SAP Innovation Summer Camp Come with a Curiosity Leave with a Plan July 12 - 13, 2012 | SAP Americas HQ www.sap.com/sapsummercamp

Transcript of SAP Innovation Summer Camp Come with a Curiosity –...

SAP Innovation Summer Camp

Come with a Curiosity – Leave with a Plan

July 12 - 13, 2012 | SAP Americas HQ

www.sap.com/sapsummercamp

© 2012 SAP AG. All rights reserved. 2

Disclaimer

This presentation outlines our general product direction and should not be relied on

in making a purchase decision. This presentation is not subject to your license

agreement or any other agreement with SAP. SAP has no obligation to pursue any

course of business outlined in this presentation or to develop or release any

functionality mentioned in this presentation. This presentation and SAP's strategy

and possible future developments are subject to change and may be changed by

SAP at any time for any reason without notice. This document is provided without a

warranty of any kind, either express or implied, including but not limited to, the

implied warranties of merchantability, fitness for a particular purpose, or non-

infringement. SAP assumes no responsibility for errors or omissions in this

document, except if such damages were caused by SAP intentionally or grossly

negligent.

Infrastructure Track Migration to HANA Part 1 – Active Global Support Migration Methodology Overview

© 2012 SAP AG. All rights reserved. 4

Agenda

Migration to HANA Part 1 – Active Global Support Migration Methodology

Overview

Motivation and Scope

Methodology

Delivery Model

Conclusion

Motivation and Scope

© 2012 SAP AG. All rights reserved. 6

Migration to SAP HANA A Great Opportunity!

The opportunity

Run Better – Run your Best-Run Business on

the SAP InMemory computing platform

New levels of performance and throughput

Completely new business scenarios possible

Unified and seamlessly integrated application

and database stack

Simplified maintenance

Effective end-to-end operations support

Reduced TCO

© 2012 SAP AG. All rights reserved. 7

Migration to SAP HANA And a Challenge?

The related questions

Will the new platform fulfill the high

performance and throughput requirements?

How can High-Availability and Disaster

Recovery be ensured?

Will the SAP database seamlessly fit into the

existing infrastructure?

What does it mean for the operations team?

How can downtimes be managed?

What is the overall project duration, what are

related efforts?

What are the risks?

© 2012 SAP AG. All rights reserved. 8

Migration to SAP HANA The Offering 1/2

Holistic offering via SAP MaxAttention

and SAP Active Embedded Support

SAP offers comprehensive support for

migrations to SAP HANA holistically

covering all phases and aspects of such a

project

Address the related challenges proactively

Apply best practices and experiences from

supporting the top companies

Make a migration project safe, effective and

predictable

© 2012 SAP AG. All rights reserved. 9

…delivered as a flexible package consisting of

The methodology implemented in SAP Solution Manager

This is the backbone of each migration!

All involved roles – SAP TQM, consultants, customer experts, partners – leverage

this methodology

Consistent approach and quality across all involved parties

Best Practices templates and guidelines for each of the tasks

Onsite services

Remote offerings: Expert Guided Implementations, remote service deliveries,….

Enablement: Guided procedures, trainings, remote expert sessions,….

Migration to SAP HANA The Offering 2/2

Methodology

© 2012 SAP AG. All rights reserved. 11

Migration to SAP HANA Holistic Approach Based on Proven Best Practices

One end-to-end methodology – implemented in SAP Solution Manager

Migration Tasks Architecture

Infrastructure

Operational

Readiness

Performance

Scalability

Project

Management

Project Management

Define, drive and control milestones and Q-gates

Architecture & Infrastructure

Define the infrastructure and landscape architecture to

fulfill requirements of the migration as well as the

operation after GoLive

Migration Tasks

Ensure that migration tasks are executed along a

proven plan and approach and based on best practices

for procedures and configurations

Performance & Scalability

Ensure performance, throughput, scalability, availability.

Define the technical architecture and infrastructure

Operational Readiness

Ensure that procedures, tools and skills are adequate

to run the new solution safely and efficiently

© 2012 SAP AG. All rights reserved. 12

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA The Foundation: Roadmap in SAP Solution Manager – Overview

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 13

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA- Concept and Project Setup Migration Planning Workshop

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 14

Concept & Project Setup Creation of the Migration Master Plan

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Migration Master Plan

Migration Master

Plan Definition

Customer-specific

Roadmap-guided

Supported by

MaxAttention and

ActiveEmbedded

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

Holistic definition of the migration project

Identify important boundary conditions and dependencies

Target landscape definition

Technical architecture definition

System readiness check

Definition of migration approach (downtime-minimized or...)

