    Geotechnical systems

    Embankment, Eemshaven, Netherlands SASSYSTEMS

    Project:Julianahaven in EemshavenEstablishing of a permanent anchorage construction for the embankment

    Client:

    N. Kraaijeveld B.V.

    Construction period:

    October 2006 - January 2007

    Construction company:

    BAUER Funderingstechnieken BV, Mijdrecht, Netherlands

    Scope of supply:

    Over all SAH supplied an amount of 540 SAS 670/800 thread bars 75 mm and in total 1,080 pcs of re-quired accessories, like anchor nuts and lock nuts as well as coupler splicing with a total weight of 370 tonsfor the anchorage system.The right hand thread bars with lengths up to 41.40 m ensure a yield load of 2,960kN and an ultimate load of 3,535 kN respectively.

    Application:

    Concerning to the aggressive environment conditions the long term durability of the anchorage system willbe ensured by a double corrosion protection assembly. Therefore the SAS thread bar is placed in a corrugatedsheathing pre-grouted. So the SAS System can also be used for tensile loading in a durable operation.

    GT 01

    3

  • 8/10/2019 SAS Reference Projects

    4/604

    Projekt:Kge Hafen, Einbau einer dauerhaften Spundwandrckverankerung fr die Hafenanlage

    Auftraggeber:

    Kge Jorddepot

    Bauzeit:

    Dezember 2007 - Dezember 2008

    Generalunternehmer:

    P. Aarsleff A/S

    Lieferant:

    Grnbech & Snner A/S

    Lieferumfang:

    170 to SAS 670/800 Gewindestbe mit 57,5 mm mit Lngen von 11,6 - 12,6 m. Fr die Verankerungenwurden 962 Stk. Gelenkbolzen mit speziell vergteten Ankermuttern in Kombination mit Gelenkmutternzum Spannen der Gewindestbe verwendet.

    Anwendung:

    Die hochfesten SAS Gewindestbe werden als Zugbnder fr die Spundwandrckverankerungen eingesetzt.Nach dem Auffllen von Sand zwischen den Wnden werden die zur Aussteifung verwendeten H-Profileentfernt, so dass die hochfesten Gewindestbe die Zugkrfte aufnehmen. Aufgrund der beengten Platzver-hltnisse im Gurtungsbereich, werden Gelenkbolzen mit speziell vergteten Ankermuttern in Kombinationmit Gelenkmuttern zur Spundwandrckverankerung eingesetzt.

    Hafenanlage, Kge Hafen, Dnemark SASSYSTEMS

    Geotechnik

    GT 02

  • 8/10/2019 SAS Reference Projects

    5/60

    Geotechnical systems

    Embankment, Kge Hafen, Denmark SASSYSTEMS

    Project:Kge Harbour, permanent sheet pile wall constructionfor the embankment

    Client:

    Kge Jorddepot

    Construction period:

    December 2007 - December 2008

    Main contractor:

    P. Aarsleff A/S

    Supplier:

    Grnbech & Snner A/S

    Scope of supply:

    170 tons SAS 670/800 thread bars 57.5 mm with length of 11.6 up to 12.6 m. For the anchorages 962 pcs.of joint bolts with special tempered anchor nuts in combination with joint nuts are used for tensioning theSAS thread bars.

    Application:

    SAS thread bars 670/800 are used as tie rods for the permanent sheet pile wall construction. After the sandhas been filled in between the walls, the H-Profiles, which are used for the bracing of the sheet pile construc-tion, will be removed and the tension load is taken by the high strength SAS thread bars. Due to the smallavailable space between the U-Profiles, joint bolts with special tempered anchor nuts in combination with

    joint nuts are used for the sheet pile wall anchorage.

    GT 02

    5

  • 8/10/2019 SAS Reference Projects

    6/60

  • 8/10/2019 SAS Reference Projects

    7/60

    Geotechnical systems

    Gateway Bridge, Brisbane, Australia SASSYSTEMS

    Project:Gateway upgrade project in Brisbane, Australia

    Client:

    QML - Queensland Motorway Limited

    Construction period:

    September 2006 - May 2010

    Construction company:

    Leighton Abigroup Joint Venture

    Supplier:

    VSL Australia Pty. Ltd.

    Scope of supply:

    150 tons SAS 835/1035 thread bars of 75 mm for the bridge pile foundation system. Mechanical splices ofthe SAS thread bars with SAS couplers allow a full load transfer.

    Application:

    The new Gateway Bridge is supported by reinforced concrete columns with an outer dimension of 15.0 mlength and 2.5 m width. The loads of the reinforced concrete columns are transferred to the reinforced con-crete pile caps, which have an area of 19.5 m length, 17.6 m width and a thickness of 3.2 m and from there tothe foundation piles with a of 1.8 m. The pile heads are reinforced with SAS 835/1035 thread bars to providevertical and horizontal post tensioning in the main pier heads.

    GT 03

    7

  • 8/10/2019 SAS Reference Projects

    8/608

    Projekt:99 Church Street in New York, USA

    Auftraggeber:

    Urban Foundation

    Bauzeit:

    September - Oktober 2008

    Bauausfhrende Firma:

    Tishman Construction

    Lieferant:

    SAS Stressteel, Inc.

    Lieferumfang:

    15 Stk. SAS Caisson Piles mit je 16 Gewindestben 63.5 mm, Lnge 33 m, Stahlgte SAS 555/700.

    Anwendung:

    SAS Caisson Piles sind im Fels eingebundene Bohrpfhle, die fr Grndungen eingesetzt werden. Die Trag-fhigkeit der Caisson Piles erhht sich durch den Einsatz der hochfesten Gewindestbe SAS 555/700 alsDruckglieder signifikant. Die SAS Caisson Piles mit einer Lnge von 33 m wurden als Einheit im Werk vorge-fertigt und anschlieend zur Baustelle transportiert. Dadurch ist ein einfacher, schneller und sicherer Einbauder Caisson Piles auf der Baustelle mglich gewesen. SAS Muffen ermglichen die mechanische Verbindungder Gewindestbe - versetzte Muffenste - und die Anforderungen des Bauherrn an die Caisson Piles miteiner Lnge von 33 m wurden hervorragend erfllt.

    99 Church Street, New York, USA SASSYSTEMS

    Geotechnik

    GT 04

  • 8/10/2019 SAS Reference Projects

    9/60

    Geotechnical systems

    99 Church Street, New York, USA SASSYSTEMS

    Project:99 Church Street in New York, USA

    Client:

    Urban Foundation

    Construction period:

    September - October 2008

    Construction company:

    Tishman Construction

    Supplier:

    SAS Stressteel, Inc.

    Scope of supply:

    15 pcs. SAS Caisson Piles each with 16 thread bars 63.5 mm, length 33 m, steel grade SAS 555/700

    Application:

    SAS Caisson Piles are rock-socket bore piles used for foundations. The load carrying capacity of the Cais-son Piles are significantly increased with the high-strength SAS thread bars 555/700 used as compressionelements. The SAS Caisson Piles with a total length of 33 m were fabricated in one section and transportedto construction site. Therefore, the installation process at the job-site was very fast, easy and safe. SAS cou-plers made the mechanical splices - staggered bar couplings - of the thread bars possible and the contrac-tors specifications of a length of 33 m of the Caisson Piles were excellently fulfilled.

    GT 04

    9

  • 8/10/2019 SAS Reference Projects

    10/6010

    Projekt:Dry Dock in Dubai, VAE

    Auftraggeber:

    Dry Docks World

    Bauzeit:

    Februar 2008 - Mrz 2009

    Bauausfhrende Firma:

    Dutco Balfour Beatty

    Lieferant:

    VSL Middle East LLC

    Lieferumfang:

    219 t SAS 670 Gewindestbe 63,5 mm, 23 t SAS 670 Gewindestbe 57,5 mm, 1.300 Stk. Muffen, Mutternund Ankerplatten

    Anwendung:

    Die hochfesten Gewindestbe SAS 670 werden als Zugstbe zwischen den Pfahlwnden eingesetzt. Die Ln-ge eines SAS Zugstabes betrgt 31,5 m. Mit SAS Muffen und Muttern wird die mechanische Vebindung derZugstbe hergestellt. Fr einen permanenten Korrosionsschutz wurden die Zugstbe gereinigt, gebrstet,mit einer Grundierung gestrichen und abschlieend mit einem speziellen Band umwickelt. Zustzlich wur-den PVC Rohre eingesetzt, um die Zugstbe vor mechanischen Beanspruchungen zu schtzen.SAS Gewindestbe weisen ein geringeres Gewicht als konventionelle Zugstbe bei gleicher Tragfhigkeit auf.Dadurch wird eine einfache und sichere Handhabung mit dem SAS Zugstabsystem garantiert.

