQR NUMBERGalvanic CP TestingSATR-X-3101CP-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOREQUIPMENT ID NUMBER(S)EQUIPMENT DESCRIPTIONEQPT CODESYSTEM ID.PLANT NO.LAYOUT DRAWING NUMBERREV. NO.PURCHASE ORDER NUMBEREC / PMCC / MCC NO.SCHEDULED TEST DATE & TIMEACTUAL TEST DATE & TIMEQUANTITY INSP.MH's SPENTTRAVEL TIMESAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBERSAUDI ARAMCO ACTIVITY NUMBERWORK PERMIT REQUIRED?SAUDI ARAMCO INSPECTION LEVELCONTRACTOR INSPECTION LEVELITEM No.TEST PROCEDURE ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATEA. PROCEDUREA1Ensure that the proper voltmeters and ammeters and suitable reference electrodes was used for CP testing.SAES-X-400Sec. 3.1A2Check the meter batteries periodically to ensure they still function properly. Generally, they should be replaced every year.SAES-X-400Sec. 3.1A3Ensure that all meters was calibrated.SAES-X-400Sec. 3.1A4Ensure that high input impedance meters for structure-to-electrolyte potential measurements, especially in areas of high resistivity was used. Input impedance should be 20 megohms or greater.SAES-X-400Sec. 3.1A5Use a clamp-on-ammeter for the direct measurements of DC currents. Meters having current measuring capacity up to 200 amps and a variety of clamp sizes are preferred.SAES-X-400Sec. 3.1A6Ensure that the copper-copper sulfate and silver-silver chloride reference electrodes was properly maintained.SAES-X-400Sec. 3.1A7Check test leads of voltmeters used for structure-to-electrolyte measurements periodically, for continuity and integrity. Repair or replace faulty leads or connections before making measurements.SAES-X-400Sec. 3.1A8The minimum design life for galvanic or impressed current anode systems shall be either 7 years, or the testing and inspection (T&I) period, whichever is greater.SAES-X-500Sec. 4.3.1B. TEST EQUIPMENT AND MATERIALS CRITERIAB1. MultimeterC. TEST RESULTSEQUIPMENT IDENTIFICATIONTEST POINTSLOCATIONGALVANIC ANODE TYPESTRUCTURE TO ELECTROLYTE POTENTIAL (mV)POLARIZATION CURRENT (Amp)REMARKSVolt MeterBrand: ______________

S/N: ______________

Calib. Date:___________AmmeterBrand: ______________

S/N: ______________

Calib. Date:___________

Page &P of &N

Multipage SATR Pages 2,3,4.SAUDI ARAMCO ID/PID - 18-MAY-05 - REV 0 (Standards Cutoff - JUNE 2008)REV 330-Jun-08SAUDI ARAMCO TEST REPORTSATR NUMBERDATE APPROVEDQR NUMBERGalvanic CP TestingSATR-X-3101CP-PROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTORITEM No.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATED. CONCLUSIONSITEM No.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATED1SafetyCathodic protection personnel are responsible for obtaining appropriate work permits and associated gas test results from the operations foreman in all classified areas before starting any job.SAES-P-332Sec. 3D2Test results are acceptable and in accordance with Saudi Aramco Engineering Standards and contractual requirements.N/AREMARKS:REFERENCE DOCUMENTS:1. SAEP-332 Cathodic Protection Commissioning, 31 May 20052. SAES-X-400 Cathodic Protection of Buried Pipelines, 22 October 20073. SAES-X-500 Cathodic Protection of Vessel and Tank Internals, 31 March 2008Contractor / Third-PartySaudi AramcoTechnician Performing Test*PMT RepresentativeName, Title, Department,Company, Initials and Date:Test Performed Successfully and Results are Acceptable:Name, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC InspectorPID RepresentativeName, Initials and Date:Witnessed TestWork / Rework May ProceedName, Initials and Date:T&I WitnessedQC Record ReviewedWork VerifiedQC SupervisorProponent and OthersName, Sign and Date:Quality Record Approved:Name, Organization,Initials and Date:T&I WitnessedQC Record ReviewedWork Verified*Person Responsible for Implementation of Test and Analysis of ResultsY = YES N = NO F = FAILED

Page &P of &N