Geotechnical systems
Embankment, Eemshaven, Netherlands SASSYSTEMS
Project:Julianahaven in EemshavenEstablishing of a permanent anchorage construction for the embankment
Client:
N. Kraaijeveld B.V.
Construction period:
October 2006 - January 2007
Construction company:
BAUER Funderingstechnieken BV, Mijdrecht, Netherlands
Scope of supply:
Over all SAH supplied an amount of 540 SAS 670/800 thread bars 75 mm and in total 1,080 pcs of re-quired accessories, like anchor nuts and lock nuts as well as coupler splicing with a total weight of 370 tonsfor the anchorage system.The right hand thread bars with lengths up to 41.40 m ensure a yield load of 2,960kN and an ultimate load of 3,535 kN respectively.
Application:
Concerning to the aggressive environment conditions the long term durability of the anchorage system willbe ensured by a double corrosion protection assembly. Therefore the SAS thread bar is placed in a corrugatedsheathing pre-grouted. So the SAS System can also be used for tensile loading in a durable operation.
GT 01
3
-
8/10/2019 SAS Reference Projects
4/604
Projekt:Kge Hafen, Einbau einer dauerhaften Spundwandrckverankerung fr die Hafenanlage
Auftraggeber:
Kge Jorddepot
Bauzeit:
Dezember 2007 - Dezember 2008
Generalunternehmer:
P. Aarsleff A/S
Lieferant:
Grnbech & Snner A/S
Lieferumfang:
170 to SAS 670/800 Gewindestbe mit 57,5 mm mit Lngen von 11,6 - 12,6 m. Fr die Verankerungenwurden 962 Stk. Gelenkbolzen mit speziell vergteten Ankermuttern in Kombination mit Gelenkmutternzum Spannen der Gewindestbe verwendet.
Anwendung:
Die hochfesten SAS Gewindestbe werden als Zugbnder fr die Spundwandrckverankerungen eingesetzt.Nach dem Auffllen von Sand zwischen den Wnden werden die zur Aussteifung verwendeten H-Profileentfernt, so dass die hochfesten Gewindestbe die Zugkrfte aufnehmen. Aufgrund der beengten Platzver-hltnisse im Gurtungsbereich, werden Gelenkbolzen mit speziell vergteten Ankermuttern in Kombinationmit Gelenkmuttern zur Spundwandrckverankerung eingesetzt.
Hafenanlage, Kge Hafen, Dnemark SASSYSTEMS
Geotechnik
GT 02
-
8/10/2019 SAS Reference Projects
5/60
Geotechnical systems
Embankment, Kge Hafen, Denmark SASSYSTEMS
Project:Kge Harbour, permanent sheet pile wall constructionfor the embankment
Client:
Kge Jorddepot
Construction period:
December 2007 - December 2008
Main contractor:
P. Aarsleff A/S
Supplier:
Grnbech & Snner A/S
Scope of supply:
170 tons SAS 670/800 thread bars 57.5 mm with length of 11.6 up to 12.6 m. For the anchorages 962 pcs.of joint bolts with special tempered anchor nuts in combination with joint nuts are used for tensioning theSAS thread bars.
Application:
SAS thread bars 670/800 are used as tie rods for the permanent sheet pile wall construction. After the sandhas been filled in between the walls, the H-Profiles, which are used for the bracing of the sheet pile construc-tion, will be removed and the tension load is taken by the high strength SAS thread bars. Due to the smallavailable space between the U-Profiles, joint bolts with special tempered anchor nuts in combination with
joint nuts are used for the sheet pile wall anchorage.
GT 02
5
-
8/10/2019 SAS Reference Projects
6/60
-
8/10/2019 SAS Reference Projects
7/60
Geotechnical systems
Gateway Bridge, Brisbane, Australia SASSYSTEMS
Project:Gateway upgrade project in Brisbane, Australia
Client:
QML - Queensland Motorway Limited
Construction period:
September 2006 - May 2010
Construction company:
Leighton Abigroup Joint Venture
Supplier:
VSL Australia Pty. Ltd.
Scope of supply:
150 tons SAS 835/1035 thread bars of 75 mm for the bridge pile foundation system. Mechanical splices ofthe SAS thread bars with SAS couplers allow a full load transfer.
Application:
The new Gateway Bridge is supported by reinforced concrete columns with an outer dimension of 15.0 mlength and 2.5 m width. The loads of the reinforced concrete columns are transferred to the reinforced con-crete pile caps, which have an area of 19.5 m length, 17.6 m width and a thickness of 3.2 m and from there tothe foundation piles with a of 1.8 m. The pile heads are reinforced with SAS 835/1035 thread bars to providevertical and horizontal post tensioning in the main pier heads.
GT 03
7
-
8/10/2019 SAS Reference Projects
8/608
Projekt:99 Church Street in New York, USA
Auftraggeber:
Urban Foundation
Bauzeit:
September - Oktober 2008
Bauausfhrende Firma:
Tishman Construction
Lieferant:
SAS Stressteel, Inc.
Lieferumfang:
15 Stk. SAS Caisson Piles mit je 16 Gewindestben 63.5 mm, Lnge 33 m, Stahlgte SAS 555/700.
Anwendung:
SAS Caisson Piles sind im Fels eingebundene Bohrpfhle, die fr Grndungen eingesetzt werden. Die Trag-fhigkeit der Caisson Piles erhht sich durch den Einsatz der hochfesten Gewindestbe SAS 555/700 alsDruckglieder signifikant. Die SAS Caisson Piles mit einer Lnge von 33 m wurden als Einheit im Werk vorge-fertigt und anschlieend zur Baustelle transportiert. Dadurch ist ein einfacher, schneller und sicherer Einbauder Caisson Piles auf der Baustelle mglich gewesen. SAS Muffen ermglichen die mechanische Verbindungder Gewindestbe - versetzte Muffenste - und die Anforderungen des Bauherrn an die Caisson Piles miteiner Lnge von 33 m wurden hervorragend erfllt.
99 Church Street, New York, USA SASSYSTEMS
Geotechnik
GT 04
-
8/10/2019 SAS Reference Projects
9/60
Geotechnical systems
99 Church Street, New York, USA SASSYSTEMS
Project:99 Church Street in New York, USA
Client:
Urban Foundation
Construction period:
September - October 2008
Construction company:
Tishman Construction
Supplier:
SAS Stressteel, Inc.
Scope of supply:
15 pcs. SAS Caisson Piles each with 16 thread bars 63.5 mm, length 33 m, steel grade SAS 555/700
Application:
SAS Caisson Piles are rock-socket bore piles used for foundations. The load carrying capacity of the Cais-son Piles are significantly increased with the high-strength SAS thread bars 555/700 used as compressionelements. The SAS Caisson Piles with a total length of 33 m were fabricated in one section and transportedto construction site. Therefore, the installation process at the job-site was very fast, easy and safe. SAS cou-plers made the mechanical splices - staggered bar couplings - of the thread bars possible and the contrac-tors specifications of a length of 33 m of the Caisson Piles were excellently fulfilled.
GT 04
9
-
8/10/2019 SAS Reference Projects
10/6010
Projekt:Dry Dock in Dubai, VAE
Auftraggeber:
Dry Docks World
Bauzeit:
Februar 2008 - Mrz 2009
Bauausfhrende Firma:
Dutco Balfour Beatty
Lieferant:
VSL Middle East LLC
Lieferumfang:
219 t SAS 670 Gewindestbe 63,5 mm, 23 t SAS 670 Gewindestbe 57,5 mm, 1.300 Stk. Muffen, Mutternund Ankerplatten
Anwendung:
Die hochfesten Gewindestbe SAS 670 werden als Zugstbe zwischen den Pfahlwnden eingesetzt. Die Ln-ge eines SAS Zugstabes betrgt 31,5 m. Mit SAS Muffen und Muttern wird die mechanische Vebindung derZugstbe hergestellt. Fr einen permanenten Korrosionsschutz wurden die Zugstbe gereinigt, gebrstet,mit einer Grundierung gestrichen und abschlieend mit einem speziellen Band umwickelt. Zustzlich wur-den PVC Rohre eingesetzt, um die Zugstbe vor mechanischen Beanspruchungen zu schtzen.SAS Gewindestbe weisen ein geringeres Gewicht als konventionelle Zugstbe bei gleicher Tragfhigkeit auf.Dadurch wird eine einfache und sichere Handhabung mit dem SAS Zugstabsystem garantiert.
