SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS
P R E P A R E D B Y :
AlamedaCountyCommunityDevelopmentAgency224W.WintonAvenue,Room111Hayward,CA94544Contact:AndrewYoung510.670.5400
W I T H T E C H N I C A L A S S I S T A N C E F R O M :
ICF630KStreet,Suite400Sacramento,CA95814Contact:BradSchafer916.737.3000
September2018
![Page 2: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/2.jpg)
AlamedaCountyCommunityDevelopmentDepartment.2018.SandHillWindRepoweringProjectEnvironmentalAnalysis.September.(ICF00631.17.)Hayward,CA.WithtechnicalassistancefromICF,Sacramento,CA.
![Page 3: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/3.jpg)
Sand Hill Wind Repowering Project Environmental Analysis
i September 2018
ICF 00631.17
Contents
List of Tables and Figures ...................................................................................................................... iii
List of Acronyms and Abbreviations ...................................................................................................... iv
Chapter 1 Introduction ............................................................................................................. 1‐1
1.1 Project Overview .............................................................................................................. 1‐1
1.2 Relationship to the PEIR ................................................................................................... 1‐1
1.3 Changes Relevant to the PEIR Analysis ............................................................................ 1‐2
1.4 Organization of this Document ........................................................................................ 1‐6
1.5 References Cited .............................................................................................................. 1‐6
Chapter 2 Project Description ................................................................................................... 2‐1
2.1 Project Location and Land Ownership ............................................................................. 2‐1
2.2 Project Need, Goals, and Objectives ................................................................................ 2‐2
2.3 Existing Facilities .............................................................................................................. 2‐2
2.4 Proposed Project Features ............................................................................................... 2‐3
2.5 Project Construction ...................................................................................................... 2‐10
2.6 Operation and Maintenance Activities .......................................................................... 2‐17
2.7 Post‐Project Decommissioning ...................................................................................... 2‐18
Chapter 3 Environmental Analysis ............................................................................................ 3‐1
3.1 Aesthetics and Visual Resources ................................................................................... 3.1‐1
3.2 Agricultural and Forestry Resources ............................................................................. 3.2‐1
3.3 Air Quality ..................................................................................................................... 3.3‐1
3.4 Biological Resources ..................................................................................................... 3.4‐1
3.5 Cultural Resources ........................................................................................................ 3.5‐1
3.6 Geology, Soils, Mineral Resources, and Paleontological Resources ............................. 3.6‐1
3.7 Greenhouse Gas Emissions ........................................................................................... 3.7‐1
3.8 Hazards and Hazardous Materials ................................................................................ 3.8‐1
3.9 Hydrology and Water Quality ....................................................................................... 3.9‐1
3.10 Land Use and Planning ................................................................................................ 3.10‐1
3.11 Noise ........................................................................................................................... 3.11‐1
3.12 Population and Housing .............................................................................................. 3.12‐1
3.13 Public Services ............................................................................................................. 3.13‐1
3.14 Recreation ................................................................................................................... 3.14‐1
3.15 Transportation/Traffic ................................................................................................ 3.15‐1
3.16 Utilities and Service Systems ...................................................................................... 3.16‐1
Chapter 4 List of Preparers ....................................................................................................... 4‐1
![Page 4: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/4.jpg)
Sand Hill Wind Repowering Project Environmental Analysis
ii September 2018
ICF 00631.17
Appendix A Air Quality Technical Memorandum
Appendix B Biological Resources Evaluation Report
Appendix C Cultural Resources Survey Report
Appendix D Sound Technical Report
![Page 5: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/5.jpg)
Sand Hill Wind Repowering Project Environmental Analysis
iii September 2018
ICF 00631.17
Tables and Figures
Table
1‐1 Turbine Specifications Contemplated in the PEIR and for Use with the Proposed Project .......... 1‐3
1‐2 Operational, Approved, or Foreseeable Projects in the APWRA .................................................. 1‐5
2‐1 Parcels and Proposed Uses ........................................................................................................... 2‐1
2‐2 Turbine Specifications ................................................................................................................... 2‐4
2‐3 Updated Alameda County Turbine Setback Requirements .......................................................... 2‐4
2‐4 Estimated Disturbance Associated with Project Construction (acres) ....................................... 2‐11
3.4‐1 Approximate Acreage of Land Cover Types ............................................................................... 3.4‐1
Figures appear at the end of the chapter or section in which they are referenced
1‐1 Project Location
2‐1 Parcel Boundaries
2‐2a Sand Hill Wind Repowering Project—Layout 1
2‐2b Sand Hill Wind Repowering Project—Layout 2
2‐2c Sand Hill Wind Repowering Project—Layout 3
3.1‐1 Visual Simulation Viewpoint Locations
3.1‐2 Viewpoint 1—Looking Southwest from California Aqueduct Bikeway at Bethany Reservoir
3.1‐3 Viewpoint 2—Looking East along Christensen Road near Bethany Reservoir Entrance Road
3.1‐4 Viewpoint 3—Looking South along Bruns Road from 0.15 mile South of Kelso Road
3.1‐5 Viewpoint 4—Looking Southwest along Mountain House Road from 1.4 miles South of Kelso
Road
3.1‐6 Viewpoint 5—Looking North by Northwest along Mountain House Road from North of West
Grant Line Road Intersection
3.1‐7 Viewpoint 6—Looking West by Northwest from California Aqueduct Bikeway at Grant Line
Road Crossing
3.1‐8 Viewpoint 7—Looking West by Northwest from Westbound I‐580 at the West Grant Line Road
Onramp
3.1‐9 Viewpoint 8—Looking Northeast from Altamont Pass Road at Unnamed Access Road
![Page 6: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/6.jpg)
Sand Hill Wind Repowering Project Environmental Analysis
iv September 2018
ICF 00631.17
Acronyms and Abbreviations
APE areaofpotentialeffectsAPLIC AvianPowerLineInteractionCommitteeAPWRA AltamontPassWindResourceAreaBMPs bestmanagementpracticesCDFW CaliforniaDepartmentofFishandWildlifeCEQA CaliforniaEnvironmentalQualityActCNDDB CaliforniaNaturalDiversityDatabaseCounty AlamedaCountyCommunityDevelopmentAgencyCRHR CaliforniaRegisterofHistoricResourcesCUP conditionalusepermitCUPA CertifiedUnifiedProgramAgencydBA A‐weighteddecibelEACCS EastAlamedaCountyConservationStrategyECAP EastCountyAreaPlanEIR environmentalimpactreportFAA FederalAviationAdministrationgen‐tie generation‐tieGHG greenhousegasH&S HealthandSafetyHDD horizontaldirectionaldrillingHMBP HazardousMaterialsBusinessPlanI‐ InterstatekV kilovoltMW megawattNAHC NativeAmericanHeritageCommissionNRHP NationalRegisterofHistoricPlacesO&M Operations&MaintenancePG&E PacificGasandElectricCompanyPRD PermitRegistrationDocumentProjectorproposedProject SandHillWindRepoweringProjectQA/QC qualityassurance/qualitycontrolRPS RenewablesPortfolioStandardSandHill SandHillWind,LLCSF6 sulfurhexafluorideSMARTS StormwaterMultipleApplicationandReportTrackingSystemSPCC SpillPreventionControlandCountermeasuresSWPPP stormwaterpollutionpreventionplan
![Page 7: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/7.jpg)
Sand Hill Wind Repowering Project Analysis
Draft
1‐1 September 2018
ICF 00631.17
Chapter 1 Introduction
InNovember2014,theAlamedaCountyCommunityDevelopmentAgency(County)certifiedtheAltamontPassWindResourceAreaRepoweringFinalProgramEnvironmentalImpactReport(PEIR).ThePEIRincludesadetailedaccountofthehistoryandlegalactivitiesculminatinginpreparationofthePEIR,andprovidesaframeworkforconsiderationofsubsequentprojects,providedtheyareconsistentwiththePEIRandwouldbedevelopedtobeconsistentwiththeCounty’sgoals,objectives,andconditionsassetforththerein.ThisanalysishasbeenpreparedspecificallytoaddresstheSandHillWindRepoweringProject(Project),inaccordancewiththepurposesofthePEIR.
LeadAgencyContactInformation ProjectSponsorContactInformation
AlamedaCountyCommunityDevelopmentAgency SandHillWind,LLC
Mr.AndrewYoung,SeniorPlanner KorinaCassidy
224WestWintonAvenue,Room111 2180South1300East,Suite600
Hayward,CA94544 SaltLakeCity,UT84106
510.670.5400 415.692.7727
1.1 Project Overview SandHillWind,LLC(SandHill)isproposingtheSandHillWindRepoweringProject(Projectorpro‐posedProject)on15privatelyownedparcelsintheAltamontPassWindResourceArea(APWRA)(Figure1‐1).TheproposedProjectwouldentailinstallationofupto40newwindturbinesandisexpectedtoutilizeturbineswithgeneratingcapacitiesbetween2.3and4.0megawatts(MW),allgenerallysimilarinsizeandappearance,todevelopupto144.5MW.Threeconceptualalternativelayoutsareproposed,eachusingupto40windturbines.Thelayoutsaresubstantiallysimilar,mainlyvaryingaccordingtothelocationof11turbinesinthecenteroftheProjectarea,southandwestofBethanyReservoirandtheirrelativedistancefromtheprimaryaccessroadfortheProject.Thefinallayoutwouldbeselectedbasedonsiteconstraints(e.g.,aviansitingconsiderations),dataobtainedfrommeteorologicalmonitoringofthewindresources,andturbineavailability.Eachofthesefactorswouldbeconsideredwhenmicrositingturbines,withthefinallayoutreflectingoneorsomecombinationofthealternativelayouts.Existingroadswouldbeusedwherepossible,andtemporarywideningandsomenewroadswouldbenecessary.TheProjectwouldalsorequirethreegeneration‐tie(gen‐tie)linesconnectingtheProjecttotwosubstations.
1.2 Relationship to the PEIR TheCountyhaspreparedthisanalysisandtheassociatedchecklisttovalidatetheproposedProject’sconformancewiththeanalysisandmitigationpresentedinthePEIR,andtoensurethattheSandHillProjectisincompliancewithrequirementsoftheCaliforniaEnvironmentalQualityAct(CEQA).The
![Page 8: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/8.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐2 September 2018
ICF 00631.17
summaryanalysisinthechecklistisintendedtoinformdecisionmakersandthepublicoftheProject’sconformitywiththeanalysisinthePEIRandtoidentifythespecificimpactsandmitigationmeasuresrelevanttotheProject.ThisanalysisandchecklistsupportthedecisionnottoprepareasubsequentEIRpursuanttoSection15168(c)(2)oftheStateCEQAGuidelines.Therelationshipofthechecklist(supportedbythisanalysis)tothePEIRisconsistentwiththeintentofaprogramEIRasestablishedinStateCEQAGuidelinesSection15168(d),whichcallsforuseofaninitialstudytodeterminewhetheralater,directlyrelated(ortiered)projectwouldhavenewordifferentenvironmentaleffectsthatwerenotdisclosedinthePEIRorthatwouldwarrantanewEIR.TheenvironmentalchecklistpreparedfortheproposedProjectconstitutesaninitialstudyforthepurposeofSection15063,includingitsprovisionforusewithapreviouslypreparedEIR(Section15063(b)(1)(B)).Moreover,anypublicnoticerequiredbyCountyordinancewillstate,asrequiredbyStateCEQAGuidelinesSection15168(e),thattheactivitiesassociatedwiththeSandHillProjectarewithinthescopeofthePEIRandthatthePEIRadequatelydescribedandassessedtheseactivities.
AsshowninChapter3,EnvironmentalAnalysis,despitethechangesmentionedinthenextsection,theproposedProjectwouldnotresultinanyimpactsnotaddressedinthePEIR,norwoulditresultinimpactsofgreaterseveritythanthosepresentedinthePEIR.
1.3 Changes Relevant to the PEIR Analysis SincepreparationofthePEIR,fivefactorsrelevanttothePEIRanalysishaveemerged.First,someoftheturbinesunderconsiderationfortheproposedProject,whilemostlywithinthedimensionalspecificationsoftheturbinesanalyzedinthePEIR,exceedtheindividualnameplatecapacityoftheturbinesanalyzedinthePEIRbyasmallmargin.Theconsequencesofthischangearetwo‐fold:fewerturbineswouldberequiredtoachievethesameProject‐levelgenerationcapacity,andthelargerturbineswouldhavealargerrotor‐sweptarea.
ThesecondfactorinvolvesquestionsregardingthereliabilityofestimatedavianmortalityratesaspresentedinthePEIR.ThisissueisaddressedbrieflybelowandindetailinSection3.4.2,Environ‐mentalImpactsandMitigationMeasures.
Third,thesizeoftheproposedProject—144.5MW—islargerthantheoriginallyproposedSandHillProjectasconsideredinthePEIR.WhiletheoriginallyproposedSandHillProjectwas34MW,itoccupiedasmallerareathanthecurrentProject.TheproposedProjectnowencompassestheoriginalareaaswellasadditionalareasthatwereconsideredfordevelopmentinthePEIR.Overall,themixofforeseeablefuturewindprojectshaschangedfromthatcontemplatedinthePEIR,buttheoveralllevelofanticipatedwinddevelopmentremainsthesame.
Fourth,whilethePEIRdidnotincludediscussionofOperationsandMaintenance(O&M)(Project‐levelanalysesdidincludeO&Mbuildings),SandHillproposestoinstallsuchafacility.
Finally,theCountyisawarethatinformationregardingnighttimelightingduringoperationoftheturbines,aswellasFAArequirements,mayinfactbedifferentfromtheinformationinthePEIR.ThesefiveissuesaredescribedandevaluatedindetailinthefollowingsubsectionsandinChapter3,EnvironmentalAnalysis,ofthisdocument.
![Page 9: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/9.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐3 September 2018
ICF 00631.17
1.3.1 Turbine Size
SandHillproposestwotypesofturbines:a2.3MWmodelanda3.6or3.8MWmodel.BecauseSandHillhasnotyetselectedthespecificturbinemodels,itretainstheoptionofusingturbinesupto4.0MW,dependingonproductavailabilityattimeofconstruction.However,regardlessoftheturbinemodelselected,theProjectwouldnotexceedtheproposed144.5MWcapacity,andtheoveralldimensionsofindividualturbineswouldnotexceedthosecurrentlyproposed.
ThePEIRanalyzedprojectswitharangeofturbinesizes.Table1‐1showsthemaximumdimensionsofthisrangeforcomparisonwiththelargestofthreeturbinetypesunderconsiderationfortheproposedProject.
Table 1‐1. Turbine Specifications Contemplated in the PEIR and for Use with the Proposed Project
TurbineModel PEIRMaximum—3.0MW GeneralElectric3.6MWa
Rotortype 3‐blade/horizontalaxis 3‐blade/horizontalaxis
Bladelength 62.5m(205ft) 67.2m(220ft)
Rotordiameter 125m(410ft) 137m(449ft)
Rotor‐sweptarea 12,259m2(131,955ft2) 14,741m²(158,671ft2)
Towertype Tubular Tubular
Tower(hub)height 96m(315ft) 83.6m(274ft)
Totalheight(fromgroundtotopofblade) 153m(502ft) 152m(499ft)
Bladeheight(fromgroundtobottomofblade)b 17.5m(57ft) 16.4m(54ft)aA3.8MWturbineandanas‐yet‐undeterminedturbinewithacapacityupto4.0MWhavealsobeenconsidered;however,the3.6MWturbineislargerinalldimensionsthanthe3.8MWandthe4.0MWturbines,andisthereforepresentedhereasthelargestoftheproposedturbinetypes.bThePEIRevaluatedhubheightsrangingfrom80to96metersandbladelengthsrangingfrom41.25to62.5meters.Measurementsassumingthelowestdistancefromthegroundsurfacetothebottomofthebladetiparepresentedhere.
Asshowninthetable,theproposedSandHillturbineswouldbewithinthespecificationsestablishedinthePEIRforrotortype,towertype,tower(hub)height,andtotalheight.However,bladelengthswouldbeupto15feet(approximately7%)longer,rotordiametersupto39feet(approximately9%)greater,androtor‐sweptareaupto2,482m2(approximately17%)larger.
BecausesomeoftheproposedProjectspecificationsexceedthosedescribedinthePEIR,additionalreviewofpotentiallyaffectedenvironmentalresourcesisprovidedinthisdocument.Largerturbinescouldaffectthreeresources:aesthetics(Section3.1),hazards(i.e.,setbacks)(Section3.8),andbiologicalresources(i.e.,birdsandbats)(Section3.4).Atthesametime,itshouldbeborneinmindthatwhilea3MWturbinewasthelargestconsideredinthePEIR,forpurposesoftheanalysisofavianmortality,theturbineusedasthebasisfordevelopingestimatesoffutureortypicalprojectimpactswastheVascoWinds2.3MWturbine.Theconsequenceoftheincreasednameplatecapacitytoa3.6,3.8oreven4.0MWturbine,however,wouldbelowerimpactsperMWforcertainenvironmentaltopicareas,becausea144.5MWprojectwouldrequire62turbinesofthecapacityoftheVascoWindsturbines,whereasthesame144.5MWcapacitywouldbeachievedwith40oftheturbinesproposedfortheSandHillProject.Thisdecreaseddensityofturbineswouldresultinproportionallylesserimpactsassociatedwithairqualityemissions,traffic,andgrounddisturbance.
![Page 10: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/10.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐4 September 2018
ICF 00631.17
1.3.2 Avian Mortality Estimates
SubsequenttocertificationofthePEIR,thefirstrepoweringproject,GoldenHills,wascompletedaspartoftheoverallAPWRArepoweringeffort.Inlate2017,H.T.Harvey&AssociatespreparedtheGoldenHillsWindEnergyCenterPostconstructionFatalityMonitoringReport:Year1,presentingtheresultsofthefirstyear’smonitoringeffortandanalysisofthoseresults.ThemonitoringeffortindicatedpotentiallyhighermortalityratesthanthoseestimatedinthePEIR(particularlyforgoldeneaglesandred‐tailedhawks).However,asexplainedindetailinthediscussionofImpactBIO‐11inSection3.4.2,EnvironmentalImpactsandMitigationMeasures,theseresultsdonotindicatenewormoreseveresignificanteffectsbeyondthoseanticipatedinthePEIR.ThePEIRanalyzedeffectsonavianandbatspeciesusinginformationonmultiplerepoweredprojectscollectedovermultipleyears,notingthat“…fatalityratesintheAPWRAarehighlyvariable(thatisbecausetheydifferacrossyears,turbinetypes,geographies,andtopographies…”).Consequently,thenewinformationonavianandbatfatalitiesfrom1yearofmonitoringasingleprojectduringanabnormallywetyearwithinthelargerAPWRA—andsuggestingmoresevereimpactsonbirdsandbats—cannotbeextrapolatedtoimplythattheSandHillProjectwouldresultinnewsignificanteffectsorasubstantialincreaseintheseverityofeffects.Abodyofinformationspanningmultipleprojectsandmultipleyearsofmonitoringarenecessarytoformconclusionsregardingeffects.
1.3.3 Megawatt Cap
ThePEIRidentifiedtwoalternativesforrepoweringtheAPWRA,analyzingbothatanequallevelofdetail.BecausetheCountyadoptedandcertifiedthePEIRwithoutidentifyingapreferredalterna‐tive,theCountymayauthorizeeitheralternative.Alternative2wasthelargeralternative,assumingamaximumcapacityof450MWfortheAPWRAatfullrepowering.ThePEIRalsoanalyzedtwoprojects,GoldenHillsandPattersonPass,andconsideredfourotherfutureprojects(Table1‐2).WhilethePEIRdidnotcontemplatethesequencingofprojectsconsideredinthefuture,CountystaffconsiderthatthefutureprojectsidentifiedinthePEIRshouldbeconsideredfirstinallocatingthetotalnameplatecapacity.Subsequentprojectswouldbereviewedonafirst‐come,first‐servedbasis.AsoutlinedinTable1‐2,thetotalcapacityofapproved,operational,orforeseeablefutureprojectsconsideredinthePEIRis316.5MW.TheSandHillProjectwouldincreasethattotalto425MW.Becausethisislessthanthe450MWcapestablishedbyAlternative2,theproposedProjectwouldnotconflictwiththePEIR.However,theRooneyRanchProjectsite(alsoknownastheSantaClarasite)isalsounderconsiderationforrepowering;thisprojectwouldhavea25.1MWnameplatecapacity.IftheRooneyRanchProjectwereauthorizedunderthePEIR,thetotalcapacityoftheprogramareawouldincreaseto450.1MW,a0.02%exceedanceofthe450MWcontemplatedinAlternative2ofthePEIR.Forallresources,thisminordifferencecannotrealisticallybemeasuredandiswithintheroundingalreadyusedinthePEIR;itwouldnotresultinnewsignificanteffectsorasubstantialincreaseintheseverityofeffectsalreadydescribedinthePEIR.
