Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two...

19
Satellite Navigation Program Satellite Navigation Program Satellite Navigation Program Satellite Navigation Program IRNSS IRNSS IRNSS IRNSS Presentation by Indian delegation at STSC-UNCOPUOS, Vienna Feb, 2012

Transcript of Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two...

Page 1: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

Satellite Navigation ProgramSatellite Navigation ProgramSatellite Navigation ProgramSatellite Navigation Program

IRNSSIRNSSIRNSSIRNSS

Presentation by Indian delegation

at STSC-UNCOPUOS, Vienna

Feb, 2012

Page 2: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

GAGANGAGANGAGANGAGAN----FOP ConfigurationFOP ConfigurationFOP ConfigurationFOP Configuration

INLUSINLUSINLUSINLUS---- IBIBIBIB INLUSINLUSINLUSINLUS----2A2A2A2A

INLUSINLUSINLUSINLUS---- IAIAIAIA

INRESINRESINRESINRES----1111

INRESINRESINRESINRES----8888

INRESINRESINRESINRES----9999

INRESINRESINRESINRES----15151515

GNSS GNSS GNSS GNSS ConstellationConstellationConstellationConstellation

USERUSERUSERUSER

GEOGEOGEOGEO----2222 GEOGEOGEOGEO----1111

Scope of work for Final Scope of work for Final Scope of work for Final Scope of work for Final Operation PhaseOperation PhaseOperation PhaseOperation Phase

Data Communication Data Communication Data Communication Data Communication NetworkNetworkNetworkNetwork

Existing GAGAN TDS Existing GAGAN TDS Existing GAGAN TDS Existing GAGAN TDS SetupSetupSetupSetup

INMCC INMCC INMCC INMCC ----1111 INMCC INMCC INMCC INMCC ----2222

GEOGEOGEOGEO----3333

SystemSystemSystemSystem FOPFOPFOPFOP

INRESINRESINRESINRES 15 (3 15 (3 15 (3 15 (3 chains)chains)chains)chains)

INMCCINMCCINMCCINMCC 2222

INLUSINLUSINLUSINLUS----SGSGSGSG 2222

O&MO&MO&MO&M 2222

Iono ModelIono ModelIono ModelIono Model(Equatorial)(Equatorial)(Equatorial)(Equatorial)

IGMIGMIGMIGM----MLDFMLDFMLDFMLDF

GEOGEOGEOGEO 1 (GSAT1 (GSAT1 (GSAT1 (GSAT----8)8)8)8)

INLUSINLUSINLUSINLUS----RFRFRFRF 1111

COM LinksCOM LinksCOM LinksCOM Links 2222

System/Activities Completed

System/Activities Planned

SystemSystemSystemSystem FOPFOPFOPFOP

INLUSINLUSINLUSINLUS----RFRFRFRF 2222

GEOGEOGEOGEO GSATGSATGSATGSAT----10, 10, 10, 10, 15151515

Comm. Comm. Comm. Comm. LinksLinksLinksLinks

1111

Page 3: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

�GSAT-8 carrying GAGAN Payload

launched on 21 May 2011

�INLUS RFU Subsystem Tested and

Evaluated

�GSAT-8 GAGAN Payload IOT

Completed

GAGAN payload on GSATGAGAN payload on GSATGAGAN payload on GSATGAGAN payload on GSAT----8: 8: 8: 8: Completion of ground and in orbit testCompletion of ground and in orbit testCompletion of ground and in orbit testCompletion of ground and in orbit test

1st Signal In Space from GAGAN payload received on 13-Sep-2011

Page 4: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

Presentation to ISRO CouncilPresentation to ISRO CouncilPresentation to ISRO CouncilPresentation to ISRO Council

CompletedCompletedCompletedCompleted Planned ActivitiesPlanned ActivitiesPlanned ActivitiesPlanned Activities

Ground ElementsGround ElementsGround ElementsGround Elements

INLUSINLUSINLUSINLUS----2 2 2 2 at Bangalore: at Bangalore: at Bangalore: at Bangalore: CompletedCompletedCompletedCompleted