Dry Dock, Dubai, VAE SASSYSTEMS
Geotechnik
GT 05
-
8/10/2019 SAS Reference Projects
11/60
Geotechnical systems
Dry Dock, Dubai, UAE SASSYSTEMS
Project:Dry Dock in Dubai, UAE
Client:
Dry Docks World
Construction period:
February 2008 - March 2009
Construction company:
Dutco Balfour Beatty
Supplier:
VSL Middle East LLC
Scope of supply:
219 tons SAS thread bars 670, 63,5 mm, 23 tons SAS thread bars 670, 57,5 mm, 1,300 pcs. couplers,nuts and anchor plates
Application:
The high strength SAS thread bars 670 were used for a tie rod application of a pile wall. The total length ofthe SAS tie rods between the pile walls were 31.5 m. SAS couplers and nuts made the mechanical splices ofthe thread bars possible. For a permanent corrosion protection, the SAS thread bars were cleaned, brushed,coated with a primer and wrapped with a tape. PVC pipes were used to protect the tie rods against mechani-cal damages. Compared to conventional tie rods, SAS thread bars are less heavy at the same load capacityand therefore easy and safe handling is guaranteed with the SAS tie rod system.
GT 05
11
-
8/10/2019 SAS Reference Projects
12/60
-
8/10/2019 SAS Reference Projects
13/60
-
8/10/2019 SAS Reference Projects
14/6014
Projekt:Erweiterung Al Salam Street und Abu Dhabi City Ring Strae, Auftrag Nr. (1) Al Salam Street Tunnel
Auftraggeber:
Department of Municipal Affairs, Abu Dhabi Municipalty, UAE
Bauzeit:
Mai 2008 - Oktober 2010
Bauausfhrende Firma:
Samsung - Saif Bin Darwish JV
Lieferant:
VSL Middle East LLC
Lieferumfang:
280 to Gewindesthle SAS 670 28, 43, 57,5 und 63,5 mm, 2.585 Stk. Muffen, 796 Stk. Ankerplatten und1.153 Stk. Ankermuttern
Anwendung:
Durch einen Tunnel mit einer Gesamtlnge von ca. 4 km erfolgt die Unterfhrung der Salam Street. NachFertigstellung ist die Salam Street eine vierspurige Schnellstrae mit Anbindung an die HauptverkehrsstraeMina Road. Whrend des Bauvorhabens werden die Baugrubenwnde mit Gewindestahl SAS 670 rckver-ankert. Aufgrund der hheren Tragfhigkeit im Vergleich zu konventionellen Bewehrungssthlen und wegender einfachen, schnellen und sicheren Montage sind die SAS Gewindestahlsysteme besonders fr den Ein-satz in beengten Platzverhltnissen geeignet.
Al Salam Street, Abu Dhabi, VAE SASSYSTEMS
Geotechnik
GT 07
-
8/10/2019 SAS Reference Projects
15/60
Geotechnical systems
Al Salam Street, Abu Dhabi, UAE SASSYSTEMS
Project:Upgrading Al Salam Street and Abu Dhabi City Ring Road, Contract No. (1) Al Salam Street Tunnel
Client:
Department of Municipal Affairs, Abu Dhabi Municipalty, UAE
Construction period:
May 2008 - October 2010
Construction company:
Samsung - Saif Bin Darwish JV
Supplier:
VSL Middle East LLC
Scope of supply:
280 tons thread bars SAS 670 28, 43, 57,5 and 63,5 mm, 2,585 pcs. couplers, 796 pcs. anchor plates and1,153 pcs. anchor nuts
Application:
With a tunnel of about 4 km length the upgrading of the Salam Street is completed. After finishing the SalamStreet is a four lanes road with connection to the expressway Mina Road.For stabilization of the pits SAS 670 thread bars are used as tie rods for the retaining walls. A higher loadcarrying capacity compared to conventional reinforcing steel and an easy, fast and safe installation of the SASthread bar system are the main advantages even in cramped areas of construction site.
GT 07
15
-
8/10/2019 SAS Reference Projects
16/6016
Projekt:Bau der neuen Schrgseilbrcke im Zentrum der Stadt Opole in Polen
Auftraggeber:
Straenbaubehrde der Stadt Opole
Bauzeit:
April 2009 - Dezember 2010
Bauausfhrende Firma:
Himmel & Papesch Opole Sp. z o.o. und MOSTMAR
Lieferant:
ATM Sp. z o.o. Polen
Lieferumfang:
Doppelt korrosionsgeschtzte Verpressanker:100 to SAS 670/800 Gewindestbe 75 mm mit Zubehr
Anwendung:
Fr den Bau der neuen Schrgseilbrcke werden doppelt korrosionsgeschtzte Verpressanker bestehendaus SAS Gewindestben der Stahlgte 670/800 verwendet.Bei diesem Bauvorhaben dienen die SAS Verpressanker als Rckverankerung der Schrgseil-Fundamenteund zur Grndung der Brckenpfeiler. Durch die SAS Verpressanker werden je nach Anwendungsgebiet Zug-lasten in den Baugrund eingeleitet.
Schrgseilbrcke, Opole, Polen SASSYSTEMS
Geotechnik
GT 08
-
8/10/2019 SAS Reference Projects
17/60
Geotechnical systems
Cable-stayed bridge, Opole, Poland SASSYSTEMS
Project:Construction of the new Cable-stayed bridge in the centre of Opole in Poland
Client:
Road Authority of the City of Opole
Construction period:
April 2009 - December 2010
Construction company:
Himmel & Papesch Opole Sp. z o.o. und MOSTMAR
Supplier:
ATM Sp. z o.o. Poland
Scope of supply:
Double Corrosion Protected Ground Anchors: 100 tons SAS 670/800 thread bars 75 mm with accessories
Application:
Ground anchors with SAS thread bars of steel grade 670/800 and with a double corrosion protection are usedfor the construction of the new stay-cabled bridge.For this project the applications of SAS ground anchors are: back anchorage of the stay cables and foun-dation of the bridge piers. Depending on the application, due to SAS ground anchors tension loads can betransferred into the ground.
GT 08
17
-
8/10/2019 SAS Reference Projects
18/60
-
8/10/2019 SAS Reference Projects
19/60
Geotechnical systems
American School, Dubai, UAE SASSYSTEMS
Project:American School of Dubai, UAE
Client:
American School of Dubai Committee
Construction period:
May - July 2010
Construction company:
Al Ahmadia Aktor
Supplier:
VSL Middle East LLC
Scope of supply:
17.2 tons thread bars grade SAS 670/800 43 mm with anchor nuts, couplers and anchor pieces
Application:
This project includes the upgrading of the existing foundations of the new campus of the American School ofDubai located in Barsah. For the additional increasing of the carrying capacity of the foundations, micropileswith a length up to 16.7 m - SAS thread bars grade 670/800 - are used as additional foundation elements.Micropiles are foundation elements able to transfer loads through skin friction into deeper, stable soil layers.The advantage of SAS micropiles is a high load carrying capacity due to well-target injection with a small di-ameter. Thereby, SAS micropiles are excellent qualified for the additional upgrading of existing foundations.
GT 09
19
-
8/10/2019 SAS Reference Projects
20/6020
Projekt:MCE 485 Marina Coastal Expressway in Singapur
Auftraggeber:
LTA - Land Transport Authorithy
Bauzeit:
August 2009 - Dezember 2011
Bauausfhrende Firma:
Penta Ocean Construction Co. Ltd.