Overall transition roadmap – high-level project plan

Definition of the AGS engagement – service plan

© 2012 SAP AG. All rights reserved. 15

Deliverable 1: Target solution landscape definition

(production)

1. Which software components are installed and shall be

retained, which components are obsolete (e.g. BWA)?

2. Which additional main software components are

required?

o SLT

o AS ABAP and Java stacks

o Standalone database servers

3. How can planned landscape changes be integrated?

o System splits due to functional or organizational changes

(e.g. separate HR system, regional instead of global

systems, …)

o Consolidation of systems (e.g consolidation of multiple

BW systems , reintegration of LoB systems into central

system, …)

o Systems to be decommissioned

Concept & Project Setup Migration Master Plan: Deliverable 1: Target Solution Landscape Definition

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 16

Concept & Project Setup Migration Master Plan: Deliverable 2: System Readiness for Migration

Deliverable 2: System readiness for migration

Performance / Scalability

1. Are there top consumers or business critical

applications which require optimization prior migration

(e.g. to mitigate non-scalabilities or to reach SLAs)?

2. Is it required to verify in detail the performance of

custom applications as part of the migration project?

3. What should be the focus of single user and load tests

within the migration project?

Data volume

1. For which systems is data archiving or data deletion

advisable prior migrating the databases?

2. What is the status of DVM strategy after migration?

Dependencies

1. For which system is an SP, EhP or release upgrade

required to meet the installation prerequisites?

2. For which systems is a Unicode conversion required?

3. What is the required software component

release to enable further desired

business functionality?

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 17

Concept & Project Setup Migration Master Plan: Deliverable 3: Definition of Migration Approach

Deliverable 3: Definition of migration approach

1. What technical migration approaches are feasible?

o What’s the estimated downtime objective?

o What’s the required (interim) system landscape?

o What’s the estimated effort?

2. Which migration approach fits to the system downtime

requirements from business?

3. What testing is required for the migration approach?

4. What changes to the transport landscape are

required?

5. What prerequisites are missing to implement the

chosen migration approaches?

Decision on the migration approach (based on a

cost-benefits evaluation)

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 18

Deliverable 4: Technical architecture definition

Server and storage architecture

1. Should the current hardware / OS platform be retained and what’s their

purpose?

2. What updates are required to the existing OS?

3. What will be the scalability approach for the database server (e.g.

single high-scale vs. scale-out via multiple blades)?

4. What additional hardware is required and what could be their OS?

5. What changes to the current storage system / layout are required to

support the migration process and the final database?

6. How to integrate database backups into the storage infrastructure and

management software?

Virtualization concept

1. What virtualization method is appropriate for the future database

application, server hardware and OS? How are the other SW

components integrated?

2. What will be the mapping of virtual servers to the planned hardware

and the related mapping of technical components to new virtual

servers?

HA / DR concept

1. Can SAP HANA be integrated into an existing

HA/DR setup and what’s the architecture?

2. What HA/DR setup is advisable with respect to

SLAs?

Concept & Project Setup Migration Master Plan: Deliverable 4: Technical Architecture Definition

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 19

Concept & Project Setup Migration Master Plan: Deliverable 5: Overall Transition Roadmap

Deliverable 5: Overall transition roadmap

1. What is the proposed sequencing of systems?

This is based on:

o System criticality

o Dependencies between systems

o Technical objectives (expected performance gain, cost

reduction)

o Business benefits (new functionality with HANA)

o Migration approach and related effort

o Hardware capacity

o End-of-life of software or hardware

2. How can the system migrations be mapped to the

customer’s release and maintenance calendar?

3. What non-production landscape is required (additional

sandbox, test or replication systems)?

4. What custom / legacy applications require

adjustments?

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 20

Concept & Project Setup Developing the Plan

Migration Master Plan

© 2012 SAP AG. All rights reserved. 21

Concept & Project Setup Migration Master Plan: Deliverable 6: Role / Tasks of AGS Engagement

Deliverable 6: Definition of role / tasks of AGS

engagement

1. Definition of the role of the TQM as “co-project lead”

for the migration project

2. Who will be in charge of doing the technical

migration?

3. What kind of services and service delivery model

(remote, onsite) will be required?

4. When is the planned project start?

5. When is the service delivery expected (draft

schedule)?