    Dry Dock, Dubai, VAE SASSYSTEMS

    Geotechnik

    GT 05

  • 8/10/2019 SAS Reference Projects

    11/60

    Geotechnical systems

    Dry Dock, Dubai, UAE SASSYSTEMS

    Project:Dry Dock in Dubai, UAE

    Client:

    Dry Docks World

    Construction period:

    February 2008 - March 2009

    Construction company:

    Dutco Balfour Beatty

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    219 tons SAS thread bars 670, 63,5 mm, 23 tons SAS thread bars 670, 57,5 mm, 1,300 pcs. couplers,nuts and anchor plates

    Application:

    The high strength SAS thread bars 670 were used for a tie rod application of a pile wall. The total length ofthe SAS tie rods between the pile walls were 31.5 m. SAS couplers and nuts made the mechanical splices ofthe thread bars possible. For a permanent corrosion protection, the SAS thread bars were cleaned, brushed,coated with a primer and wrapped with a tape. PVC pipes were used to protect the tie rods against mechani-cal damages. Compared to conventional tie rods, SAS thread bars are less heavy at the same load capacityand therefore easy and safe handling is guaranteed with the SAS tie rod system.

    GT 05

    11

  • 8/10/2019 SAS Reference Projects

    12/60

  • 8/10/2019 SAS Reference Projects

    13/60

  • 8/10/2019 SAS Reference Projects

    14/6014

    Projekt:Erweiterung Al Salam Street und Abu Dhabi City Ring Strae, Auftrag Nr. (1) Al Salam Street Tunnel

    Auftraggeber:

    Department of Municipal Affairs, Abu Dhabi Municipalty, UAE

    Bauzeit:

    Mai 2008 - Oktober 2010

    Bauausfhrende Firma:

    Samsung - Saif Bin Darwish JV

    Lieferant:

    VSL Middle East LLC

    Lieferumfang:

    280 to Gewindesthle SAS 670 28, 43, 57,5 und 63,5 mm, 2.585 Stk. Muffen, 796 Stk. Ankerplatten und1.153 Stk. Ankermuttern

    Anwendung:

    Durch einen Tunnel mit einer Gesamtlnge von ca. 4 km erfolgt die Unterfhrung der Salam Street. NachFertigstellung ist die Salam Street eine vierspurige Schnellstrae mit Anbindung an die HauptverkehrsstraeMina Road. Whrend des Bauvorhabens werden die Baugrubenwnde mit Gewindestahl SAS 670 rckver-ankert. Aufgrund der hheren Tragfhigkeit im Vergleich zu konventionellen Bewehrungssthlen und wegender einfachen, schnellen und sicheren Montage sind die SAS Gewindestahlsysteme besonders fr den Ein-satz in beengten Platzverhltnissen geeignet.

    Al Salam Street, Abu Dhabi, VAE SASSYSTEMS

    Geotechnik

    GT 07

  • 8/10/2019 SAS Reference Projects

    15/60

    Geotechnical systems

    Al Salam Street, Abu Dhabi, UAE SASSYSTEMS

    Project:Upgrading Al Salam Street and Abu Dhabi City Ring Road, Contract No. (1) Al Salam Street Tunnel

    Client:

    Department of Municipal Affairs, Abu Dhabi Municipalty, UAE

    Construction period:

    May 2008 - October 2010

    Construction company:

    Samsung - Saif Bin Darwish JV

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    280 tons thread bars SAS 670 28, 43, 57,5 and 63,5 mm, 2,585 pcs. couplers, 796 pcs. anchor plates and1,153 pcs. anchor nuts

    Application:

    With a tunnel of about 4 km length the upgrading of the Salam Street is completed. After finishing the SalamStreet is a four lanes road with connection to the expressway Mina Road.For stabilization of the pits SAS 670 thread bars are used as tie rods for the retaining walls. A higher loadcarrying capacity compared to conventional reinforcing steel and an easy, fast and safe installation of the SASthread bar system are the main advantages even in cramped areas of construction site.

    GT 07

    15

  • 8/10/2019 SAS Reference Projects

    16/6016

    Projekt:Bau der neuen Schrgseilbrcke im Zentrum der Stadt Opole in Polen

    Auftraggeber:

    Straenbaubehrde der Stadt Opole

    Bauzeit:

    April 2009 - Dezember 2010

    Bauausfhrende Firma:

    Himmel & Papesch Opole Sp. z o.o. und MOSTMAR

    Lieferant:

    ATM Sp. z o.o. Polen

    Lieferumfang:

    Doppelt korrosionsgeschtzte Verpressanker:100 to SAS 670/800 Gewindestbe 75 mm mit Zubehr

    Anwendung:

    Fr den Bau der neuen Schrgseilbrcke werden doppelt korrosionsgeschtzte Verpressanker bestehendaus SAS Gewindestben der Stahlgte 670/800 verwendet.Bei diesem Bauvorhaben dienen die SAS Verpressanker als Rckverankerung der Schrgseil-Fundamenteund zur Grndung der Brckenpfeiler. Durch die SAS Verpressanker werden je nach Anwendungsgebiet Zug-lasten in den Baugrund eingeleitet.

    Schrgseilbrcke, Opole, Polen SASSYSTEMS

    Geotechnik

    GT 08

  • 8/10/2019 SAS Reference Projects

    17/60

    Geotechnical systems

    Cable-stayed bridge, Opole, Poland SASSYSTEMS

    Project:Construction of the new Cable-stayed bridge in the centre of Opole in Poland

    Client:

    Road Authority of the City of Opole

    Construction period:

    April 2009 - December 2010

    Construction company:

    Himmel & Papesch Opole Sp. z o.o. und MOSTMAR

    Supplier:

    ATM Sp. z o.o. Poland

    Scope of supply:

    Double Corrosion Protected Ground Anchors: 100 tons SAS 670/800 thread bars 75 mm with accessories

    Application:

    Ground anchors with SAS thread bars of steel grade 670/800 and with a double corrosion protection are usedfor the construction of the new stay-cabled bridge.For this project the applications of SAS ground anchors are: back anchorage of the stay cables and foun-dation of the bridge piers. Depending on the application, due to SAS ground anchors tension loads can betransferred into the ground.

    GT 08

    17

  • 8/10/2019 SAS Reference Projects

    18/60

  • 8/10/2019 SAS Reference Projects

    19/60

    Geotechnical systems

    American School, Dubai, UAE SASSYSTEMS

    Project:American School of Dubai, UAE

    Client:

    American School of Dubai Committee

    Construction period:

    May - July 2010

    Construction company:

    Al Ahmadia Aktor

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    17.2 tons thread bars grade SAS 670/800 43 mm with anchor nuts, couplers and anchor pieces

    Application:

    This project includes the upgrading of the existing foundations of the new campus of the American School ofDubai located in Barsah. For the additional increasing of the carrying capacity of the foundations, micropileswith a length up to 16.7 m - SAS thread bars grade 670/800 - are used as additional foundation elements.Micropiles are foundation elements able to transfer loads through skin friction into deeper, stable soil layers.The advantage of SAS micropiles is a high load carrying capacity due to well-target injection with a small di-ameter. Thereby, SAS micropiles are excellent qualified for the additional upgrading of existing foundations.

    GT 09

    19

  • 8/10/2019 SAS Reference Projects

    20/6020

    Projekt:MCE 485 Marina Coastal Expressway in Singapur

    Auftraggeber:

    LTA - Land Transport Authorithy

    Bauzeit:

    August 2009 - Dezember 2011

    Bauausfhrende Firma:

    Penta Ocean Construction Co. Ltd.