Lieferant:
VSL Singapur
Lieferumfang:
1300 to SAS 950/1050 Spannstahl 32 mm mit Muffen und Haltemuttern
Anwendung:
Die bisher teuerste Autobahn Singapurs verbindet den stlichen und westlichen Teil Singapurs miteinander.Mit je fnf Fahrspuren in jede Richtung weist diese Schnellstrae eine Lnge von 5 km auf, wovon 3,5 km alsTunnel ausgefhrt werden. SAS Pfhle mit Spannsthlen werden aufgrund der bis ~57 m Tiefe anstehendenweichen Bodenschichten (weicher Meereston) eingesetzt. Temporr dienen SAS Pfhle zur Auftriebssicher-ung (Zugpfahl) und permanent als Grndungspfahl (Druckpfahl). Mit einer Gesamtlnge von bis zu 70 mwerden die SAS Pfhle bauseits aus Einzelschssen mit einer Lnge von 11,80 m schnell, einfach und sichermit Muffen und Haltemuttern gekoppelt.
Expressway, Singapur SASSYSTEMS
Geotechnik
GT 10
-
8/10/2019 SAS Reference Projects
21/60
Geotechnical systems
Expressway, Singapore SASSYSTEMS
Project:MCE 485 Marina Coastal Expressway in Singapore
Client:
LTA - Land Transport Authorithy
Construction period:
August 2009 - December 2001
Construction company:
Penta Ocean Construction Co. Ltd.
Supplier:
VSL Singapur
Scope of supply:
1300 tons SAS 950/1050 post-tensioning bars of 32 mm with couplers and fix nutsApplication:
It is the most expensive expressway of Singapore and it is the traffic connection between the east andwest part of Singapore. With each five lanes for every direction, the expressway has a total length of5 km, where of 3.5 km are realized as a tunnel. SAS piles with post-tensioning bars are used because of theexisting soft soil layers (soft marine clay) up to a depth of ~57 m. SAS piles are used temporary for the nega-tive buoyancy (tensile) and permanent as foundation piles (compression). With a total length of 70 m SASpiles are connected fast, easy and safe with couplers and fix nuts based on single bar sections with lengthsof 11.80 m.
GT 10
21
-
8/10/2019 SAS Reference Projects
22/6022
Projekt:Sport City Tower in Doha, Qatar. Die uere Fassade des 320 m hohen Wolkenkratzers ist eine Kombinationaus Edelstahl und verglasten Flchen. Seine Struktur vereint Stahlbeton und Stahl mit Tiefbohrpfhlen undeinem Betonkern.
Auftraggeber:
The Sport City Project Committee
Bauzeit:
April 2005 - November 2006
Generalunternehmer:ARGE MIDMAC - Six Construct
Lieferant:
VSL Middle East
Lieferumfang:
44 SAS 835/1035 Gewindestbe, 75 mm, l 13,0 m mit einer jeweiligen Vorspannkraft von 3.200 kN inklu-sive Zubehr 9 ringfrmig angeordnete Spezialplatten mit jeweils mehr als 2,5 to Gesamtgewicht und 300mm Strke
Anwendung:
In einer Hhe von 260 m ist dieses Vorspannsystem fr die dreidimensionale Ausrichtung der 60 m hohenfreitragenden Stahlkonstruktion in Form einer halboffenen Tulpe erforderlich. Innerhalb dieser ist ein 30 mhoher Kelch platziert, in dem die olympische Flamme whrend der Asien Spiele 2006 brannte.
Sport City Tower, Doha, Qatar SASSYSTEMS
Vorspanntechnik
PT 01
-
8/10/2019 SAS Reference Projects
23/60
Post-tensioning systems
Sport City Tower, Doha, Qatar SASSYSTEMS
Project:Sport City Tower in Doha, Qatar. The external facade of the 320 m high sky scraper is a combination ofarchitectural stainless steel and glazing panels. Its structure combines reinforced concrete and structuralsteel, with deep piles and a slip-formed concrete core.
Client:
The Sport City Project Committee
Construction period:
April 2005 - November 2006
Main contractor:Joint Venture ARGE MIDMAC - Six Construct
Supplier:
VSL Middel East
Scope of supply:
44 SAS 835/1035 thread bars 75 mm, l 13,0 m with a post-tensioning force of 3,200 kN each inclusive allrequired accessories 9 ring-shaped arranged special slabs of more than 2,5 tons each and 300 mm thick-nessApplication:
At the elevation of 260 m above ground level, this post-tensioning system is required for the three-dimen-sional alignment of the 60 m high cantilever steel construction in form of a half-open tulip. Inside this con-struction a 30 m high goblet is placed, in which the Olympic flame burned during the Asian Games 2006.
PT 01
23
-
8/10/2019 SAS Reference Projects
24/6024
Projekt:Die alte Schleuse am Fluss Couesnon wird durch ein neues, spezielles Stauwehr ersetzt, um die Versand-ung der Bucht zu vermeiden. Hierfr wird bei Ebbe das Wehr geffnet, das angestaute Wasser schiet indie Bucht hinaus und reit die Ablagerungen mit sich.
Auftraggeber:
Socit mixte Baie du Mont-Saint-Michel
Bauzeit:
2006 - 2012
Generalunternehmer:QUILLE (Bouygues)
Lieferant/Subunternehmer:
DYWIDAG SYSTEMS INTERNATIONAL
Lieferumfang:
54 Stk. SAS 835/1035 Gewindestbe 75 mm, l=4,15 m, 54 Stk. SAS 835/1035 Gewindestbe 75 mm,l=4,48 m. Die Bruchlast je Stab betrgt 4.572 kN.
Anwendung:
Whrend der Flut wird das Stauwehr geschlossen und der Fluss Couesnon aufgestaut. Die dabei entste-henden Wasserdrcke werden von den neuen Stauwehrtoren aufgenommen. Hierfr werden die Tore desStauwehrs mit je zwei Sechsergruppen des Spannglieds SAS 835/1035 75 mm gegen die Stauwehrpfeilervorgespannt. Die SAS Spannsthle wurden auf eine Last von 2.250kN vorgespannt.
Stauwehr, Mont Saint Michel, Frankreich SASSYSTEMS
Vorspanntechnik
PT 02
-
8/10/2019 SAS Reference Projects
25/60
Post-tensioning systems
Weir, Mont Saint Michel, France SASSYSTEMS
Project:The old weir at the river Couesnon is replaced by a new special weir, in order to avoid the sand silting of thebay. The principle is simple: at the ebb-tide the weir is opened, the dammed up water shoots into the bayand flushes the alluvial deposits with it.
Client:
Socit mixte Baie du Mont-Saint-Michel
Construction period:
2006 - 2012
Main contractor:QUILLE (Bouygues)
Supplier/sub contractor:
DYWIDAG SYSTEMS INTERNATIONAL
Scope of supply:
54 pcs. SAS 835/1035 thread bars 75 mm, l = 4,15 m and 54 pcs. SAS 835/1035 thread bars 75 mm, l =4,48 m with accessories. The ultimate load of each thread bar is 4,572 kN.Application:
During flood-tide the weir is closed and the river Couesnon is dammed up. The pressure force of the dammedup water is held by the new special weir. Therefore the watergates of the weir are pre-stressed to the con-crete pylons with two groups of ground anchors of SAS 835/1035 75 mm tendons. The thread bars are pre-stressed to a working load of 2,250 kN.
PT 02
25
-
8/10/2019 SAS Reference Projects
26/60
-
8/10/2019 SAS Reference Projects
27/60
Post-tensioning systems
Port, Busan, South Korea SASSYSTEMS
Project:New Port in Busan, South Korea
Client:
Joint Venture of Hyundai Develop. Company and Bouygues
Construction period:
March 2008 - October 2008 (Caissons with SAS stress bars)
Subcontractor:
TAEAH Construction Company
Supplier:
VSL Korea
Scope of supply:
281 tons SAS 950/1050 stress bars with 36 mm, with length of 7.45 m up to 10.95 m. In addition, the ac-cessories like couplers, stressing anchorages and fix nutsApplication:
SAS stress bars are used as anchors for the lifting devices of the Caissons. The weight of the Caissons is ap-prox. 2,500 tons. Altogehter 62 Caissons have to be anchored with SAS stress bars. In each Caisson 64 SAS950/1050 stress bars 36 mm with a length of 7.45 m up to 10.95 m are embedded. The Caissons are filled upwith gravel and sand after they were brought to their final position in the offshore area by heavy ship crane.The high bonding characteristics of the SAS stress bars make the SAS System superior to all conventionalbars.