![Page 11: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/11.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐5 September 2018
ICF 00631.17
Table 1‐2. Operational, Approved, or Foreseeable Projects in the APWRAa
Project Owner/Operator Status TotalMW
PattersonPassb EDF Approved(PEIR) 19.8
GoldenHillsc NextEra Operational(PEIR) 85.9
GoldenHillsNorth NextEra Operational 40.8
SandHilld Ogin(nowsPower) Foreseeable(PEIR) 36
MulqueenyRanch Brookfield Foreseeable(PEIR) 80
SummitWinde AWI(nowSalka,LLC) Approved 54
Subtotal 316.5
SandHill(additional)d sPower CUPApplicationSubmitted 108.5
RooneyRanchf sPower Foreseeable 25.1
Total 450.1aCountyplanningstaffhasreceivedinformationfromtwoadditionalcompanies,DunoAir‐AltamontandNRG,indicatingtheyaredevelopingprojectsintheAPWRA.BecausethenumberofMWstobedevelopedundertheseprojectsisnotyetknowntheyarenotlistedinthistable.ReviewoftheseprojectsunderthePEIR,ifultimatelyproposed,wouldoccuratalaterdate.
bCountyplanningstaffhasindicatedthatthePattersonPassProjectisundernewownershipandisnolongerownedbyEDF.
c GoldenHillswasidentifiedinthePEIRasupto88.4MWbut85.9MWwereultimatelyconstructed.dTheSandHillProjectwasidentifiedinthePEIRasupto34MW.Underadditionalreview,itwasultimatelyapprovedforupto36MW.sPower,thecurrentprojectowner,hasappliedtoexpandtheProjecttoatotalof144.5MW(36MW+108.5MW=144.5MW).
e TheSummitWindProjectwasidentifiedinthePEIRasupto95MWbutwasapprovedin2016foratotalof54MW.
f TheRooneyRanchProjectproposedbysPowerwouldbesubjecttoapprovalbytheCityofSantaClara.
1.3.4 Operations and Maintenance Facility
ThePEIRdidnotaddressO&Mfacilitiesattheprogramlevel;however,thetwoindividualprojectsevaluatedinthatdocumentbothincludedO&Mfacilities,aswouldtheSandHillProject.WhilethePEIRstatedthatnosepticorotherwastewatertreatmentsystemswouldbepartofrepoweringprojects,SandHillproposestoinstallsuchasysteminconjunctionwithitsO&Mfacility.Inaccord‐ancewithlocalregulations,theinstallationofsuchasystemwouldbesubjecttoapprovalandpermittingbyAlamedaCountyDepartmentofEnvironmentalHealth.Ifpreconstructioninvestigationsindicatethatthesoilsonsitearenotsuitabletosupportsuchasystem,portabletoilets,suppliedandservicedbyacommercialvendor,wouldbeusedinstead.
1.3.5 Turbine Lighting
TheCountyhasnotedthatalthoughthePEIRstatedthatlightingforrepoweredturbineswouldbesimilartothelightingofpreviouslyexistingturbines,infactthenewturbineshaveFAA‐mandatedlightingthatdiffersobservablyfromthelightingusedonpreviouslyexistingturbines.TheFAA‐mandatedlightingismorenoticeabletothepublic.Theanalysisevaluatesandsupportsadetermination,however,thatthischangeisnotcauseforpreparationofaSupplementalEIRtoaddressthechange.Thischangeinobservableeffectsisnottheconsequenceofafeatureofthe
![Page 12: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/12.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐6 September 2018
ICF 00631.17
ProjectthatisdifferentfromtheanticipatedfeaturesdescribedinthePEIR,orinitscircumstances;itisinsteadsolelyachangeininformation.Inthiscase,CEQAprohibitsasupplementalreviewoftheissuebecausethecorrectinformationabouttherelativelightingimpactsofnewversusoldturbineswasreadilyavailableduringpreparationofthePEIR.Forexample,theVascoWindsProject,whichhasnighttimelighting,couldhavebeenobservedatthetimethePEIRwasprepared.Thus,CEQAprohibitstheCountyfrompreparingasupplementalEIRunderPublicResourcesCodeSection21166(c)andCaliforniaCodeofRegulationsTitle14Section15162(a)(3)onthebasisofthelightingissuebecauseitconstitutesinformationthatcouldhavebeenknownwiththeexerciseofreasonablediligenceatthetimethepreviousEIRwascertifiedascomplete.
AsdiscussedinSection3.1.2,SandHillhasagreedtoworkwiththeCountytotheextentpossibletoimplementlightmanagementtechniquesaspartoftheProject.Consequently,consideringtheanalysisaboveandwithSandHill’scooperation,thisanalysisconfirmsthattheProjectwouldnotresultinanewsourceofsubstantiallightorglarebeyondthatdescribedinthePEIR.
1.4 Organization of this Document ThisanalysishasbeenstructuredtoparallelthePEIR;accordingly,allresourcetopicsareaddressed—eventhosethatclearlywouldfallwithintheanalysisandconclusionsinthePEIR.Followingthisintroductorychapter,theanalysiscomprisesthechaptersandappendiceslistedbelow.
Chapter2,ProjectDescription,describestheProjectfeatures,sequenceofconstruction,anddetailsofoperationsandmaintenance.
Chapter3,EnvironmentalAnalysis,providestheanalysisofeachresourcetopicconsideredinthePEIR,withaconclusionregardinganydivergencefromtheconclusionspresentedinthePEIR.
Chapter4,ListofPreparers,identifiesthepersonsinvolvedinthepreparationofthisdocument.
AppendixA,AirQualityTechnicalMemorandum,providestheassumptionsandmodelingresultsusedtosupporttheairqualityanalysisfortheproposedProject.
AppendixB,BiologicalResourcesEvaluationReport,istheProject‐specificreportdetailingbiologicalconditionsintheProjectarea.
AppendixC,CulturalResourcesSurveyReport,isthereportpreparedbyICFculturalresourcesstafffortheproposedProject.
AppendixD,SoundTechnicalReport,isthereportdetailingthenoiseanalysispreparedfortheproposedProject.
1.5 References Cited AlamedaCountyCommunityDevelopmentAgency.2014.AltamontPassWindResourceArea
RepoweringFinalProgramEnvironmentalImpactReport.StateClearinghouse#2010082063.October.(ICF00323.08.)Hayward,CA.WithtechnicalassistancefromICFInternational,Sacramento,CA.
![Page 13: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/13.jpg)
Alameda County Community Development Agency Introduction
Sand Hill Wind Repowering Project Environmental Analysis
1‐7 September 2018
ICF 00631.17
H.T.Harvey&Associates.2017.GoldenHillsWindEnergyCenterPostconstructionFatalityMonitoringReport:Year1.December15.PreparedforGoldenHillsWind,LLC,Livermore,CA.
![Page 14: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/14.jpg)
Livermore
Patterson Pass Rd
A l a m e d aA l a m e d aC o u n t yC o u n t y
C o n t r a C o s t aC o n t r a C o s t aC o u n t yC o u n t y
S a n J o a q u i nS a n J o a q u i nC o u n t yC o u n t y
GG2063
GG7827
GG2063
§̈¦205
§̈¦580 Midway Rd
Ames St
S Va
sco
Rd
W Byron Rd
N Vasco Rd
W Bethany Rd
Gree
nvill
e Rd
County Hwy J2
Mines Rd
Tesla Rd
W Grant Line Rd
Byron Hwy
Altamont Pass Rd
Vasco Rd
Figure 1-1 Project Location
Project Location
0 1 20.5Miles E
Imagery Source: ESRI/NAIP 2016
LegendProject Area
Path:
K:\Pr
ojects
_1\N
ew_D
imen
sion_
Energ
y\006
31_1
7\Figu
res\20
1801
10\Fi
gure_
1_Pr
oject_
Overv
iew.m
xd; A
uthor:
; Date
: 1/26
/2018
![Page 15: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/15.jpg)
![Page 16: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/16.jpg)
Sand Hill Wind Repowering Project Analysis
Draft
2‐1 September 2018
ICF 00631.17
Chapter 2 Project Description
2.1 Project Location and Land Ownership TheProjectareacomprises15parcels(Table2‐1andFigure2‐1),mostofwhichwerepreviouslyusedforwindproduction.LanduseintheProjectareaandthesurroundingAPWRAconsistslargelyofcattle‐grazedlandsupportingoperatingwindturbinesandancillaryfacilities.
Generallycharacterizedbyrollingfoothillsofannualgrassland,themostlytreelessregionissteeperonthewestandgraduallyflattertotheeastwhereitslopestowardtheflooroftheCentralValley.Elevationsinthearearangefromapproximately600to1,200feetabovesealevel.
SandHillhasleaseagreementswiththelandownerstoinstall,operate,andmaintaintherepoweredwindturbineswhilepermittingongoingagriculturalactivitiestocontinue.
Table 2‐1. Parcels and Proposed Usesa
Assessor’sParcelNumber Acreage ProposedUse
99B‐7750‐6 101 Windturbinesandassociatedfacilities
99B‐6325‐1‐4 69 Accessandsetback
99B‐6325‐1‐3 224 Windturbinesandassociatedfacilities
99B‐7375‐1‐7 314 Windturbinesandassociatedfacilities
99B‐7400‐1‐5 598 Windturbinesandassociatedfacilities
99B‐7300‐1‐5 443 Windturbinesandassociatedfacilities
99B‐7050‐4‐6 73 Windturbinesandassociatedfacilities
99B‐7050‐1‐9 82 Windturbinesandassociatedfacilities
99B‐7050‐4‐1 27 Accessandsetback
99B‐7350‐2‐1 2 Accessandsetback
99B‐7350‐2‐15 334 Windturbinesandassociatedfacilities
99B‐7350‐2‐5 57 Accessandsetback
99B‐7500‐3‐2 53 Windturbinesandassociatedfacilities
99B‐7500‐3‐1 113 Windturbinesandassociatedfacilities
99B‐7600‐1‐1 105 Windturbinesandassociatedfacilities
Total 2,595 aThegen‐tielinesandsubstationsarenotincludedinthislistbecausetheyareexistingfacilitiesthatwouldbeupgradedaspartoftheproposedProject.
![Page 17: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/17.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐2 September 2018
ICF 00631.17
2.2 Project Need, Goals, and Objectives TheProjectobjectiveistorepowertheexistingwindProjectonprivatelyownedlandtodevelopa144.5MWcommerciallyviablewindenergyfacilitythatwoulddeliverrenewableenergytotheelectricalgrid.
2.3 Existing Facilities
2.3.1 Wind Turbines and Foundations
TheproposedProjectmayincludetheremovalofoldturbinefoundationswheretheyconflictwiththelocationofrepoweredProjectcomponents(e.g.,roadwaysandgroundequipment).
2.3.2 Access Roads
PrimaryaccesstotheProjectareaisthroughlockedgatesoffAltamontPassRoadandMountainHouseRoad.Onsiteroadsaregraveledandvaryinwidthfrom12to20feet.
2.3.3 Meteorological Towers
Four50‐meter(164‐foot)meteorologicaltowersarepresentonsite.Thesetowersmonitorandrecordmeteorologicaldatasuchaswindspeed,winddirection,andatmosphericpressure.
2.3.4 Power Collection System
ElectricitygeneratedbyaportionofthepreviousprojectwascollectedfromeachwindturbineandtransmittedtotheAMLandDyerRoadsubstations,wherethevoltagewasincreasedforinterconnectionwiththePacificGasandElectricCompany’s(PG&E’s)transmissionlines.Thecollectionsystemcomprisespad‐mountedtransformers,undergroundcables,overheadcablesonwoodenpoles,assortedcircuitbreakersandswitches,electricalmetering/protectiondevices,andthesubstations.
2.3.4.1 Substations
ThepointofinterconnectionattheDyerRoadsubstationhasbeenrelocatedtotheSantaClarasubstation.TheexistingAMLsubstationencompasses0.6acrenorthofAltamontPassRoad;theexistingSantaClarasubstationencompasses0.2acresouthofAltamontPassRoad.
2.3.4.2 Transmission Lines
SeveralPG&EtransmissionlinesbisecttheProjectparcels.
2.3.5 Cattle Handling and Staging Areas
SeveralcattlehandlingandstagingareasarelocatedintheProjectarea.
![Page 18: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/18.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐3 September 2018
ICF 00631.17
2.4 Proposed Project Features TheproposedProjectcharacteristicsarelistedbelow,illustratedinFigures2‐2athrough2‐2c,anddiscussedingreaterdetailinthefollowingsubsections.
Atotalnameplategenerationcapacityofupto144.5MW.
RemovalofoldwindturbinefoundationswheretheyconflictwithnewProjectcomponents.
Installationofupto40newwindturbinegenerators,towers,foundations,andpad‐mountedtransformers.
DevelopmentofProjectroadsandinstallationofapowercollectionsystem.
Useofexistingroadstotheextentpossible.
Useofexistingsubstations(withupgradestotheequipment).
Constructionofanoperationsandmaintenance(O&M)facility.
Installationofthreepermanentmeteorologicaltowers.
2.4.1 Wind Turbines
MostoftheturbinesbeingrepoweredintheAPWRAwereinstalledinthe1980sandrepresentfirst‐andsecond‐generationutility‐gradecommercialwindturbinetechnology,nowconsideredoldtechnology.Thetermsfirst‐generation,second‐generation,third‐generation,andfourth‐generationareusedtogroupwindturbinetypeswithsimilartechnologiescurrentlyinstalledortobeinstalledintheprogramarea.Inthiscontext,first‐generationwindturbinesarethosedesignedandinstalledduringthe1980s.Second‐generationturbinesarethosedesignedandinstalledinthe1990s.Third‐generationturbinesarethoseinstalledinpreviousrepoweringprojectsthatusesimilardesigntoturbinesproposedfortheProjectbutthatareofsmallersize(i.e.,upto1MW).Fourth‐generationturbines—suchasthoseproposedforinstallation,arelarge,1.6–4MWturbines.
TheproposedrepoweringProjectwouldentailinstallationofupto40fourth‐generationturbinesintheProjectarea.ArangeofturbinesisbeingconsideredfortheproposedProject.Turbinesbeingconsideredrangeinnameplatecapacityfrom2.3to4.0MW,arotordiameterof90–140meters(295–459feet),towerheightof80–110meters(262–361feet),andamaximumtotalturbineheightof152meters(499feet).ThecurrentProjectlayoutassumestheuseofturbineswiththespecificationspresentedinTable2‐2.
![Page 19: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/19.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐4 September 2018
ICF 00631.17
Table 2‐2. Turbine Specificationsa
TurbineModel
TurbineCharacteristic GeneralElectric2.3‐116GeneralElectric3.6‐137
GeneralElectric3.8‐130
Rotortype 3‐blade/horizontalaxis 3‐blade/horizontalaxis
3‐blade/horizontalaxis
BladeLength 56.9m(187ft) 67.2m(220ft) 63.7m(209ft)
Rotordiameter 116m(381ft) 137m(449ft) 130m(427ft)
Rotor‐sweptarea 10,568m²(113,753ft2) 14,741m²(158,671ft2)
13,273m²(142,869ft2)
Rotationalspeed Variable:5.0–14.9rpm Variable:6.3–13.6rpm Variable:6.95–12.1rpm
Towertype Tubular Tubular Tubular
Tower(hub)height 80m(308ft) 83.6m(274ft) 85m(279ft)
Rotorheight(fromgroundtolowesttipofblade)
22m(72.2ft) 15.1m(49.5ft) 20m(65.6ft)
Totalheight(fromgroundtotopofblade)
138m(453ft) 152m(499ft) 150m(492ft)
aDependingonavailabilityatthetimeofconstruction,turbinesofupto4.0MWmaybeusedfortheproposedProject.TurbinedimensionswouldnotexceedthoseshowninthetableandtheProjectcapacitywouldnotexceed144.5MW.
2.4.1.1 Siting Requirements
SandHillwilladheretotherequirementsofAlamedaCountytomaintainconsistencywithregionalplanningthathasbeenconductedtodate.SetbackrequirementswereoriginallydevelopedforAlamedaCountywindfarmsinthe1980sand1990sinconsiderationofavarietyoffactors,suchasappropriatedistancebetweenupwindanddownwindturbinesforeffectivewindproduction,noiseeffectsonsensitivelanduses,visualimpactsresultingfromproximitytoresidencesandpossibleshadowflicker,concernswithtowercollapse,andbladethrowhazard(whereallorpartofarotorblademaybreakloosefromthenacelleandstrikeanoccupiedareaorinfrastructure).Setbackshavehistoricallybeendeterminedonaproject‐by‐projectbasisinaccordancewiththestandardconditionsofapprovalforaconditionalusepermit(CUP).However,whilethestandardconditionsappliedinthe1980sand1990swereappropriatefortheoldergenerationturbines,theymaynotsufficeforthefourth‐generationturbinesproposedforrepowering.Accordingly,theCountyhasdevelopedasetofupdatedstandardstobeusedforproposedrepoweringprojects.TheseareshowninTable2‐3.
Table 2‐3. Updated Alameda County Turbine Setback Requirements
AffectedLandUseorCorridor
GeneralSetback
SetbackAdjustmentforTurbineElevationAboveorBelowAffectedUsea AlternativeMinimumb
AdjacentparcelwithapprovedwindenergyCUPc
1.1timesrotorlength
1%TTHaddedorsubtractedper10ftofturbineelevation,respectively,aboveorbelowaffectedparcel
50%ofgeneralsetback
![Page 20: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/20.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐5 September 2018
ICF 00631.17
AffectedLandUseorCorridor
GeneralSetback
SetbackAdjustmentforTurbineElevationAboveorBelowAffectedUsea AlternativeMinimumb
AdjacentparcelwithoutapprovedwindenergyCUP
1.25timesTTH
1%TTHper10ftaboveorbelowaffectedparcel
1.1timesrotorlength
Adjacentdwellingunit 3timesTTH
1%TTHper10ftaboveorbelowaffectedunit
50%ofgeneralorelevationdifferentialsetback
Publicroad(includingI‐580),trail,commercialorresidentialzoning
2.5timesTTH
1%TTHper10ftaboveorbelowaffectedright‐of‐way
50%ofgeneralsetbackwithreportbyqualifiedprofessional,approvedbyPlanningDirector
Recreationareaorproperty
1.25timesTTH
1%TTHper10ftaboveorbelowaffectedproperty
TTH
Transmissionlined 2timesTTH
1%TTHper10ftaboveorbelowpathofconductorlineatgroundlevel
50%ofgeneralsetbackwithreportbyqualifiedprofessional,approvedbyPlanningDirector
Note: TTH=totalturbineheight:theheighttothetopoftherotorat12:00position.Setbackdistancetobemeasuredhorizontallyfromcenteroftoweratgroundlevel.
a TheGeneralSetbackbasedonTTHwillbeincreasedorreduced,respectively,basedonwhole10‐ftincrementsinthegroundelevationoftheturbineaboveorbelowanaffectedparcel,dwellingunit,roadright‐of‐way,ortransmissioncorridorconductorline.Anyportionofa10‐ftincrementingroundelevationwillbedisregarded(orroundeddowntothenearest10‐ftinterval).
bAlternativeMinimumreferstoareducedsetbackstandard,includinganyadjustmentforelevation,allowedwithanotarizedagreementoraneasementontheaffectedproperty(ifapplicable),subjecttoapprovalofthePlanningDirector.
c CUP=conditionalusepermit.NosetbackfromparcellinesisrequiredwithinthesamewindenergyCUPboundary.KnowledgeofproposedwindenergyCUPsonadjacentparcelstobebasedonbestavailableinformationatthetimeofthesubjectapplication.
DMeasuredfromthecenteroftheconductorlinenearesttheturbine.
2.4.1.2 Wind Turbine Installation
Foundations
Thetypeofturbinefoundationuseddependsonterrain,windspeeds,andwindturbinetype.TwofoundationtypesmaybeusedinrepoweringAPWRAwindprojects:aninverted“T”slabfoundationoraconcretecylinderfoundation.AninvertedTslabfoundationisatypeofspreadfootingfoundation.Asingleconcretepadisplacedatgroundlevel,althoughpartofthepadmaybeplacedbelowgroundleveldependingontheslope.Atthecenterofthepadisacylindricalconcretepedestaltowhichthewindturbinetowerisbolted—hencethename,invertedT.