    Lieferant:

    VSL Singapur

    Lieferumfang:

    1300 to SAS 950/1050 Spannstahl 32 mm mit Muffen und Haltemuttern

    Anwendung:

    Die bisher teuerste Autobahn Singapurs verbindet den stlichen und westlichen Teil Singapurs miteinander.Mit je fnf Fahrspuren in jede Richtung weist diese Schnellstrae eine Lnge von 5 km auf, wovon 3,5 km alsTunnel ausgefhrt werden. SAS Pfhle mit Spannsthlen werden aufgrund der bis ~57 m Tiefe anstehendenweichen Bodenschichten (weicher Meereston) eingesetzt. Temporr dienen SAS Pfhle zur Auftriebssicher-ung (Zugpfahl) und permanent als Grndungspfahl (Druckpfahl). Mit einer Gesamtlnge von bis zu 70 mwerden die SAS Pfhle bauseits aus Einzelschssen mit einer Lnge von 11,80 m schnell, einfach und sichermit Muffen und Haltemuttern gekoppelt.

    Expressway, Singapur SASSYSTEMS

    Geotechnik

    GT 10

  • 8/10/2019 SAS Reference Projects

    21/60

    Geotechnical systems

    Expressway, Singapore SASSYSTEMS

    Project:MCE 485 Marina Coastal Expressway in Singapore

    Client:

    LTA - Land Transport Authorithy

    Construction period:

    August 2009 - December 2001

    Construction company:

    Penta Ocean Construction Co. Ltd.

    Supplier:

    VSL Singapur

    Scope of supply:

    1300 tons SAS 950/1050 post-tensioning bars of 32 mm with couplers and fix nutsApplication:

    It is the most expensive expressway of Singapore and it is the traffic connection between the east andwest part of Singapore. With each five lanes for every direction, the expressway has a total length of5 km, where of 3.5 km are realized as a tunnel. SAS piles with post-tensioning bars are used because of theexisting soft soil layers (soft marine clay) up to a depth of ~57 m. SAS piles are used temporary for the nega-tive buoyancy (tensile) and permanent as foundation piles (compression). With a total length of 70 m SASpiles are connected fast, easy and safe with couplers and fix nuts based on single bar sections with lengthsof 11.80 m.

    GT 10

    21

  • 8/10/2019 SAS Reference Projects

    22/6022

    Projekt:Sport City Tower in Doha, Qatar. Die uere Fassade des 320 m hohen Wolkenkratzers ist eine Kombinationaus Edelstahl und verglasten Flchen. Seine Struktur vereint Stahlbeton und Stahl mit Tiefbohrpfhlen undeinem Betonkern.

    Auftraggeber:

    The Sport City Project Committee

    Bauzeit:

    April 2005 - November 2006

    Generalunternehmer:ARGE MIDMAC - Six Construct

    Lieferant:

    VSL Middle East

    Lieferumfang:

    44 SAS 835/1035 Gewindestbe, 75 mm, l 13,0 m mit einer jeweiligen Vorspannkraft von 3.200 kN inklu-sive Zubehr 9 ringfrmig angeordnete Spezialplatten mit jeweils mehr als 2,5 to Gesamtgewicht und 300mm Strke

    Anwendung:

    In einer Hhe von 260 m ist dieses Vorspannsystem fr die dreidimensionale Ausrichtung der 60 m hohenfreitragenden Stahlkonstruktion in Form einer halboffenen Tulpe erforderlich. Innerhalb dieser ist ein 30 mhoher Kelch platziert, in dem die olympische Flamme whrend der Asien Spiele 2006 brannte.

    Sport City Tower, Doha, Qatar SASSYSTEMS

    Vorspanntechnik

    PT 01

  • 8/10/2019 SAS Reference Projects

    23/60

    Post-tensioning systems

    Sport City Tower, Doha, Qatar SASSYSTEMS

    Project:Sport City Tower in Doha, Qatar. The external facade of the 320 m high sky scraper is a combination ofarchitectural stainless steel and glazing panels. Its structure combines reinforced concrete and structuralsteel, with deep piles and a slip-formed concrete core.

    Client:

    The Sport City Project Committee

    Construction period:

    April 2005 - November 2006

    Main contractor:Joint Venture ARGE MIDMAC - Six Construct

    Supplier:

    VSL Middel East

    Scope of supply:

    44 SAS 835/1035 thread bars 75 mm, l 13,0 m with a post-tensioning force of 3,200 kN each inclusive allrequired accessories 9 ring-shaped arranged special slabs of more than 2,5 tons each and 300 mm thick-nessApplication:

    At the elevation of 260 m above ground level, this post-tensioning system is required for the three-dimen-sional alignment of the 60 m high cantilever steel construction in form of a half-open tulip. Inside this con-struction a 30 m high goblet is placed, in which the Olympic flame burned during the Asian Games 2006.

    PT 01

    23

  • 8/10/2019 SAS Reference Projects

    24/6024

    Projekt:Die alte Schleuse am Fluss Couesnon wird durch ein neues, spezielles Stauwehr ersetzt, um die Versand-ung der Bucht zu vermeiden. Hierfr wird bei Ebbe das Wehr geffnet, das angestaute Wasser schiet indie Bucht hinaus und reit die Ablagerungen mit sich.

    Auftraggeber:

    Socit mixte Baie du Mont-Saint-Michel

    Bauzeit:

    2006 - 2012

    Generalunternehmer:QUILLE (Bouygues)

    Lieferant/Subunternehmer:

    DYWIDAG SYSTEMS INTERNATIONAL

    Lieferumfang:

    54 Stk. SAS 835/1035 Gewindestbe 75 mm, l=4,15 m, 54 Stk. SAS 835/1035 Gewindestbe 75 mm,l=4,48 m. Die Bruchlast je Stab betrgt 4.572 kN.

    Anwendung:

    Whrend der Flut wird das Stauwehr geschlossen und der Fluss Couesnon aufgestaut. Die dabei entste-henden Wasserdrcke werden von den neuen Stauwehrtoren aufgenommen. Hierfr werden die Tore desStauwehrs mit je zwei Sechsergruppen des Spannglieds SAS 835/1035 75 mm gegen die Stauwehrpfeilervorgespannt. Die SAS Spannsthle wurden auf eine Last von 2.250kN vorgespannt.

    Stauwehr, Mont Saint Michel, Frankreich SASSYSTEMS

    Vorspanntechnik

    PT 02

  • 8/10/2019 SAS Reference Projects

    25/60

    Post-tensioning systems

    Weir, Mont Saint Michel, France SASSYSTEMS

    Project:The old weir at the river Couesnon is replaced by a new special weir, in order to avoid the sand silting of thebay. The principle is simple: at the ebb-tide the weir is opened, the dammed up water shoots into the bayand flushes the alluvial deposits with it.

    Client:

    Socit mixte Baie du Mont-Saint-Michel

    Construction period:

    2006 - 2012

    Main contractor:QUILLE (Bouygues)

    Supplier/sub contractor:

    DYWIDAG SYSTEMS INTERNATIONAL

    Scope of supply:

    54 pcs. SAS 835/1035 thread bars 75 mm, l = 4,15 m and 54 pcs. SAS 835/1035 thread bars 75 mm, l =4,48 m with accessories. The ultimate load of each thread bar is 4,572 kN.Application:

    During flood-tide the weir is closed and the river Couesnon is dammed up. The pressure force of the dammedup water is held by the new special weir. Therefore the watergates of the weir are pre-stressed to the con-crete pylons with two groups of ground anchors of SAS 835/1035 75 mm tendons. The thread bars are pre-stressed to a working load of 2,250 kN.

    PT 02

    25

  • 8/10/2019 SAS Reference Projects

    26/60

  • 8/10/2019 SAS Reference Projects

    27/60

    Post-tensioning systems

    Port, Busan, South Korea SASSYSTEMS

    Project:New Port in Busan, South Korea

    Client:

    Joint Venture of Hyundai Develop. Company and Bouygues

    Construction period:

    March 2008 - October 2008 (Caissons with SAS stress bars)

    Subcontractor:

    TAEAH Construction Company

    Supplier:

    VSL Korea

    Scope of supply:

    281 tons SAS 950/1050 stress bars with 36 mm, with length of 7.45 m up to 10.95 m. In addition, the ac-cessories like couplers, stressing anchorages and fix nutsApplication:

    SAS stress bars are used as anchors for the lifting devices of the Caissons. The weight of the Caissons is ap-prox. 2,500 tons. Altogehter 62 Caissons have to be anchored with SAS stress bars. In each Caisson 64 SAS950/1050 stress bars 36 mm with a length of 7.45 m up to 10.95 m are embedded. The Caissons are filled upwith gravel and sand after they were brought to their final position in the offshore area by heavy ship crane.The high bonding characteristics of the SAS stress bars make the SAS System superior to all conventionalbars.