PT 03
27
-
8/10/2019 SAS Reference Projects
28/6028
Projekt:Capital Gate Tower in Abu Dhabi, VAE
Auftraggeber:
ADNEC, Abu Dhabi National Exhibitions Company
Bauzeit:
April - September 2008 (Einbau & Vorspannung SAS Spannstbe)
Bauausfhrende Firma:
Al Habtoor Engineering
Lieferant:
VSL Middle East LLC
Lieferumfang:
49 to SAS 835/1035 Spannstbe 65 mm, Lnge 16 m, 160 Stk. Ankerplatten, Konus 30, 195 Stk. Anker-muttern, ballig 30, 160 Stk. Muffen, Standard sowie Spannmuffen und Spannverankerungen
Anwendung:
Wegen der hohen dynamischen Lasten des Capital Gate Towers, sind die tragenden Wnde des Gebudes mitSAS Spannstben 835/1035 bewehrt und vorgespannt. Konventionelle Bewehrungsstbe werden aufgrundder hohen Tragfhigkeiten effektiv durch SAS Spannstbe ersetzt, bei gleichzeitiger Reduzierung der Anzahlan erforderlichen Bewehrungsstben. Die 35 Stockwerke des Capital Gate Towers - mit einer Gesamtflchevon 50.000 m - werden als Brorume und Hotel genutzt.
Capital Gate Tower, Abu Dhabi, VAE SASSYSTEMS
Vorspanntechnik
PT 04
-
8/10/2019 SAS Reference Projects
29/60
Post-tensioning systems
Capital Gate Tower, Abu Dhabi, UAE SASSYSTEMS
Project:Capital Gate Tower in Abu Dhabi, UAE
Client:
ADNEC, Abu Dhabi National Exhibitions Company
Construction period:
April - September 2008 (installation & stressing of SAS bars)
Main contractor:
Al Habtoor Engineering
Supplier:
VSL Middle East LLC
Scope of supply:
49 tons SAS 835/1035 pre-stressing bars 65 mm, length 16 m, 160 pcs. anchor plates cone, 30, 195 pcs.bull nose nuts, 30, 160 pcs. couplers, standard stressing couplers and stressing anchoragesApplication:
Due to the high dynamic loads of the Capital Gate Tower, the basement level core walls of the building arereinforced and pre-stressed with SAS stress bars 835/1035. In order to reduce the required quantity of bars,the conventional rebars are successfully replaced by the high-strength SAS stress bars. With 35 floors and atotal area of 50,000 m, the Capital Gate Tower is used as offices and as hotel.
PT 04
29
-
8/10/2019 SAS Reference Projects
30/6030
Projekt:Quadropol Foundation Zementfabrik in Dibba, Fujairah, VAE
Auftraggeber:
Fujairah Cement Factory
Bauzeit:
Januar 2008 - Mai 2009 (Einbau & Vorspannung SAS Spannstbe)
Bauausfhrende Firma:
Emirates General Contracting
Lieferant:
VSL Middle East LLC
Lieferumfang:
44 to SAS 950/1050 Spannstbe, 47mm, Lnge 10,95m, 284 Stk. Ankerplatten gerade, 284 Stk. Ankermut-tern gerade, 284 Stk. Ankerplatten, Konus 30, 284 Stk. Ankermuttern ballig 30
Anwendung:
Quadropol Foundation besitzt 4 Klinkermhlen. Um die dynamischen Lasten einer Klinkermhle der ZementFabrik aufnehmen zu knnen, wird diese ber eine Stahlplatte mit SAS Spannstben im Beton Fundamentverankert. Insgesamt werden 4 Fundamente mit je 71 SAS Spannstben 950/1050 errichtet. PVC Rhrenschtzen die SAS Spannstbe temporr whrend des Einbauzustandes vor mechanischen Beanspruchun-gen.
Zementfabrik, Fujairah, VAE SASSYSTEMS
Vorspanntechnik
PT 05
-
8/10/2019 SAS Reference Projects
31/60
Post-tensioning systems
Cement Factory, Dibba, Fujairah, UAE SASSYSTEMS
Project:Quadropol Foundation Cement Factory in Dibba, Fujairah, UAE
Client:
Fujairah Cement Factory
Construction period:
January 2008 - May 2009 (installation & stressing of SAS bars)
Main contractor:
Emirates General Contracting
Supplier:
VSL Middle East LLC
Scope of supply:
44 tons SAS 950/1050 stress bars, 47 mm, length 10.95 m, 284 pcs. anchor plates flat, 284 pcs. anchornuts flat, 284 pcs. anchor plates cone 30, 284 pcs. bull nose nuts 30Application:
Quadropol Foundation contains of 4 lime stone milling machines. To transfer the dynamic loads of the limestone mill of the cement factory, the mill is anchoraged in the concrete foundation by a steel plate with SASstress bars. All in all, 4 foundations with each of 71 SAS stress bars installed. PVC tubes are used to protecttemporarily the SAS bars against mechanical damages up to completion of the construction.
PT 05
31
-
8/10/2019 SAS Reference Projects
32/6032
Projekt:Nelson Mandela Bay Stadion
Auftraggeber:
Nelson Mandela Bay Metropolitan
Bauzeit:
Mrz 2007 - Juni 2009
Bauausfhrende Firma:
Grinaker-LTA / Interbeton bv.
Lieferant:
Duraset
Lieferumfang:
135 Stk. SAS 950/1050 Spannsthle, 36 mm, Lnge 3,00 m, verbundloses Spannglied mit Ankerplattenund Kalottenmuttern an jedem Stabende, 315 Stk. SAS 950/1050 Spannsthle, 32 mm, Lnge 2,80 m,verbundloses Spannglied mit Ankerplatten und Kalottenmuttern an jedem Stabende
Anwendung:
Das neue Nelson Mandela Stadion fr die Fuball Weltmeisterschaft 2010 in Sd Afrika umfasst eine Ka-pazitt von 45.900 Sitzpltzen fr Zuschauer. Die SAS Spannsthle 950/1050 werden fr die vertikale undhorizontale Verankerung der Stahl Dachkonstruktion mit den Betonelementen verwendet. Die Gesamtflcheder Dachkonstruktion betrgt 45.000 m. Die Verankerung der SAS 950/1050 Spannsthle mit den Betonele-menten erfolgt mit Ankerplatten und Kalottenmuttern.
Nelson Mandela Bay Stadion, Johannesburg, Sdafrika SASSYSTEMS
Vorspanntechnik
PT 06
-
8/10/2019 SAS Reference Projects
33/60
Post-tensioning systems
Nelson Mandela Bay Stadium, Johannesburg, South africa SASSYSTEMS
Project:Nelson Mandela Bay Stadium
Client:
Nelson Mandela Bay Metropolitan
Construction period:
March 2007 - June 2009
Main contractor:
Grinaker-LTA / Interbeton bv.
Supplier:
Duraset
Scope of supply:
135 pcs. SAS 950/1050 post-tensioning bars, 36 mm, length 3.00 m, unbonded tendon with anchor platesand dome nuts at both ends of the bars, 315 pcs. SAS 950/1050 post-tensioning bars, 32 mm, length 2.80m, unbonded tendon with anchor plates and dome nuts at both ends of the barsApplication:
The new Nelson Mandela Stadium, for the 2010 football world cup in South Africa, has a seating capacity for45,900 fans. The SAS post-tensioning 950/1050 bars are used for the vertical and horizontal anchoring of thesteel roof structure to the concrete elements. The total area of the roof structure is 45,000 m. The anchor-age of the SAS 950/1050 bars is realized with anchor plates and dome nuts cast into the concrete elements.