Aconcretecylinderfoundationisalargeconcretecylinderwithaconcretepedestalthatisslightlylargerthanthetowerbasediameter.Thesizeoftheconcretecylinderandpadisdeterminedbywindturbinesizeandsite‐specificconditions(e.g.,expectedmaximumwindspeeds,soilcharacteristics).Itsweightmustbesufficienttoholdthewindturbineinplace.
![Page 21: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/21.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐6 September 2018
ICF 00631.17
Eithertypeoffoundationistypicallyformedbyplacingconcreteinanexcavatedfootingwithreinforcedsteel.Thefoundationwouldbeinstalledimmediatelywithintheturbineworkareaadjacenttothecranepad.Whilethefoundationtypeisdeterminedbyterrain,windspeeds,andturbinetype,ingeneral,thefoundationisformedbyplacingconcreteinanexcavatedfootingwithreinforcedsteel.Asmallgraveledareawouldencircleeachfoundationtofacilitatemaintenanceaccess.ThetotaldiameterofthefinalProjectfootprintforeachturbine,includingthegraveledarea,wouldbeapproximately60feet.
Construction
Repoweredturbineconstructionentailsplacementofafoundation,newtower,rotor,nacelle,andtransformer.ConstructionandinstallationofrepoweredturbinesisregulatedbyCountyconditionsofapproval,buildingpermitrequirements,andgradingpermitrequirements.
Ateachturbinesite,alevelturbineworkareawouldbegradedtosupporttheconstructionoftowerfoundationsandtosupporttheuseoflargecranestolifttheturbinecomponentsintoplace.Theextentandshapeofgradingateachturbinesitewoulddependonlocaltopography;however,eachsitewouldrequireapproximately2.9acresofgradedareatosupporttheconstructionoffoundationsandinstallationofturbines.Acranepadwouldbeleveledandgradedwithintheturbineworkareaateachturbinesite.Thecranepad—aflat,level,andcompactedarea—wouldprovidethebasefromwhichthecranewouldworktoplacetheturbine.Mostwindturbineconstructionactivitieswouldtakeplacewithintheturbineworkarea.Followingconstruction,theturbineworkareawouldbereclaimed.
ConstructionandinstallationofturbinesinthisareaisregulatedbytheCounty’sconditionsofapproval,buildingpermitrequirements,andgradingpermitrequirements.Theturbinetowers,nacelles,andbladesaredeliveredtoeachturbinelocationintheorderofassembly,oncetheconcreteofthefoundationhasbeenpouredandhascuredsufficiently.Largecranesarebroughttoeachsitetoliftandassembletheturbinecomponents.First,thebasesectionofthetowerissecuredtothefoundationusinglargebolts.Theremainingtowersectionsarethenliftedwiththecraneandconnectedtothebasesection.Afterthenacelleandrotoraredeliveredtotheturbinesite,theturbinebladesareboltedtotherotorhub,andthenacelleandrotorareliftedbyacraneandconnectedtothemainshaft.
Excessrockgeneratedbyfoundationconstructionwouldbespreadonexistingroadsandmaintenanceareassurroundingtheturbines.Oldfoundationsfromthepreviouswindprojectonsitemayberemovediftheyarewithinproposedconstructionareas,ifremovalisnecessaryfortheinstallationofnewturbines,ortocomplywithlandowneragreementsorCountyrequirements;suchremovalswouldinvolveworkersdemolishingthefoundationsusingjackhammersorsimilartools.ThematerialfromoldturbinefoundationsmaybereusedforroadbaseorhauledoffsitetotheAltamontLandfill.
2.4.2 Site Preparation and Access Roads
Fourth‐generationturbinetowersandbladesaresignificantlylongerthanolderturbinecomponentsandrequirelargerandlongertrucksandcranesfortransportandinstallation.ThesevehiclesrequirewiderroadswithshallowerturnsandgradientsthanarecurrentlypresentintheProjectarea.Consequently,theexistingroadinfrastructuremustbeupgradedtoaccommodateconstructionoftheturbines.Roadinfrastructureupgradeswouldincludegrading,widening,andre‐gravelingof
![Page 22: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/22.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐7 September 2018
ICF 00631.17
theexistingroads.Existingroadwidthsvaryfrom12to20feet;futureroadsareexpectedtobeapproximately20feetwide.Newroadsmaybeneededinareaswhereexistingroadsdonotprovideaccesstoproposedturbinelocations.
MostroadsintheportionoftheProjectareawherenewturbineswouldbeinstalledwouldbetemporarilywidenedtoapproximately40feettoaccommodatelargertowersaswellasthelargerequipmentnecessarytoinstallthem.Itislikelythatthelocationswhereroadscurveastheyclimbhillstotheridgetopswouldrequiremoreroadworkandwouldbewidenedtomorethan40feetinsomespotstosafelyaccommodatethelargerequipment.Inaddition,accessroadentrancesfrommainroadsontotheProjectsitewouldneedtobewidenedtoprovidesufficientspacefortheminimumturningradiusofconstructioncranesandotherflatbeddeliverytrucks.Landssubjecttotemporaryroadwideningbeyonda20‐footpermanentwidthwouldbereclaimedafterconstruction.
Culverts aregenerally installedaspartof the roaddrainage systemon slopes, although someareinstalledatsmallstreamcrossings.Existingculvertsmayneedtobereplacedwithlargerculvertsorreinforcedtoprovideadequatesizeandstrengthforconstructionvehicles.
2.4.3 Staging Areas
Sevenstagingareasofvarioussizes,totalingupto34acres,wouldbeestablishedintheProjectarea.Theseareaswouldbeusedforthestorageofturbinecomponents,constructionequipment,watertanks,officetrailers,andothersuppliesneededforProjectconstruction.Thetrailerswouldbeusedtosupportworkforceneedsandsitesecurity,andwouldalsohouseafirstaidstation,emergencyshelter,andhandtoolstorageareafortheconstructionworkforce.Parkingareaswouldbelocatednearthetrailers.Vegetationwouldbeclearedandthestagingareaswouldbegradedlevel.Theseareaswouldusenativematerial,supplementedwithgravelorsoilstabilizer,ifneeded,andappropriateerosioncontroldevices(e.g.,earthberm,siltfences,strawbales)wouldbeinstalledtomanagewaterrunoff.Diversionditcheswouldbeinstalled,asnecessary,topreventstormwaterfromrunningontothesitefromsurroundingareas.Followingcompletionofconstructionactivities,thecontractorwouldrestorethetemporarystagingareas.Thegravelsurfacewouldberemoved,andtheareaswouldbecontourgraded(ifnecessaryandifenvironmentallybeneficial)toconformwiththenaturaltopography.Stockpiledtopsoilwouldbereplaced,andtheareawouldbestabilizedandreseededwithanappropriateseedmixture.
2.4.4 Meteorological Towers
Threepermanentmeteorologicaltowerswouldbeinstalledinstrategiclocationsonsitetomonitorwindspeedsandtocalibrateturbines.Thepermanentmeteorologicaltowerswouldbeafreestandingtowerdesignwithoutguywires,approximately80meterstall.Thepermanentmeteorologicaltowerswouldeachrequireasmallconcretefoundationandgraveledareaaroundthetower,aswellasanaccessroadtofacilitatemaintenanceactivities.Thesmallfoundationandgraveledareawouldbeapproximately30feetindiameter.
2.4.5 Power Collection System
Eachnewwindturbinemustbeconnectedtothemedium‐voltageelectricalcollectionsystemviaapad‐mountedtransformer.Thecollectionsystemcarrieselectricitygeneratedbytheturbinestoasubstation,wherethevoltagelevelofthecollectionsystemissteppeduptothatofthepowergrid.Fromthesubstation,electricityiscarriedthroughaninterconnectionpointtothetransmissionlines
![Page 23: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/23.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐8 September 2018
ICF 00631.17
thatdistributeelectricitytothepowergrid.TransmissionlinesintheProjectvicinityaremaintainedbyPG&E.Eachofthecollectionsystemcomponentsisdiscussedbelow.
2.4.5.1 Collection Lines
Medium‐voltagecollectionlineswouldcollectpowerfromeachturbineforconveyancetothesubstation.Medium‐voltagelinesarenormallyupto35kilovolts(kV).Thenewmedium‐voltagecollectionlineswouldbeinstalledundergroundasclosetoProjectroadsaspossibletominimizegrounddisturbanceaswellastofacilitateaccessforanynecessaryO&Mactivitiesonthelines.
Installationofundergroundmedium‐voltagelinesisaccomplishedinmostcasesusingacut‐and‐coverconstructionmethod.Adisturbancewidthof20feetisgenerallystandardtoallowforthetrenchexcavationandequipment,butthiswidthmayvarydependingonthetopographyandsoiltype.Typically,thetopsoilisseparatedfromthesubsurfacesoilforlaterreplacement.A3‐foot‐widetrenchisthenplowedusingaspecialbulldozerattachmentthatburiesthelineinthesamepassinwhichitdigsthetrench.Oncethecollectionlinesareinplace,thetrenchispartiallybackfilledwithsubsurfacesoil.Typically,communicationlinesarethenplacedinthetrench.Thetrenchisthenbackfilledwiththeremainingsubsurfacesoil,compacted,andcoveredwiththereservedtopsoil.
Tominimizesurfacedisturbancewithinwetlandsandstreams,collectionlinesmaybeinstalledunderwetlandsandotherwatersusinghorizontaldirectionaldrilling(HDD)techniques,wherefeasible.HDDinvolvestheuseofasteereddrillinghead,whichallowstheboremachinetositatgroundlevel,boredownalongonthecollectionlineroute,andtodirecttheborebackuptothesurfaceatadistantpoint.Theboremachineusesadrillingfluidintheprocess,typicallyamixtureoffineclay(suchasbentonite)andfreshwater.Theclayandwatermixturecoatsthewalloftheboreholetohelpholditopenandtoprovidelubricationforthedrillstemandconduitbeinginstalled.Excessdrillingfluidistypicallycapturedusingavacuumtruck.
Collectionlineswouldterminateneartheedgeofthepropertywherepowerwouldbeconveyedoffsitetothesubstationsthroughgen‐tielines.Thegen‐tielineswouldbeinstalledundergroundoroverhead,makinguseofexistingoverheadpowerpoleswherepossible.Ifgen‐tielinesarecarriedonexistingpoles,theselineswouldneedtobestrungwithnewconductingwire(i.e.,reconductored),requiringworkareas(i.e.,pullsites)tostringtheupgradedpowerline.Additionally,somepowerpolesmayneedtobereplaced.Ifnewoverheadcollectionorgen‐tielinefacilitiesarerequired,theywouldbecompletedincompliancewiththelatestrecommendationsoftheAvianPowerLineInteractionCommittee(APLIC).
Threeoffsitegen‐tiecorridorswouldbeusedfortheProjectaslistedbelowandshowninFiguresFigure2‐2athrough2‐2c.
Gen‐tie1—HeadingwestfromtheProjectareaapproximately3.4milesadjacenttoAltamontPassRoad,0.14milesouthalongaprivateroad,intotheSantaClarasubstation.
Gen‐tie2—HeadingeastfromtheProjectareaapproximately1mileadjacenttoAltamontPassRoad,0.5milenorthandwestonprivateland,intotheAMLsubstation.
Gen‐tie3—HeadingsouthfromtheProjectareaapproximately0.4mileadjacenttoMountainHouseRoad,0.8milesouthwestadjacenttoGrantLineRoad,0.6milewestadjacenttoAltamontPassRoad,0.5milenorthandwestonprivateland,intotheAMLsubstation.
![Page 24: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/24.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐9 September 2018
ICF 00631.17
Gen‐tie3maynotbeneededifcollectionlinesfromthenorthernandeasternparcelsarerouteddirectlyacrosstheCaliforniaAqueductwhereitbisectstheplanareaasopposedtothealignmentsdescribedabove.
2.4.5.2 Transformers and Power Poles
Transformersboostthevoltageoftheelectricityproducedbytheturbinestothevoltageofthecollectionsystem.Eachturbinewouldhaveitsowntransformeradjacenttoorwithintheturbine,eithermountedonasmallpadadjacenttotheturbineorwithinthetower.
Theinstallationofoverheadpowerlinesandpolesonsitewouldbelimitedtolocationswhereundergroundlinesareinfeasibleandlocationsimmediatelyoutsidethesubstationswhereundergroundmedium‐voltagelinescomeabovegroundtoconnecttothesubstations.
Toinstallpowerpoles,alaydownareaisrequired.Tomountthemedium‐voltagelinesonapowerpole,apullsiteandatensionsitearerequired.Polesites,pullsites,tensionsites,accessroads,andlaydownareasarecleared(i.e.,mowed)ifnecessary.Poleholesandanynecessaryanchorholesareexcavated.Wherepossible,amachineaugerisusedtoinstallpoles.Thewidthanddepthofthesettingholedependsonthesizeofthepole,soiltype,span,andwindloading.
Powerpolesareframed,devicesinstalled,andanyanchorsandguywiresareinstalledbeforethepoleisset.Anchorsandguywiresinstalledduringconstructionareleftinplace.Aftersettingthepole,conductorsarestrung.
2.4.5.3 Substations
Themainfunctionsofacollectorsubstationaretostepupthevoltagefromtheturbinecollectionlinestothetransmissionlevelandtoprovidefaultprotection.Thebasicelementsofthesubstationfacilitiesareacontrolhouse,abankofoneortwomaintransformers,outdoorbreakers,capacitorbanks,relayingequipment,high‐voltagebuswork,steelsupportstructures,anundergroundgroundinggrid,andoverheadlightning‐suppressionconductors.Themainoutdoorelectricalequipmentandcontrolhouseareinstalledonaconcretefoundation.TheProjectwouldconnecttotwoexistingsubstationsasdescribedbelow.
TheAMLsubstationservedasthecollectorsubstationforaportionofthepreviouswindproject.TheAMLsubstationconsistsofagraveledfootprintareaofapproximately0.6acre,a12‐footchain‐linkperimeterfence,andanoutdoorlightingsystem.TheAMLsubstationwouldnotbeexpanded;however,equipmentwithintheexistingfencemaybeupgradedfortherepoweringProject.Anynewlightswouldbeshieldedordirecteddownwardtoreduceglare.Theupgradedsubstationwouldremainfencedinkeepingwiththefencingaroundtheexistingsubstation(i.e.,12‐footchainlinkperimeterfencing).
TheSantaClarasubstationconsistsofagraveledfootprintareaofapproximately0.2acre,a12‐footchain‐linkperimeterfence,andanoutdoorlightingsystem.TheSantaClarasubstationwouldnotbeexpanded;however,equipmentwithintheexistingfencemaybeupgradedfortherepoweringProject.1Anynewlightswouldbeshieldedordirecteddownwardtoreduceglare.Theupgraded
1TheSantaClarasubstationistheconnectionpointfortheRooneyRanchWindRepoweringProject,proposedbythesamedeveloper.IftheRooneyRanchWindRepoweringProjectisconstructed,itwouldincludeanexpansionofthesubstationtoa0.3‐acrefootprint.
![Page 25: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/25.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐10 September 2018
ICF 00631.17
substationwouldbefencedinkeepingwiththefencingaroundtheexistingsubstation(i.e.,12‐footchainlinkperimeterfencing).
2.4.6 Operations and Maintenance Facility
AnO&Mbuildingwouldbeconstructedonsite.Operations,storage,andrepairswouldtakeplaceatthefacility.Uponcompletionofconstruction,theO&MfacilitywouldreceivepowerfromtappingintotheexistingPG&Epowerlines.Thelinetapwouldbeundergroundedalongproposedaccessroads.Portablerestroomswouldbeusedduringtheconstructionphase,andtheO&Mbuildingrestroomfacilitieswouldbeusedduringoperation.AnonsitewastewatertreatmentsystemwouldberequiredforthepermanentrestroomfacilitiesandwouldbesubjecttopermittingbytheAlamedaCountyDepartmentofEnvironmentalHealth.Ifanonsitewastewatertreatmentsystemisdeterminedtobeinfeasible,portabletoilets,servicedbyacontractor,wouldbeusedinstead.TheO&Mbuilding,parking,andequipmentstoragecouldoccupyapproximately2acres;thebuildingorbuildingswouldhavefloorspacenogreaterthan10,000squarefeet.TwolocationsarebeingconsideredfortheO&Mbuilding(Figures2‐2athrough2‐2c),referredtoasO&MOptionAandO&MOptionB.ThefinallocationwouldbeselectedbySandHillbasedonsiteconditionsandfinalleaseagreements.
2.5 Project Construction TurbineswouldbedeliveredtothesitefromthePortofStocktonorothernearbyportorrailtransferlocations.Towerassemblyrequirestheuseofonelargetrack‐mountedcraneandtwosmallcranes.Theturbinetowers,nacelles,androtorbladeswouldbedeliveredtoeachfoundationsiteandunloadedbycrane.Alargetrack‐mountedcranewouldbeusedtohoistthebasetowersectionverticallythenloweritoverthethreadedfoundationbolts.Thelargecranewouldthenraiseeachadditionaltowersectiontobeboltedthroughtheattachedflangestothetowersectionbelow.Thecranethenwouldraisethenacelle,rotorhub,andbladestobeinstalledatopthetower.Twosmallerwheeledcraneswouldbeusedtooffloadturbinecomponentsfromtrucksandtoassistintheprecisealignmentofthetowersections.EstimateddisturbanceareasassociatedwithProjectconstructionandwerecalculatedbyestimatingdisturbanceassociatedwitheachalternativelayout,andusingthescenariothatwouldresultinthemostextensiveimpacts(Table2‐4).
![Page 26: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/26.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐11 September 2018
ICF 00631.17
Table 2‐4. Estimated Disturbance Associated with Project Construction (acres)a
ProjectComponent/Activity PermanentImpacts TemporaryImpacts
Powercollectionsysteminstallation 0.0 31.5
Gen‐tieinstallation 0.0 15.0
Stagingareasinstallation 0.0 34.5
O&Mfacilityinstallation 2.0 3.0
Newaccessroads 10.6 7.6
Accessroadexpansionb 7.9 24.3
Turbinefoundationinstallation 2.6 107.0
Meteorologicaltowerinstallation 0.2 0.6
Total 23.3 223.5a Threealternativelayoutsareproposed;theestimateddisturbancereflectsthelayoutwiththemostextensiveimpacts.
b Existingaccessroadswouldbereusedtotheextentpossible;however,somesectionsofnewaccessroadwouldberequired.
2.5.1 Schedule
Projectconstructionwouldproceedafterallconstruction‐relatedpermitsareissued.Theseactivitiesareanticipatedtoproceedaccordingtothesequencedescribedbelow.Construction‐relatedbestmanagementpractices(BMPs)wouldbeimplementedduringtheNovember–Aprilwetseason.ThefinalapprovedworkhourswouldbespecifiedintheproposedProject’sCUP.Ifextendedhoursarenecessaryordesired,theappropriateapprovalswouldbesought.
2.5.2 Construction Sequence
Typicalconstructionstepsarelistedbelow.
Demarcationofconstructionareasandanysensitivebiological,cultural,orotherresourcesneedingprotection.
Constructionoftemporarystagingareas.
Roadinfrastructureupgrades.
Erosionandsedimentcontrol.
Windturbineconstruction.
Finalsitepreparation.
Cranepadconstruction.
Foundationexcavationandconstruction.
Towerassembly.
Installationofnacelleandrotor.
Powercollectionsystemandcommunicationlineinstallation.
![Page 27: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/27.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐12 September 2018
ICF 00631.17
Gen‐tieinstallation
Upgradestothesubstation.
Permanentmeteorologicaltowerinstallation.
Finalcleanupandrestoration.
ConstructionoftheO&MbuildingwouldnotdependonthesequenceofconstructionfortherestoftheProject.
TheconstructioncontractorswouldpreparetheProjectarea,deliverandinstalltheProjectfacilities,overseeconstruction,andcompletefinalcleanupandrestorationoftheconstructionsites.SandHillwouldimplementBMPsconsistentwithstandardpracticeandwiththerequirementsofthePEIRaswellasanystateorfederalpermitstominimizesoilerosion,sedimentationofdrainagesdownslopeoftheProjectarea,andanyotherenvironmentalimpacts.Examplesoflikelyerosioncontrolmeasuresarelistedbelow.
Useofstrawwattles,siltfences/strawbaledikes,andstrawbalestominimizeerosionandcollectsediment(toprotectwildlife,nomonofilament‐coveredsedimentcontrolmeasureswouldbeused).