    PT 03

    27

  • 8/10/2019 SAS Reference Projects

    28/6028

    Projekt:Capital Gate Tower in Abu Dhabi, VAE

    Auftraggeber:

    ADNEC, Abu Dhabi National Exhibitions Company

    Bauzeit:

    April - September 2008 (Einbau & Vorspannung SAS Spannstbe)

    Bauausfhrende Firma:

    Al Habtoor Engineering

    Lieferant:

    VSL Middle East LLC

    Lieferumfang:

    49 to SAS 835/1035 Spannstbe 65 mm, Lnge 16 m, 160 Stk. Ankerplatten, Konus 30, 195 Stk. Anker-muttern, ballig 30, 160 Stk. Muffen, Standard sowie Spannmuffen und Spannverankerungen

    Anwendung:

    Wegen der hohen dynamischen Lasten des Capital Gate Towers, sind die tragenden Wnde des Gebudes mitSAS Spannstben 835/1035 bewehrt und vorgespannt. Konventionelle Bewehrungsstbe werden aufgrundder hohen Tragfhigkeiten effektiv durch SAS Spannstbe ersetzt, bei gleichzeitiger Reduzierung der Anzahlan erforderlichen Bewehrungsstben. Die 35 Stockwerke des Capital Gate Towers - mit einer Gesamtflchevon 50.000 m - werden als Brorume und Hotel genutzt.

    Capital Gate Tower, Abu Dhabi, VAE SASSYSTEMS

    Vorspanntechnik

    PT 04

  • 8/10/2019 SAS Reference Projects

    29/60

    Post-tensioning systems

    Capital Gate Tower, Abu Dhabi, UAE SASSYSTEMS

    Project:Capital Gate Tower in Abu Dhabi, UAE

    Client:

    ADNEC, Abu Dhabi National Exhibitions Company

    Construction period:

    April - September 2008 (installation & stressing of SAS bars)

    Main contractor:

    Al Habtoor Engineering

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    49 tons SAS 835/1035 pre-stressing bars 65 mm, length 16 m, 160 pcs. anchor plates cone, 30, 195 pcs.bull nose nuts, 30, 160 pcs. couplers, standard stressing couplers and stressing anchoragesApplication:

    Due to the high dynamic loads of the Capital Gate Tower, the basement level core walls of the building arereinforced and pre-stressed with SAS stress bars 835/1035. In order to reduce the required quantity of bars,the conventional rebars are successfully replaced by the high-strength SAS stress bars. With 35 floors and atotal area of 50,000 m, the Capital Gate Tower is used as offices and as hotel.

    PT 04

    29

  • 8/10/2019 SAS Reference Projects

    30/6030

    Projekt:Quadropol Foundation Zementfabrik in Dibba, Fujairah, VAE

    Auftraggeber:

    Fujairah Cement Factory

    Bauzeit:

    Januar 2008 - Mai 2009 (Einbau & Vorspannung SAS Spannstbe)

    Bauausfhrende Firma:

    Emirates General Contracting

    Lieferant:

    VSL Middle East LLC

    Lieferumfang:

    44 to SAS 950/1050 Spannstbe, 47mm, Lnge 10,95m, 284 Stk. Ankerplatten gerade, 284 Stk. Ankermut-tern gerade, 284 Stk. Ankerplatten, Konus 30, 284 Stk. Ankermuttern ballig 30

    Anwendung:

    Quadropol Foundation besitzt 4 Klinkermhlen. Um die dynamischen Lasten einer Klinkermhle der ZementFabrik aufnehmen zu knnen, wird diese ber eine Stahlplatte mit SAS Spannstben im Beton Fundamentverankert. Insgesamt werden 4 Fundamente mit je 71 SAS Spannstben 950/1050 errichtet. PVC Rhrenschtzen die SAS Spannstbe temporr whrend des Einbauzustandes vor mechanischen Beanspruchun-gen.

    Zementfabrik, Fujairah, VAE SASSYSTEMS

    Vorspanntechnik

    PT 05

  • 8/10/2019 SAS Reference Projects

    31/60

    Post-tensioning systems

    Cement Factory, Dibba, Fujairah, UAE SASSYSTEMS

    Project:Quadropol Foundation Cement Factory in Dibba, Fujairah, UAE

    Client:

    Fujairah Cement Factory

    Construction period:

    January 2008 - May 2009 (installation & stressing of SAS bars)

    Main contractor:

    Emirates General Contracting

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    44 tons SAS 950/1050 stress bars, 47 mm, length 10.95 m, 284 pcs. anchor plates flat, 284 pcs. anchornuts flat, 284 pcs. anchor plates cone 30, 284 pcs. bull nose nuts 30Application:

    Quadropol Foundation contains of 4 lime stone milling machines. To transfer the dynamic loads of the limestone mill of the cement factory, the mill is anchoraged in the concrete foundation by a steel plate with SASstress bars. All in all, 4 foundations with each of 71 SAS stress bars installed. PVC tubes are used to protecttemporarily the SAS bars against mechanical damages up to completion of the construction.

    PT 05

    31

  • 8/10/2019 SAS Reference Projects

    32/6032

    Projekt:Nelson Mandela Bay Stadion

    Auftraggeber:

    Nelson Mandela Bay Metropolitan

    Bauzeit:

    Mrz 2007 - Juni 2009

    Bauausfhrende Firma:

    Grinaker-LTA / Interbeton bv.

    Lieferant:

    Duraset

    Lieferumfang:

    135 Stk. SAS 950/1050 Spannsthle, 36 mm, Lnge 3,00 m, verbundloses Spannglied mit Ankerplattenund Kalottenmuttern an jedem Stabende, 315 Stk. SAS 950/1050 Spannsthle, 32 mm, Lnge 2,80 m,verbundloses Spannglied mit Ankerplatten und Kalottenmuttern an jedem Stabende

    Anwendung:

    Das neue Nelson Mandela Stadion fr die Fuball Weltmeisterschaft 2010 in Sd Afrika umfasst eine Ka-pazitt von 45.900 Sitzpltzen fr Zuschauer. Die SAS Spannsthle 950/1050 werden fr die vertikale undhorizontale Verankerung der Stahl Dachkonstruktion mit den Betonelementen verwendet. Die Gesamtflcheder Dachkonstruktion betrgt 45.000 m. Die Verankerung der SAS 950/1050 Spannsthle mit den Betonele-menten erfolgt mit Ankerplatten und Kalottenmuttern.

    Nelson Mandela Bay Stadion, Johannesburg, Sdafrika SASSYSTEMS

    Vorspanntechnik

    PT 06

  • 8/10/2019 SAS Reference Projects

    33/60

    Post-tensioning systems

    Nelson Mandela Bay Stadium, Johannesburg, South africa SASSYSTEMS

    Project:Nelson Mandela Bay Stadium

    Client:

    Nelson Mandela Bay Metropolitan

    Construction period:

    March 2007 - June 2009

    Main contractor:

    Grinaker-LTA / Interbeton bv.

    Supplier:

    Duraset

    Scope of supply:

    135 pcs. SAS 950/1050 post-tensioning bars, 36 mm, length 3.00 m, unbonded tendon with anchor platesand dome nuts at both ends of the bars, 315 pcs. SAS 950/1050 post-tensioning bars, 32 mm, length 2.80m, unbonded tendon with anchor plates and dome nuts at both ends of the barsApplication:

    The new Nelson Mandela Stadium, for the 2010 football world cup in South Africa, has a seating capacity for45,900 fans. The SAS post-tensioning 950/1050 bars are used for the vertical and horizontal anchoring of thesteel roof structure to the concrete elements. The total area of the roof structure is 45,000 m. The anchor-age of the SAS 950/1050 bars is realized with anchor plates and dome nuts cast into the concrete elements.

    PT 06

    33

  • 8/10/2019 SAS Reference Projects

    34/6034

    Projekt:Fuballstadion in Johannesburg, Sdafrika

    Auftraggeber:

    City of Johannesburg

    Bauzeit:

    Januar 2007 - Oktober 2009

    Bauausfhrende Firma:

    Grinaker-LTA / Interbeton bv.