PT 06
33
-
8/10/2019 SAS Reference Projects
34/6034
Projekt:Fuballstadion in Johannesburg, Sdafrika
Auftraggeber:
City of Johannesburg
Bauzeit:
Januar 2007 - Oktober 2009
Bauausfhrende Firma:
Grinaker-LTA / Interbeton bv.
Lieferant:
Duraset
Lieferumfang:
850 Stk. SAS 950/1050 Spannstahl 36 mm, Lnge 3,00 m verbundloses Spannglied mit Ankerplatten undKalottenmuttern an jedem Stabende
Anwendung:
Das neue Soccer City Stadion in Johannesburg fr die Fuball Weltmeisterschaft 2010 umfasst eine Kapazittvon 94.000 Sitzpltzen fr Zuschauer. Die SAS Spannsthle 950/1050 werden fr die vertikale Verankerungder Dachkonstruktion mit den Beton Sttzen verwendet. Die Gesamtflche der Dachkonstruktion betrgt370.000 m. Die Verankerung der SAS 950/1050 Spannsthle mit den Beton Sttzen erfolgt mit Ankerplattenund Kalottenmuttern. Aufgrund der einfachen, schnellen und sicheren Handhabung der SAS GewindestahlSysteme, ist eine effiziente Bauzeit garantiert.
Fuballstadion, Johannesburg, Sdafrika SASSYSTEMS
Vorspanntechnik
PT 07
-
8/10/2019 SAS Reference Projects
35/60
Post-tensioning systems
Soccer City Stadium, Johannesburg, South africa SASSYSTEMS
Project:Soccer City Stadium in Johannesburg, South africa
Client:
City of Johannesburg
Construction period:
January 2007 - October 2009
Construction company:
Grinaker-LTA / Interbeton bv.
Supplier:
Duraset
Scope of supply:
850 pcs. SAS 950/1050 post-tensioning bars 36 mm, length 3.00 m, unbonded tendon with anchor platesand dome nuts at both ends of the barsApplication:
The new Soccer City Stadium in Johannesburg, for the football world cup in South Africa, has a seating ca-pacity for 94,000 fans. The SAS post-tensioning bars 950/1050 are used for the vertical anchoring of the roofstructure to the concrete columns. The total area of the roof structure is 370,000 m. The anchorage of theSAS 950/1050 bars is realized with anchor plates and dome nuts cast into the concrete columns. Due to theeasy, fast and safe handling of the SAS thread bar system an efficient construction time is guaranteed.
PT 07
35
-
8/10/2019 SAS Reference Projects
36/6036
Projekt:Nationalstadion in Warschau, Polen
Architekt:
JSK Architekci Sp. z o.o., GMP International GmbH, SBP GmbH
Bauzeit:
2011 - 2012
Bauausfhrende Firma:
PBG S.A., Alpine Bau GmbH
Lieferant:ATM Sp. z o.o.
Lieferumfang:
Insgesamt hat ATM Sp. z o.o. als von SAH in Polen qualifiziertes Spezialunternehmen 692 Stck SAS950/1050 40 Stabspannglieder ohne Verbund gem der Europischen Technischen Zulassung ETA-05/0122 geliefert, eingebaut und vorgespannt.
Anwendung:
Der Idee einer leichtwirkenden und transparenten Struktur folgend, verankern die SAH Vorspannsystemedie Vertikallasten aus den Stahlabspannungen und der Dachkonstruktion in den Fundamentblcken.Erffnet am 29. Januar 2012 fanden im Nationalstadion in Warschau insgesamt fnf Spiele der Fuball Eu-ropameisterschaft 2012 inklusive dem Erffnungsspiel statt.
Nationalstadion, Warschau, Polen SASSYSTEMS
Vorspanntechnik
PT 08
-
8/10/2019 SAS Reference Projects
37/60
-
8/10/2019 SAS Reference Projects
38/60
-
8/10/2019 SAS Reference Projects
39/60
-
8/10/2019 SAS Reference Projects
40/6040
Projekt:
Hochhaus Ten Museum Park in Miami, USA50-stckiges Hochhaus mit einer Gesamthhe von 178 m
Auftraggeber:
Biscayne Associates, Inc., Miami, FL
Bauzeit:
2007 - 2008
Lieferant:
AREVA NP GmbH
Lieferumfang:
326 to SAS 555/700 63,5 mmSAS Muffen mit Madenschrauben
Anwendung:
SAS 555/700 Gewindestbe werden in diesem Bauwerk als Bewehrung in den Schubwnden - dem Haupt-tragelement des Gebudes - eingesetzt. Die bei Hochhusern verstrkt auftretenden Windlasten erfordernin den Schubwnden einen hohen Bewehrungsgrad. Um dies zu vermeiden, werden bei diesem Projekt dieAnzahl und Menge von Betonstahl reduziert, indem der konventionelle Betonstahl durch den hherwertigen
Gewindestahl SAS 555/700 63,5mm ersetzt wird. Durch die Verwendung von Muffen anstelle von bergrei-fungssten werden weitere Einsparungen erzielt.
Ten Park Museum, Miami, USA SASSYSTEMS
Bewehrungstechnik
RS 02
-
8/10/2019 SAS Reference Projects
41/60
Project:
Skyscraper Ten Museum Park, Miami, USA50 story skyscraper with a total height of 178 m
Client:
Biscayne Associates, Inc., Miami, FL
Construction period:
2007 - 2008
Supplier:
AREVA NP GmbH
Scope of supply:
326 to SAS 555/700 63,5 mmSAS couplers with set screws
Application:
SAS 555/700 thread bars are used in this building as reinforcing steel in the shear walls - the primary sup-porting elements in the building. Due to high wind loads on tall structures shear walls contain large concen-tration of rebar. A practical and elegant solution is to reduce the number and quantity of rebar by substitutingthread bars SAS 555/700 63.5 mm for conventional rebar. Additionally, eliminating lap splices with thread-
able coupling results in significant savings in labor costs due to reduced rebar tonnage to be fabricated andinstalled.
Reinforcing coupling system
Ten Park Museum, Miami, USA SASSYSTEMS
RS 02
41
-
8/10/2019 SAS Reference Projects
42/6042
Projekt:
Hochhaus Epic Hotel & Residence in Miami, USA55-stckiges Hochhaus mit einer Gesamthhe von 174 m
Auftraggeber:
CMC Consruction Inc., Miami FL
Bauzeit:
bis Mitte 2008
Lieferant:
SAS Stressteel Corp., Fairfield, N.J.
Lieferumfang:
2.000 to SAS 670/800 Gewindestbe 63,5 mm, 121 to SAS 670/800 Gewindestbe 43 mm, SAS Muffenmit Madenschrauben
Anwendung:
SAS 670/800 Gewindestbe werden in diesem Bauwerk als Bewehrung in den Fundamenten und den Schub-wnden eingesetzt. Die bei Hochhusern verstrkt auftretenden Windlasten erfordern in den Schubwndeneinen hohen Bewehrungsgrad. Um dies zu vermeiden, werden bei diesem Projekt die Anzahl und Mengevon Betonstahl reduziert, indem der konventionelle Betonstahl durch den hherwertigen Gewindestahl SAS
670/800 43 mm und 63,5 mm ersetzt wird. Durch die Verwendung von Muffen anstelle von bergreifungs-sten werden weitere Einsparungen erzielt.
Epic Hotel, Miami, USA SASSYSTEMS
Bewehrungstechnik
RS 03
-
8/10/2019 SAS Reference Projects
43/60
Reinforcing coupling system
Epic Hotel, Miami, USA SASSYSTEMS
Project:
Scyscraper Epic & Residences in Miami, USA55-story skyscraper with a total high of 174 m
Client:
CMC Consruction Inc., Miami FL
Construction period:
until mid 2008
Supplier:
SAS Stressteel Corp., Fairfield, N.J.