Reseedingandrestorationofthesite.
Maintenanceoferosioncontrolmeasures.
Regularinspectionandmaintenanceoferosioncontrolmeasures.
Theconstructionactivitiesandtheapproximatedurationofeacharelistedbelow.
Stagingareas:2weeks.
Roadconstruction:8weeks.
Foundations/electrical:8weeks.
Turbinedeliveryandinstallation:12weeks.
Electricaltrenchingandsubstationupgrades:12weeks.
Cleanup:12weeks.
2.5.3 Demarcation of Sensitive Resources
Sensitiveresourcesinandadjacenttoconstructionareaswouldbemarkedtoensureadequateavoidance.Sensitiveareasidentifiedthroughtheenvironmentalapprovalandpermittingprocesseswouldbestakedandflagged.Priortoconstruction,theconstructioncontractorandanysubcontractorswouldconductawalk‐throughofareastobeaffected,orpotentiallyaffected,byconstructionactivities.Thepreconstructionwalk‐throughswouldbeconductedregularlytoidentifysensitiveresourcestobeavoided,limitsofclearing,locationofdrainagefeatures,andthelayoutforsedimentationanderosioncontrolmeasures.Followingidentificationofthesefeatures,specificconstructionmeasureswouldbereviewed,andanymodificationstoconstructionmethodsorlocationswouldbeagreeduponbeforeconstructioncouldbegin.
![Page 28: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/28.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐13 September 2018
ICF 00631.17
2.5.4 Workforce
Basedondataprovided for typicalwindenergyprojectsof similarsize,anaverageof75workerswouldbeemployedduringconstruction,withapeakworkforceof150workers.Craftworkerswouldincludemillwrights,ironworkers,electricians,equipmentoperators,carpenters,laborers,andtruckdrivers.Localconstructioncontractorsandsupplierswouldbeusedtotheextentpossible.
2.5.5 Construction Equipment
Equipmentusedforconstructionofrepoweringactivitiesoftenincludesthetypeslistedbelow.
Cranes
Lowboys/trucks/trailers
Flatbedtrucks
Servicetrucks(e.g.,pickuptrucks)
Backhoes
Bulldozers
Excavators
Graders
Dumptrucks
Track‐typedozers
Rockcrushers
Watertrucks
Compactors
Loaders
Rollers
Drillrigs
Trenchingcable‐layingvehicles
Cementtrucks
Concretetrucksandpumps
Smallhydrauliccranes
Heavyandintermediatecranes
Forklifts
Generators
2.5.6 Hazardous Materials Storage
Hazardousmaterials(e.g,fuel,lubricants,otheroils)wouldbestoredatthestagingarea(useofextremelyhazardousmaterialsisnotanticipated).Tominimizethepotentialforharmfulreleasesof
![Page 29: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/29.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐14 September 2018
ICF 00631.17
hazardousmaterialsthroughspillsorcontaminatedrunoff,thesesubstanceswouldbestoredwithinsecondarycontainmentareasinaccordancewithfederal,state,andlocalrequirementsandpermitconditions.Storagefacilitiesforpetroleumproductswouldbeconstructed,operated,andmaintainedinaccordancewiththeSpillPreventionControlandCountermeasures(SPCC)PlanthatwouldbepreparedandimplementedfortheproposedProject(Title40CodeofFederalRegulationsPart112).TheSPCCPlanwouldspecifyengineeringstandards(forexample,secondarycontainment);administrativestandards(forexample,trainingwithspecialemphasisonspillprevention,standardoperatingprocedures,inspections);andBMPs.
AHazardousMaterialsBusinessPlan(HMBP)wouldbedevelopedfortheproposedProject.TheHMBPwouldcontainspecificinformationregardingthetypesandquantitiesofhazardousmaterials,aswellastheirproduction,use,storage,spillresponse,transport,anddisposal.
2.5.7 Traffic and Parking
ConstructiontrafficroutingwouldbeestablishedinaConstructionTrafficPlan,whichwouldincludeatrafficsafetyandsigningplanpreparedbySandHillincoordinationwiththeCountyandotherrelevantagencies.Theplanwoulddefinehours,routes,andsafetyandmanagementrequirements.
Thisplanwouldincorporatemeasuressuchasinformationalsigns,trafficcones,andflashinglightstoidentifyanynecessarychangesintemporaryroadwayconfiguration.Flaggerswithtwo‐wayradioswouldbeusedtocontrolconstructiontrafficandreducethepotentialforaccidentsalongroads.Speedlimitswouldbesetcommensuratewithroadtype,trafficvolume,vehicletype,andsite‐specificconditionsasnecessarytoensuresafeandefficienttrafficflow.OnsiteconstructiontrafficwouldberestrictedtotheroadsdevelopedfortheproposedProject.Useofexistingunimprovedroadswouldberestrictedtoemergencysituations.
Vehicletripstothesiteduringconstructionwouldincludeoversizedvehiclesdeliveringwindturbinegeneratorandsubstationmaterials,heavyequipment,andotherconstruction‐relatedmaterials.ConstructionoftheproposedProjectcomponents(roads,turbines,substation,andelectrical/communicationlines)wouldtakeplaceconcurrently,usingindividualvehiclesformultipletasks.Therewouldalsobedailyroundtripsofvehiclestransportingconstructionpersonneltothesite.ThetotalnumberoftripswouldbeestimatedtosupportsubsequentanalysisbytheCounty.
Construction‐relatedparkingwouldbedirectedtotheconstructionstagingareas.Carpoolingwouldbeusedwheneverpossible.
Afterconstruction,O&MoftheproposedProjectwouldrequirefewertrips,consistingmostlyofpickupsorotherlight‐dutytrucks.
2.5.8 Water and Wastewater Needs
Waterforconstructionactivitieswouldbeprovidedthroughanagreementwithmunicipalorprivatesuppliers.Temporaryonsitewatertanksandwatertruckswouldbemadeavailableforfirewatersupport,dustsuppression,andconstructionneeds.Dailywaterusewouldvary,dependingontheweatherconditionsandtimeofyear,bothofwhichaffecttheneedfordustcontrol.Hot,dry,windyconditionswouldnecessitategreateramountsofwater.Tankertruckswouldapplywatertoconstructionareaswhereneededtoaidinroadcompactionandreduceconstruction‐generated
![Page 30: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/30.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐15 September 2018
ICF 00631.17
dust.Aminimalamountofwaterwouldberequiredforconstructionworkerneeds(drinkingwater,sanitationfacilities).Thiswaterwouldbetruckedinordeliveredasbottleddrinkingwater.Alocalsanitationcompanywouldprovideandmaintainappropriateconstructionsanitationfacilities.Portabletoiletswouldbeplacedateachofthestagingareas.Whennecessary,additionalfacilitieswouldbeplacedatspecificconstructionlocations.AppropriateBMPtrainingwouldbeprovidedtotruckoperatorstopreventrunofffromdustsuppressionandcontrolactivities.Waterusedforcementmixingandtruckwashingwouldbemanagedinaccordancewithapplicablepermitconditions(andBMPs).
WhiletheproposedProjectwouldrequireonlyaminimalamountofwateronatemporarybasisduringconstruction,andanevensmalleramountofwaterduringoperationsfortheO&Mbuilding,SandHillhasvoluntarilypreparedawatersupplyassessment(WSA)forthepurposeofensuringthatsufficientwatersupplyisavailablefortheproposedProject.Waterforconstruction(primarilyfordustcontrol)wouldbeobtainedfromZone7WaterAgency,Byron‐BethanyIrrigationDistrict,theCityofLivermore,orotherapprovedwaterdistrictoragencyifavailable.Waterforoperationswouldbeobtainedfromagroundwatersourcebyinstallinganonsitewell.TheWSAconcludesthatthereisanadequatewatersupplyavailabletomeettheneedsoftheproposedProjectforbothconstructionactivitiesandoperations.
2.5.9 Inspection and Startup Testing
Priortooperation,eachcompletedturbinewouldbeinspectedandcheckedformechanical,electrical,andcontrolfunctionsinaccordancewiththemanufacturer’sspecificationsbeforebeingreleasedforstartuptesting.Aseriesofstartupprocedureswouldthenbeperformedbythemanufacturer’stechnicians.Electricaltestsonthetransformers,undergroundpowerlines,andcollectorsubstationswouldbeperformedbyqualifiedengineers,electricians,andtestpersonneltoensurethatelectricalequipmentisoperatingwithintolerancesandthattheequipmenthasbeeninstalledinaccordancewithdesignspecifications.TheabovegroundpowerlinesinterconnectingtothePG&Esystemwouldbetestedandinspectedasrequired.
2.5.10 Restoration
Clearinganddisposingoftrash,debris,andscrubonthoseportionsofthesitewhereconstructionwouldoccurwouldbeperformedattheendofeachworkdaythroughallstagesofconstruction.Existingvegetationwouldbeclearedonlywherenecessary.Allexcavationswouldbebackfilledwithcompactedearthandaggregateassoonascableinfrastructureistested.Disposalofcuttingsanddebriswouldbeinanapprovedfacilitydesignedtohandlethewaste.
Beforeconstructioniscomplete,allremainingtrashanddebriswouldberemovedfromthesite.AnydebriswouldbeproperlydisposedofoffsiteconsistentwithrestorationrequirementsfornearbyprojectsanddescribedinaReclamationPlan,whichwouldbedevelopedpriortoconstructionaspartoftheconstructionplanningandpermittingprocess.Anymaterialplacedintheareasofthefoundationsorroadswouldbecompactedasrequiredforsoilstability.
![Page 31: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/31.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐16 September 2018
ICF 00631.17
2.5.11 Safety and Environmental Compliance Programs
2.5.11.1 Quality Assurance and Quality Control
Aqualityassurance/qualitycontrol(QA/QC)programwouldbeimplementedtoensurethatconstructionandstartupofthefacilityarecompletedasspecified.SandHillwouldberesponsibleforensuringimplementationoftheQA/QCprogrampriortoconstruction.TheprogramwouldspecifyimplementingandmaintainingQA/QCprocedures,environmentalcomplianceprogramsandprocedures,andhealthandsafetycomplianceprogramsandprocedures,andwouldintegrateSandHill’sactivitieswiththecontractorsduringProjectconstruction.Theengineeringprocurementandconstructioncontractorandturbinesupplierwouldberesponsibleforenforcingcompliancewiththeconstructionproceduresprogramforalloftheirsubcontractors.
2.5.11.2 Environmental Compliance
OrientationofconstructionstaffwouldincludeeducationonthepotentialenvironmentalimpactsofProjectconstruction.Theconstructionmanagerwouldestablishproceduresforstafftoformallyreportanyissuesassociatedwiththeenvironmentalimpacts,tokeepmanagementinformed,andtofacilitaterapidresponse.
2.5.11.3 Stormwater Control
BecausetheProjectwoulddisturbmorethan1acre,itwouldrequirecoverageunderthestate’sGeneralPermitforStormWaterDischargesAssociatedwithConstructionandLandDisturbanceActivities(Order2010‐0014‐DWQ)(ConstructionGeneralPermit).Permitcoveragewouldbeobtainedbysubmittingpermitregistrationdocuments(PRDs)totheStateWaterResourcesControlBoardthroughitsStormwaterMultipleApplicationandReportTrackingSystem(SMARTS)website.ThePRDsincludeanoticeofintent,sitemaps,astormwaterpollutionpreventionplan(SWPPP),arisklevelassessment,andothermaterials.TheSWPPPwouldincludetheelementsdescribedinSectionAoftheConstructionGeneralPermitandmapsthatshowthelocationandtypeoferosioncontrol,sedimentcontrol,andnon‐stormwaterBMPs,allofwhichareintendedtopreventsignificantwaterqualityimpactsonreceivingwaters.TheSWPPPwouldalsodescribesiteinspection,monitoring,andBMPmaintenanceproceduresandschedules.
2.5.11.4 Safety Compliance
SandHillanditsconstructioncontractorsandsubcontractorswouldberesponsibleforconstructionhealthandsafetyissues.Thecontractorwouldprovideahealthandsafety(H&S)coordinator,whowouldensurethatapplicablelaws,regulations,ordinances,andstandardsconcerninghealthandsafetyarefollowedandthatanyidentifieddeficienciesarecorrectedasquicklyaspossible.TheH&Scoordinatorwouldconductonsiteorientationandsafetytrainingforcontractandsubcontractemployeesandwouldreportbacktotheonsiteconstructionmanager.Uponidentificationofahealthandsafetyissue,theH&Scoordinatorwouldworkwiththeconstructionmanagerandresponsiblesubcontractorordirecthireworkerstocorrecttheviolation.
2.5.11.5 Emergency Situations
Ifseverestormsresultinadownedpowerline,standardO&Mprocedureswouldbeapplied.Theturbineswouldbeequippedwithinternalprotectivecontrolmechanismstosafelyshutthemdown
![Page 32: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/32.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐17 September 2018
ICF 00631.17
intheeventofahigh‐voltagegridoutageoraturbinefailurerelatedtofireormechanicalproblems.Aseparatelow‐voltagedistributionservicefeedmightbeconnectedtothelow‐voltagesideofthecollectorsubstationsasabackupsystemtoprovideauxiliarypowertoProjectfacilitiesincaseofoutages.Forsafety,thecollectorsubstationswouldbefenced,locked,andproperlysignedtopreventaccesstohigh‐voltageequipment.Safetysignagewouldbepostedaroundturbines,transformers,andotherhigh‐voltagefacilitiesandalongroads,asrequired.
2.5.11.6 Public Access and Security
TheProjectwouldbelocatedentirelyonpropertieswithrestrictedpublicaccess.OnlyauthorizedaccesstotheProjectsitewouldbeallowed.Thesiteisfencedandthecollectorsubstationswouldbefencedwithanadditional12‐foot‐highchain‐linkfencetopreventpublicandwildlifeaccesstohigh‐voltageequipment.Safetysignswouldbepostedinconformancewithapplicablestateandfederalregulationsaroundallturbines,transformers,andotherhigh‐voltagefacilitiesandalongaccessroads.VegetationclearancewouldbemaintainedadjacenttoProjectingressandegresspointsandaroundthecollectorsubstations,transformers,andinterconnectionriserpoles.
2.5.11.7 Hazardous Materials Storage and Handling
TheCounty’sHazardousMaterialsProgramDivisionistheCertifiedUnifiedProgramAgency(CUPA)forallareasofAlamedaCounty.ManagementofhazardousmaterialswouldbeconductedinaccordancewithaCounty‐approvedHMBPdevelopedfortheproposedProjectpursuanttotherequirementsoftheCUPA.HazardousmaterialsusedduringO&MactivitieswouldbestoredwithintheproposedO&MbuildinginabovegroundcontainerswithappropriatespillcontainmentfeaturesasprescribedbythelocalfirecodeortheSPCCPlanfortheO&Mbuildingasstipulatedbytheappropriateregulatoryauthority.SuchmaterialswouldbesimilarintypeandamounttothosecurrentlystoredandusedforO&Mfortheexistingfacility.
Lubricantsusedintheturbinegearboxarepotentiallyhazardous.Thegearboxwouldbesealedtopreventlubricantleakage.Thegearboxlubricantwouldbesampledperiodicallyandtestedtoconfirmthatitretainsadequatelubricatingproperties.Whenthelubricantshavedegradedtothepointwheretheyarenolongeradequate,thegearboxwouldbedrained,newlubricantadded,andtheusedlubricantsdisposedofatanappropriatefacilityinaccordancewithallapplicablelawsandregulations.
Transformerscontainoilforheatdissipation.Thetransformersaresealedandcontainnopolychlorinatedbiphenylsormovingparts.Thetransformeroilwouldnotbesubjecttoperiodicinspectionanddoesnotneedreplacement.
O&Mvehicleswouldbeproperlymaintainedtominimizeleaksofmotoroil,hydraulicfluid,andfuel.Duringoperation,O&MvehicleswouldbeservicedandfueledattheproposedO&Mbuilding(usingmobilefueltanks)oratanoffsitelocation.Nostoragetanksarelocatedattheexistingproject,andnoneareproposed.
2.6 Operation and Maintenance Activities Maintenanceofturbinesandassociatedinfrastructureincludesawidevarietyofactivities.Routinemaintenanceinvolvesactivitiessuchascheckingtorqueontowerboltsandanchors;checkingfor
![Page 33: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/33.jpg)
Alameda County Community Development Agency Project Description
Sand Hill Wind Repowering Project Environmental Analysis
2‐18 September 2018
ICF 00631.17
cracksandothersignsofstressontheturbinemainframeandotherturbinecomponents;inspectingforleakageoflubricants,hydraulicfluids,andotherhazardousmaterialsandreplacingthemasnecessary;inspectingthegroundingcables,wireropesandclips,andsurgearrestors;cleaning;andrepainting.Mostroutinemaintenanceactivitiesoccurinandaroundthetowerandthenacelle.CleanupfromroutinemaintenanceactivitieswouldbeconductedatthetimemaintenanceisperformedbytheO&Mpersonnel.Whileperformingmostroutinemaintenanceactivities,O&Mstaffwouldtravelbypickuporotherlight‐dutytrucks.Inaddition,nonroutinemaintenancesuchasrepairorreplacementofrotorsorothermajorcomponentscouldbenecessary.Suchmaintenancewouldinvolveuseofoneormorecranesandequipmenttransportvehicles.
MonitoringofProjectoperationswouldbecomputer‐based;computersinthebaseofeachturbinetowerwouldbeconnectedtotheO&Mfacilitythroughfiber‐opticorwirelesstelecommunicationlinks.
TheO&Mworkforcewouldconsistofturbinetechnicians,operationspersonnel,administrativepersonnel,andmanagementstaff.O&Mstaffwouldmonitorturbineandsystemoperation,performroutinemaintenance,shutdownandrestartturbineswhennecessary,andprovidesecurity.AllO&MstaffwouldbetrainedregularlytoobserveBMPs.Approximatelyfourtosixfull‐timestaffwouldberequiredtoconductO&Mactivities.
2.7 Post‐Project Decommissioning Theanticipatedlifeofthewindfarmismorethan30years,asupgradingandreplacingequipmentcouldextendtheoperatinglifeindefinitelywithappropriatepermitapprovals.However,thelifeoftheProjectforCEQApurposeswouldbe35years.
Decommissioningwouldinvolveremovingtheturbines,transformers,andrelatedinfrastructureinaccordancewithlandowneragreements.Substationsandmettowersmayberemovedandthesitesreclaimed;alternatively,thesitescouldberetainedforcontinueduse.Asinglelargecranewouldbeusedtodisassembletheturbines,andsmallercraneswouldliftthepartsontotruckstobehauledaway.Generally,turbines,electricalcomponents,andtowerswouldeitherberefurbishedandresoldorrecycledforscrap.Allunsalvageablematerialswouldbedisposedofatauthorizedsitesinaccordancewithfederal,state,andlocallaws,regulations,ordinances,andadoptedpoliciesineffectatthetimeoffinaldecommissioning.Existingserviceroadswouldbeused.Roadreclamationwouldbeaccomplishedusingscrapersandgraveltrucks.Sitereclamationafterdecommissioningwouldbesubjecttoalocallyapprovedreclamationplan.Basedonsite‐specificrequirements,thereclamationplanwouldincluderegrading,spotreplacementoftopsoil,andrevegetationofdisturbedareaswithanapprovedseedmix.