    Lieferant:

    Duraset

    Lieferumfang:

    850 Stk. SAS 950/1050 Spannstahl 36 mm, Lnge 3,00 m verbundloses Spannglied mit Ankerplatten undKalottenmuttern an jedem Stabende

    Anwendung:

    Das neue Soccer City Stadion in Johannesburg fr die Fuball Weltmeisterschaft 2010 umfasst eine Kapazittvon 94.000 Sitzpltzen fr Zuschauer. Die SAS Spannsthle 950/1050 werden fr die vertikale Verankerungder Dachkonstruktion mit den Beton Sttzen verwendet. Die Gesamtflche der Dachkonstruktion betrgt370.000 m. Die Verankerung der SAS 950/1050 Spannsthle mit den Beton Sttzen erfolgt mit Ankerplattenund Kalottenmuttern. Aufgrund der einfachen, schnellen und sicheren Handhabung der SAS GewindestahlSysteme, ist eine effiziente Bauzeit garantiert.

    Fuballstadion, Johannesburg, Sdafrika SASSYSTEMS

    Vorspanntechnik

    PT 07

  • 8/10/2019 SAS Reference Projects

    35/60

    Post-tensioning systems

    Soccer City Stadium, Johannesburg, South africa SASSYSTEMS

    Project:Soccer City Stadium in Johannesburg, South africa

    Client:

    City of Johannesburg

    Construction period:

    January 2007 - October 2009

    Construction company:

    Grinaker-LTA / Interbeton bv.

    Supplier:

    Duraset

    Scope of supply:

    850 pcs. SAS 950/1050 post-tensioning bars 36 mm, length 3.00 m, unbonded tendon with anchor platesand dome nuts at both ends of the barsApplication:

    The new Soccer City Stadium in Johannesburg, for the football world cup in South Africa, has a seating ca-pacity for 94,000 fans. The SAS post-tensioning bars 950/1050 are used for the vertical anchoring of the roofstructure to the concrete columns. The total area of the roof structure is 370,000 m. The anchorage of theSAS 950/1050 bars is realized with anchor plates and dome nuts cast into the concrete columns. Due to theeasy, fast and safe handling of the SAS thread bar system an efficient construction time is guaranteed.

    PT 07

    35

  • 8/10/2019 SAS Reference Projects

    36/6036

    Projekt:Nationalstadion in Warschau, Polen

    Architekt:

    JSK Architekci Sp. z o.o., GMP International GmbH, SBP GmbH

    Bauzeit:

    2011 - 2012

    Bauausfhrende Firma:

    PBG S.A., Alpine Bau GmbH

    Lieferant:ATM Sp. z o.o.

    Lieferumfang:

    Insgesamt hat ATM Sp. z o.o. als von SAH in Polen qualifiziertes Spezialunternehmen 692 Stck SAS950/1050 40 Stabspannglieder ohne Verbund gem der Europischen Technischen Zulassung ETA-05/0122 geliefert, eingebaut und vorgespannt.

    Anwendung:

    Der Idee einer leichtwirkenden und transparenten Struktur folgend, verankern die SAH Vorspannsystemedie Vertikallasten aus den Stahlabspannungen und der Dachkonstruktion in den Fundamentblcken.Erffnet am 29. Januar 2012 fanden im Nationalstadion in Warschau insgesamt fnf Spiele der Fuball Eu-ropameisterschaft 2012 inklusive dem Erffnungsspiel statt.

    Nationalstadion, Warschau, Polen SASSYSTEMS

    Vorspanntechnik

    PT 08

  • 8/10/2019 SAS Reference Projects

    37/60

  • 8/10/2019 SAS Reference Projects

    38/60

  • 8/10/2019 SAS Reference Projects

    39/60

  • 8/10/2019 SAS Reference Projects

    40/6040

    Projekt:

    Hochhaus Ten Museum Park in Miami, USA50-stckiges Hochhaus mit einer Gesamthhe von 178 m

    Auftraggeber:

    Biscayne Associates, Inc., Miami, FL

    Bauzeit:

    2007 - 2008

    Lieferant:

    AREVA NP GmbH

    Lieferumfang:

    326 to SAS 555/700 63,5 mmSAS Muffen mit Madenschrauben

    Anwendung:

    SAS 555/700 Gewindestbe werden in diesem Bauwerk als Bewehrung in den Schubwnden - dem Haupt-tragelement des Gebudes - eingesetzt. Die bei Hochhusern verstrkt auftretenden Windlasten erfordernin den Schubwnden einen hohen Bewehrungsgrad. Um dies zu vermeiden, werden bei diesem Projekt dieAnzahl und Menge von Betonstahl reduziert, indem der konventionelle Betonstahl durch den hherwertigen

    Gewindestahl SAS 555/700 63,5mm ersetzt wird. Durch die Verwendung von Muffen anstelle von bergrei-fungssten werden weitere Einsparungen erzielt.

    Ten Park Museum, Miami, USA SASSYSTEMS

    Bewehrungstechnik

    RS 02

  • 8/10/2019 SAS Reference Projects

    41/60

    Project:

    Skyscraper Ten Museum Park, Miami, USA50 story skyscraper with a total height of 178 m

    Client:

    Biscayne Associates, Inc., Miami, FL

    Construction period:

    2007 - 2008

    Supplier:

    AREVA NP GmbH

    Scope of supply:

    326 to SAS 555/700 63,5 mmSAS couplers with set screws

    Application:

    SAS 555/700 thread bars are used in this building as reinforcing steel in the shear walls - the primary sup-porting elements in the building. Due to high wind loads on tall structures shear walls contain large concen-tration of rebar. A practical and elegant solution is to reduce the number and quantity of rebar by substitutingthread bars SAS 555/700 63.5 mm for conventional rebar. Additionally, eliminating lap splices with thread-

    able coupling results in significant savings in labor costs due to reduced rebar tonnage to be fabricated andinstalled.

    Reinforcing coupling system

    Ten Park Museum, Miami, USA SASSYSTEMS

    RS 02

    41

  • 8/10/2019 SAS Reference Projects

    42/6042

    Projekt:

    Hochhaus Epic Hotel & Residence in Miami, USA55-stckiges Hochhaus mit einer Gesamthhe von 174 m

    Auftraggeber:

    CMC Consruction Inc., Miami FL

    Bauzeit:

    bis Mitte 2008

    Lieferant:

    SAS Stressteel Corp., Fairfield, N.J.

    Lieferumfang:

    2.000 to SAS 670/800 Gewindestbe 63,5 mm, 121 to SAS 670/800 Gewindestbe 43 mm, SAS Muffenmit Madenschrauben

    Anwendung:

    SAS 670/800 Gewindestbe werden in diesem Bauwerk als Bewehrung in den Fundamenten und den Schub-wnden eingesetzt. Die bei Hochhusern verstrkt auftretenden Windlasten erfordern in den Schubwndeneinen hohen Bewehrungsgrad. Um dies zu vermeiden, werden bei diesem Projekt die Anzahl und Mengevon Betonstahl reduziert, indem der konventionelle Betonstahl durch den hherwertigen Gewindestahl SAS

    670/800 43 mm und 63,5 mm ersetzt wird. Durch die Verwendung von Muffen anstelle von bergreifungs-sten werden weitere Einsparungen erzielt.

    Epic Hotel, Miami, USA SASSYSTEMS

    Bewehrungstechnik

    RS 03

  • 8/10/2019 SAS Reference Projects

    43/60

    Reinforcing coupling system

    Epic Hotel, Miami, USA SASSYSTEMS

    Project:

    Scyscraper Epic & Residences in Miami, USA55-story skyscraper with a total high of 174 m

    Client:

    CMC Consruction Inc., Miami FL

    Construction period:

    until mid 2008

    Supplier:

    SAS Stressteel Corp., Fairfield, N.J.

    Scope of supply:

    2,000 tons SAS 670/800 thread bars 63.5 mm, 121 tons SAS 670/800 thread bars 43 mm, SAS couplerswith set screws

    Application:

    SAS 670/800 thread bars are used in this building as reinforcing steel in the foundation slab and shear walls- the primary supporting elements in the building. Due to high wind loads on tall structures shear walls con-tain concentration of reinforcing steel. A practical and elegant solution is to reduce the number and quantityof rebar by substituting thread bars SAS 670/800 43 mm and 63.5 mm for conventional rebar. Additionally,

    eliminating lap splices with threadable coupling results in significant savings in labor costs due to reducedrebar tonnage to be fabricated and installed.