MaxAttention Engagement/Service plan

Business objectives

Functional objectives

Technical objectives (performance, cost)

Downtime

Release- and rollout schedule

Prerequisites and dependencies

Release upgrades

Unicode conversions

SP / EHP upgrade

SAP system dependencies

Landscape objectives

Landscape inventory and objectives

Define SAP systems for migration

System priority & transition

SLA requirements

Infrastructure objectives

OS / Virtualization platform change

HW platform change

© 2012 SAP AG. All rights reserved. 22

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA Concept and Project Setup – Definition of Technical Details

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 23

Migration Master Plan

Hardware Decision

Sizing Result

Concept & Project Setup Definition of Technical Details

Step 2: Definition of detailed concepts

Detailed migration method definition

Which migration approach will be used for each system (group) –

based on a decision of costs / effort vs. downtime feasibility – agreed

with business?

What’s the effort and time estimation per system to be migrated

(based on the migration approach and required preparation tasks)?

Define the system migration sequence?

Detailed target landscape definition

What landscape is required for production, non-production and

temporary systems used in the migration project?

What is the technical configuration of target software components (e.g.

application servers, database)?

Detailed technical infrastructure definition

What is the detailed server and storage configuration?

What is the future Virtualization concept, how are the SAP

components embedded?

What is the detailed target HA/DR concept?

What is the backup strategy (tools, device, scheduling)?

© 2012 SAP AG. All rights reserved. 24

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA Blueprint and Realization Phase

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 25

Blueprint Developing the Detailed Migration Plans

Migration Master Plan

Detailed Migration Plans

© 2012 SAP AG. All rights reserved. 26

Realization Migration Realization

Flexibility for roles and responsibilities in the realization

For the realization of the migration steps (set up of systems, test migrations, testing...)

different possibilities are foreseen – in order to be able to flexibly react on the concrete

customer situation

Realization tasks are done by the customer (or outsourcing partner)

Involvement of implementation partners or SAP consulting

Factory approach – remote execution of the majority of steps by SAP

RDS package (see next slide)

© 2012 SAP AG. All rights reserved. 27

Predefined Installation of SAP

HANA

BW Authorization Migration

BW Data Volume Optimization

BW Functional Upgrade

BW Technical Upgrade

Unicode Conversion

BW OS/DB Migration to HANA

RDS Services Package

(RDS V1.1)

RDS Configuration

Project plan

Efforts

Economical estimate

Deliverables

Delivery model

Resources

Realization Possible Approach for Realization of Migration Tasks: RDS Services Package

Small

Medium

Large

X-Large

Results of Migration Planning Workshop

BW version

# of objects

Size of the database

Unicode readiness

Authorizations readiness

Data flows readiness

Level of customization

# of SAP and non-SAP data sources

Configuration of the Java stack

Based on the results of the HANA Migration Planning Workshop the customer relevant services are determined and scoped, in order to provide an appropriate RDS Services Package. Depending on the specific services needed the RDS Services Package will be defined.

© 2012 SAP AG. All rights reserved. 28

Consistent Quality Management across all involved parties

Independent of who executes the various upgrade and migration steps, SAP MaxAttention

and SAP ActiveEmbedded Support provides Quality Management leveraging the proven

Safeguarding Methodology – extended with the specifics of SAP HANA

Realization E2E Quality Management

Based on the experience from supporting hundreds of Upgrades and Migrations in all

industries, SAP Active Global Support has developed a set of Quality Gates and related

KPIs and checks to ensure that the solution after the migration fulfills all aspects required for

a mission-critical usage, like

• Performance and scalability

• Continuous availability

• Data consistency

• Safety of operations

Basis for delivery is the SAP Solution Manager.

© 2012 SAP AG. All rights reserved. 29

Realization Milestones and Q-Gates for Migration Realization and Beyond

Plan Build Run

Quality

Gates

Planning

Complete

End of

Project

Testing

Complete

Production

Migration

Dress

Rehearsal

Dev. System

Migration

Sandbox

Migration(s)

Quality System

Migration

Start of Project

Migration

Phases Concept &

Preparation Blueprint Realization

Post

Go-Live

Downtime

Estimated

Scope

Defined High-Level

Plan and

Architecture

Sign-Off

E2E Quality Management by SAP MaxAttention and SAP ActiveEmbedded Support

Milestone and Q-Gate

Other Milestone or Key Step

Legend

© 2012 SAP AG. All rights reserved. 30

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA Performance and Scalability

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 31

Performance and Scalability Work Stream across all Project Phases

Establish performance

baseline

Workload analysis

Overall resource consumption

What are the top consumers

What are the current end-to-end

response times for users?