Scope of supply:
2,000 tons SAS 670/800 thread bars 63.5 mm, 121 tons SAS 670/800 thread bars 43 mm, SAS couplerswith set screws
Application:
SAS 670/800 thread bars are used in this building as reinforcing steel in the foundation slab and shear walls- the primary supporting elements in the building. Due to high wind loads on tall structures shear walls con-tain concentration of reinforcing steel. A practical and elegant solution is to reduce the number and quantityof rebar by substituting thread bars SAS 670/800 43 mm and 63.5 mm for conventional rebar. Additionally,
eliminating lap splices with threadable coupling results in significant savings in labor costs due to reducedrebar tonnage to be fabricated and installed.
RS 03
43
-
8/10/2019 SAS Reference Projects
44/6044
Projekt:
Hochhaus Opernturm in Frankfurt, Deutschland
Auftraggeber:
Opernplatz Property Holdings GmbH & Co. KG
Bauzeit:
Januar 2007 - Dezember 2009
Generalunternehmer:
Ed. Zblin AG
Bauherr:
Tishman Speyer
Lieferumfang:
Gewindestahl und Kontaktmuffen der Stahlgte SAS 670/800 fr Muffenste, 30 - 75 mm, mit einer Ge-samtmenge von: 320 to Gewindestahl und 3.700 Stk. Kontaktmuffen
Anwendung:
Die hochfesten Gewindesthle der Stahlgten SAS 670/800 werden erstmalig fr die Bewehrung der Mega-sttzen und der Randsttzen eingesetzt (Gebudehhe ~170 m) Die gesamte Lngsbewehrung der Mega- und
Randsttzen wird einheitlich in dem hochfesten Gewindestahl SAS 670/800 ausgefhrt. Der Bewehrungs-grad der Sttzen des Opernturms Frankfurt betrgt bis zu 13 %. Stabdurchmesser bis 75 mm ermglichentrotz des hohen Bewehrungsgrades eine sehr gute Bewehrungsfhrung. Die kraftschlssige Verbindung derGewindestbe durch Kontaktmuffen ermglicht die Weiterleitung groer Druckkrfte.
Opernturm, Frankfurt, Deutschland SASSYSTEMS
Bewehrungstechnik
RS 04
-
8/10/2019 SAS Reference Projects
45/60
Reinforcing coupling system
Frankfurt Operatower, Germany SASSYSTEMS
Project:
Scyscraper Operatower in Frankfurt, Germany
Client:
Opernplatz Property Holdings GmbH & Co. KG
Construction period:
January 2007 - December 2009
Main contractor:
Ed. Zblin AG
Owner:
Tishman Speyer
Scope of supply:
SAS thread bars of steel grade 670/800 and contact couplers, 30 - 75 mm, with a total amount of 320 toSAS thread bars and 3,700 pcs. contact couplers.
Application:
The high-strength SAS thread bars 670/800 and contact couplers are used for reinforcing the columns of ahigh-rise building (total height of the building ~170 m) in Germany for the first time. The total longitudinal re-
inforcement of the high load capacity and edge columns is designed with the high-strength SAS thread bars670/800. The ratio of reinforcement is up to 13 %. This high ratio of reinforcement at no congestion of steel inthe columns is possible due to the rebar of up to 75 mm. Mechanical splices of SAS thread bars by contactcouplers allow the transferring of high compressive forces.
RS 04
45
-
8/10/2019 SAS Reference Projects
46/6046
Projekt:Feste Fahrbahn Bgl, ICE Hochgeschwindigkeitsstrecke Nrnberg-Ingolstadt & Erfurt-Illmenau
Auftraggeber:
Deutsche Bahn AG
Bauzeit:
April 2003 - April 2004 (Nrnberg-Ingolstadt)Juli 2011 - August 2012 (Erfurt-Ilmenau)
Streckenlnge:
128 km
Bauausfhrende Firma:
Max Bgl
Lieferumfang:
1865 to Gewindestahl SAS 500 20 mm (Fixlnge l = 6,44 m)
Anwendung:
Der Gewindestahl SAS 500 wurde zur Lngskopplung der vorgefertigten Gleistragplatten von MaxBgl verwendet. Es wurden jeweils 6 Stbe in ein Tragelement einbetoniert. Die Gleistragplattenmit einer nominalen Lnge von 6,50 m wurden untereinander ber die freiliegenden Enden derGewindestbe mittels Spannschlssern und Kalottenmuttern verbunden und verspannt. ber diekraftschlssige Verbindung der Tragplatten durch die Gewindestbe knnen die dynamischenBelastungen aus dem Fahrbetrieb der ICE Hochgeschwindigkeitszge sicher abgetragen werden.
ICE Hochgeschwindigkeitsstrecke, Deutschland SASSYSTEMS
Bewehrungstechnik
RS 05
-
8/10/2019 SAS Reference Projects
47/60
Reinforcing coupling system
ICE high speed railway line, Germany SASSYSTEMS
Project:Slab track system Bgl, ICE high speed railway line Nrnberg-Ingolstadt & Erfurt-Illmenau
Client:
Deutsche Bahn AG
Construction period:
April 2003 - April 2004 (Nrnberg-Ingolstadt)July 2011 - August 2012 (Erfurt-Illmenau)
Total distance:
128 km
Main contractor:
Max Bgl
Scope of supply:
1865 tons thread bars SAS 500 20 mm with fix lenght of 6,44 m
Application:
Thread bars SAS 500 are used for coupling the prefabricated components of fixed trackway system,manufactured on the production sites of the precasting plants of Max Bgl. Each pre cast slabs consist of sixbars. The fixed trackway elements with a nominal length of 6,50 m was connected and stressed via exposedends of thread bars together with turnbuckles and dome nuts. In fact of force-locked connection betweenthe pre cast slabs with thread bars dynamic loads caused by high-speed trains can be absorbed safely.
RS 05
47
-
8/10/2019 SAS Reference Projects
48/6048
Projekt:Hochhaus Tanzende Trme in Hamburg
Bauzeit:
Mai 2010 bis Juni 2012
Generalunternehmer:
Ed. Zblin AG
Bauherr:
STRABAG Real Estate GmbH
Lieferumfang:
Gewindestahl und Kontaktmuffen der Stahlgte SAS 670/800, 43 und 57 mm, mit einer Gesamtmengevon 140 to Gewindestahl und 600 Stck. Kontaktmuffen
Anwendung:
Die hochfesten Gewindesthle der Stahlgte SAS 670/800 wurden fr die Ortbetoninnen- und FT-Randstt-zen des Hochhauses (Gebudehhe ca. 90 m) eingesetzt. Die gesamte Lngsbewehrung wurde einheitlich indem hochfestem Gewindestahl SAS 670/800 ausgefhrt. Bei den Ortbetonsttzen erfolgte der Bewehrungss-to ber Kontaktmuffen. Der Stumpfsto der FT-Randsttzen wurden mit hochfestem Mrtel vergossen. DerBewehrungsgrad der Sttzen betrgt maximal 13 %. Die groen Stabdurchmesser bis 57 mm ermglichentrotz des hohen Bewehrungsgrades eine sehr gute Bewehrungsfhrung.
Tanzende Trme, Hamburg, Deutschland SASSYSTEMS
Bewehrungstechnik
RS 06
-
8/10/2019 SAS Reference Projects
49/60
Reinforcing coupling system
Dancing Towers, Hamburg, Germany SASSYSTEMS
Project:Skyscraper Dancing Towers in Hamburg, Germany
Construction Period:
May 2010 - June 2012
Main constractor:
Ed. Zblin AG
Owner:
STRABAG Real Estate GmbH
Main contractor:
Max Bgl
Scope of supply:
SAS thread bars of steel grade 97 (SAS 670/800) and contact couplers, 43 and 57 mm, with a total amountof 140 tons SAS thread bars and 600 pcs. contact couplers
Application:
The high-strength SAS thread bars 670/800 are used for reinforcing the columns of a high-rise building (totalheight of the building ~90 m) in Germany. The total longitudinal reinforcement of the high load capacity andedge columns is designed with the high-strength SAS thread bars 670/800. The ratio of reinforcement is upto 13%. This high ratio of reinforcement at no congestion of steel in the columns is possible due to the rebardiameter of up to 57 mm. Mechanical splices of SAS thread bars by contact couplers allow the transferringof high compressive forces.