Test & EvaluationTest & EvaluationTest & EvaluationTest & Evaluation

Proto M&C system for INLUS RFUProto M&C system for INLUS RFUProto M&C system for INLUS RFUProto M&C system for INLUS RFU Development in DODevelopment in DODevelopment in DODevelopment in DO----178B 178B 178B 178B

DELHI (Nangloi) INLUSDELHI (Nangloi) INLUSDELHI (Nangloi) INLUSDELHI (Nangloi) INLUS----3 FMA: 3 FMA: 3 FMA: 3 FMA: Civil works initiated Civil works initiated Civil works initiated Civil works initiated

Commissioning by Commissioning by Commissioning by Commissioning by AprAprAprApr’’’’12121212

Ionosphere Algorithm Ionosphere Algorithm Ionosphere Algorithm Ionosphere Algorithm

ISRO developed IGMISRO developed IGMISRO developed IGMISRO developed IGM----MLDF MLDF MLDF MLDF

model model model model

Incorporation into Incorporation into Incorporation into Incorporation into operational systemoperational systemoperational systemoperational system

Agreed by AAI, DGCA, RTNAgreed by AAI, DGCA, RTNAgreed by AAI, DGCA, RTNAgreed by AAI, DGCA, RTN Review by TRT for Review by TRT for Review by TRT for Review by TRT for CertificationCertificationCertificationCertification

Space SegmentSpace SegmentSpace SegmentSpace Segment

GSATGSATGSATGSAT----8 launch, IOT & integration8 launch, IOT & integration8 launch, IOT & integration8 launch, IOT & integration GSAT GSAT GSAT GSAT ----10,15 launch & 10,15 launch & 10,15 launch & 10,15 launch & integrationintegrationintegrationintegration

System Acceptance Test System Acceptance Test System Acceptance Test System Acceptance Test

Preliminary Completed in DecPreliminary Completed in DecPreliminary Completed in DecPreliminary Completed in Dec’’’’10101010 Final during JunFinal during JunFinal during JunFinal during Jun’’’’12121212

Certification by DGCACertification by DGCACertification by DGCACertification by DGCA

Work InitiatedWork InitiatedWork InitiatedWork Initiated Completion by JunCompletion by JunCompletion by JunCompletion by Jun’’’’13131313

Major ActivitiesMajor ActivitiesMajor ActivitiesMajor Activities

APVAPVAPVAPV----1 1 1 1 Performance Performance Performance Performance using IGMusing IGMusing IGMusing IGM----MLDFMLDFMLDFMLDF

Page 5: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

GAGAN versus GPS scatter plot and position uncertainties (15GAGAN versus GPS scatter plot and position uncertainties (15GAGAN versus GPS scatter plot and position uncertainties (15GAGAN versus GPS scatter plot and position uncertainties (15----SepSepSepSep----2011)2011)2011)2011)

Page 6: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

ApplicationsApplicationsApplicationsApplications• For AviationFor AviationFor AviationFor Aviation

– High Accuracy, Global High Accuracy, Global High Accuracy, Global High Accuracy, Global Coverage, Direct EnCoverage, Direct EnCoverage, Direct EnCoverage, Direct En----route, route, route, route, Reduced and Simplified Reduced and Simplified Reduced and Simplified Reduced and Simplified equipment onequipment onequipment onequipment on----board & groundboard & groundboard & groundboard & ground

• Other Potential UsersOther Potential UsersOther Potential UsersOther Potential Users

– Survey, Land Management Survey, Land Management Survey, Land Management Survey, Land Management Scientific Research, Business Scientific Research, Business Scientific Research, Business Scientific Research, Business solutions, Geodynamics etc.,solutions, Geodynamics etc.,solutions, Geodynamics etc.,solutions, Geodynamics etc.,

Tasks AheadTasks AheadTasks AheadTasks Ahead• Signal In Space tests including Signal In Space tests including Signal In Space tests including Signal In Space tests including airairairair----borne receiversborne receiversborne receiversborne receivers

• Production of SBAS ReceiversProduction of SBAS ReceiversProduction of SBAS ReceiversProduction of SBAS Receivers