![Page 34: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/34.jpg)
Mountain House Creek
Bethany Reservoir
Ca l i f o r n i a A q u e du c t
Delta
Men
d o t a C a n a l
§̈¦580
A l t a m o n t P a s s R d
Mou
n ta i
nH
ous
eR
d
G r a n t L i n e R d
Chr istensen Rd
99B-7750-6
99B-6325-1-4
99B-6325-1-3
99B-7375-1-799B-7400-1-5
99B-7300-1-5
99B-7050-4-6
99B-7050-1-9
99B-7350-2-1
99B-7350-2-15
99B-7350-2-5
99B-7500-3-2
99B-7500-3-1
99B-7600-1-1
99B-7050-4-1
0 2,500 5,0001,250Feet
E
Imagery Source: ESRI/NAIP 2016
Figure 2-1 Parcel Boundaries
LegendParcel Boundaries
Path:
K:\Pr
ojects
_1\N
ew_D
imen
sion_
Energ
y\006
31_1
7\Figu
res\Pr
ojectD
escri
ption
\Figu
re_2_
Parce
l_Bou
ndari
es.m
xd; A
uthor:
; Date
: 4/16
/2018
![Page 35: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/35.jpg)
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
#*
#*
#*
Delta-Mendota Canal
California Aquaduct
BethanyReservoir
W Grant Line Rd
Altamont Pass Rd
Moun
tain
Hou
se R
d
Grant Line Rd
Christensen Rd
California Aqueduct Bikeway
Midway Rd
§̈¦580
§̈¦205
2
3
4
10
23
40
39
38
37
1
5
6
7
8
9
11
12-B
13-B
14-B
15-B
16-B
17-B
18-B
19-B
20-B
21-B
22-B
27
28
32
33
34
35
36
2425
26
29
30
31
0 2,000 4,0001,000Feet E
Base Map Source: ICF (2013);SPower (2017)
Imagery Source: NAIP (2016)
Figure 2-2cSand Hill Wind Repowering Project—Layout 3
Project AreaProposed ProjectComponents!( Turbine (2.3MW)!(
Turbine (3.6 MW or3.8MW)
") AML Substation")
Santa ClaraSubstation
#*PermanentMeteorological TowerAccess Roads*Gen-tie 1Gen-tie 2
Gen-tie 3Electrical CollectionLinesO&M Building - OptionAO&M Building - OptionB
Temporary Work AreasO&M Building WorkArea - Option AO&M Building WorkArea - Option BLaydown AreaTurbine Work Area ")
Altamont Pass Rd
Driveway
Main
View
Match
line
Inset
Map M
atchli
ne
Main View Matchline
* Existing roads will be temporarily widenedand reused for the repowering project. Other existing roads will be abandoned.
Path:
\\PDC
CITR
DSGI
S1\Pr
ojects
_1\N
ew_D
imen
sion_
Energ
y\006
31_1
7\Figu
res\C
EQA\F
igure2
c_X_
Proje
ct_Dis
turba
nceA
ll201
8061
9_Alt
3.mxd
; Auth
or: ; D
ate: 6
/20/20
18
![Page 36: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/36.jpg)
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
#*
#*
#*
Delta-Mendota Canal
California Aquaduct
BethanyReservoir
W Grant Line Rd
Altamont Pass Rd
Moun
tain
Hou
se R
d
Grant Line Rd
Christensen Rd
California Aqueduct Bikeway
Midway Rd
§̈¦580
§̈¦205
2
3
4
10
23
40
39
38
37
1
5
6
7
8
9
11
12-A
13-A
14-A
15-A
16-A
17-A
18-A
19-A
20-A
21-A22-A
27
28
32
33
34
35
36
2425
26
29
30
31
0 2,000 4,0001,000Feet E
Base Map Source: ICF (2013);SPower (2017)
Imagery Source: NAIP (2016)
Figure 2-2bSand Hill Wind Repowering Project—Layout 2
Project AreaProposed ProjectComponents!( Turbine (2.3MW)!(
Turbine (3.6 MW or3.8MW)
") AML Substation")
Santa ClaraSubstation
#*PermanentMeteorological TowerAccess Roads*Gen-tie 1Gen-tie 2
Gen-tie 3Electrical CollectionLinesO&M Building - OptionAO&M Building - OptionB
Temporary Work AreasO&M Building WorkArea - Option AO&M Building WorkArea - Option BLaydown AreaTurbine Work Area ")
Altamont Pass Rd
Driveway
Main
View
Match
line
Inset
Map M
atchli
ne
Main View Matchline
* Existing roads will be temporarily widenedand reused for the repowering project. Other existing roads will be abandoned.
Path:
\\PDC
CITR
DSGI
S1\Pr
ojects
_1\N
ew_D
imen
sion_
Energ
y\006
31_1
7\Figu
res\C
EQA\F
igure2
b_X_
Proje
ct_Dis
turba
nceA
ll201
8061
9_Alt
2.mxd
; Auth
or: ; D
ate: 6
/20/20
18
![Page 37: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/37.jpg)
")
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
!(
#*
#*
#*
Delta-Mendota Canal
California Aquaduct
BethanyReservoir
W Grant Line Rd
Altamont Pass Rd
Moun
tain
Hou
se R
d
Grant Line Rd
Christensen Rd
California Aqueduct Bikeway
Midway Rd
§̈¦580
§̈¦205
2
3
4
10
23
1
5
6
7
8
9
11
12
13
14
15
16
17
18
19
20
21 22
27
28
32
33
34
35
36
37
38
39
40
2425
26
29
30
31
0 2,000 4,0001,000Feet E
Base Map Source: ICF (2013);SPower (2017)
Imagery Source: NAIP (2016)
Figure 2-2a Sand Hill Wind Repowering Project—Layout 1
Project AreaProposed ProjectComponents!( Turbine (2.3MW)!(
Turbine (3.6 MW or3.8MW)
") AML Substation")
Santa ClaraSubstation
#*PermanentMeteorological TowerAccess Roads*Gen-tie 1Gen-tie 2
Gen-tie 3Electrical CollectionLinesO&M Building - OptionAO&M Building - OptionB
Temporary Work AreasO&M Building WorkArea - Option AO&M Building WorkArea - Option BLaydown AreaTurbine Work Area ")
Altamont Pass Rd
Driveway
Main
View
Match
line
Inset
Map M
atchli
ne
Main View Matchline
* Existing roads will be temporarily widenedand reused for the repowering project. Other existing roads will be abandoned.
Path:
\\PDC
CITR
DSGI
S1\Pr
ojects
_1\N
ew_D
imen
sion_
Energ
y\006
31_1
7\Figu
res\C
EQA\F
igure2
a_X_
Proje
ct_Dis
turba
nceA
ll201
8061
9_Alt
1.mxd
; Auth
or: ; D
ate: 6
/20/20
18
![Page 38: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/38.jpg)
Sand Hill Wind Repowering Project Analysis
Draft
3‐1 September 2018
ICF 00631.17
Chapter 3 Environmental Analysis
AsdiscussedinChapter1,Introduction,theanalysisinthisdocumentparallelstheorganizationofthePEIR.Whilesomeresourcetopicsmighthavebeensummarilydismissed,itwasdeemedpreferabletoprovideabriefargumentsupportingthedecisiontoomitamoredetailedanalysis.
Theresourcediscussionsareorganizedasshownbelow.Wherereferencesarecited,theyareprovidedattheendofeachsection.
Section3.1—AestheticsandVisualResources
Section3.2—AgriculturalandForestryResources
Section3.3—AirQuality
Section3.4—BiologicalResources
Section3.5—CulturalResources
Section3.6—Geology,Soils,MineralResources,andPaleontologicalResources
Section3.7—GreenhouseGasEmissions
Section3.8—HazardsandHazardousMaterials
Section3.9—HydrologyandWaterQuality
Section3.10—LandUseandPlanning
Section3.11—Noise
Section3.12—PopulationandHousing
Section3.13—PublicServices
Section3.14—Recreation
Section3.15—Transportation/Traffic
Section3.16—UtilitiesandServiceSystems
![Page 39: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/39.jpg)
Alameda County Community Development Agency Environmental Analysis
Agricultural and Forestry Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.1‐1 September 2018
ICF 00631.17
3.1 Aesthetics and Visual Resources ThePEIRpresentedabroadandthoroughanalysisoftheimpactsonaestheticsandvisualresourcesthatwouldresultfromrepoweringtheprogramarea,selectingkeyviewpointstodevelopphotosimulationscomparingtheviewunderexistingconditionswiththesameviewunderrepoweredconditions.ToconducttheProject‐levelanalysis,analystsselectedeightProject‐specificviewpointstocharacterizevisualchangesthatwouldresultfromProjectimplementation(Figure3.1‐1).
Viewpoint1—LookingsouthwestfromtheCaliforniaAqueductBikewayonthenorthshoreofBethanyReservoir.
Viewpoint2—LookingeastalongChristensenRoadneartheBethanyReservoirentranceroad.
Viewpoint3—LookingsouthalongBrunsRoadfrom0.15milesouthoftheKelsoRoadintersection.
Viewpoint4—LookingsouthwestalongMountainHouseRoadfrom1.4milessouthoftheKelsoRoadintersection.
Viewpoint5—LookingnorthbynorthwestalongMountainHouseRoadfromjustnorthoftheGrantLineRoadintersection.
Viewpoint6—LookingwestbynorthwestfromtheCaliforniaAqueductBikewayattheGrantLineRoadcrossingoftheCaliforniaAqueduct.
Viewpoint7—LookingwestbynorthwestfromwestboundInterstate(I‐)580attheWestGrantLineRoadonramp.
Viewpoint8—LookingnortheastfromAltamontPassRoadatanunnamedaccessroad.
Areviewofeachofthealternativelayoutswasconductedtodetermineifanyparticularlayoutwassubstantiallydifferentfromavisualanalysisperspective.Theresultsofthatreviewindicatedthatthelayoutswerenotsubstantiallydifferent;Layout2wasselectedforthevisualsimulations(thelayoutwiththe“middle”groupofturbines).Asnotedpreviously,the“middle”groupof11turbineslocatedsouthofBethanyReservoirhavedifferentlocationsineachofthethreelayouts.Visualsimulationswerepreparedforeachviewpointusingthelargestandtallestturbinesconsideredtoensurethatthemostseverevisualimpactswouldbeconsidered.
3.1.1 Existing Conditions
AsdescribedinthePEIR,theProjectvicinity,inthenortheasternportionoftheAWPRA,ismostlycharacterizedbygrass‐covered,rollinghills,withroadcutstoaccommodateruralroadsandI‐580.Stringsofturbines,powerlines,transformers,accessroads,andsubstationsarethemostvisuallydistinctartificialfeaturesthroughoutmostthevicinity.Ruralresidencesdotthevicinitysurround‐ingtheProjectarea,butonlyasingleresidenceiswithinit.TheCaliforniaAqueduct,theCaliforniaAqueductBikeway,andBethanyReservoirliebetweentheeasternandwesternportionsoftheProjectarea.TheeasternterminusoftheBrushyPeakRegionalPreservetoBethanyReservoirregionalmultiusetrailisimmediatelyoutsidethenorthwesternboundaryoftheProjectarea.
MountainHouseRoad,aCounty‐designatedscenicroadway,passesthroughtheeasternportionoftheProjectarea(Figure3.1‐1).Theareanorthwestoftheroadiscurrentlyundeveloped,althoughit
![Page 40: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/40.jpg)
Alameda County Community Development Agency Environmental Analysis
Agricultural and Forestry Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.1‐2 September 2018
ICF 00631.17
supportedwindturbinesinthepast.Numerousoldergenerationturbinesarepresentonthesoutheastsideoftheroad.
3.1.2 Environmental Impacts and Mitigation Measures
TheProject‐levelanalysiswasbasedonreviewofthePEIRandonthevisualphotosimulationslistedabove.ThesephotosimulationsarepresentedinFigures3.1‐2through3.1‐9.
ThePEIRreliedonaqualitativeevaluationofthevisualimpactsofrepoweringtheprogramareaoverall.Ingeneral,thePEIRcharacterizedthenewrepoweredturbinesacrosstheprogramareaincomparisonwiththeexistingold‐generationturbines.TheSandHillProject’sturbineswouldhaveaslightlylongerbladelength(i.e.,15feet)androtor‐sweptareathantheturbinesevaluatedinthePEIR,buttheProjectwouldrequirefewerturbinesbecauseeachwouldhaveahighercapacitythanthosecontemplatedinthePEIR.ThelongerbladelengthisnotexpectedtobevisuallynoticeablefromnearbyroadsorresidencesbecausetheproposedturbinesareconsistentwiththeoveralldimensionsofthoseevaluatedinthePEIR;consequently,theanalysisinthePEIRisrelevantandappropriatefortheProject.Accordingly,theapplicant’sproposaltouseslightlylargerturbineswouldnotconstituteanewsignificanteffectorasubstantialincreaseintheseverityofeffectsonvisualresourcescomparedtothosedescribedinthePEIR.AdditionalanalysisspecifictotheProjectisprovidedbelow.
ImpactAES‐1:Temporaryvisualimpactscausedbyconstructionactivities(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionactivitiescouldresultinasignificantimpact,particularlyforhighlysensitiveviewerssuchasresidentsandrecreationists.TheanalysisspecificallycalledoutBethanyReservoir,whichissurroundedbytheSandHillProjectarea,aswellasscenicroadwaysandrecreationaltrails.Accordingly,thepotentialvisualimpactsassociatedwithconstructionasaddressedinthePEIRwouldapplytotheProject;asconcludedinthePEIR,implementationofMitigationMeasureAES‐1,Limitconstructiontodaylighthours,wouldreducetheseimpactstoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactAES‐2:Haveasubstantialadverseeffectonascenicvista(lessthansignificantwithmitigation)
ThePEIRconcludedthatwhilethenew,largeturbinesmaybemorevisuallyevidentthantheolder,smallerturbines,theirwidespacingonthelandscapewouldbelessdisruptiveofthelandscapefeatures.Theprogram‐levelanalysisraisedthegreatestconcernforareaswithoutturbines;intheProjectarea,suchconditionsexistonlyoncertainparcelseastandsouthofBethanyReservoir.MitigationMeasureAES‐2a,Requiresitedevelopmentreview,specificallystates:
Newturbinesalongridgelinesorhilltopsthathavenotpreviouslybeendevelopedwithcommercial‐scalewindturbineswillnotbeallowed,unlessaseparateSiteDevelopmentReviewiscompletedthatdeterminesthatthevisualeffectswillbesubstantiallyavoidedbydistancefrompublicviewpoints(e.g.,morethan2,000feet),interveningterrain,screeninglandscaping,orcompensatoryimprovementstoequivalentandnearby(radiusof1mile)scenicfeatures,asapprovedbythePlanningDirector.
Accordingly,whileaportionoftherepoweringProjectisbeingplannedinanareathatwaspreviouslydevelopedwithwindturbines,thoseturbineswereremovedpriortoissuanceofthe
![Page 41: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/41.jpg)
Alameda County Community Development Agency Environmental Analysis
Agricultural and Forestry Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.1‐3 September 2018
ICF 00631.17
NoticeofPreparationforthePEIRin2010.TheProjectwouldintroducesubstantialchangestocurrentviewswithinandoftheProjectareaalongMountainHouseRoadbyconstructingnewturbineswherenonehavebeensincebefore2010.Forthepurposesoffullandconservativedisclosure,anddespitethefactthattheareawasdevelopedwithwindturbinesinthepast,theconstructionofturbinesinthisareacouldhaveasubstantialadverseeffectonascenicvista;thisimpactisconsideredpotentiallysignificant.ImplementationofMitigationMeasureAES‐2a,Requiresitedevelopmentreview,wouldreducethisimpacttoaless‐than‐significantlevel.VisualimpactsfromotherareasoftheProjectarealsoconsideredpotentiallysignificantforthereasonscommontootherwindrepoweringprojects—specifically,theappearanceofmultiplepiecesofconstructionequipment.ImplementationofMitigationMeasuresAES‐2b,Maintainsitefreeofdebrisandrestoreabandonedroadways,andAES‐2c,Screensurpluspartsandmaterials,wouldreducethisimpacttoaless‐than‐significantlevel.TheseconclusionsareconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddresstheseimpacts.
ImpactAES‐3:Substantiallydamagescenicresources,includingbutnotlimitedtotrees,rockoutcroppings,andhistoricbuildingsalongascenichighway(lessthansignificantwithmitigation)
Asdescribedabove,MountainHouseRoadintheeasternportionoftheProjectareaisaCounty‐designatedscenicroadway.AsstatedinthePEIR:
TherearealsoportionsofI‐580,AltamontPassRoad,FlynnRoad,MountainHouseRoad,PattersonPassRoad,andtheproposedRoute239Freeway…wherenoturbinescurrentlyexist,butmotoristsontheseroadsareaccustomedtoseeingwindturbinesalongtheroute,sotheywouldnotbeadverselyaffected.
AlthoughtheareanorthwestofMountainHouseRoaddoesnotcurrentlysupportturbinedevelopment,ithasdonesointhepast.Moreover,theoppositesideoftheroadwayisheavilydevelopedwitholdergenerationturbines,whichwillberemovedin2018.Althoughtheseconsiderationsservetominimizetheseverityofthisimpact,thePEIRconcludedthatitwaslessthansignificantwithmitigation.Accordingly,thisanalysisconcludesthatimplementationofMitigationMeasuresAES‐2a,AES‐2bandAES‐2cwouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactAES‐4:Substantiallydegradetheexistingvisualcharacterorqualityofthesiteanditssurroundings(lessthansignificantwithmitigation)
ThePEIRconcludedthat,ingeneral,replacingnumeroussmallturbineswithfewer,muchlargerturbineswouldnotdegradetheexistingvisualcharacteroftheareabutratherwouldimprovethevisualquality.Theanalysisraisedconcernsaboutareaswhereturbinesdonotcurrentlyexist,butasdisclosedinthediscussionofImpactAES‐3,theareanorthwestofMountainHouseRoadwasconsideredtohavepotentiallysignificantimpactstriggeringsitedevelopmentreviewunderMitigationMeasureAES‐2a.WhileitmightbearguedthatthisimpactasitpertainstotheSandHillProjectmightbeconsideredlessthansignificantbecausetheareawasdevelopedwithwindturbinesinthepast(priortodevelopmentofthePEIR),forpurposesoffullandconservativedisclosure,thisimpactisconsideredpotentiallysignificant.ImplementationofMitigationMeasuresAES‐2a,AES‐2bandAES‐2wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 42: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/42.jpg)
Alameda County Community Development Agency Environmental Analysis
Agricultural and Forestry Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.1‐4 September 2018
ICF 00631.17
ImpactAES‐5:Createanewsourceofsubstantiallightorglarethatwouldadverselyaffectdaytimeornighttimeviewsinthearea(lessthansignificantwithmitigation)
ThePEIRconcludedthatlightingrequiredbytheFederalAviationAdministration(FAA)intheProjectareaandvicinityandlightingassociatedwiththesubstationswouldbeshieldedanddirecteddownwardtoreduceglare,andthatthecolorofnewtowersandrotorswouldbeneutralandnon‐reflective.SincethepreparationofthePEIR,theCountyhasnotedthatlightingassociatedwiththeturbinesmayhaveeffectsbeyondthosedescribedinthePEIR.However,asdiscussedinSection1.3.5,TurbineLighting,theseeffectscouldhavebeenknownwhenthePEIRwasprepared.Consequently,thisanalysisconfirmsthattheProjectwouldnotresultinanewsourceofsubstantiallightorglarebeyondwhatisdescribedinthePEIR.
However,thePEIRalsoconcludedthatshadowflicker—causedbybladerotation—couldcreateadisruptivevisualintrusiontoresidentswhoareexposedtotheconditionforextendedperiods:morethan30minutesinagivendayor30hoursinagivenyear.InaccordancewithMitigationMeasureAES‐5,Analyzeshadowflickerdistanceandmitigateeffectsorincorporatechangesintoprojectdesigntoaddressshadowflicker,SandHillwillretainaqualifiedengineeringfirmtoconductashadowflickeranalysis.ThetermsofthemitigationmeasurerequirethatSandHillimplementmeasurestominimizetheeffectinconsultationwiththeowneroftheaffectedresidence.ImplementationofMitigationMeasureAES‐5wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactAES‐6:Consistencywithstateandlocalpolicies(lessthansignificantwithmitigation)
AsdisclosedinthePEIR,theCountywouldbeobligatedtocomplywithmeasuressetforthtoprotectvisualresourcesalongscenicroadwaysandopenspaceareasidentifiedforprotection,asdetailedintheScenicRouteandOpenSpaceElementsoftheAlamedaCountyGeneralPlan(AlamedaCounty1966).Inaddition,theCountyisobligatedtocomplywithmeasuressetforthintheEastCountyAreaPlan(ECAP)toprotectvisualresourcessuchassensitiveviewsheds,streetsandhighways,scenichighways,andareasaffectedbywindfarms(AlamedaCounty2000).TheproposedProjectissimilarlysubjecttotheserequirements.ImplementationofMitigationMeasuresAES‐2b,AES‐2c,AES‐3,andAES‐5wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
3.1.3 References Cited
AlamedaCounty.1966.ScenicRouteElementoftheGeneralPlan.May.ReprintedJune1974,AmendedMay5,1994.
———.2000.EastCountyAreaPlan.AdoptedMay1994.ModifiedbypassageofMeasureD,effectiveDecember22,2000.Oakland,CA.