    RS 03

    43

  • 8/10/2019 SAS Reference Projects

    44/6044

    Projekt:

    Hochhaus Opernturm in Frankfurt, Deutschland

    Auftraggeber:

    Opernplatz Property Holdings GmbH & Co. KG

    Bauzeit:

    Januar 2007 - Dezember 2009

    Generalunternehmer:

    Ed. Zblin AG

    Bauherr:

    Tishman Speyer

    Lieferumfang:

    Gewindestahl und Kontaktmuffen der Stahlgte SAS 670/800 fr Muffenste, 30 - 75 mm, mit einer Ge-samtmenge von: 320 to Gewindestahl und 3.700 Stk. Kontaktmuffen

    Anwendung:

    Die hochfesten Gewindesthle der Stahlgten SAS 670/800 werden erstmalig fr die Bewehrung der Mega-sttzen und der Randsttzen eingesetzt (Gebudehhe ~170 m) Die gesamte Lngsbewehrung der Mega- und

    Randsttzen wird einheitlich in dem hochfesten Gewindestahl SAS 670/800 ausgefhrt. Der Bewehrungs-grad der Sttzen des Opernturms Frankfurt betrgt bis zu 13 %. Stabdurchmesser bis 75 mm ermglichentrotz des hohen Bewehrungsgrades eine sehr gute Bewehrungsfhrung. Die kraftschlssige Verbindung derGewindestbe durch Kontaktmuffen ermglicht die Weiterleitung groer Druckkrfte.

    Opernturm, Frankfurt, Deutschland SASSYSTEMS

    Bewehrungstechnik

    RS 04

  • 8/10/2019 SAS Reference Projects

    45/60

    Reinforcing coupling system

    Frankfurt Operatower, Germany SASSYSTEMS

    Project:

    Scyscraper Operatower in Frankfurt, Germany

    Client:

    Opernplatz Property Holdings GmbH & Co. KG

    Construction period:

    January 2007 - December 2009

    Main contractor:

    Ed. Zblin AG

    Owner:

    Tishman Speyer

    Scope of supply:

    SAS thread bars of steel grade 670/800 and contact couplers, 30 - 75 mm, with a total amount of 320 toSAS thread bars and 3,700 pcs. contact couplers.

    Application:

    The high-strength SAS thread bars 670/800 and contact couplers are used for reinforcing the columns of ahigh-rise building (total height of the building ~170 m) in Germany for the first time. The total longitudinal re-

    inforcement of the high load capacity and edge columns is designed with the high-strength SAS thread bars670/800. The ratio of reinforcement is up to 13 %. This high ratio of reinforcement at no congestion of steel inthe columns is possible due to the rebar of up to 75 mm. Mechanical splices of SAS thread bars by contactcouplers allow the transferring of high compressive forces.

    RS 04

    45

  • 8/10/2019 SAS Reference Projects

    46/6046

    Projekt:Feste Fahrbahn Bgl, ICE Hochgeschwindigkeitsstrecke Nrnberg-Ingolstadt & Erfurt-Illmenau

    Auftraggeber:

    Deutsche Bahn AG

    Bauzeit:

    April 2003 - April 2004 (Nrnberg-Ingolstadt)Juli 2011 - August 2012 (Erfurt-Ilmenau)

    Streckenlnge:

    128 km

    Bauausfhrende Firma:

    Max Bgl

    Lieferumfang:

    1865 to Gewindestahl SAS 500 20 mm (Fixlnge l = 6,44 m)

    Anwendung:

    Der Gewindestahl SAS 500 wurde zur Lngskopplung der vorgefertigten Gleistragplatten von MaxBgl verwendet. Es wurden jeweils 6 Stbe in ein Tragelement einbetoniert. Die Gleistragplattenmit einer nominalen Lnge von 6,50 m wurden untereinander ber die freiliegenden Enden derGewindestbe mittels Spannschlssern und Kalottenmuttern verbunden und verspannt. ber diekraftschlssige Verbindung der Tragplatten durch die Gewindestbe knnen die dynamischenBelastungen aus dem Fahrbetrieb der ICE Hochgeschwindigkeitszge sicher abgetragen werden.

    ICE Hochgeschwindigkeitsstrecke, Deutschland SASSYSTEMS

    Bewehrungstechnik

    RS 05

  • 8/10/2019 SAS Reference Projects

    47/60

    Reinforcing coupling system

    ICE high speed railway line, Germany SASSYSTEMS

    Project:Slab track system Bgl, ICE high speed railway line Nrnberg-Ingolstadt & Erfurt-Illmenau

    Client:

    Deutsche Bahn AG

    Construction period:

    April 2003 - April 2004 (Nrnberg-Ingolstadt)July 2011 - August 2012 (Erfurt-Illmenau)

    Total distance:

    128 km

    Main contractor:

    Max Bgl

    Scope of supply:

    1865 tons thread bars SAS 500 20 mm with fix lenght of 6,44 m

    Application:

    Thread bars SAS 500 are used for coupling the prefabricated components of fixed trackway system,manufactured on the production sites of the precasting plants of Max Bgl. Each pre cast slabs consist of sixbars. The fixed trackway elements with a nominal length of 6,50 m was connected and stressed via exposedends of thread bars together with turnbuckles and dome nuts. In fact of force-locked connection betweenthe pre cast slabs with thread bars dynamic loads caused by high-speed trains can be absorbed safely.

    RS 05

    47

  • 8/10/2019 SAS Reference Projects

    48/6048

    Projekt:Hochhaus Tanzende Trme in Hamburg

    Bauzeit:

    Mai 2010 bis Juni 2012

    Generalunternehmer:

    Ed. Zblin AG

    Bauherr:

    STRABAG Real Estate GmbH

    Lieferumfang:

    Gewindestahl und Kontaktmuffen der Stahlgte SAS 670/800, 43 und 57 mm, mit einer Gesamtmengevon 140 to Gewindestahl und 600 Stck. Kontaktmuffen

    Anwendung:

    Die hochfesten Gewindesthle der Stahlgte SAS 670/800 wurden fr die Ortbetoninnen- und FT-Randstt-zen des Hochhauses (Gebudehhe ca. 90 m) eingesetzt. Die gesamte Lngsbewehrung wurde einheitlich indem hochfestem Gewindestahl SAS 670/800 ausgefhrt. Bei den Ortbetonsttzen erfolgte der Bewehrungss-to ber Kontaktmuffen. Der Stumpfsto der FT-Randsttzen wurden mit hochfestem Mrtel vergossen. DerBewehrungsgrad der Sttzen betrgt maximal 13 %. Die groen Stabdurchmesser bis 57 mm ermglichentrotz des hohen Bewehrungsgrades eine sehr gute Bewehrungsfhrung.

    Tanzende Trme, Hamburg, Deutschland SASSYSTEMS

    Bewehrungstechnik

    RS 06

  • 8/10/2019 SAS Reference Projects

    49/60

    Reinforcing coupling system

    Dancing Towers, Hamburg, Germany SASSYSTEMS

    Project:Skyscraper Dancing Towers in Hamburg, Germany

    Construction Period:

    May 2010 - June 2012

    Main constractor:

    Ed. Zblin AG

    Owner:

    STRABAG Real Estate GmbH

    Main contractor:

    Max Bgl

    Scope of supply:

    SAS thread bars of steel grade 97 (SAS 670/800) and contact couplers, 43 and 57 mm, with a total amountof 140 tons SAS thread bars and 600 pcs. contact couplers

    Application:

    The high-strength SAS thread bars 670/800 are used for reinforcing the columns of a high-rise building (totalheight of the building ~90 m) in Germany. The total longitudinal reinforcement of the high load capacity andedge columns is designed with the high-strength SAS thread bars 670/800. The ratio of reinforcement is upto 13%. This high ratio of reinforcement at no congestion of steel in the columns is possible due to the rebardiameter of up to 57 mm. Mechanical splices of SAS thread bars by contact couplers allow the transferringof high compressive forces.