What is the current duration for

business-critical background

jobs?

During migration

Tune the system for the new DB

single user monitoring / load testing

Post Go-Live

Re-establish performance baseline

Define Guiding principles

Non-regression for end users

and business processes

© 2012 SAP AG. All rights reserved. 32

Performance and Scalability (1) Concept & Project Setup – Establish a Baseline

Resourc

e c

onsum

ptio

n

baselin

e

Establish workload profile

Overall physical resource

consumption

Load balancing

System health check

Focus for measurements

and optimizations in the

Realization Phase

and

for post GoLive support

Document top consumers

Check if they scale

Prioritize key transactions

Script key transactions

Overall response time and

break-down

Benchmarks for migration

optimization

Work

load c

onsum

ers

E

nd u

ser

Experie

nce

Monitr

© 2012 SAP AG. All rights reserved. 33

Performance and Scalability (2) Realization - Single User Optimization & Tests

Sin

gle

user

measure

ment End user Experience Monitor.

Overall response time and break-

down

Benchmarks for migration

optimization

Proactive optimization

Single user optimization

Quick turnaround of optimization

Reproducible through scripting

Multiple iterations

Load testing

Verification of single user

optimizations

Checking system behavior

under load Performance analysis & optimiz.

Search with index

Optimal buffering

Parallel processing

Scalability measurements

Variations with number and size

of objects

Linearity of CPU & DB time

Sin

gle

user

measure

ments

Sin

gle

user

measure

ments

Verification through load tests

Multiple users, response time

under load

Number of parallel batch jobs Lo

ad

te

st

© 2012 SAP AG. All rights reserved. 34

Performance and Scalability – Post GoLive (3) Ensure a Seamless Transition into Proactive Performance/Capacity Mgmt.

Resourc

e c

onsum

ptio

n

baselin

e

Establish workload profile

Overall physical resource

consumption

Load balancing

System health check

Post Go-Live activities

Establish workload profile

Is it overall similar to before? If not,

are the differences as expected?

Monitor end user experience

Is it overall similar to before? If not,

are the differences as expected?

E.g., in reporting

Monitor resource consumption of

top consumers

Do they show the same behavior?

Perform regular system health

checks

Data volume management

Load balancing

Buffer settings

Document top consumers

Check if they scale

Prioritize key transactions

Script key transactions

Overall response time and

break-down

Benchmarks for migration

optimization

Work

loa

d

co

nsu

mers

E

nd u

ser

response

tim

e m

onitoring

Concept &

Preparation

Migration

Realization Post Go-Live

Migration

Blueprint

Establish the new baseline

© 2012 SAP AG. All rights reserved. 35

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Migration to SAP HANA Operational Readiness

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Pro

ductio

n c

ut-

over

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Performance Baseline - KPI

Sizing

Source Scalability check

© 2012 SAP AG. All rights reserved. 36

Operational Readiness Concept & Project Setup - From Current to Future Concept

Guiding principles

Create an operational “inventory” of the DB environment

The inventory covers

– Roles, responsibilities and skills of the DBA team

– Current tools in use for managing the SAP DB’s (e.g., native DB administration tools, tools for running

backups…)

– Current procedures for DB operations (daily and ad-hoc, monitoring and administration), but also

project work

(e.g., DB copy procedures)

Current and To-Be state determine the transfer roadmap

DB Tools

DB Procedures

People DB

Tools

DB Procedures

People

AS

-IS

TO

-BE

© 2012 SAP AG. All rights reserved. 37

DB security

Administration

Procedures

Administration

Tools

Monitoring

Backup /

Restore

Responsibilities

Skills DB scripts

• Review of OS / DB related security settings

including DB infrastructure security

according to company security guidelines

• Adaption of customer s

pecific DB

maintenance

scripts

• Native DB

expert tools

Operational Readiness Concept & Project Setup - Influencing Factors

• Adaption of daily and

ad-hoc administration

routines

• Review of backup & restore

procedures according to business SLAs

• New DB monitoring

and troubleshooting

procedures; Integration

into central alerting

• Additional /

different tasks

• New DB administration

knowledge required

DB Tools

DB Procedures

People

© 2012 SAP AG. All rights reserved. 38

Operational Readiness for BW on HANA Typical Approach

Approach

For achieving operational readiness, the following sequence of steps is recommended:

(1) Conduct an “Inventory/Planning” workshop “HANA Administration Workshop”

This Workshop comprises the following elements

a) Inventory of the current operations skills and practices

b) Knowledge transfer about HANA operations (principles, tools, best practices)

c) Joint definition of a customer-specific operations concept

(2) Define and agree a plan for up-skilling as well as for implementing new tools and

procedures

(3) Execute the plan (leveraging the MaxAttention/ActiveEmbedded Support team)

Delivery Model

© 2012 SAP AG. All rights reserved. 40

The delivery model and the division of work can be defined in a flexible way

tailored to the concrete customer situation (partners, division of work, priorities in

the project,….)

Migration to SAP HANA Flexible Delivery Model

The SAP offering is delivered as a flexible package consisting of

The methodology implemented in SAP Solution Manager

This is the backbone of each migration!

All involved roles – SAP TQM, consultants, customer experts, partners leverage this methodology

Consistent approach and quality across all involved parties

Best Practices templates and guidelines for each of the tasks

Onsite services

Remote offerings: Expert Guided Implementations, remote service deliveries,….

Enablement: Guided procedures, trainings, remote expert sessions,….

Based on an initial scoping, the TQM together with a customer project lead will

define which of the existing delivery modes are most appropriate for each task area

© 2012 SAP AG. All rights reserved. 41

Delivery Model Delivery Backbone: Roadmap in SAP Solution Manager

Solution Manager Roadmap for Migrations to SAP

databases

What is in the box?

Migration tasks for all work areas of the migration project

Project management tasks for the TQM

Quality Gate definitions

Task-related detailed information (“accelerators”)

– Checklists, questionnaires supporting the execution of the different

tasks

– Templates for different topics in the project

– Best practice documents (performance, ...) and whitepapers

– Explanation of appropriate services per phase and task area

– Knowledge transfer elements

– FAQs

– Reference to further relevant information including the following

o SAP Notes (e.g. latest information about product options, installation

requirements, …)

o SAP Guides (e.g. installation, security, ...)

© 2012 SAP AG. All rights reserved. 42

Involved Parties and Distribution of Task Areas High-Level View on Roles and Responsibilities

Tasks Customer Implementation

Partner

SAP Consulting SAP AGS

MaxAttention

Project Management R A

Architecture, steering of concept and

execution

A, R R

Quality Assurance overall A R R

(Driven by TQM)

Test Planning and Execution

(Regression, Interface, Performance, …)

R A, R

Infrastructure Design and Build A, R R (for design)

Technical design of the solution A, R R

System provisioning A, R

Technical migration execution

(migrations, upgrades,….)

A, R Execution of

defined task areas

Performance and Scalability of the new

solution

R R A, R

Business application adoption

(custom application adjustment,….)

A, R Execution of

defined task areas

Operations (Preparation and Execution) A, R R (best practices, up-

skilling)

© 2012 SAP AG. All rights reserved. 43

This TQM has technical background in the area of databases, upgrade and technology/infrastructure in

order to be able to functionally lead the project tasks that are delivered by SAP Active Global Support as

well as to manage the Q-Gates

Delivery Model – New Role Technical Quality Manager (TQM) for Database Migration

New role:

Technical Quality Manager for Engineering Service “Database Migration”

Leads all activities delivered by SAP MaxAttention/Active Embedded Support

Leads these activities as a project, guiding and leading scope definition and execution

Involves experts onsite or in the back-office – as required

Executes some of these tasks

Ensures consistent work streams (instead of single services)

Leads the QA tasks according to the Safeguarding approach

Manages defined Q-Gates

Leads / executes post-GoLive tasks

Manages all activities in the post-GoLive phase

© 2012 SAP AG. All rights reserved. 44

Project Manager

Manager of the project execution

• Owns the detailed project plan

• Incrementally refines all tasks

• Determines dependencies

between detailed tasks and

defines the execution sequence

• Estimates and measures effort

and duration of tasks

• Manages resources,

assigns them to tasks

• Integrates customer

specific project

management

methodology for project

execution & control

Technical Quality Manager

Quality manager for the migration project

• Defines content and schedule of quality gates in

cooperation with the project manager

• Responsible for quality assurance in the quality

gates

• Ensures overall completeness of migration

approach, (all work areas are reflected in the

project plan)

Delivery Model – Technical Quality Manager TQM vs. Project Manager

• Prepares AGS services and

provides information in the

Solution Manager

• Ensures complete,

comprehensible status

information in the Solution

Manager project

• Schedules and coordinates

services and onsite and

remote activities by AGS

© 2012 SAP AG. All rights reserved. 45

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Delivery Model – New Services from SAP AGS Mapping of the Main New Services to the Roadmap

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Project definition

Blueprint

Q – Gate Def.