![Page 43: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/43.jpg)
BethanyReservoir SRA
Ala
med
a C
ount
ySa
n Jo
aqu
in C
ount
y
Grant Line Rd
Christensen Rd
Burn
s Rd
Kelso Rd
Midway Rd
N Midway Rd
Mountain House Rd
Jess
Ranch Rd
Altamont Pass Rd
580
1
10
29
30
31
32
33
34
35
36
37
27
28
2425
26
38
39
40
11
12
13
14
15
16
17
18
19
20
2122
23
2
3
4
5
6
7
8
9
R2
1
3
2
4
87
6
5
LEGEND
Simulation Viewpoint Locations with Direction and Number
1
Proposed 2.3 MW Turbine Locations, Layout 2
Receptor
Proposed 3.6 MW Turbine Locations, Layout 2
Scenic Routes
Sand Hill Project Area
0 0.25
Miles
0.5
Figure 3.1-1Visual Simulation Viewpoint Locations
ICF
Gra
phic
s …
000
66.1
7 (5
-1-2
018)
tm
1
3
![Page 44: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/44.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-2Viewpoint 1—Looking Southwest from California Aqueduct Bikeway
at Bethany Reservoir
Existing View
Simulation
![Page 45: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/45.jpg)
Figure 3.1-3Viewpoint 2—Looking East along Christensen Road
near Bethany Reservoir Entrance Road
Existing View
Simulation
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
![Page 46: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/46.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-4Viewpoint 3—Looking South along Bruns Road
from 0.15 mile South of Kelso Road
Existing View
Simulation
![Page 47: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/47.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-5Viewpoint 4—Looking Southwest along Mountain House Road
from 1.4 miles South of Kelso Road
Existing View
Simulation
![Page 48: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/48.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-6Viewpoint 5—Looking North by Northwest along Mountain House Road
from North of West Grant Line Road Intersection
Existing View
Simulation
![Page 49: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/49.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-7Viewpoint 6—Looking West by Northwest from California Aqueduct Bikeway
at Grant Line Road Crossing
Existing View
Simulation
![Page 50: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/50.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-8Viewpoint 7—Looking West by Northwest from Westbound I-580
at the West Grant Line Road Onramp
Existing View
Simulation
Image source: Google Street View, 10/2017.
![Page 51: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/51.jpg)
ICF
Gra
phic
s …
006
31.1
7 (5
-1-2
018)
tm
Figure 3.1-9Viewpoint 8—Looking Northeast from Altamont Pass Road
at Unnamed Access Road
Existing View
Simulation
Image source: Google Street View, 8/2015.
![Page 52: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/52.jpg)
![Page 53: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/53.jpg)
Alameda County Community Development Agency Environmental Analysis
Agricultural and Forestry Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.2‐1 September 2018
ICF 00631.17
3.2 Agricultural and Forestry Resources ThePEIRidentifiedapproximately24acresofPrimeFarmlandintheextremenortheastcorneroftheprogramareaandfoundthatconversionofthisagriculturallandwouldconstituteasignificantimpact,whichcouldbemitigatedtoaless‐than‐significantlevel.However,becausethePrimeFarmlandisoutsidetheSandHillProjectarea,therewouldbenoimpact.Similarly,thePEIRfoundthatbecausewindturbinesareaconditionallypermitteduseongrazinglandunderWilliamsonActcontract,therewouldbenoimpactpertainingtoconflictswithexistingzoning.Finally,thereisnoforestlandintheprogramarea.Accordingly,agriculturalandforestryresourcesarenotdiscussedfurtherinthisanalysis.
![Page 54: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/54.jpg)
Alameda County Community Development Agency Environmental Analysis
Air Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.3‐1 September 2018
ICF 00631.17
3.3 Air Quality ThePEIRevaluatedimpactsassociatedwithdevelopmentofupto450MWincombinednameplatecapacitywithintheprogramarea.Project‐levelcriteriapollutantemissionsandassociatedairqualityimpactswereassessedusingmanyofthesamemethodsandmodelsasdescribedinthePEIR.Specifically,analystsestimatedcombustionexhaustandfugitivedustbasedonProject‐specificconstructionandoperatingdata(e.g.,schedule,equipment,truckvolumes)providedbytheProjectengineerandacombinationofemissionfactorsandmethodologiesfromCalEEMod,version2016.3.2;CaliforniaAirResourcesBoard’s(ARB’s)EMFAC2017model;theU.S.EnvironmentalProtectionAgency’s(EPA’s)AP‐42CompilationofAirPollutantEmissionFactors,andseveralotherindustry‐acceptedtools.AppendixAprovidesadditionalmodelingdetail,includingequipmentandvehicleassumptions.
3.3.1 Existing Conditions
AsdescribedinthePEIR,theproposedProjectislocatedinAlamedaCounty,whichisintheBayAreaAirQualityManagementDistrict(BAAQMD).Concentrationsofozone,carbonmonoxide(CO),nitrogendioxide(NO2),sulfurdioxide(SO2),lead(Pb),andparticulatematter(PM10andPM2.5)arecommonlyusedasindicatorsofambientairqualityconditions.ThesepollutantsareknownascriteriapollutantsandareregulatedbyEPAandARBthroughnationalandCaliforniaambientairqualitystandards(NAAQSandCAAQS),respectively.TheNAAQSandCAAQSestablishlimitsofcriteriapollutantconcentrationstoprotecthumanhealthandpreventenvironmentalandpropertydamage.OtherpollutantsofconcernintheProjectareaarenitrogenoxides(NOX)andreactiveorganicgases(ROG),whichareprecursorstoozone,anddieselparticulatematter(DPM),whichcancausecancerandotherhumanhealthailments.Ingeneral,theProjectareaisgenerallywellventilatedbywinds,resultinginrelativelygoodambientairqualityconditions.
3.3.2 Environmental Impacts and Mitigation Measures
ConstructionemissionswouldprimarilyoccurintheProjectareaintheBAAQMD.However,someequipmentandmaterialswouldoriginatefromthePortofStocktonandthecityofTracy,bothofwhicharewithintheSanJoaquinValleyAirPollutionControlDistrict(SJVAPCD).Accordingly,heavy‐dutytrucktripexhaustemissionsthatwouldbegeneratedintheSJVAPCDhavebeenquantifiedandincludedintheconstructionanalysis.OperationalemissionswouldoccurexclusivelyintheBAAQMD.ConsistentwiththePEIR,thresholdsdevelopedbytheBAAQMDandSJVAPCDareusedtoevaluatethesignificanceoftheProject’semissionsandassociatedairqualityimpacts(SanJoaquinValleyAirPollutionControlDistrict2015;BayAreaAirQualityManagementDistrict2017).
ImpactAQ‐1:Conflictwithorobstructimplementationoftheapplicableairqualityplan(lessthansignificant)
ThePEIRconcludedthatrepoweringprojectsunderbothalternativeswouldnotconflictwiththegoalsofBAAQMD’sCleanAirPlanorSJVAPCD’sairqualityattainmentplans.Accordingly,becausetheSandHillProjectisconsistentwiththeassumptionsusedinthePEIR,thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
![Page 55: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/55.jpg)
Alameda County Community Development Agency Environmental Analysis
Air Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.3‐2 September 2018
ICF 00631.17
ImpactAQ‐2:Violateanyairqualitystandardorcontributesubstantiallytoanexistingorprojectedairqualityviolation(significantandunavoidable)
ThePEIRconcludedthatmaximumdailyunmitigatedROGandNOXfromconstructionofrepoweringprojectswouldexceedBAAQMD’ssignificancethresholds,resultinginasignificantimpact.FugitivedustwouldalsoconstituteasignificantimpactwithoutapplicationofBMPs.ImplementationofMitigationMeasuresAQ‐2a,Reduceconstruction‐relatedairpollutantemissionsbyimplementingapplicableBAAQMDBasicConstructionMitigationMeasures,andAQ‐2b,Reduceconstruction‐relatedairpollutantemissionsbyimplementingmeasuresbasedonBAAQMD’sAdditionalConstructionMitigationMeasures,wouldensurethatimpactsrelatedtofugitivedustwouldbelessthansignificant.However,implementationofthesemeasureswouldnotreduceROGorNOXemissionstoaless‐than‐significantlevel.Accordingly,theimpactofconstruction‐relatedROGandNOXemissionswouldbesignificantandunavoidableintheBAAQMD.Neitherlong‐termoperationoftheProjectnormaterialhaulinginSJVAPCDduringconstructionwouldexceedanyairdistrictthresholds,andimpactswouldbelessthansignificant.TheseconclusionsareconsistentwiththeanalysispresentedinthePEIR.
ImpactAQ‐3:Resultinacumulativelyconsiderablenetincreaseofanycriteriapollutantforwhichtheprojectregionisanonattainmentareaforanapplicablefederalorstateambientairqualitystandard(includingreleasingemissionsthatexceedquantitativethresholdsforozoneprecursors)(significantandunavoidableforconstructionandlessthansignificantforoperation)
ThePEIRconcludedthatconstructionofrepoweringprojectswouldexceedBAAQMD’sROGandNOXthresholdsevenafterimplementationoffeasiblemitigation.Accordingly,thePEIRdeterminedthatcumulativeconstructionimpactsintheBAAQMDwouldbesignificantandunavoidable.Long‐termoperationoftherepoweredprojectswasfoundtohavealess‐than‐significantcumulativeairqualityimpact.
AsdiscussedunderImpactAQ‐2,neitherlong‐termoperationoftheproposedProjectnormaterialhaulinginSJVAPCDduringconstructionwouldexceedairdistrictthresholds.Accordingly,cumulativeimpactsduringconstructionintheSJVAPCDandduringoperationintheBAAQMDwouldbelessthansignificant.Construction‐relatedNOxandPMemissionsintheBAAQMDwouldexceedtheairdistrict’sthresholds,resultinginapotentiallysignificantimpact.ImplementationofMitigationMeasuresAQ‐2aandAQ‐2bwouldensurethatimpactsrelatedtofugitivedustwouldbelessthansignificant.However,NOXemissionswouldremainsignificantandunavoidableandcumulativelyconsiderable.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactAQ‐4:Exposesensitivereceptorstosubstantialpollutantconcentrations(lessthansignificantwithmitigation)
ThePEIRconcludedthatreceptorexposuretoDPMfromconstructionoftherepoweringprojectswouldbelessthansignificantwithimplementationofMitigationMeasuresAQ‐2aandAQ‐2b,whichwouldreducebothcriteriapollutantsandDPMemissions.
Long‐termoperationoftheproposedProjectwouldnotresultinasignificantnewsourceofemissions.Offsitetrucktripsduringconstructionwouldbetransitory,usingmultipleroadsoverawidespreadarea,therebyhelpingtodispersetoxicpollutantsandminimizeexposure.OnsiteconstructionactivitieswouldgenerateDPM,butthesewouldoccuroverarelativelyshortperiod—approximately1year,farlessthantheexposuredurationof30yearsthatistypicallyassociated
![Page 56: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/56.jpg)
Alameda County Community Development Agency Environmental Analysis
Air Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.3‐3 September 2018
ICF 00631.17
withchroniccancerrisk(OfficeofEnvironmentalHealthHazardAssessment2015).EmissionswouldalsobespatiallydispersedthroughouttheProjectareaandatmultipleturbinelocations.
WhileexposuretoDPMemissionswouldbeofshortduration,tworeceptorsarewithin1,000feetofturbineworkareas.Thesereceptorsmaybeexposedtoincreasedhealthrisksduringconstructionattheseindividuallocations.Accordingly,thisimpactisconservativelyconcludedtobepotentiallysignificant.ImplementationofMitigationMeasuresAQ‐2aandAQ‐2bwouldreduceDPMemissionsandassociatedhealthriskstosensitivereceptors.Thisimpactwouldbelessthansignificantwithmitigation.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactAQ‐5:Createobjectionableodorsaffectingasubstantialnumberofpeople(lessthansignificant)
ThePEIRconcludedthatneitherconstructionnoroperationoftherepoweringprojectswouldresultinsignificantodorimpacts.OdoremissionsundertheproposedProjectwouldbesimilartothoseevaluatedattheprogramlevel;theywouldbeprimarilylimitedtotheconstructionperiod.Sourcesofodorsduringconstructionwouldbediesel‐poweredtrucksandvehicles.Potentialodorsfromthesesourceswouldbetemporary(1year)andspatiallydispersedovertheProjectarea.Accordingly,theproposedProjectisnotanticipatedtocreateobjectionableodorsthatwouldviolateairdistrictnuisancerules.Thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
3.3.3 References Cited
BayAreaAirQualityManagementDistrict.2017.AirQualityGuidelines.May.
OfficeofEnvironmentalHealthHazardAssessment.2015.AirToxicsHotSpotProgramRiskAssessmentGuidelinesGuidanceManualforPreparationofHealthRiskAssessments.February.
SanJoaquinValleyAirPollutionControlDistrict.2015.GuidanceforAssessingandMitigatingAirQualityImpacts.March.
![Page 57: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/57.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐1 September 2018
ICF 00631.17
3.4 Biological Resources ToevaluatethepotentialProject‐specificimpactsonbiologicalresources,ICFpreparedtheBiologicalResourcesEvaluationfortheSandHillWindRepoweringProject(AppendixB).InadditiontoreviewingpreviousworkconductedinsupportofthePEIRandtheEastAlamedaConservationStrategy(EACCS),aswellassurveysconductedinportionsoftheProjectareaforanearlierwindproject,ICFbiologistssearchedtheCaliforniaDepartmentofFishandWildlife’s(CDFW’s)CaliforniaNaturalDiversityDatabase(CNDDB)(CaliforniaDepartmentofFishandWildlife2018)andtheU.S.FishandWildlifeServiceIPaCTrustResourceReportspecieslistfortheProjectarea(U.S.FishandWildlifeService2018).
Inaddition,ICFbotanists/wetlandecologistsconductedaquaticresourcedelineationsurveysinOctoberandNovember2017andJanuary2018.ThesewereformaldelineationsundertakenwiththepurposeofcharacterizingpotentialwatersoftheUnitedStates,includingwetlands,intheProjectarea.
Biologistsconductedhabitatsurveysofthebiologicalstudyarea(i.e.,theProjectareaplusa1.24‐milebufferaroundittoaccountforthepossibledispersaldistanceofCaliforniatigersalamandersfromaquaticbreedinghabitat).ICFalsoconductedasiteassessmentforCaliforniatigersalamanderandCaliforniared‐leggedfrog.
3.4.1 Existing Conditions
3.4.1.1 Land Cover Types
NotallthelandcovertypesdescribedinthePEIRwerefoundtobepresentintheProjectarea.ThelandcovertypesandtheextentofeachidentifiedthroughthesurveyeffortsareshowninTable3.4‐1.
Table 3.4‐1. Approximate Acreage of Land Cover Types
LandCover/HabitatType Acres
Nonnativeannualgrassland 2,604.7
Alkaliwetland/drainage 20.1
Vernalpool 0.3
Perennialwetlanddrainage 9.7
Pond 6.3
Ephemeraldrainage 3.7
Canal(aqueducts) 1.0
Developed/existinginfrastructure 54.7
Total 2,700.5
![Page 58: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/58.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐2 September 2018
ICF 00631.17
3.4.1.2 Special‐Status Plants
AccordingtotheBiologicalResourcesEvaluation,the10special‐statusplantspecieslistedbelowhavebeenidentifiedashavingthepotentialtooccurintheProjectarea.AllthesespecieswereconsideredinthePEIR,althoughadditionalspeciesthatcouldoccurintheprogramareaweredeterminednottooccurintheProjectareaduetomicrohabitatconditionsorrangeconstraints.
Large‐floweredfiddleneck(Amsinckiagrandiflora)—state‐andfederallylistedasendangered.
SanJoaquinspearscale(Atriplexjoaquiniana)—CRPR1B.2.2
Bigtarplant(Blepharizoniaplumosa)—CRPR1B.11.
Round‐leavedfilaree(Californiamacrophylla)—CRPR1B.11.
Lemmon’sjewelflower(Caulanthuslemmonii)—CRPR1B.21.
Recurvedlarkspur(Delphiniumrecurvatum)—CRPR1B.21.
Diamond‐petaledCaliforniapoppy(Eschscholziarhombipetala)—CRPR1B.11.
Shiningnavarretia(Navarretianigelliformisssp.radians)—CRPR1B.21.
Raylessragwort(Senecioaphanactis)—CRPR2.21.
Caper‐fruitedtropidocarpum(Tropidocarpumcapparideum)—CRPR1B.11.
Fourofthesespecies—SanJoaquinspearscale,caper‐fruitedtropidocarpum,round‐leavedfilaree,anddiamond‐petaledCaliforniapoppy—havebeenpreviouslydocumentedwithinoradjacenttothestudyarea.
3.4.1.3 Special‐Status Wildlife
AccordingtotheBiologicalResourcesEvaluation,thespecial‐statuswildlifespecieslistedbelowhavebeenidentifiedashavingthepotentialtooccurintheProjectarea.AllthesespecieswereconsideredinthePEIR,althoughadditionalspeciesthatcouldoccurintheprogramareaweredeterminednottooccurintheProjectareaduetomicrohabitatconditionsorrangeconstraints.
Vernalpoolfairyshrimp(Branchinectalynchi)—federallylistedasthreatened.
Vernalpooltadpoleshrimp(Lepiduruspackardi)—federallylistedasendangered.
Californiatigersalamander(Ambystomacaliforniense)—state‐andfederallylistedasthreatened.
Californiared‐leggedfrog(Ranadraytonii)—federallylistedasthreatened.
Westernspadefoot(Speahammondii)—CDFWspeciesofspecialconcern.
Westernpondturtle(Actinemysmarmorata)—CDFWspeciesofspecialconcern.
SanJoaquincoachwhip(Masticophisflagellumruddocki)—CDFWspeciesofspecialconcern.
2CRPR = CaliforniaRarePlantRank. 1B.1= rare,threatenedorendangeredinCaliforniaandelsewhere,seriouslyendangeredinCalifornia. 1B.2= rare,threatenedorendangeredinCaliforniaandelsewhere,fairlyendangeredinCalifornia. 2.2 = rare,threatenedorendangeredinCalifornia,butmorecommonelsewhere,fairlyendangeredin
California.
![Page 59: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/59.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐3 September 2018
ICF 00631.17
Blainville’shornedlizard(Phyrnosomablainvillii)—CDFWspeciesofspecialconcern.
White‐tailedkite(Elanusleucurus)—Californiafullyprotected.
Northernharrier(Circuscyaneus)—CDFWspeciesofspecialconcern.
Baldeagle(Haliaeetusleucocephalus)—federallyde‐listed;state‐listedasendangered,fullyprotected.
Goldeneagle(Aquilachrysaetos)—Californiafullyprotected.
Swainson’shawk(Buteoswainsoni)—state‐listedasthreatened.
Westernburrowingowl—CDFWspeciesofspecialconcern.
Loggerheadshrike(Laniusludovicianus)—CDFWspeciesofspecialconcern.
Tricoloredblackbird(Agelaiustricolor)—state‐listedasthreatened.
Americanbadger(Taxideataxus)—CDFWspeciesofspecialconcern.
SanJoaquinkitfox(Vulpesmacrotismutica)—state‐listedasthreatened;federallylistedasendangered.
Californiared‐leggedfrog,burrowingowls,andforaginggoldeneagleswereobservedinthestudyareaduringtheOctober2017surveysaswellasduring2012surveyspreviouslyconductedforanotherwindproject(ICFInternational2013).