    RS 06

    49

  • 8/10/2019 SAS Reference Projects

    50/6050

    Projekt:Hochhaus Sky Tower in Wroclaw, Polen. 46 stckiges Hotel mit einer Gesamthhe von 212 m, mit Geschf-ten, Restaurants und einem medizinischen Zentrum.

    Bauzeit:

    Dezember 2007 - November 2012

    Auftraggeber:

    LC CORP S.A., Polen

    Lieferumfang:

    500 to SAS 500 Gewindestahl, 16, 20 und 25 mm mit 40.000 Verbindungen fr Muffen und Endveranke-rungen

    Anwendung:

    SAS 500 Gewindestahl wird in diesem Bauwerk als Anschlubewehrung in den Haupttragelementen, Sttzenund Schubwnden des Aussteifungskernes eingebaut. Die bei Hochhusern verstrkt auftretenden Windlas-ten erfordern in den Schubwnden des Aussteifungskernes einen hohen Bewehrungsgrad, welcher durchden Einbau von Muffenverbindungen ermglicht wurde.

    Sky Tower, Wroclaw, Polen SASSYSTEMS

    Bewehrungstechnik

    RS 07

  • 8/10/2019 SAS Reference Projects

    51/60

    Reinforcing coupling system

    Sky Tower, Wroclaw, Poland SASSYSTEMS

    Project:Skyscraper Sky Tower in Wroclaw, Poland. 46-story hotel-skyscraper with a total height of 212 m, withshops, restaurants and a medical centre

    Construction Period:

    December 2007 - November 2012

    Client:

    LC CORP S.A., Poland

    Scope of supply:

    500 tons SAS 500 thread bars, 16, 20 and 25 mm and 40 000 accessories for coupler and end anchorage.

    Application:

    SAS 500 thread bars were used in this building as reinforcement steel in shear walls and columns as partof the shear core. Due to high wind loads on tall structures shear walls contain concentration of reinforcingsteel made possible by using couplers splices.

    RS 07

    51

  • 8/10/2019 SAS Reference Projects

    52/6052

    Projekt:Neues World Trade Center in Manhattan - New York, USA

    Bauzeit:

    2008 - 2015 (geplant)

    Auftraggeber:

    Silverstein Properties

    Generalunternehmer:

    Halmar International, Turner Constructions, Tishman Constructions

    Lieferumfang:

    6.200 to SAS 670/800 hochfester Bewehrung, 43 mm bis 75 mm mit Platten, Muttern und Muffen, 450 toSAS 835/1035 Spannstbe, 75 mm als DCP Felsanker mit Ankerkopf und Muffenverbindung

    Anwendung:

    Auf dem Areal der am 11. September 2001 zerstrten Zwillingstrme des World-Trade-Centers wurden eineGedchtnissttte sowie vier neue Trme (1 WTC bis 4 WTC) errichtet. Der Masterplan fr den Wiederaufbauwurde von Daniel Libeskind erstellt. Der 1 WTC (ehemals Freedom Tower) wird bei seiner Fertigstellungmit ber 540 m das hchste Gebude New Yorks sein. SAS Stahl wurde sowohl in der Grndung (als DCP-Anker sowie als Caisson-Pfhle) als auch in der Tragstruktur (Sttzen und Schubwnde) der Gebude ver-wendet. Herkmmliche Bewehrung wurde zur Kostenoptimierung durch SAS 670 ersetzt. Dabei wurde frreine Stahlbetonsttzen eine Vorfertigung von Bewehrungskrben vorgenommen. Der als hochfeste Beweh-rung in Verbundsttzen verwendete Stahl wurde Stab fr Stab eingebaut. Der einfache, rasche und damitwirtschafltiche Einbau der Gewindesthle hat sowohl die Verlege- und Baufirma als auch den Bauherrnberzeugt.

    Neue World Trade Center, New York, USA SASSYSTEMS

    Bewehrungstechnik

    RS 08

  • 8/10/2019 SAS Reference Projects

    53/60

    Reinforcing coupling system

    New World Trade Center, New York, USA SASSYSTEMS

    Project:New World Trade Center in Manhattan - New York, USA

    Construction Period:

    2008 - 2015 (expected)

    Client:

    Silverstein Properties

    Main contractor:

    Halmar International, Turner Constructions, Tishman Constructions

    Scope of supply:

    6,200 tons SAS 670 high strength reinforcement bars, 43 mm to 75 mm with plates, lock nuts and coup-lers, 450 tons SAS 835/1035 post-tensioning bars, 75 mm as DCP-rockanchors with anchor heads andcoupling systems

    Application:

    The twin towers of the original world trade center were destroyed on the September 11 2001. On the samesite a memorial and four new towers (1 WTC to 4 WTC) were built. The master plan architect for the rebuild-ing was Daniel Libeskind. One world trade center (former Freedom Tower) will reach approx.. 540m and willbe the highest building of New York when its finished. SAS steel was used for foundation work (DCP-anchorsand caisson-piles) and for the superstructure (columns and shear walls) of the new towers. Common rein-forcement was replaced by SAS 670 for cost reduction reasons. Reinforcement cages were used to improvethe workflow for reinforced concrete columns. The reinforcement for the composite columns was assembledbar by bar. The easy, fast and hence economic assembling of high strength thread bars satisfied the rein-forcement and construction company as well as the owner of the building.

    RS 08

    53

  • 8/10/2019 SAS Reference Projects

    54/6054

    Projekt:

    432 Park Avenue in New York, USAGebudehhe 426 m mit einem Schlankheitsverhltnis von 15:1

    Bauzeit:

    2011 - 2015 (geplant)

    Ausfhrende Firmen:

    Investor Lend Lease, Statiker WSP Cantor Seinuk, Architekt Rafael Violi+ SLCE Architects,Baufirma Roger + Sons Concrete Corp.

    Lieferant:

    SAS Stressteel

    Lieferumfang:

    DCP Anker SAS 835/1035 (~70 Tonnen) 75 mm, Hochfeste Bewehrung SAS 670 von 43 mm - 63 mm(~2.400 Tonnen)

    Anwendung:

    432 PARK Avenue wird bei Fertigstellung eines der hchsten Gebude der USA sein. Es wird sowohl dasEmpire State Building als auch den 1 WTC-Turm berragen. Eine hohe Bewehrungskonzentration in dervertikalen Tragstruktur erforderte den Einsatz von hochfester Bewehrung SAS 670 der Annahtte. Der erste

    Entwurf mit herkmmlicher Bewehrung wurde als unbaubar betrachtet. Um die hohen Auftriebskrfteaufnehmen zu knnen, wurden die tragfhigsten Stabanker (SAS 835/1035) eingesetzt.Die Lngsbewehrungder Sttzen sowie der Schubwnde des Turms wurde aus SAS 670 ausgefhrt. Zur Beschleunigung des Bau-ablaufs werden die Bewehrungskrbe vorgefertigt auf die Baustelle transportiert und vor Ort als ein Stckeingebaut. Einmal mehr besttigt sich: New York baut auf Stahlwerk Annahtte.

    432 Park Avenue, New York, USA SASSYSTEMS

    Bewehrungstechnik

    RS 09

  • 8/10/2019 SAS Reference Projects

    55/60

    Reinforcing coupling system

    432 Park Avenue, New York, USA SASSYSTEMS

    Project:

    432 Park Avenue in New York, USAroof height = 1,398 = 426 m, with a 15:1 slenderness ration

    Construction Period:

    2011 - 2015 (expected)

    Main contractors:

    General contractor Lend Lease, Structural Eng. WSP Cantor Seinuk, Architect Rafael Violi + SLCEArchitects, Concrete contractor Roger + Sons Concrete Corp.

    Supplier:

    SAS Stressteel

    Scope of supply:

    DCP rock anchors SAS835/1035 - (3) grade 150 (~70 ton) 75 mm, High strength reinforcement SAS 670from 43 - 63 mm (~2,400 ton)

    Application:

    432 Park Avenue at completion will be one of the tallest US-building structures with a roof height exceedingthat of both the empire state building and the New World Trade Center Tower 1. Large concentrations of re-inforcement in the structure required the use of SAS high performance systems. The structure was deemed

    un-buildable without using SAS materials. The largest available rock anchor tie down the structure to bed-rock to resist uplift on the structure. The primary tower columns consists of all SAS 670 thread bars, as wellas the large boundary elements of the core shear walls were replaced with SAS 670 materials. Aiding thecontractors with the schedule cycle, all columns and shear wall elements were provided prefabricated intocage modules for rapid construction in the field. Once again New York is built with material from StahlwerkAnnahtte.

