Sarah HartmanFossil Hydro OperationsEngineering Co-op ProgramDecember 2015
About Me■ University of Cincinnati
– Chemical Engineering
– Expected Graduation, May 2017
■ 4th Session with Duke Energy
Gibson Technical Team– Manager, Clint Fuhs
– Mentors, Sarah Hamman and
Josh Estep
2
Previous Co-ops■ 1st and 2nd Sessions – Air Emissions Management
– Midwest Emissions Compliance Monthly Call Report
■ 3rd Session – Water / Waste– EPA Regulations and Permits
3
Co-op Development Opportunities
■ United Way Day of Caring Helped paint parking spots and buildings, along with Jana Jochim (pictured) and Mike Hobson.
■ Attended:― Reverse Osmosis Seminar― Confined Space Training,
Entrant and Air Monitor― Enable training, New item
request/change
4
Overview & Rotation Responsibilities■ Presentation Overview:
– Ammonia Vapor Equalization Header
– Equipment Inspections
■ Rotation Responsibilities:– Participating in Daily Pre-Job Briefs
– Ordering Materials for the Header Project
– Creating Purge & Repair Plans
5
Ammonia Vapor Equalization Header Project
■ Business Case: The current tank equalization header has a drop leg in the lines, where liquid can get trapped and build up pressure. The replacement line has the header spanning overtop the tanks, which will provide better equalization and safer operation.
■ Project Scope: Participating in daily pre-job briefs, ordering materials, and creating Purge & Repair plans.
■ Lessons Learned: Being Flexible
Communication
Decision Making Process
LOTO Requirements
Enterprise Asset Management (EAM) system
6
Ammonia Vapor Equalization Header Project
7
PSM – Process Safety Management. An OSHA program designed to promote safe use and storage of Highly Hazardous Chemicals.
Current Design New Design
Ammonia Vapor Eq. Header ProjectDaily Pre-Job Briefs
■ For each pre-job I would introduce a daily PSM / safety topic, as well as any new information on the project.
8
Example of information for morning meetings
Ammonia Vapor Eq. Header ProjectPurge and Repair Plans
■ Header is to be implemented in 3 Stages, – Stage 1 – Spade Flange (pancake) on each tank where header attaches.
– Stage 2 – Put a high-point vent on 2A and 2B Tank Truck unloading lines.
– Stage 3 – Tie Header into system.
9
Ammonia Vapor Eq. Header ProjectPurge and Repair Plans
■ Driving Safety through Procedures:
10
Driving Safety through Procedures
Stage 1 P&IDs
Stage 1 Pancakes
Before After
Pancake Handle
Stage 2 P&IDs
Stage 3 P&IDs
Ammonia Vapor Eq. Header ProjectChallenges
■ Coordinating Materials ■ Constantly evolving Plans
16
Equipment Inspections
17
■ SCR Absorber■ FGD Surge Tank■ Boiler Penthouse■ Condenser & Water Box – Mapped Tube Plugs■ DC Heater, Induct Heat Exchanger (Not Inspections)
Surge Tank Boiler Penthouse
Looking Ahead
Next Work Rotation■ My next work rotation will by my 5th and final co-op before
graduation.■ I will be working at the Cincinnati Office with Ashley Norton in the
Water Cycle Chemistry Group.
18
Questions?