3.4.2 Environmental Impacts and Mitigation Measures
ImpactBIO‐1:Potentialforground‐disturbingactivitiestoresultinadverseeffectsonspecial‐statusplantsorhabitatoccupiedbyspecial‐statusplants(lessthansignificantwithmitigation)
ThePEIRconcludedthatground‐disturbingactivitiesassociatedwithProjectconstructioncouldresultinadverseimpactsonspecial‐statusplantsandtheirhabitat.BecausetheactivitiesassociatedwiththeSandHillProjectandthespecial‐statusplantspecieswithpotentialtooccurintheProjectareaareunchangedfromthosecontemplatedinthePEIR,theimpactwouldbecomparabletothatpresentedinthePEIR,andthesamemitigationmeasureswouldapply.ImplementationofMitigationMeasuresBIO‐1a,Conductsurveystodeterminethepresenceorabsenceofspecial‐statusplantspecies;BIO‐1b,Implementbestmanagementpracticestoavoidandminimizeimpactsonspecial‐statusspecies;BIO‐1c,Avoidandminimizeimpactsonspecial‐statusplantspeciesbyestablishingactivityexclusionzones;BIO‐1d,Compensateforimpactsonspecial‐statusplantspecies;andBIO‐1e,Retainabiologicalmonitorduringground‐disturbingactivitiesinenvironmentallysensitiveareas,wouldreducethisimpacttoaless‐thansignificantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐2:Adverseeffectsonspecial‐statusplantsandnaturalcommunitiesresultingfromtheintroductionandspreadofinvasiveplantspecies(lessthansignificantwithmitigation)
ThepotentialfortheintroductionandspreadofinvasiveplantspeciesintheProjectareaasaresultofconstructionactivitieswouldbethesameasdescribedinthePEIRforrepoweringprojects
![Page 60: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/60.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐4 September 2018
ICF 00631.17
overall.Theintroductionofinvasivenonnativeplantspecieswouldconstituteasignificantindirectimpact.ImplementationofMitigationMeasuresBIO‐1b;BIO‐2,Preventintroduction,spread,andestablishmentofinvasiveplantspecies;BIO‐5c,Restoredisturbedannualgrasslands;andWQ‐1,ComplywithNPDESrequirements,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐3:Potentialmortalityoforlossofhabitatforvernalpoolbranchiopodsandcurved‐footedhygrotusdivingbeetle(lessthansignificantwithmitigation)
ThePEIRconcludedthatrepoweringprojectscouldresultinhabitatlossforanddirectmortalityofindividualvernalpoolbranchiopodaswellascurved‐footedhygrotusdivingbeetles(Hygrotuscurvipes).TheBiologicalResourcesEvaluationdeterminedthatnopotentialhabitatforlonghornfairyshrimp(Branchinectalongiantenna)ispresentintheProjectarea.However,becausepotentialhabitatforvernalpoolfairyshrimp,vernalpooltadpoleshrimp,andcurved‐footedhygrotusdivingbeetleispresentinandneartheProjectarea,mortalityandhabitatlossarepotentiallysignificantimpacts.ThePEIRconcludedthatimplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3a,Conductpreconstructionsurveysforhabitatforspecial‐statuswildlifespecies;andBIO‐3b,Implementmeasurestoavoid,minimize,andmitigateimpactsonvernalpoolbranchiopodsandcurved‐footedhygrotusdivingbeetle,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐4:Potentialdisturbanceormortalityofandlossofsuitablehabitatforvalleyelderberrylonghornbeetle(noimpact)
AlthoughthePEIRidentifiedthepotentialforimpactsonvalleyelderberrylonghornbeetle(Desmoceruscalifornicus)inportionsoftheprogramarea,noelderberryshrubs(thespecies’hostplant)havebeenidentifiedintheProjectarea;accordingly,therewouldbenoimpactandnomitigationwouldberequired.
ImpactBIO‐5:PotentialdisturbanceormortalityofandlossofsuitablehabitatforCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrog(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionaswellasoperationandmaintenanceactivitiescouldresultinhabitatlossforCaliforniatigersalamander,westernspadefoot,Californiared‐leggedfrog,andfoothillyellow‐leggedfrog,aswellasmortalityofindividuals.SiteassessmentsconductedfortheBiologicalResourcesEvaluationfoundnosuitablehabitatforfoothillyellow‐leggedfrog;however,becausesuitablehabitatfortheotherthreespeciesispresentintheProjectarea,theProjectcouldresultinsignificantimpacts.ThePEIRconcludedthatimplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3c;BIO‐5a,Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusamphibians;BIO‐5b,Compensateforlossofhabitatforspecial‐statusamphibians;andBIO‐5cwouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 61: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/61.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐5 September 2018
ICF 00631.17
ImpactBIO‐6:Potentialdisturbanceormortalityofandlossofsuitablehabitatforwesternpondturtle(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionactivitiescouldresultindirecteffectsonwesternpondturtlesandtheirhabitat.BecausetheBiologicalResourcesEvaluationidentifiedsuitablehabitatforthisspeciesintheProjectarea,suchimpactscouldresultfromProjectconstruction.ImplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3a;andBIO‐6,Conductpreconstructionsurveysforwesternpondturtleandmonitorconstructionactivitiesifturtlesareobserved,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐7:PotentialdisturbanceormortalityofandlossofsuitablehabitatforBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhip(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionactivitiesand,toalesserextent,operationandmaintenanceactivitiescouldresultinhabitatlossforandindividualfatalitiesofBlainville’shornedlizard,Alamedawhipsnake,andSanJoaquincoachwhip.TheBiologicalResourcesEvaluationfoundthatAlamedawhipsnakehadlittletonolikelihoodtooccurintheProjectarea;however,thepotentialremainsfordirectimpactsontheothertwospeciesofspecial‐statusreptiles.ImplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3a;BIO‐5c;BIO‐7a,Implementbestmanagementpracticestoavoidandminimizeeffectsonspecial‐statusreptiles;andBIO‐7b,Compensateforlossofhabitatforspecial‐statusreptiles,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐8:Potentialconstruction‐relateddisturbanceormortalityofspecial‐statusandnon–special‐statusmigratorybirds(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionactivitiesduringthenestingseasonofwhite‐tailedkite,baldeagle,northernharrier,Swainson’shawk,goldeneagle,westernburrowingowl,loggerheadshrike,andtricoloredblackbirdcouldresultindirecteffectsonthesespecies,aswellasonnon–special‐statusmigratorybirds,iftheyarenestingintheprogramarea.BecauseofthescarcityoftreesintheProjectarea,particularlynearproposedturbinesitesandroadways,thereislimitedpotentialforconstructionactivitiestoaffectnestingeaglesortree‐nestspecies(e.g.,Swainson’shawks,goldeneagles,kites).However,shrub‐andground‐nestingspecies(e.g.,tricoloredblackbird,westernburrowingowl)couldbeaffectedbyconstructionactivities.BecauseconstructionactivitiesdescribedinthePEIRarethesameasthoseanticipatedfortheSandHillProject,theimpactswouldbethesame.ImplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3a;BIO‐5c;BIO‐8a,Implementmeasurestoavoidandminimizepotentialimpactsonspecial‐statusandnon–special‐statusnestingbirds;andBIO‐8b,Implementmeasurestoavoidandminimizepotentialimpactsonwesternburrowingowl,wouldreducetheseimpactstoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐9:Permanentandtemporarylossofoccupiedhabitatforwesternburrowingowlandforaginghabitatfortricoloredblackbirdandotherspecial‐statusandnon–special‐statusbirds(lessthansignificantwithmitigation)
![Page 62: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/62.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐6 September 2018
ICF 00631.17
ThePEIRconcludedthatrepoweringprojectswouldresultinthetemporaryandpermanentlossofgrasslandthatissuitableforaginghabitatforburrowingowlsandotherspecial‐statusandnon–special‐statusmigratorybirds.However,thePEIRelectednottoproposecompensatorymitigationforlossofSwainson’shawkforaginghabitat,becausethatspeciesrarelyusesgrasslandintheprogramarea.BecausegrasslandhabitatintheProjectareaisconsistentwiththatthroughouttheprogramarea,thesameimpactswouldapply.ImplementationofMitigationMeasuresBIO‐5b;BIO‐5c;andBIO‐9,Compensateforthepermanentlossofoccupiedhabitatforwesternburrowingowl,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐10:PotentialinjuryormortalityofandlossofhabitatforSanJoaquinkitfoxandAmericanbadger(lessthansignificantwithmitigation)
ThePEIRconcludedthatrepoweringprojectscouldresultintemporaryandpermanentlossofgrasslandhabitatthatcouldsupportSanJoaquinkitfoxesandAmericanbadgers,aswellasindirectmortalityofindividuals.TheBiologicalResourcesEvaluationconcludedthatbadgershaveahighlikelihoodtooccurintheProjectarea,whileSanJoaquinkitfoxesareunlikelytousetheareabuthaveaslightlikelihoodofmovingthroughitbetweenothermoresuitableareas.Becauseofdeclinesinbothspecies,anyimpactswouldbesignificant,especiallyiftheyresultinfatalities.BecauseProjectactivitiesandProjectareaconditionsareconsistentwiththosecontemplatedinthePEIR,theimpactswouldbethesame.ImplementationofMitigationMeasuresBIO‐1b;BIO‐1e;BIO‐3a;BIO‐5c;BIO‐10a,ImplementmeasurestoavoidandminimizepotentialimpactsonSanJoaquinkitfoxandAmericanbadger;andBIO‐10b,CompensateforlossofsuitablehabitatforSanJoaquinkitfoxandAmericanbadger,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐11:Avianmortalityresultingfrominteractionwithwindenergyfacilities(significantandunavoidable)
ThePEIRconcludedthatrepoweringwouldresultinsignificantandunavoidableimpactsassociatedwithavianmortality,althoughitanticipatedthatmortalityrateswoulddecreasewiththetransitionfromold‐generationtonew‐generationturbines.ThisexpectationwasbasedoncombinedestimatesofavianmortalityfromthreedifferentrepoweringprojectsintheAPWRA,givenasarateofxnumberofbirddeathsperMWperyear,invariouscombinationsofspecies(allraptorspecies,eachofeightindividualraptorspecies,andallnativenon‐raptorspecies).Theseestimatesindicatedreductionsof32–83%inraptorfatalities(e.g.,31–79%fewerAmericankestrelfatalitiesforbuildoutof450MWintheAPWRA.ThePEIRacknowledged,however,thattheavianmortalityestimateswereuncertain,statingthat(AlamedaCountyCommunityDevelopmentAgency2014:3.4‐103):
…whilerepoweringisintendedtoreducefatalities,enoughuncertaintyremainsinlightofproject‐andsite‐specificdatatowarrantaconservativeapproachintheimpactanalysis.Accordingly,thecontinuedorincreasedlossofbirds(includingspecial‐statusspecies)ataratepotentiallygreaterthantheexistingbaselinefatalityratesisconsideredasignificantandunavoidableimpact[emphasisadded].3
3SimilarstatementsarerepeatedthroughoutthePEIR;seepage3.4‐121:
![Page 63: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/63.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐7 September 2018
ICF 00631.17
AsnotedinSection1.3.2,AvianMortalityEstimates,ofthisanalysis,earlymonitoringresultsfromtheGoldenHillsrepoweringprojectthatbeganoperationsinDecember2015,numerousvariablesandinconsistenciesinthemethodsofpreviousmonitoringeffortsintheAPWRAraisequestionsregardingtheaccuracyoftheavianmortalityestimatespresentedinthePEIR.
TheGoldenHillsdatareflectasingleyearofmonitoringduringnorthernCalifornia’swettestyearonrecord,usingsearchmethods(i.e.,searchdogsandshorter,7‐daysearchintervals)thatwerenotusedformostofthebaseline(andrepower)mortalityestimatespresentedinthePEIR.Theshort,1‐yeardurationduringunusuallyhighrainfallconditionsandtheuseofdifferentsearchmethodsmakecomparisonwiththePEIR’sbaselinedatadifficult(H.T.Harvey&Associates2017:51–52).Whiletheinformationinthereportisrelevant,itdoesnotchangethefindingsorconclusionsofthePEIRwithrespecttoavianandbatfatalities—namely,thatimpactswillbesignificantandunavoidableaftermitigation—forthereasonsdiscussedbelow.
TheGoldenHillsestimatedmortalityrateforallraptorscombined(theprimarycriterionforAPWRAavianimpactmeasurement)wassignificantlylowerthanthepre‐repoweringaveragefromtheAPWRA‐wideavianmonitoringstudy(whichalreadyreflectedsignificantmortalityreductionsresultingfromseasonalshutdownandtheremovalofhigh‐riskturbinesinaccordancewiththe2007agreement)(H.T.Harvey&Associates2017:51).APWRA‐widenonrepoweredaveragemortalityratesforallraptorscombinedwas2.43/MW/year.Theall‐raptorscombinedmortalityrateforGoldenHillsinitsfirstyearofoperationwas1.56/MW/year,36%lessthantheaverageAPWRA‐widerateeventhoughthelatterincludedseasonalshutdownsandhigh‐riskturbineremovals.
TheprimarymortalitymodelusedintheH.T.Harveyreportestimatedhighergoldeneaglemortalityratesthanbaseline,nonrepoweredconditions(H.T.Harvey&Associates2017:50).However,theauthorsexplainedthatthemodel“inflate[d]theestimatebyincorporatingsearcherefficiencyandcarcasspersistenceparametersthatrepresentmedium/largebirdsasagroupratherthaneaglesspecifically.”OthermodelsusedintheH.T.Harveyreportthatdidnotincorporatetheseparametersyieldedresultsthatwere“closertoreality.”Thosemodelsestimatedgoldeneaglemortalityratesnearlymatching(0.09/MW/year)orslightlybelow(0.07/MW/year)baselineconditions(0.08/MW/year)(H.T.Harvey&Associates2017:50).AlltheseratesarehigherthantheratesofthethreerepoweredprojectsusedtogenerateestimatesinthePEIR.ButthereportobservedthatallofitsgoldeneaglemortalityratesmaybeoverstatedasaconsequenceofbiasattributabletothepresenceofoldturbinesneartheGoldenHillssitethatprovidedperchingandnestingopportunitiesforraptors,includinggoldeneagles,seenperchingonthemonseveraloccasions(H.T.Harvey&Associates2017:46,50).
Red‐tailedhawkmortalityratesobservedinthefirst‐yearstudybyH.T.HarveyalsoexceededboththeratesofthethreerepoweringprojectsusedtogeneratethePEIR’sestimatesforGoldenHillsand
Asdescribedabove,forallavianfocalspeciesanalyzed,afullyrepoweredprogramareawouldbeexpectedtoreduceestimatedfatalityrates.However,fatalitieswouldstillbeexpectedtoresultfromtheoperationoftherepoweredturbines,anduncertaintysurroundingtheaccuracyoftheestimatedfatalityratesandthetypesofspeciespotentiallyaffectedremains.Consideringthisinformation,anddespitetheanticipatedreductionsinavianimpactscomparedtothebaselinerates,theCountyhasdeterminedtouseaconservativeapproachfortheimpactassessment,concludingthatturbinerelatedfatalitiescouldconstituteasubstantialadverseeffectonavianspeciesbecausetheratesforsomeorallofthespeciescouldbegreaterthanthebaselinerates.Thisimpactwouldbesignificant.ImplementationofMitigationMeasuresBIO‐11athroughBIO‐11iwouldreducethisimpact,butnottoaless‐than‐significantlevel;accordingly,thisimpactisconsideredsignificantandunavoidable.
![Page 64: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/64.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐8 September 2018
ICF 00631.17
theAPWRA‐wideestimates,buttheH.T.Harveyreportobservedthatadditionalyearsofstudywouldbeneededtodeterminewhetherthiswasananomalyorastandardpattern(H.T.Harvey&Associates2017:50).Asstatedinthereport,red‐tailedhawkresultsmayalsohavebeenskewedbyperchingandnestingopportunitiescreatedbynearbyoldturbines,theremovalofwhichwouldlikelyreducefatalityrates.TheotherraptorspeciesanalyzedintheH.T.Harveyreport,Americankestrelandburrowingowl,revealedsignificantlylowermortalityratesthanwereestimatedinthePEIR(H.T.Harvey&Associates2017:50).
Batfatalities(499.2at5.81/MW/year)werehigherthanestimatedforGoldenHillsinthePEIR(from148at1.68/MW/yearto347at3.9/MW/year),but,asexplainedintheH.T.Harveyreport,thePEIR’sestimateswerefaultybecauseVascoWind’sbatmortalityratesinthefirstandsecondyearswereinfact5.76/MW/yearand6.69/MW/year,not1.68/MW/year;accordingly,GoldenHills’batmortalityratesforthefirstyearwereinlinewiththecorrectmortalityratesatVascoWinds(H.T.Harvey&Associates2017:52).
ThedifferencesbetweentheH.T.HarveyreportandthemortalityestimatesofthePEIRdonotindicateanewormoreintensesignificantimpactbeyondthescopeofthePEIR.ThePEIRrecognizedtheuncertaintyofitsavianmortalityestimatesandconcludedthatmortalityratesunderthe450MWrepoweringprogramcouldexceedbaseline,nonrepoweredmortalityrates(AlamedaCountyCommunityDevelopmentAgency2014).Morespecifically,whilethePEIRusedthe“bestavailable”datafromthreerepoweringprojectstoestimateapossiblereductionoffatalitiesundertherepoweringprogram,thePEIR’simpactconclusionforthe450MWrepoweringprogramexpresslyacknowledgedtheuncertaintyinherentinsuchdata.
Thus,whilethePEIRpresentedmortalityestimatesthatlookedpromising,thoseestimateswereuncertainandultimatelywerenotrelieduponasthebasisforitsimpactconclusion.LiketheH.T.Harveyreport,thePEIRconcludedthatmoredatawereneeded:“[p]ostconstructionmonitoring,oncetheturbinesareinoperation,willprovidedatatoquantifytheactualextentofchangeinavianfatalitiesfromrepoweringandtheextentofavianfatalityforprojectsintheprogramarea…”(AlamedaCountyCommunityDevelopmentAgency2014:3.4‐119).Inlightofthisuncertainty,thePEIRrequiresadaptivemanagementforanyrepoweringprojectwhere“…fatalitymonitoring…resultsinanestimatethatexceedsthepreconstructionbaselinefatalityestimates(i.e.,estimatesatthenonrepoweredturbinesasdescribedinthisPEIR)…toensurethatthebestavailablescienceisusedtominimizeimpactstobelowbaseline”(AlamedaCountyCommunityDevelopmentAgency2014:3.4‐116).ThePEIRdrewasimilarconclusionandrequiredasimilaradaptivemanagementprogramforimpactsonbats(AlamedaCountyCommunityDevelopmentAgency2014:3.4‐133,3.4‐136).Therefore,eventhoughsomeofthefirst‐yearresultsfromtheGoldenHillsprojectexceedthemortalityestimatesofthePEIR,thoseimpactsarestillwithinthescopeofthePEIR’simpactconclusionsandassociatedmitigationmeasures.
WhilethePEIRsetforthmultiplemeasurestoaddressavianmortality,itconcludedthatthesemeasureswouldnotreducetheimpacttoaless‐than‐significantlevel.ThisconclusionholdstruefortheSandHillProject,andalthoughitremainsdifficulttoestimatemortalityrateswithcertainty,continuedmonitoringwillcontributetothebodyofknowledgeinformingthiseffort.ImplementationofthecombinedprogramofMitigationMeasures,BIO‐11a,Prepareaproject‐specificavianprotectionplan;BIO‐11b,Siteturbinestominimizepotentialmortalityofbirds;BIO‐11c,Useturbinedesignsthatreduceavianimpacts;BIO‐11d,Incorporateavian‐safepracticesintodesignofturbine‐relatedinfrastructure;BIO‐11e,Retrofitexistinginfrastructuretominimizerisktoraptors;BIO‐11f,Discouragepreyforraptors;BIO‐11g,Implementpostconstructionavianfatalitymonitoring
![Page 65: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/65.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐9 September 2018
ICF 00631.17
forallrepoweringprojects;BIO‐11h,Compensateforthelossofraptorsandotheravianspecies,includinggoldeneagles,bycontributingtoconservationefforts;andBIO‐11i,Implementanavianadaptivemanagementprogram,wouldreducethisimpactbutnottoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldaddressthisimpact.
ImpactBIO‐12:Potentialmortalityordisturbanceofbatsfromroostremovalordisturbance(lessthansignificant)
ThePEIRidentifiedtwospecial‐statusbatspecies—pallidbat(Antrozouspallidus)andTownsend’sbig‐earedbat(Corynorhinustownsendii)—ashavingthepotentialtoroostintheprogramarea.However,theBiologicalResourcesEvaluationfoundthatnosuitableroostinghabitatispresentintheProjectarea.Accordingly,thisimpactwouldbelessthansignificant,andnomitigationisrequired.
ImpactBIO‐13:Potentialforconstructionactivitiestotemporarilyremoveoralterbatforaginghabitat(lessthansignificant)
ThePEIRconcludedthatwhileconstructionactivitiescoulddegradeforaginghabitat,theoverallrepoweringeffort,bydecommissioningnumerousold‐generationturbines,wouldoffsetthelossofhabitatassociatedwithinstallationofnewturbinesandinfrastructure.Thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactBIO‐14:Turbine‐relatedfatalitiesofspecial‐statusandotherbats(significantandunavoidable)
ThePEIRconcludedthatrepoweringwouldresultinturbine‐relatedfatalitiesofspecial‐statusandotherbats.WhiletheBiologicalResourcesEvaluationfoundthattheProjectareadidnotsupportroostinghabitatforspecial‐statusbats,special‐statusandotherbatsareassumedtomigrateandforageintheProjectareaastheydothroughouttheprogramarea.