    RS 09

    55

  • 8/10/2019 SAS Reference Projects

    56/60

  • 8/10/2019 SAS Reference Projects

    57/60

    Tunnelling & Mining

    Daftha-Shis Tunnel , Dubai, UAE SASSYSTEMS

    Project:Daftha-Shis Road & Tunnel in Dubai, UAE

    Client:

    Government of Sharjah, Directorate of Public Works

    Construction period:

    January 2006 - August 2010

    Main contractor:

    General Mechanic Company

    Supplier:

    VSL Middle East LLC

    Scope of supply:

    Portal: 400 pcs. SAS 670 thread bars 18 mm, L = 6.15 m, domed washer 30, bull nose nut 30, 1,200 pcs.lantern spacer. Tunnel: 25,000 pcs. SAS 500 thread bars 25 mm, L = 4.15 m, domed washer 30, dome nut30, resin cartridges

    Application:

    SAS thread bars are used as rock dowels for the portal face and as rock bolts for the inner tunnel layer. TheSAS thread bars and accessories for the portal are hot-dip galvanized. The tunnel exists of two tunnel sec-tions with a length of 1,250 km and 1,275 km. For production the rock bolts are stressed to 50 kN and thebond length of the fast set resin cartridges is 1.00 m and of the slow set resin cartridges is 3.00 m.

    TM 01

    57

  • 8/10/2019 SAS Reference Projects

    58/6058

    Projekt:Kalibergwerk in Werra-Unterbreizbach, Deutschland. In der weltgrten Mine fr Kali und Magnesiumwerden auf einer Untertage-Flchenausdehnung von ca. 300 km aus einer Tiefe von bis zu 800 m jhrlichca. 20.000.000 to gefrdert. Das abgebaute Material wird zu Spezial- und Standarddnger sowie zu Pflan-zenschutz- und Salzprodukten weiter verarbeitet.

    Auftraggeber:

    K+S Kali GmbH, Kassel, Deutschland

    Lieferzeitraum:

    seit 1997

    Systemlieferant:

    Windgassen GmbH & Co. KG, Kln, Deutschland

    Lieferumfang:

    Jhrlich wird eine Gesamtmenge von 450.000 Stk. Gewindestben mit einem Gesamtgewicht von 850 tofr das Spreizdbel-Anker-System geliefert. SAS 450/700 Gewindestbe mit 16 mm mit Lngen von 1200und 1450 mm gewhrleisten eine Strecklast von 93 kN und eine Bruchlast von 145 kN.

    Anwendung:

    SAS 450/700 Gewindestbe sind aus naturharten und hochduktilen Stahlqualitten gefertigt, um das ge-forderte Arbeitsvermgen und die fr die Anwendung im Bergbau besonderen Kriterien und Anforderungenbasierend auf nationalen und internationalen Normen zu erfllen. Aufgrund dieser Eigenschaften, kom-biniert mit einer einfachen und schnellen Einbaumethode, sind die SAS Gewindestbe perfekt geeignet zurStabilisierung des Hohlraumes von Kalibergwerken.

    Kalibergwerk, Werra-Unterbreizbach, Deutschland SASSYSTEMS

    Tunnelbau & Bergbau

    TM 02

  • 8/10/2019 SAS Reference Projects

    59/60

    Tunnelling & Mining

    Potash-mine, Werra-Unterbreizbach, Germany SASSYSTEMS

    Project:Potash-mine in Werra-Unterbreizbach, Germany. The world`s greatest mining for potash and magnesiumwith a subsurface superficial area of approximately 300 km with a yearly output of about 20,000,000 tons ina maximum depth of 800 m. The exhausted material will be further processed to special andstandard fertilizer as well as to plant care and salt products.

    Client:

    K+S Kali GmbH, Kassel, Germany

    Construction period:

    since 1997

    Distributor:

    Windgassen GmbH & Co. KG, Cologne, Germany

    Scope of supply:

    SAH supplies yearly an amount of 450,000 pcs. of thread bars with a total weight of 850 tons for the expan-sion shell anchorage system. SAS 450/700 thread bars 16 mm, L = 1200 and 1450 mm ensure a yield loadof 93 kN and an ultimate load of 145 kN.

    Application:

    The SAS 450/700 thread bars for mining applications have to fulfil special criteria and requirements for min-ing applications given by national and international standards. Therefore, SAS thread bars have to be madeof natural hard and high-ductile steel qualities due to the required working capacity. Concerning to thoseproperties together with an easy and fast installation-procedure SAS thread bars are perfect to use for anexpansion shell anchorage system to stabilize and secure the excavations of the potash-mine.

    TM 02

    59

  • 8/10/2019 SAS Reference Projects

    60/60

    Streckgrenze / Zugfestigkeit

    yield stress / ultimate stress

    Anwendungsbereiche

    areas of application

    Nenn-

    nom.-

    Strecklast

    yield load

    Bruchlast

    ultimate load

    Flche

    cross section area

    Gewicht

    weight

    Dehnung

    elongation

    [mm] [kN] [kN] [mm2] [m/to] [kg/m] Agt

    [%] A10

    [%]

    SAS 500 / 550 - grade 75

    12 57 62 113 1123,6 0,89

    Bewehrungstechnik /reinforcing systems

    14 77 85 154 826,4 1,21

    6 10

    16 100 110 201 632,9 1,5820 160 175 314 404,9 2,47

    25 245 270 491 259,7 3,85

    Geotechnik /geotechnical systems

    28 310 340 616 207,0 4,83

    32 405 440 804 158,5 6,31

    40 630 690 1260 101,3 9,87

    50 980 1080 1960 64,9 15,40

    SAS 555 / 700 - grade 80 63,5 1760 2215 3167 40,2 24,86 5

    Alternativ SAS 550 /620 erhltlich / alternative SAS 550 / 620 grade 75 available

    SAS 450 / 700 - grade 60

    Bergbau / mining16 93 145 207 617,3 1,62 (A

    5) 15

    25 220 345 491 259,7 3,85 (A5) 20

    SAS 650 / 800 - grade 90

    Bergbau / mining

    22 247 304 380 335,6 2,98

    (A5) 18

    25 319 393 491 259,7 3,85

    28 400 493 616 207,0 4,83

    30 460 565 707 180,2 5,55

    SAS 670 / 800 - grade 97

    18 170 204 254 500,0 2,00

    Geotechnik /geotechnical systems

    22 255 304 380 335,6 2,98

    25 329 383 491 259,7 3,85

    28 413 493 616 207,0 4,83

    Ankertechnik / tunneling & mining

    30 474 565 707 180,2 5,55 5 10

    35 645 770 962 132,5 7,55

    43 973 1162 1452 87,7 11,40

    50 1315 1570 1963 64,9 15,40

    Hochfeste Bewehrung / reinforcing

    coupling system

    57,5 1740 2077 2597 49,1 20,3863,5 2122 2534 3167 40,2 24,86

    75 2960 3535 4418 28,8 34,68

    SAS 950 / 1050 - grade 150

    Spanntechnik /post-tensioning

    systems

    Geotechnik /geotechnical systems

    18 230 255 241 510,2 1,96

    5 7

    26,5 525 580 551 223,2 4,48

    32 760 845 804 153,1 6,53

    36 960 1070 1020 120,9 8,27

    40 1190 1320 1257 97,9 10,21

    47 1650 1820 1735 70,9 14,10

    SAS 835 / 1035 - grade 150

    Spanntechnik /post-tensioning

    systems

    57 2155 2671 2581 47,7 20,95

    4 765 2780 3447 3331 36,9 27,1075 3690 4572 4418 27,9 35,90

    SAS 900 / 1100 FA - grade 160 FA schweibar / weldable

    Schalungstechnik / formwork ties

    15 159 195 177 694,4 1,443 7

    20 283 345 314 390,6 2,56

    26,5 495 606 551 223,2 4,48 2 7

    SAS 900 / 1050 FC - grade 150 FC

    Schalungstechnik / formwork ties15 159 186 177 694,4 1,44

    3 7