Detailed Migration plan

Detailed test planning

Realization

Q-Gate management / issue tracking

Infrastructure setup & configuration

Verification

Post

Go-Live

Operations handover

Project tracking

Test scope determination

Issue tracking

Sandbox Migrations Detailed Migration Method definition

Issue tracking

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

Serv

ice

1 –

Mig

ration

Pla

nnin

g

Work

shop

Optional: Landscape architecture planning

Service 2a – Performance baseline

Service 3 – Post

GoLive

Service 4a – Operational readiness

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Performance Baseline - KPI

Sizing

Source Scalability check

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Technical architecture options of DB’s

Performance

Monitoring

Performance

Optimization

Hyper care /

Optimization

Pro

ductio

n c

ut-

over

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

TIC for Migration

Serv

ice

5 –

GoLiv

e S

upport

Service 2b – Performance optimization

Serv. bundle 4b : Operational readiness

Operations procedures

Tool implementation

Trainings

SLA verification

Performance Verification & Optimization

No execution of the migration tasks,

just the safeguarding of the project.

© 2012 SAP AG. All rights reserved. 46

Arc

hit

ectu

re

Infr

astr

uctu

re

Op

era

tio

nal

Read

iness

Perf

orm

an

ce

Scala

bilit

y

Delivery Model – Execution of Migration/Upgrade Steps Flexibility for Involving Partners and SAP Consulting

Pro

ject

Mg

mt.

Concept &

Project Setup

Mig

rati

on

&

Test

Detailed target SAP landscape definition

Detailed technical infrastructure definition

Blueprint

Q – Gate Def.

Realization

Q-Gate management / issue tracking

Performance Verification & Optimization

Operations procedures

Post

Go-Live

Tool implementation

Trainings

SLA verification

Performance

Monitoring

Performance

Optimization

Operations handover

Test scope determination

Issue tracking

Mig

ration m

aste

r pla

n d

efinitio

n

mig

ration s

cope,

arc

hitectu

re a

nd t

echnic

al in

frastr

uctu

re

Detailed Migration Method definition

Issue tracking

Hyper care /

Optimization

Inventory

Procedures

Tools

Roles & Skills

Definition of future concept

Operations procedures

Tool roadmap

Roles & Skills, training plan

Technical architecture options of DB’s

Performance Baseline - KPI

Sizing

Source Scalability check

Pro

ductio

n c

ut-

over

Project definition

Project tracking

Infrastructure setup & configuration

Verification

Detailed Migration plan

Detailed test planning

Sandbox Migrations

Cut-over rehearsal

Functional regressions

Performance, HA, Sec. tests

Migration of non-prod systems

Migration tests

The tasks of executing migration and upgrade steps often is outtasked

to an implementation partner. The presented methodology is flexible to

include such work models.

If required, these tasks also can be taken over by SAP, e.g. using the

RDS service offering or a remote execution in a “factory approach”.

Conclusion

© 2012 SAP AG. All rights reserved. 48

Migration to SAP HANA Conclusion

This offering

delivered via the

SAP MaxAttention

and

SAP ActiveEmbedded

support

engagement model

means …

… holistically addressing all aspects of a migration project

combining best practices and methodologies of the involved

topics into one end-to-end methodology

… leveraging experiences from many years of working with

companies in all industries and providing them in a

consistently consumable way via SAP Solution Manager

… providing different delivery options – ranging from

provisioning of best practices to remote enabling to onsite

services – creating flexibility to define a project in a customer-

specific way

… laying the foundation to ensure a consistent quality of

migration projects independent of which company or partner

executes the tasks

… builds confidence that a migration to one of the SAP

Database platforms is safe and predictable

… provides a strong value proposition for AGS support

offerings

© 2012 SAP AG. All rights reserved. 49

Migration to SAP HANA – Availability Methodology and Services for MaxAttention and ActiveEmbedded Support

This offering is available NOW

Roadmap and Best Practices in SAP Solution

Manager

First version available with Solution

Manager content SP33

Complete version available with SP34

Accompanying Engineering Services are

integrated into the SAP MaxAttention and

SAP ActiveEmbedded Support engagement

model