• User MeetUser MeetUser MeetUser Meet

Page 7: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

32.5⁰

111.75

Page 8: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

S. S. S. S.

NoNoNoNo

Service Service Service Service

AreaAreaAreaArea

Description of the Description of the Description of the Description of the

service areaservice areaservice areaservice area

1111 Primary Primary Primary Primary

Service Service Service Service

AreaAreaAreaArea

Indian land mass Indian land mass Indian land mass Indian land mass

and 1500 km from and 1500 km from and 1500 km from and 1500 km from

Indian geopolitical Indian geopolitical Indian geopolitical Indian geopolitical

boundryboundryboundryboundry

� Targeted position accuracy better than 20 metresTargeted position accuracy better than 20 metresTargeted position accuracy better than 20 metresTargeted position accuracy better than 20 metres

IRNSS Visibility

Page 9: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

IRNSS ArchitectureIRNSS ArchitectureIRNSS ArchitectureIRNSS Architecture

Page 10: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

� Space Segment consists of Seven satellites Space Segment consists of Seven satellites Space Segment consists of Seven satellites Space Segment consists of Seven satellites

� 3 Satellites in Geo3 Satellites in Geo3 Satellites in Geo3 Satellites in Geo----Stationary orbit at 32.5Stationary orbit at 32.5Stationary orbit at 32.5Stationary orbit at 32.5°, 83, 83, 83, 83° and 131.5and 131.5and 131.5and 131.5° East. East. East. East.

� 4 Satellites in GEO Synchronous orbit placed at inclination of 4 Satellites in GEO Synchronous orbit placed at inclination of 4 Satellites in GEO Synchronous orbit placed at inclination of 4 Satellites in GEO Synchronous orbit placed at inclination of 29292929°

with Longitude crossing at 55with Longitude crossing at 55with Longitude crossing at 55with Longitude crossing at 55° and 111.75and 111.75and 111.75and 111.75° East. East. East. East.

� Two spare satellite are also planned.Two spare satellite are also planned.Two spare satellite are also planned.Two spare satellite are also planned.

� The Satellites are specially configured for the Navigation. SameThe Satellites are specially configured for the Navigation. SameThe Satellites are specially configured for the Navigation. SameThe Satellites are specially configured for the Navigation. Sameconfiguration for GEO and GSO which is desirable for the productconfiguration for GEO and GSO which is desirable for the productconfiguration for GEO and GSO which is desirable for the productconfiguration for GEO and GSO which is desirable for the production ion ion ion of the satellites. Production plan & schedule are worked out.of the satellites. Production plan & schedule are worked out.of the satellites. Production plan & schedule are worked out.of the satellites. Production plan & schedule are worked out.

� IRNSS Satellites are to be launched by the Indian launcher PSIRNSS Satellites are to be launched by the Indian launcher PSIRNSS Satellites are to be launched by the Indian launcher PSIRNSS Satellites are to be launched by the Indian launcher PSLV.LV.LV.LV.

� The first Satellite will be launched in 2012.The first Satellite will be launched in 2012.The first Satellite will be launched in 2012.The first Satellite will be launched in 2012.The subsequent launches The subsequent launches The subsequent launches The subsequent launches are planned once in Six months. are planned once in Six months. are planned once in Six months. are planned once in Six months. The full constellation will be The full constellation will be The full constellation will be The full constellation will be operational by 2015.operational by 2015.operational by 2015.operational by 2015.

Page 11: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

3 geo3 geo3 geo3 geo----stationary satellites revolving in stationary satellites revolving in stationary satellites revolving in stationary satellites revolving in equatorial orbitequatorial orbitequatorial orbitequatorial orbit

4 geo4 geo4 geo4 geo----synchronous satellites revolving synchronous satellites revolving synchronous satellites revolving synchronous satellites revolving in independent 29in independent 29in independent 29in independent 290000 inclined orbitsinclined orbitsinclined orbitsinclined orbits

IRNSS ConstellationIRNSS ConstellationIRNSS ConstellationIRNSS Constellation

Page 12: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

� IRNSS Satellites are designed around IIRNSS Satellites are designed around IIRNSS Satellites are designed around IIRNSS Satellites are designed around I----1K bus.1K bus.1K bus.1K bus.