RS 06
49
-
8/10/2019 SAS Reference Projects
50/6050
Projekt:Hochhaus Sky Tower in Wroclaw, Polen. 46 stckiges Hotel mit einer Gesamthhe von 212 m, mit Geschf-ten, Restaurants und einem medizinischen Zentrum.
Bauzeit:
Dezember 2007 - November 2012
Auftraggeber:
LC CORP S.A., Polen
Lieferumfang:
500 to SAS 500 Gewindestahl, 16, 20 und 25 mm mit 40.000 Verbindungen fr Muffen und Endveranke-rungen
Anwendung:
SAS 500 Gewindestahl wird in diesem Bauwerk als Anschlubewehrung in den Haupttragelementen, Sttzenund Schubwnden des Aussteifungskernes eingebaut. Die bei Hochhusern verstrkt auftretenden Windlas-ten erfordern in den Schubwnden des Aussteifungskernes einen hohen Bewehrungsgrad, welcher durchden Einbau von Muffenverbindungen ermglicht wurde.
Sky Tower, Wroclaw, Polen SASSYSTEMS
Bewehrungstechnik
RS 07
-
8/10/2019 SAS Reference Projects
51/60
Reinforcing coupling system
Sky Tower, Wroclaw, Poland SASSYSTEMS
Project:Skyscraper Sky Tower in Wroclaw, Poland. 46-story hotel-skyscraper with a total height of 212 m, withshops, restaurants and a medical centre
Construction Period:
December 2007 - November 2012
Client:
LC CORP S.A., Poland
Scope of supply:
500 tons SAS 500 thread bars, 16, 20 and 25 mm and 40 000 accessories for coupler and end anchorage.
Application:
SAS 500 thread bars were used in this building as reinforcement steel in shear walls and columns as partof the shear core. Due to high wind loads on tall structures shear walls contain concentration of reinforcingsteel made possible by using couplers splices.
RS 07
51
-
8/10/2019 SAS Reference Projects
52/6052
Projekt:Neues World Trade Center in Manhattan - New York, USA
Bauzeit:
2008 - 2015 (geplant)
Auftraggeber:
Silverstein Properties
Generalunternehmer:
Halmar International, Turner Constructions, Tishman Constructions
Lieferumfang:
6.200 to SAS 670/800 hochfester Bewehrung, 43 mm bis 75 mm mit Platten, Muttern und Muffen, 450 toSAS 835/1035 Spannstbe, 75 mm als DCP Felsanker mit Ankerkopf und Muffenverbindung
Anwendung:
Auf dem Areal der am 11. September 2001 zerstrten Zwillingstrme des World-Trade-Centers wurden eineGedchtnissttte sowie vier neue Trme (1 WTC bis 4 WTC) errichtet. Der Masterplan fr den Wiederaufbauwurde von Daniel Libeskind erstellt. Der 1 WTC (ehemals Freedom Tower) wird bei seiner Fertigstellungmit ber 540 m das hchste Gebude New Yorks sein. SAS Stahl wurde sowohl in der Grndung (als DCP-Anker sowie als Caisson-Pfhle) als auch in der Tragstruktur (Sttzen und Schubwnde) der Gebude ver-wendet. Herkmmliche Bewehrung wurde zur Kostenoptimierung durch SAS 670 ersetzt. Dabei wurde frreine Stahlbetonsttzen eine Vorfertigung von Bewehrungskrben vorgenommen. Der als hochfeste Beweh-rung in Verbundsttzen verwendete Stahl wurde Stab fr Stab eingebaut. Der einfache, rasche und damitwirtschafltiche Einbau der Gewindesthle hat sowohl die Verlege- und Baufirma als auch den Bauherrnberzeugt.
Neue World Trade Center, New York, USA SASSYSTEMS
Bewehrungstechnik
RS 08
-
8/10/2019 SAS Reference Projects
53/60
Reinforcing coupling system
New World Trade Center, New York, USA SASSYSTEMS
Project:New World Trade Center in Manhattan - New York, USA
Construction Period:
2008 - 2015 (expected)
Client:
Silverstein Properties
Main contractor:
Halmar International, Turner Constructions, Tishman Constructions
Scope of supply:
6,200 tons SAS 670 high strength reinforcement bars, 43 mm to 75 mm with plates, lock nuts and coup-lers, 450 tons SAS 835/1035 post-tensioning bars, 75 mm as DCP-rockanchors with anchor heads andcoupling systems
Application:
The twin towers of the original world trade center were destroyed on the September 11 2001. On the samesite a memorial and four new towers (1 WTC to 4 WTC) were built. The master plan architect for the rebuild-ing was Daniel Libeskind. One world trade center (former Freedom Tower) will reach approx.. 540m and willbe the highest building of New York when its finished. SAS steel was used for foundation work (DCP-anchorsand caisson-piles) and for the superstructure (columns and shear walls) of the new towers. Common rein-forcement was replaced by SAS 670 for cost reduction reasons. Reinforcement cages were used to improvethe workflow for reinforced concrete columns. The reinforcement for the composite columns was assembledbar by bar. The easy, fast and hence economic assembling of high strength thread bars satisfied the rein-forcement and construction company as well as the owner of the building.
RS 08
53
-
8/10/2019 SAS Reference Projects
54/6054
Projekt:
432 Park Avenue in New York, USAGebudehhe 426 m mit einem Schlankheitsverhltnis von 15:1
Bauzeit:
2011 - 2015 (geplant)
Ausfhrende Firmen:
Investor Lend Lease, Statiker WSP Cantor Seinuk, Architekt Rafael Violi+ SLCE Architects,Baufirma Roger + Sons Concrete Corp.
Lieferant:
SAS Stressteel
Lieferumfang:
DCP Anker SAS 835/1035 (~70 Tonnen) 75 mm, Hochfeste Bewehrung SAS 670 von 43 mm - 63 mm(~2.400 Tonnen)
Anwendung:
432 PARK Avenue wird bei Fertigstellung eines der hchsten Gebude der USA sein. Es wird sowohl dasEmpire State Building als auch den 1 WTC-Turm berragen. Eine hohe Bewehrungskonzentration in dervertikalen Tragstruktur erforderte den Einsatz von hochfester Bewehrung SAS 670 der Annahtte. Der erste
Entwurf mit herkmmlicher Bewehrung wurde als unbaubar betrachtet. Um die hohen Auftriebskrfteaufnehmen zu knnen, wurden die tragfhigsten Stabanker (SAS 835/1035) eingesetzt.Die Lngsbewehrungder Sttzen sowie der Schubwnde des Turms wurde aus SAS 670 ausgefhrt. Zur Beschleunigung des Bau-ablaufs werden die Bewehrungskrbe vorgefertigt auf die Baustelle transportiert und vor Ort als ein Stckeingebaut. Einmal mehr besttigt sich: New York baut auf Stahlwerk Annahtte.
432 Park Avenue, New York, USA SASSYSTEMS
Bewehrungstechnik
RS 09
-
8/10/2019 SAS Reference Projects
55/60
Reinforcing coupling system
432 Park Avenue, New York, USA SASSYSTEMS
Project:
432 Park Avenue in New York, USAroof height = 1,398 = 426 m, with a 15:1 slenderness ration
Construction Period:
2011 - 2015 (expected)
Main contractors:
General contractor Lend Lease, Structural Eng. WSP Cantor Seinuk, Architect Rafael Violi + SLCEArchitects, Concrete contractor Roger + Sons Concrete Corp.
Supplier:
SAS Stressteel
Scope of supply:
DCP rock anchors SAS835/1035 - (3) grade 150 (~70 ton) 75 mm, High strength reinforcement SAS 670from 43 - 63 mm (~2,400 ton)
Application:
432 Park Avenue at completion will be one of the tallest US-building structures with a roof height exceedingthat of both the empire state building and the New World Trade Center Tower 1. Large concentrations of re-inforcement in the structure required the use of SAS high performance systems. The structure was deemed
un-buildable without using SAS materials. The largest available rock anchor tie down the structure to bed-rock to resist uplift on the structure. The primary tower columns consists of all SAS 670 thread bars, as wellas the large boundary elements of the core shear walls were replaced with SAS 670 materials. Aiding thecontractors with the schedule cycle, all columns and shear wall elements were provided prefabricated intocage modules for rapid construction in the field. Once again New York is built with material from StahlwerkAnnahtte.
