JAL SHAKTI ABHIYANnrega.nic.in
Contour Trench, Rajasthan
Check Dam, Tamil Nadu
Pond, Andhra Pr SikkimSasur Khederi River,Uttar Pradesh
Sukhi River,PanchmahalDist.,Gujarat
Maharashtra
• Launched by Jal Shakti Mantralaya through Department of Drinking Water and Sanitation (DWS)
• 1593 water stressed blocks
• Water Conservation Campaign for water security in rural areas
• Duration-Phase I: 1st July 2019 – 15th September 2019
(All States & UTs)
Phase II: 1st October 2019 – 30th November 2019(Retreating Monsoon)
( AP, Karnataka, TN & Puducherry)
Jal Shakti Abhiyan (JSA)
Criteria: Blocks with Critical/Over-exploited Groundwater levels. For States without Critical/Over-exploited Blocks,
Districts with the least groundwater availability are selected.
INDEX[Total Districts: 254]
231 Regular Districts23 Aspirational Districts
S.No. States / UTs Blocks1 Andhra Pradesh 692 Arunachal Pradesh 113 Assam 54 Bihar 305 Chattisgarh 26 Delhi 247 Goa 78 Gujarat 309 Haryana 8110 Himachal Pradesh 411 Jammu & Kashmir 1512 Jharkhand 513 Karnataka 5314 Kerala 315 Madhya Pradesh 2916 Maharashtra 2017 Manipur 318 Meghalaya 319 Mizoram 220 Nagaland 321 Odisha 922 Punjab 11123 Rajasthan 21824 Sikkim 825 Tamil Nadu 54126 Telangana 13727 Tripura 628 Uttar Pradesh 13929 Uttarakhand 830 West Bengal 131 Andaman & Nicobar 332 Chandigarh 133 Dadra & Nagar Have 134 Daman & Diu 135 Lakshdweep 936 Puducherry 1
Total 1593
Water Stressed Blocks/Districts to be covered
Water Stressed Rural Blocks to be covered under MGNREGS
Rural Blocks under JSA : 1,168Total Mapped in MIS: 1,140
# State/UT No. of Districts No. of Blocks1ANDAMAN AND NICOBAR 1 32ANDHRA PRADESH 9 683ARUNACHAL PRADESH 1 114ASSAM 1 55BIHAR 12 306CHHATTISGARH 2 27DADRA & NAGAR HAVELI 1 18DAMAN & DIU 1 19GOA 1 7
10GUJARAT 5 3011HARYANA 18 8112HIMACHAL PRADESH 3 313JAMMU AND KASHMIR 1 1514JHARKHAND 2 515KARNATAKA 18 5316KERALA 2 317LAKSHADWEEP 1 918MADHYA PRADESH 11 2919MAHARASHTRA 8 2020MANIPUR 2 621MEGHALAYA 1 322MIZORAM 1 223NAGALAND 1 324ODISHA 1 925PUDUCHERRY 1 126PUNJAB 20 11127RAJASTHAN 29 21928SIKKIM 1 629TAMIL NADU 26 16530TELANGANA 22 9531TRIPURA 1 632UTTAR PRADESH 35 12933UTTARAKHAND 1 834WEST BENGAL 1 1
TOTAL 241 1140
JSA Blocks
Use of GIS & Remote sensing technologies
Planning of works – CGWB and NRSC- Technicaltraining modules- e-Saksham
65% expenditure on NRM works
1593 Water Stressed Blocks in 254 Districts
Intervention Areas
1. Water conservation and rainwater harvesting (WCRWH)
2. Renovation of traditional and other water bodies/tanks (RTWB)
3. Reuse, borewell recharge structures (RR)
4. Watershed development (WD)
5. Intensive afforestation (AF)
JSA Indicators 1
Water conservation and rainwater harvesting (WCRWH)
(Nos. 51)Activities:i. Check Damii. Pondiii. Trenchiv. Rooftop Water Harvesting Structuresv. Other Rainwater Recharge Structuresvi. Other Water Conservation Structures
A series of trenches/Khantis along hill slopes hold rainwater and recharge water sources, Uttarakhand