� Dry mass of around 600 kgs and lift off mass Dry mass of around 600 kgs and lift off mass Dry mass of around 600 kgs and lift off mass Dry mass of around 600 kgs and lift off mass of 1425 kgsof 1425 kgsof 1425 kgsof 1425 kgs

� Power generation capability of 1600 W and Power generation capability of 1600 W and Power generation capability of 1600 W and Power generation capability of 1600 W and payload power requirement of 901 Wpayload power requirement of 901 Wpayload power requirement of 901 Wpayload power requirement of 901 W

� Navigation Payload Transmits SPS and RS Navigation Payload Transmits SPS and RS Navigation Payload Transmits SPS and RS Navigation Payload Transmits SPS and RS signals in L5 and S Bands.signals in L5 and S Bands.signals in L5 and S Bands.signals in L5 and S Bands.

•Payload utilizes highly stable Atomic Payload utilizes highly stable Atomic Payload utilizes highly stable Atomic Payload utilizes highly stable Atomic Frequency Standards for generation of Frequency Standards for generation of Frequency Standards for generation of Frequency Standards for generation of Navigation Signals.Navigation Signals.Navigation Signals.Navigation Signals.

•3 Axis control of the satellite with Yaw 3 Axis control of the satellite with Yaw 3 Axis control of the satellite with Yaw 3 Axis control of the satellite with Yaw steering capability to optimize the use of steering capability to optimize the use of steering capability to optimize the use of steering capability to optimize the use of Solar Panels and to support the thermal Solar Panels and to support the thermal Solar Panels and to support the thermal Solar Panels and to support the thermal control of the satellite control of the satellite control of the satellite control of the satellite

Page 13: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

� IRNSS Satellite Control Earth Stations IRNSS Satellite Control Earth Stations IRNSS Satellite Control Earth Stations IRNSS Satellite Control Earth Stations ---- 9 Nos9 Nos9 Nos9 Nos

� IRNSS Satellite Control Centre ( IRSCC ) IRNSS Satellite Control Centre ( IRSCC ) IRNSS Satellite Control Centre ( IRSCC ) IRNSS Satellite Control Centre ( IRSCC ) ---- 2 Nos2 Nos2 Nos2 Nos

� IRNSS Range and Integrity Monitoring Stations ( IRIMS )IRNSS Range and Integrity Monitoring Stations ( IRIMS )IRNSS Range and Integrity Monitoring Stations ( IRIMS )IRNSS Range and Integrity Monitoring Stations ( IRIMS ) ---- 17 Nos17 Nos17 Nos17 Nos

� IRNSS Navigation Centre ( INC ) IRNSS Navigation Centre ( INC ) IRNSS Navigation Centre ( INC ) IRNSS Navigation Centre ( INC ) ---- 2 Nos2 Nos2 Nos2 Nos

� IRNSS Network Time ( IRNWT ) IRNSS Network Time ( IRNWT ) IRNSS Network Time ( IRNWT ) IRNSS Network Time ( IRNWT ) ---- 2 Nos 2 Nos 2 Nos 2 Nos

� IRNSS CDMA Ranging Stations ( IRCDR ) IRNSS CDMA Ranging Stations ( IRCDR ) IRNSS CDMA Ranging Stations ( IRCDR ) IRNSS CDMA Ranging Stations ( IRCDR ) ---- 4 Nos4 Nos4 Nos4 Nos

� IRNSS Data Communication Network ( IRDCN ) IRNSS Data Communication Network ( IRDCN ) IRNSS Data Communication Network ( IRDCN ) IRNSS Data Communication Network ( IRDCN ) ---- 2 Nos2 Nos2 Nos2 Nos

Page 14: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

Satellite Control Facility (SCF( M ))

Hassan

1111 5555

Satellite Control Facility Satellite Control Facility Satellite Control Facility Satellite Control Facility (SCF( R ))(SCF( R ))(SCF( R ))(SCF( R ))

Bhopal

6666 9999

IRNSS Laser Ranging

IRIMS

1

IRIMS

17

IRNSS Navigation CentreBangalore

IRNWT

IRNSS CDMA Ranging

1-6

SCESSCC SCESSCC

Backup INC

Page 15: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

Navigation software will be deployed in the IRNSS Navigation CenNavigation software will be deployed in the IRNSS Navigation CenNavigation software will be deployed in the IRNSS Navigation CenNavigation software will be deployed in the IRNSS Navigation Centre.tre.tre.tre.