RS 09
55
-
8/10/2019 SAS Reference Projects
56/60
-
8/10/2019 SAS Reference Projects
57/60
Tunnelling & Mining
Daftha-Shis Tunnel , Dubai, UAE SASSYSTEMS
Project:Daftha-Shis Road & Tunnel in Dubai, UAE
Client:
Government of Sharjah, Directorate of Public Works
Construction period:
January 2006 - August 2010
Main contractor:
General Mechanic Company
Supplier:
VSL Middle East LLC
Scope of supply:
Portal: 400 pcs. SAS 670 thread bars 18 mm, L = 6.15 m, domed washer 30, bull nose nut 30, 1,200 pcs.lantern spacer. Tunnel: 25,000 pcs. SAS 500 thread bars 25 mm, L = 4.15 m, domed washer 30, dome nut30, resin cartridges
Application:
SAS thread bars are used as rock dowels for the portal face and as rock bolts for the inner tunnel layer. TheSAS thread bars and accessories for the portal are hot-dip galvanized. The tunnel exists of two tunnel sec-tions with a length of 1,250 km and 1,275 km. For production the rock bolts are stressed to 50 kN and thebond length of the fast set resin cartridges is 1.00 m and of the slow set resin cartridges is 3.00 m.
TM 01
57
-
8/10/2019 SAS Reference Projects
58/6058
Projekt:Kalibergwerk in Werra-Unterbreizbach, Deutschland. In der weltgrten Mine fr Kali und Magnesiumwerden auf einer Untertage-Flchenausdehnung von ca. 300 km aus einer Tiefe von bis zu 800 m jhrlichca. 20.000.000 to gefrdert. Das abgebaute Material wird zu Spezial- und Standarddnger sowie zu Pflan-zenschutz- und Salzprodukten weiter verarbeitet.
Auftraggeber:
K+S Kali GmbH, Kassel, Deutschland
Lieferzeitraum:
seit 1997
Systemlieferant:
Windgassen GmbH & Co. KG, Kln, Deutschland
Lieferumfang:
Jhrlich wird eine Gesamtmenge von 450.000 Stk. Gewindestben mit einem Gesamtgewicht von 850 tofr das Spreizdbel-Anker-System geliefert. SAS 450/700 Gewindestbe mit 16 mm mit Lngen von 1200und 1450 mm gewhrleisten eine Strecklast von 93 kN und eine Bruchlast von 145 kN.
Anwendung:
SAS 450/700 Gewindestbe sind aus naturharten und hochduktilen Stahlqualitten gefertigt, um das ge-forderte Arbeitsvermgen und die fr die Anwendung im Bergbau besonderen Kriterien und Anforderungenbasierend auf nationalen und internationalen Normen zu erfllen. Aufgrund dieser Eigenschaften, kom-biniert mit einer einfachen und schnellen Einbaumethode, sind die SAS Gewindestbe perfekt geeignet zurStabilisierung des Hohlraumes von Kalibergwerken.
Kalibergwerk, Werra-Unterbreizbach, Deutschland SASSYSTEMS
Tunnelbau & Bergbau
TM 02
-
8/10/2019 SAS Reference Projects
59/60
Tunnelling & Mining
Potash-mine, Werra-Unterbreizbach, Germany SASSYSTEMS
Project:Potash-mine in Werra-Unterbreizbach, Germany. The world`s greatest mining for potash and magnesiumwith a subsurface superficial area of approximately 300 km with a yearly output of about 20,000,000 tons ina maximum depth of 800 m. The exhausted material will be further processed to special andstandard fertilizer as well as to plant care and salt products.
Client:
K+S Kali GmbH, Kassel, Germany
Construction period:
since 1997
Distributor:
Windgassen GmbH & Co. KG, Cologne, Germany
Scope of supply:
SAH supplies yearly an amount of 450,000 pcs. of thread bars with a total weight of 850 tons for the expan-sion shell anchorage system. SAS 450/700 thread bars 16 mm, L = 1200 and 1450 mm ensure a yield loadof 93 kN and an ultimate load of 145 kN.
Application:
The SAS 450/700 thread bars for mining applications have to fulfil special criteria and requirements for min-ing applications given by national and international standards. Therefore, SAS thread bars have to be madeof natural hard and high-ductile steel qualities due to the required working capacity. Concerning to thoseproperties together with an easy and fast installation-procedure SAS thread bars are perfect to use for anexpansion shell anchorage system to stabilize and secure the excavations of the potash-mine.
TM 02
59
-
8/10/2019 SAS Reference Projects
60/60
Streckgrenze / Zugfestigkeit
yield stress / ultimate stress
Anwendungsbereiche
areas of application
Nenn-
nom.-
Strecklast
yield load
Bruchlast
ultimate load
Flche
cross section area
Gewicht
weight
Dehnung
elongation
[mm] [kN] [kN] [mm2] [m/to] [kg/m] Agt
[%] A10
[%]
SAS 500 / 550 - grade 75
12 57 62 113 1123,6 0,89
Bewehrungstechnik /reinforcing systems
14 77 85 154 826,4 1,21
6 10
16 100 110 201 632,9 1,5820 160 175 314 404,9 2,47
25 245 270 491 259,7 3,85
Geotechnik /geotechnical systems
28 310 340 616 207,0 4,83
32 405 440 804 158,5 6,31
40 630 690 1260 101,3 9,87
50 980 1080 1960 64,9 15,40
SAS 555 / 700 - grade 80 63,5 1760 2215 3167 40,2 24,86 5
Alternativ SAS 550 /620 erhltlich / alternative SAS 550 / 620 grade 75 available
SAS 450 / 700 - grade 60
Bergbau / mining16 93 145 207 617,3 1,62 (A
5) 15
25 220 345 491 259,7 3,85 (A5) 20
SAS 650 / 800 - grade 90
Bergbau / mining
22 247 304 380 335,6 2,98
(A5) 18
25 319 393 491 259,7 3,85
28 400 493 616 207,0 4,83
30 460 565 707 180,2 5,55
SAS 670 / 800 - grade 97
18 170 204 254 500,0 2,00
Geotechnik /geotechnical systems
22 255 304 380 335,6 2,98
25 329 383 491 259,7 3,85
28 413 493 616 207,0 4,83
Ankertechnik / tunneling & mining
30 474 565 707 180,2 5,55 5 10
35 645 770 962 132,5 7,55
43 973 1162 1452 87,7 11,40
50 1315 1570 1963 64,9 15,40
Hochfeste Bewehrung / reinforcing
coupling system
57,5 1740 2077 2597 49,1 20,3863,5 2122 2534 3167 40,2 24,86
75 2960 3535 4418 28,8 34,68
SAS 950 / 1050 - grade 150
Spanntechnik /post-tensioning
systems
Geotechnik /geotechnical systems
18 230 255 241 510,2 1,96
5 7
26,5 525 580 551 223,2 4,48
32 760 845 804 153,1 6,53
36 960 1070 1020 120,9 8,27
40 1190 1320 1257 97,9 10,21
47 1650 1820 1735 70,9 14,10
SAS 835 / 1035 - grade 150
Spanntechnik /post-tensioning
systems
57 2155 2671 2581 47,7 20,95
4 765 2780 3447 3331 36,9 27,1075 3690 4572 4418 27,9 35,90
SAS 900 / 1100 FA - grade 160 FA schweibar / weldable
Schalungstechnik / formwork ties
15 159 195 177 694,4 1,443 7
20 283 345 314 390,6 2,56
26,5 495 606 551 223,2 4,48 2 7
SAS 900 / 1050 FC - grade 150 FC
Schalungstechnik / formwork ties15 159 186 177 694,4 1,44
3 7
SAS Gewindestbe/ SAS thread bars SAS SYSTEMS
new