Mr. Crosby, Latvian Connection LLC asserts that the cancellation decision lacked credibility and was a "pretext" to avoid having to make award to Latvian Connection and to "avoid resolution of the protest." Cycad Corp., B-255870, Apr. 12, 1994, 94-1 CPD para. 253 at 5. When a procuring agency takes corrective action in response to a protest, the GAO may recommend reimbursement of protest costs if, based on the circumstances of the case, and it is clear that the agency unduly delayed taking corrective action in the face of a clearly meritorious protest. 4 C.F.R. sect. 21.8(e) (2009); AAR Aircraft Servs.--Costs, B-291670.6, May 12, 2003, 2003 CPD para. 100 at 6. A protest is clearly meritorious where a reasonable agency inquiry into the protest allegations would have shown facts disclosing the absence of a defensible legal position. Core Tech Int'l Corp.--Costs, B 400047.2, Mar. 11, 2009, 2009 CPD para. 59 at 6. The Agency could not defend the conduct of the contracting officer or her commander on solicitation W912D1-13-R-0003. Camp Arifjan Contracting Officer and it's contracting Commander, LTC Michael Scuteri, cancelled the solicitation as a pretext to avoid resolution of a protest.(197) 197/ Gonzales-McCaulley Inv. Group, Inc.,Comp. Gen. Dec. B-299936.2, 2007 CPD ¶ 192, 49 GC ¶ 451. That cancellation was made within 28 hours of the GAO's request for a Report from the Agency. LTC Colonel Scuteri acted in bad faith against Veteran Owned Business, Latvian Connection LLC for filing a protest about a solicitation, so poorly written, administered, and posted, that the only way the solicitation was going to be corrected after unresponsiveness of his contracting officers and Legal Team, was by the filing of a GAO Level Protest to illicit some professional contracting actions that resembled what is expected under the Federal Acquisition Regulations. This solicitation is an example of the level of Procurement Professionalism originating in 2013 from the 408th Contracting under the leadership of LTC Scuteri and BG Theodore C. Harrison’s that, unlike what BG Harrison states in http://www.army.mil/ecc/, The 408th located at Camp Arifjan, Kuwait are continuing to deliver substandard solicitations and this is just another in a series of unprofessional solicitations that are more designed to mislead, that to comply with FAR Part 5. However, with the continued biased assistance of the GAO, and attorneys like Mr. Crosby, Veteran Owned businesses like Latvian Connection LLC will be prejudiced and mislead by the ongoing contracting irregularities that was identified in both the Gansler report and a report on Camp Arifjan called the Fraud Triangle, by Army MAJ Amanda Flint in what is described as a case study into Procurement Integrity in Contingency Operations. This solicitation demonstrates that the fundamentals of conducting a simple solicitation still have not been achieved 4 years after the creation of the Army Contracting Command, even with that paid assistance of Contractor CACI working in the Camp Arifjan’s contracting office. On Pg 4 of the Congressional Hearing in 2011, Dr. Gansler stated: “ Writing requirements and issuing contracts, clearly these are inherently governmental functions; to acquire services is more difficult and requires high-quality, experienced government contracting and program-management personnel. “ Dr. Gansler also said “Investigation and conviction rates indicate that Army CCOs are involved in the commission of fraud by a significantly higher percentage in comparison to contracting officers in the other Services, despite being the minority of contracting personnel in theater (Gansler et al., 2007). Yet, GAO Protest of W912D1-13-R-0003; a disorganized solicitation where, the wrong solicitation was posted, SF30 Forms were not utilized for amendments and a charade of a site visit was staged only to cancel the solicitation in bad faith, show

Transcript of Sat Feb-9-2013 1228 Am GAO Delivery of Report Request to Army REPORT ON W912D1-13-R-0003 B-407972

Page 1: Sat Feb-9-2013 1228 Am GAO Delivery of Report Request to Army REPORT ON W912D1-13-R-0003   B-407972

1

Keven Barnes

From: [email protected] on behalf of Jackson, Erica L [[email protected]]Sent: Saturday, February 09, 2013 12:28 AMTo: [email protected]: Registered: B-407972_1

__LATVIAN_CONNECTION__LLC__ACK_CONF_PACKAGE_WITHOUT_PROTECTIVE_ORDER

Attachments: GAOHQ-#6109636-v1-B-407972_1__LATVIAN_CONNECTION__LLC__ACK_CONF_PACKAGE_WITHOUT_PROTECTIVE_ORDER.pdf

Categories: Yellow Category

This is a Registered E-mail® message from Jackson Erica L.

 

<<...>>

For more information about the Registered E-mail® service visit http://www.rpost.com