The software modules interface with various subsystems of the The software modules interface with various subsystems of the The software modules interface with various subsystems of the The software modules interface with various subsystems of the

ground segment and generate navigation parameters, required for ground segment and generate navigation parameters, required for ground segment and generate navigation parameters, required for ground segment and generate navigation parameters, required for broadcast broadcast broadcast broadcast

from spacecraft.from spacecraft.from spacecraft.from spacecraft.

Navigation software generates the following in 4 subNavigation software generates the following in 4 subNavigation software generates the following in 4 subNavigation software generates the following in 4 sub----frames:frames:frames:frames:

� Primary ParametersPrimary ParametersPrimary ParametersPrimary Parameters� Satellite ephemeris , clockSatellite ephemeris , clockSatellite ephemeris , clockSatellite ephemeris , clock

� Satellite health status & accuracy Satellite health status & accuracy Satellite health status & accuracy Satellite health status & accuracy

� Secondary ParametersSecondary ParametersSecondary ParametersSecondary Parameters� Satellite almanac Satellite almanac Satellite almanac Satellite almanac

� Ionospheric correctionsIonospheric correctionsIonospheric correctionsIonospheric corrections----coefficientscoefficientscoefficientscoefficients

� IRNSS time difference w.r.t UTC /GNSSIRNSS time difference w.r.t UTC /GNSSIRNSS time difference w.r.t UTC /GNSSIRNSS time difference w.r.t UTC /GNSS

� Ionospheric gird delay parametersIonospheric gird delay parametersIonospheric gird delay parametersIonospheric gird delay parameters

� Encryption keys Encryption keys Encryption keys Encryption keys

� Text messagesText messagesText messagesText messages

� Differential corrections Differential corrections Differential corrections Differential corrections

� Earth orientation parameters Earth orientation parameters Earth orientation parameters Earth orientation parameters

� Auto Nav ParametersAuto Nav ParametersAuto Nav ParametersAuto Nav Parameters

Page 16: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

� The user segment consists of IRNSS receivers The user segment consists of IRNSS receivers The user segment consists of IRNSS receivers The user segment consists of IRNSS receivers

operating inoperating inoperating inoperating in

◦ Single Frequency ( L5 or S band)Single Frequency ( L5 or S band)Single Frequency ( L5 or S band)Single Frequency ( L5 or S band)

◦ Dual Frequency (L5 and S band)Dual Frequency (L5 and S band)Dual Frequency (L5 and S band)Dual Frequency (L5 and S band)

� Single frequency and dual frequency receivers shall Single frequency and dual frequency receivers shall Single frequency and dual frequency receivers shall Single frequency and dual frequency receivers shall

receive both SPS and RS signals. receive both SPS and RS signals. receive both SPS and RS signals. receive both SPS and RS signals.

Page 17: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

�Avionic navigation and precise landing system

�Mapping and GIS data capture

�Automated logistics in factories, construction sites and mines

�Vehicle tracking and fleet management.

�Terrestrial navigation aid for hikers and travelers

�Visual and voice navigation for drivers

�Integration with mobile phones.

Page 18: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the

� ISRO is an active member of International Committee of GNSS (ICG).

� ISRO participated in many bilateral discussions with GPS, GALILEO etc. on Interoperable and compatible signal structure.

� ISRO is hosting a QZSS Monitoring Station site in ISTRAC.

Page 19: Satellite Navigation Program - UNOOSA · with Longitude crossing at 55 ° and 111.75 ° East. Two spare satellite are also planned. The Satellites are specially configured for the