JSA Indicator 2
Renovation of traditional and other water
bodies/tanks (RTWB)(Nos. 2)
Activity: i. Traditional water bodies/tanks restored
Traditional water system, Maharashtra
JSA Indicator 3
Reuse, borewell recharge structures ( RR)
(Nos. 9)Activities: i. Soak Pitii. Stabilization Pondiii. Other recharge structures
* Waste water generated from household washing and bathing
Community soak pit, MGNREGA
JSA Indicator 4
Watershed development (WD)(Nos. 71)
Activities:i. Gully Plugii. Percolation Tanksiii. Other Watershed Construction Activities
Watershed Management, Assam
JSA Indicator 5
Intensive afforestation (AF)(Nos. 43)
Activitiesi. Nurseries Seedlings plantedii. Number of Saplings plantediii. Others
(For trees consuming less water)
Kathal (Jack Fruit), Western India
JSA Team
Teams will undertake
minimum 3 trips (3 days each)
covering all villages allocated to them
Block
500 Deputy Secretaries/Directors 500 Technical Officers from Central Ground Water Board/Central Water Commission
District2 officials to be nominated by District Collector
StateState Nodal Officer:
Addl Chief Secretary/Prin Secy (PR & RD and/or WR)
Centre254 AS/JS level officers (23 Prabhari Officers – Aspirational districts)
National level NGOs will be involved in community mobilizationScientists/IITs for technical guidance
Per district1AS/JS level officer
Per 3-5 Blocks2 district officials1 Dy Secretary/Director 1 Technical Officer
Task of the JSA TeamContact District/Block level officials for update Water
Conservation work – Completed and under implementation
Visit Villages where works are being carried out
Interact with the Community to understand the WaterConservation challenge
Assess technical approach and implementation hurdles
Document Success Stories
Targets for JSA
Target Setting
Last years Achievements Last years Achievements
Approved but not started
Not approved but in shelf of works
Various level of completion (25%, 50%, 75% or 100%)
Duration of Completion
National Targets
Last Year Target- This Year
Start 90,977 1,82,706Completion 64,988 2,11,248* No. of Works
National Targets
* No. of Works
Indicators For Start For CompletionStarted Last Year Target Completed Last Year Target
1. WCRWH 14, 681 29,428 22,140 67,4552. RTWBB 1,289 2,818 1,779 8,7873. RR 6,398 13,012 14,649 18,3774. WD 18,692 37,534 16,736 69,6255. AF 49,917 99,914 9,684 46,909Total 90,977 1,82,706 64,988 2,11,148
State wise Targets - Start of Work# State Indicator 1
(WCRWH)Indicator 2
(RTWB)Indicator 3
(RR)Indicator 4
(WD)Indicator 5
(AF) Total
1 ANDAMAN AND NICOBAR 1 1 10 26 10 482 ANDHRA PRADESH 3850 144 112 4088 16542 247363 ARUNACHAL PRADESH 0 10 10 10 2 324 ASSAM 30 15 30 2 12 895 BIHAR 36 4 90 68 698 8966 CHHATTISGARH 12 18 30 8 10 787 DADRA & NAGAR HAVELI 1 2 2 5 5 158 GOA 4 4 2 5 5 209 GUJARAT 90 18 12 40 384 544
