SATR-S-4006

2
Page 1 of 2 SAUDI ARAMCO ID/PID - 6/30/2008 - REV 3 (Standards Cutoff - June 2008) REV 3 30-Jun-08 SAUDI ARAMCO TEST REPORT SATR NUMBER DATE APPROVED QR NUMBER On-site Built-up Shower Receptor Watertightness Test SATR-S-4006 15-Dec-09 Pl PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC SCHEDULED TEST DATE & TIME ACTUAL TEST DATE & TIME QUANTITY INSP. MH's SPENT SAUDI ARAMCO USE SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL TEST PROCEDURE ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A A. TEST PROCEDURE AND CHECKLIST A1 A2 B. CONCLUSIONS TEST RESULTS ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A B1 N/A REFERENCE DOCUMENTS: 1- SAES-S-060-- Saudi Aramco Plumbing Code, 28 January 2004 2- Uniform Plumbing Code (UPC), 2000 Contractor / Third-Party Saudi Aramco Test Performed Successfully and Results are Acceptable: T&I Witnessed QC Record Reviewed QC Inspector PID Representative Witnessed Test Work / Rework May Proceed T&I Witnessed QC Record Reviewed QC Supervisor Proponent and Others Name, Sign and Date: Quality Record Approved: T&I Witnessed QC Record Reviewed *Person Responsible for Implementation of Test and Analysis of Results Y = YES N ITEM No. Shower receptor shall be tested for watertightness by filling with water to the level of the rough threshold. (UPC Para 412.8.1) SAES-S-060 Para 1.1 Place the test plug so that both upper and under sides of the sub-pan be subjected to the test at the point where it is clamped to the drain (UPC Para 412.8.1) SAES-S-060 Para 1.1 ITEM No. Test results are acceptable (no leak detected) and in accordance with Saudi Aramco Engineering Standards and contractual requirements. REMARKS: Technician Performing Test* PMT Representative Name, Title, Department, Company, Initials and Date: Name, Initials and Date: Name, Initials and Date: Name, Initials and Date: Name, Organization, Initials and Date:

description

SATR-S-4006

Transcript of SATR-S-4006

Single Page SATRSAUDI ARAMCO ID/PID - 6/30/2008 - REV 3 (Standards Cutoff - June 2008)REV 330-Jun-08SAUDI ARAMCO TEST REPORTSATR NUMBERDATE APPROVEDQR NUMBEROn-site Built-up Shower Receptor Watertightness TestSATR-S-400615-Dec-09PlumbPROJECT TITLEWBS / BI / JO NUMBERCONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S)EQUIPMENT DESCRIPTIONEQPT CODESYSTEM ID.PLANT NO.

LAYOUT DRAWING NUMBERREV. NO.PURCHASE ORDER NUMBEREC / PMCC / MCC NO.

SCHEDULED TEST DATE & TIMEACTUAL TEST DATE & TIMEQUANTITY INSP.MH's SPENTTRAVEL TIMESAUDI ARAMCO USE ONLYSAUDI ARAMCO TIP NUMBERSAUDI ARAMCO ACTIVITY NUMBERWORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVELCONTRACTOR INSPECTION LEVEL

ITEM No.TEST PROCEDURE ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATE

A. TEST PROCEDURE AND CHECKLISTA1Shower receptor shall be tested for watertightness by filling with water to the level of the rough threshold. (UPC Para 412.8.1) SAES-S-060Para 1.1A2Place the test plug so that both upper and under sides of the sub-pan be subjected to the test at the point where it is clamped to the drain (UPC Para 412.8.1) SAES-S-060Para 1.1 B. CONCLUSIONSITEM No.TEST RESULTS ACCEPTANCE CRITERIAREFERENCEPASSFAILN/ARE-TEST DATE

B1Test results are acceptable (no leak detected) and in accordance with Saudi Aramco Engineering Standards and contractual requirements.N/A

REMARKS:

REFERENCE DOCUMENTS:1- SAES-S-060-- Saudi Aramco Plumbing Code, 28 January 20042- Uniform Plumbing Code (UPC), 2000

Contractor / Third-PartySaudi AramcoTechnician Performing Test* PMT Representative

Name, Title, Department,Company, Initials and Date:Test Performed Successfully and Results are Acceptable:Name, Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

QC InspectorPID RepresentativeName, Initials and Date:Witnessed TestWork / Rework May ProceedName, Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

QC SupervisorProponent and OthersName, Sign and Date: Quality Record Approved:Name, Organization,Initials and Date:T&I WitnessedQC Record ReviewedWork Verified

*Person Responsible for Implementation of Test and Analysis of ResultsY = YES N = NO F = FAILED