10 HARYANA 140 72 4 94 16 32611 HIMACHAL PRADESH 44 2 2 68 2 11812 JAMMU AND KASHMIR 212 12 5 8 21 25813 JHARKHAND 24 30 5 72 10 14114 KARNATAKA 5162 452 62 4940 9868 2048415 KERALA 92 8 10 234 118 46216 LAKSHADWEEP 2 2 2 2 5 13
State wise Targets - Start of Work# State Indicator 1
(WCRWH)Indicator 2
(RTWB)Indicator 3
(RR)Indicator 4
(WD)Indicator 5
(AF) Total
17 MADHYA PRADESH 448 10 10 72 838 137818 MAHARASHTRA 194 10 56 86 1076 142219 MANIPUR 74 2 5 82 120 28320 MEGHALAYA 42 5 5 38 260 35021 MIZORAM 47 3 5 10 5 7022 NAGALAND 5 5 5 10 30 5523 ODISHA 10 10 10 28 80 13824 PUDUCHERRY 2 2 5 10 5 2425 PUNJAB 240 794 12 540 2360 394626 RAJASTHAN 8620 712 8 2612 1168 1312027 SIKKIM 2 3 10 42 116 17328 TAMIL NADU 8728 142 10968 20194 2360 4239229 TELANGANA 270 18 1506 288 56296 5837830 TRIPURA 140 8 3 170 268 58931 UTTAR PRADESH 840 256 2 3182 7122 1140232 UTTARAKHAND 62 14 10 138 74 29833 WEST BENGAL 4 30 4 362 28 428
Total 29,428 2,818 13,012 37,534 99,914 182,706
State wise Targets - Completion# State Indicator 1
(WCRWH)Indicator 2
(RTWB)Indicator 3
(RR)Indicator 4
(WD)Indicator 5
(AF) Total
1 ANDAMAN AND NICOBAR 2 1 5 18 5 302 ANDHRA PRADESH 11101 624 955 6888 5864 254323 ARUNACHAL PRADESH 14 5 5 2 47 734 ASSAM 50 10 20 13 49 1435 BIHAR 532 94 51 550 309 15376 CHHATTISGARH 177 169 17 66 24 4527 DADRA & NAGAR HAVELI 1 1 1 2 28 GOA 1 0 1 2 2 79 GUJARAT 319 206 10 313 220 1068
10 HARYANA 463 119 8 179 36 80411 HIMACHAL PRADESH 182 7 1 205 5 39912 JAMMU AND KASHMIR 288 8 2 44 12 35413 JHARKHAND 185 20 2 88 5 30014 KARNATAKA 10222 782 283 11465 14022 3677415 KERALA 398 51 3 496 71 102016 LAKSHADWEEP 1 1 1 1 2 6
State wise Targets - Completion# State Indicator 1
(WCRWH)Indicator 2
(RTWB)Indicator 3
(RR)Indicator 4
(WD)Indicator 5
(AF) Total
17 MADHYA PRADESH 3472 258 15 479 1537 576118 MAHARASHTRA 753 16 315 313 1305 270319 MANIPUR 64 1 2 134 35 23620 MEGHALAYA 24 1 2 26 185 23821 MIZORAM 56 2 2 7 2 6922 NAGALAND 24 4 2 3 81 11523 ODISHA 26 26 5 84 104 24524 PUDUCHERRY 3 1 2 1 2 925 PUNJAB 747 1282 76 829 1775 470926 RAJASTHAN 20312 2955 133 7275 2276 3295227 SIKKIM 9 2 5 286 278 57928 TAMIL NADU 11586 765 12952 28363 3355 5702229 TELANGANA 3715 782 3395 3721 12494 2410630 TRIPURA 291 13 1 395 280 97931 UTTAR PRADESH 2175 505 58 6677 2411 1182732 UTTARAKHAND 202 61 4 347 98 71233 WEST BENGAL 59 16 41 354 17 488
Total 67,455 8,787 18,377 69,625 46,909 2,11,148
• Participation of community through:-
Self Help Groups Panchayati Raj Institution members Swachhagrahis
• Pani Panchayat in every Gram Panchayat
• Compensatory Afforestation Fund Management & Planning Authority (CAMPA)- use for Afforestation Works
• All States to communicate District/Block wise targets
What is to be done?
MIS Dashboard
• MIS Dashboard with be used for monitoring andevaluation of targets given under JSA at Block andGP Level.
• Reports will be enabled on:-(i) Indicator Wise(ii) Sub- category wise repots according to the variouslevels of completion
Check Dam
Irrigation Channel
Loose Boulder
Fish Pond
Ponds
Trenches
Thank you!!!