ImplementationofMitigationMeasuresBIO‐14a,Siteandselectturbinestominimizepotentialmortalityofbats;BIO‐14b,Implementpostconstructionbatfatalitymonitoringprogramforallrepoweringprojects;BIO‐14c,PrepareandpublishannualmonitoringreportsonthefindingsofbatuseoftheProjectareaandfatalitymonitoringresults;BIO‐14d,Developandimplementabatadaptivemanagementplan;andBIO‐14e,Compensateforexpensesincurredbyrehabilitatinginjuredbats,wouldreducetheseverityofthisimpact,butnottoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldaddressthisimpact.
ImpactBIO‐15:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonalkalimeadow(lessthansignificantwithmitigation)
ThePEIRconcludedthatroadinfrastructureupgrades—especiallythoseinvolvingcrossings—couldresultinadverseeffectsonalkalimeadow.TheaquaticresourcesdelineationsurveysconductedinsupportoftheProjectidentifiedatotalof20.1acresofalkalimeadowinthestudyarea;Projectroadswouldcrosssomeoftheseareas.ImplementationofMitigationMeasureBIO‐15,Compensateforthelossofalkalimeadowhabitat,wouldreducethisimpacttoaless‐than‐significantlevel.This
![Page 66: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/66.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐10 September 2018
ICF 00631.17
conclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐16:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonriparianhabitat(noimpact)
WhilethePEIRidentifiedseveralcategoriesofriparianhabitatintheprogramarea,thesurveysconductedinsupportoftheBiologicalResourcesEvaluationidentifiednoriparianhabitatintheProjectarea.Therewouldbenoimpact,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactBIO‐17:Potentialforground‐disturbingactivitiestoresultindirectadverseeffectsoncommonhabitats(lessthansignificant)
ThePEIRconcludedthatground‐disturbingactivitieswouldresultinthepermanentandtemporarylossofcommonhabitats—primarilyannualgrasslands.However,becauseoftheextentofthesehabitatsregionallyavailableandthereclamationactivitiesthatarepartoftheProject,thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactBIO‐18:Potentialforroadinfrastructureupgradestoresultinadverseeffectsonwetlands(lessthansignificantwithmitigation)
ThePEIRconcludedthatroadinfrastructureupgradeswouldresultinplacementoffillatcrossings,aswellaspossiblehydrologicalteration.ThisconclusionistrueoftheSandHillProjectaswell,particularlyinassociationwiththeaquaticresourcesdiscussedinImpactBIO‐15.Thiswouldbeasignificantimpact.ImplementationofMitigationMeasureBIO‐18,Compensateforthelossofwetlands,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐19:Potentialimpactonthemovementofanynativeresidentormigratorywildlifespeciesorestablishednativeresidentormigratorywildlifecorridors,andtheuseofnativewildlifenurserysites(significantandunavoidable)
ThePEIRconcludedthatconstructionactivitiescouldinterferewithwildlifemovementthroughintroductionofbarrierstopassage;moreover,asdiscussedinImpactsBIO‐11andBIO‐14,turbineoperationscouldinterferewithmovementofbirdsandbatsthroughturbine‐relatedmortality.Thiswouldconstituteasignificantimpact.ImplementationofMitigationMeasuresBIO‐1b,BIO‐1e,BIO‐3a,BIO‐4a,BIO‐5a,BIO‐5c,BIO‐7a,BIO‐8a,BIO‐8b,BIO‐10a,BIO‐11b,BIO‐11c,BIO‐11d,BIO‐11e,BIO‐11i,BIO‐12a,BIO‐12b,BIO‐14a,andBIO‐14dwouldreducethisimpactbutnottoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐20:Conflictwithlocalplansorpolicies(lessthansignificantwithmitigation)
AsdescribedinthePEIR,theECAPhasseveralpoliciesrelatedtowindfarms,includingestablishingamitigationprogramtominimizetheimpactsofwindturbineoperationsonbirdpopulations.Lossofspecial‐statusspeciesandtheirhabitat,lossofalkalimeadow,lossofriparianhabitat,andlossofexistingwetlandsasaresultofimplementingtheprogramwouldbeinconflictwiththesepolicies.
![Page 67: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/67.jpg)
Alameda County Community Development Agency Environmental Analysis
Biological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.4‐11 September 2018
ICF 00631.17
BecausetheconditionsintheProjectareaandfeaturesandcharacteristicsoftheSandHillProjectareconsistentwiththosecontemplatedinthePEIR,theimpactwouldbethesame,exceptthatriparianhabitatisnotpresentintheProjectarea.Thisimpactwouldbesignificant;however,implementationofMitigationMeasuresBIO‐1athroughBIO‐1e,BIO‐3a,BIO‐4a,BIO‐4b,BIO5athrough5c,BIO‐7a,BIO‐7b,BIO‐8a,BIO‐8b,BIO‐9,BIO10a,BIO‐10b,BIO‐15,BIO‐16,andBIO‐18wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactBIO‐21:ConflictwithprovisionsofanadoptedHCP/NCCPorotherapprovedlocal,regional,orstatehabitatconservationplan(noimpact)
BecausetherearenoadoptedHCP/NCCPsfortheprogramareaandtheprogramwouldnotconflictwiththeEACCS,therewouldbenoimpact.ThesameistruefortheProjectarea.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
3.4.3 References Cited
CaliforniaDepartmentofFishandWildlife.2018.CaliforniaNaturalDiversityDatabase,RareFind5,July2018.SearchoftheMidwayandCliftonCourtForebayUSGS7.5‐minuteQuadranglesand10surroundingquadrangles.Sacramento,CA.
ICFInternational.2013.BiologicalResourcesTechnicalReportfortheSandHillProject.February.(ICF00456.12.)Sacramento,CA.PreparedforFloDesignWindTurbineCorporation,Waltham,MA.
U.S.FishandWildlifeService.2018.IPaCTrustResourceReport.ListofFederalEndangeredandThreatenedSpeciesThatOccurinorMayBeAffectedbytheProject.Available:http://www.fws.gov/sacramento/es_species/Lists/es_species_lists.cfm.Accessed:January2018.
![Page 68: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/68.jpg)
Alameda County Community Development Agency Environmental Analysis
Cultural Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.5‐1 September 2018
ICF 00631.17
3.5 Cultural Resources ThefollowinganalysisisbasedonculturalresourcesinvestigationsconductedfortheproposedProject(AppendixC).ImpactsrelativetoculturalresourcesdependprimarilyonProjectscopeandarea.ThefootprintofindividualturbineswouldbethesameasdescribedinthePEIR.
3.5.1 Existing Conditions
AsdirectedbyMitigationMeasureCUL‐2a,Conductapreconstructionculturalfieldsurveyandculturalresourcesinventoryandevaluation,inthePEIR,investigationswereconductedfortheproposedProject.Theseinvestigationsidentifiedthreepreviouslydocumentedresourceswithintheareaofpotentialeffects(APE).
P‐01‐010613—AsegmentofGrantLineRoad(P‐01‐010613)alongtherouteoftheoriginalLincolnHighway,thefirstpavedtranscontinentalroad,constructedaround1870.
P‐01‐010947—ThePittsburg‐Tesla230kVtransmissionlineconstructedbyPG&Ein1959–1960.
P‐01‐011395—A6‐milesegmentofthePG&ETracy–Tesla230kVtransmissionlinebuiltbetween1949and1953.
Resourceslocatedwithin0.25mileoftheAPEincludeahistoric‐periodranchcomplex,apossibleboundarymarker/fence,andtwosandstonemillingstations.
AportionoftheCaliforniaAqueductmainlineintersectswiththeProjectAPEattwolocationssouthofBethanyReservoir.SegmentsoftheCaliforniaAqueductinotherlocationshavebeenevaluatedforeligibilityforinclusionintheNationalRegisterofHistoricPlaces(NRHP)/CaliforniaRegisterofHistoricResources(CRHR),andthefullextentoftheaqueducthasbeendeterminedeligibleforlistingintheNRHPandCRHR.
Reviewofhistoricliteratureandmapsrevealsthat,withtheexceptionofconstructionoftheCaliforniaAqueductandwindturbines,limiteddevelopmenthasoccurredintheAPE;rather,thevicinityhasbeenusedprimarilyascattlerangeland.WiththeexceptionoftheCaliforniaAqueduct—whichwouldnotbeaffectedbytheProject—theAPEisnotexpectedtocontainhistoricbuiltresources.
TheNativeAmericanHeritageCommission(NAHC)wascontactedthreetimesinJanuaryandFebruary2018torequestasacredlandsfiledatabasesearchandtosolicitanynewinformationsincethePEIRculturalresourcesinvestigationswereconducted.Todate,noresponsehasbeenreceived.
3.5.2 Environmental Impacts and Mitigation Measures
ImpactCUL‐1:Causeasubstantialadversechangeinthesignificanceofahistoricalresource(noimpact)
ThePEIRidentified19historicarchitecturalculturalresourcesintheprogramarea,andconcludedthatrepoweringprojectscouldresultinanadversechangeonsuchresourcesintheprogramarea.
![Page 69: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/69.jpg)
Alameda County Community Development Agency Environmental Analysis
Cultural Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.5‐2 September 2018
ICF 00631.17
ThreehistoricresourceswereidentifiedwithintheProjectarea:P‐01‐010613(GrantLineRoad)andP‐01‐010947andP‐01‐011395(bothhistorictransmissionlines).TheseresourceswerenotformallyevaluatedforeligibilityineithertheNRHPortheCRHR.However,GrantLineRoadisanactivelyusedroadwayandthetransmissionlinesconsistofoverheadpowerlines,noneofwhichwouldbeaffectedbyProjectactivities.Similarly,whileasegmentoftheCaliforniaAqueductintersectswiththeAPE,Project‐relatedactivitiesarenotanticipatedtodisturbtheseresources.TheProjectwouldnotchangeormodifytheaqueduct.TheProjectwouldincludeagen‐tielinethatwouldcrossovertheaqueductusinganoverheadelectricallineonpolesorconnectingconduittoanexistingbridge,oritwouldcrossundertheaqueductusingdirectionalboring.Directionalboringwouldnotaffecttheaqueduct.Attachingconduittoanexistingbridgewouldnotchangethefunctionordesignofthebridgeandthereforewouldnotaffecttheintegrityoftheoverallaqueduct.Becauseanoverheadelectricallineisalreadypresent,thegen‐tielinewouldnotchangetheexistingconditionsandwouldnotchangetheintegrityoftheoverallaqueduct.Accordingly,theProjectwouldnotcauseasubstantialadversechangeinthesignificanceofahistoricalresource.Therewouldbenoimpact,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactCUL‐2:Causeasubstantialadversechangeinthesignificanceofanarchaeologicalresource(lessthansignificantwithmitigation)
OfthefourpreviouslydocumentedresourceslocatedneartheAPE,two—P‐01‐000163(ranchcomplex)andP‐01‐011596(millingstation)—weredocumentedasbeinglocateddirectlyadjacenttotheAPE.PedestriansurveyrelocatedbothresourcesoutsidetheAPE,andtheywouldnotbeaffectedbytheProject.NopreviouslyundocumentedarchaeologicalresourceswereidentifiedwithintheAPEduringthepedestriansurvey.
AlthoughtheAPEandvicinitywereusedbyprehistoricpeoples,thenatureofthislandusewouldprimarilyhavebeenresourcecollection.Consequently,theexpectedrangeofprehistoricartifactandfeaturetypesintheAPEwouldincludeprojectilepointsandlithictools,lithicdebitage,bedrockmortars,andgrindingstones.Althoughtheareacouldhavebeenusedforuplandresourcecollectionactivities,theAPEislocatedfarfrompermanentwatersourcesandis,therefore,expectedtohavemoderatetolowpotentialtocontainprehistoricarchaeologicalresources.
IntheeventthatarchaeologicalresourcesareinadvertentlyuncoveredduringProjectconstruction,implementationofMitigationMeasuresCUL‐2b,Developatreatmentplanforanyidentifiedsignificantculturalresources;CUL‐2c,Conductworkerawarenesstrainingforarchaeologicalresourcespriortoconstruction;andCUL‐2d,Stopworkifculturalresourcesareencounteredduringground‐disturbingactivities,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactCUL‐3:Disturbanyhumanremains,includingthoseinterredoutsideofformalcemeteries(lessthansignificantwithmitigation)
ThePEIRconcludedthatalthoughthereisnoindicationthattheprogramareahasbeenusedforhumanburials,becauseprehistoricsitesareknowntobepresentintheprogramarea,thepossibilitycannotbediscountedentirely.IntheunanticipatedeventthathumanremainsareencounteredduringProjectconstruction,implementationofMitigationMeasureCUL‐3,Stopworkifhumanremainsareencounteredduringground‐disturbingactivities,wouldreducethisimpacttoa
![Page 70: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/70.jpg)
Alameda County Community Development Agency Environmental Analysis
Cultural Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.5‐3 September 2018
ICF 00631.17
less‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 71: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/71.jpg)
Alameda County Community Development Agency
Environmental AnalysisGeology, Soils, Mineral Resources, and
Paleontological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.6‐1 September 2018
ICF 00631.17
3.6 Geology, Soils, Mineral Resources, and Paleontological Resources
AsdescribedinthePEIR,therearenoknownmineralresourcesintheprogramareaanditwasconcludedthattheprogramwouldnotaffectmineralresources.Accordingly,mineralresourcesarenotfurtherconsideredinthisanalysis.
3.6.1 Existing Conditions
AsdescribedinthePEIR,theprogramarea,knownforthefrequentoccurrenceofearthquakesandpotentialgroundshaking,containstwoactivefaults,whicharezonedundertheAlquist‐PrioloAct.Theprogramareaisinsteep,hillyterrainknowntobesusceptibletoearthquake‐inducedlandsliding.Althoughthepotentialforliquefactionislikelylowbecauseofthedepthtogroundwaterandtheageofthegeologicunitsintheprogramarea,theriskoflateralspreadanddifferentialsettlementisnotknown.Expansivesoilsoccurinmuchoftheprogramarea,particularlyintheFontana‐Diablo‐Altamontsoilassociation,whichcharacterizestheSandHillProjectarea.Geologicunitsintheprogramareahavethepotentialtocontainpaleontologicalresources;however,mostoftheProjectareaisnotwithintheNerolyFormation,ageologicunitparticularlysensitiveforfossilmaterial.
3.6.2 Environmental Impacts and Mitigation Measures
AsdisclosedinSection1.3.4,OperationsandMaintenanceFacility,thePEIRdidnotaddressO&Mfacilitiesattheprogramlevel,andthetwoProject‐levelanalysesassumedthatnosepticorotherwastewatertreatmentsystemwouldbenecessary.However,SandHillproposestoinstallsuchasysteminconjunctionwithitsO&Mfacility.Inaccordancewithlocalregulations,theinstallationofsuchasystemwouldbesubjecttoapprovalandpermittingbyAlamedaCountyDepartmentofEnvironmentalHealth.Ifpreconstructioninvestigationsindicatethatthesoilsonsitearenotsuitabletosupportsuchasystem,portabletoilets,suppliedandservicedbyacommercialvendor,wouldbeusedinstead.BecausethisimpactwasdismissedinthePEIR,nonewimpactnumberhasbeenintroducedforthisanalysis;moreover,becauseasystemwouldonlybeinstalledifitcomplieswithlocalregulations,itwouldnotpresentanewsignificantimpact.Inaddition,theuseofportabletoiletswouldnotconstituteasignificantimpactinthecontextofsoilsbecauseoftheirownregulatoryrequirements.Accordingly,thisimpactwouldbelessthansignificantandwouldnotentailanewsignificantimpactoroneofgreaterseveritythanwasdisclosedinthePEIR.
ImpactGEO‐1:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofruptureofaknownearthquakefault(lessthansignificantwithmitigation)
ThePEIRidentifiedthreeactivefaultsintheprogramarea;however,onlyasmallportionoftheMidwayfault,designatedaspotentiallyactive,approachestheProjectarea.Ifaturbinewereconstructedonornearafault,ruptureofthatfaultcoulddamageaturbineorcauseharmtopersonnelonthesite.Theturbinecouldbedamagedorcollapseandpossiblyinjurepersonnelorpropertyintheimmediatearea.However,becausetheProjectareaismoreremovedfromidentified
![Page 72: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/72.jpg)
Alameda County Community Development Agency
Environmental AnalysisGeology, Soils, Mineral Resources, and
Paleontological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.6‐2 September 2018
ICF 00631.17
faultsthanmuchoftheprogramarea,noimpactsbeyondthoseidentifiedinthePEIRwouldresult.ImplementationofMitigationmeasureGEO‐1,Conductsite‐specificgeotechnicalinvestigationandimplementdesignrecommendationsinsubsequentgeotechnicalreport,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactGEO‐2:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofstrongseismicgroundshaking(lessthansignificantwithmitigation)
AsdisclosedinthePEIR,constructionofturbinesorpowercollectionsystemsinareaswiththepotentialtoexperiencestronggroundshakingcouldexposepeopleorstructurestopotentialsubstantialadverseeffects.Theturbinecouldbedamagedorcollapseandpossiblyinjurepersonnelordamagepropertyintheimmediatearea.ImplementationofMitigationMeasureGEO‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactGEO‐3:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultofseismic‐relatedgroundfailure,includinglandslidingandliquefaction(lessthansignificantwithmitigation)
AsdisclosedinthePEIR,ifturbinefoundationsorpowercollectionsystemsarenotproperlydesignedandsitedfortheearthquake‐inducedgroundfailureconditionspresentintheprogramarea,theycouldfailandcausedamagetoorcollapseoftheturbinetowersorcollectionsystem.Thisdamageorcollapsecouldcauseharmtopersonnelorpropertyintheimmediatearea.Althoughthepotentialforliquefactionislikelylowbecauseofthedepthtogroundwaterandtheageofthegeologicunitsintheprogramarea,theriskoflateralspreadanddifferentialsettlementisunknown.Thepotentialdamageandharmthatcouldresultfromlandsliding,lateralspread,ordifferentialsettlementwouldbeasignificantimpact.ImplementationofMitigationMeasureGEO‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactGEO‐4:Exposepeopleorstructurestopotentialsubstantialadverseeffects,includingtheriskofloss,injury,ordeath,asaresultoflandsliding(lessthansignificantwithmitigation)
AsdisclosedinthePEIR,inadditiontoseismic‐relatedgroundfailurediscussedinprecedingimpacts,constructionofturbinesorpowercollectionsystemsinareaswithpotentialtoexperiencenon‐seismic‐relatedlandslidingcausedbyheavyprecipitationcouldalsoexposepeopleorstructurestopotentialsubstantialadverseeffects.Damageorcollapseresultingfromlandslidingcouldcauseharmtopersonnelorpropertyintheimmediatearea.
WhiletheProjectmustcomplywithexistingregulatoryrequirements(buildingsafetyrequirements),theserequirementsmaynotaddressallgroundfailureissues.ImplementationofMitigationMeasureGEO‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 73: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/73.jpg)
Alameda County Community Development Agency
Environmental AnalysisGeology, Soils, Mineral Resources, and
Paleontological Resources
Sand Hill Wind Repowering Project Environmental Analysis
3.6‐3 September 2018
ICF 00631.17
ImpactGEO‐5:Resultinsubstantialsoilerosionorthelossoftopsoil(lessthansignificant)
AsdisclosedinthePEIR,decommissioningandProjectconstructioncouldcausesurfacedisturbanceandvegetationremovalresultinginsoilerosion.However,compliancewithfederalandlocalerosion‐relatedregulations(e.g.,theSWPPPdevelopedfortheProject,requirementsofthecounty’sStormwaterQualityManagementPlan)wouldensurethatground‐disturbingactivitiesdonotresultinsignificanterosion.Moreover,thePEIRrequiresareclamationplanwithspecificmeasurestakentoensurethatrepoweringsitesareregradedandseededtopre‐Projectconditions.Theserequirementswouldensurethatpotentialimpactsofsoilerosionwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactGEO‐6:Belocatedonexpansivesoil,creatingsubstantialriskstolifeorproperty(lessthansignificantwithmitigation)
ThePEIRdisclosedthatexpansivesoilsoccurinmuchoftheprogramarea,particularlyintheFontana‐Diablo‐Altamontsoilassociation,whichcharacterizestheProjectarea.Turbinefoundationsbuiltonexpansivesoilswouldbesubjecttotheshrinkandswellofthesesoils,whichcoulddamagestructuresifthesubsoil,drainage,andfoundationarenotproperlyengineered.However,soilsamplingandtreatmentproceduresareaddressedbystateandlocalbuildingcodes.CompliancewiththesecodesandimplementationofMitigationMeasureGEO‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactGEO‐7:Directlyorindirectlydestroyauniquepaleontologicalresourceorsiteoruniquegeologicfeature(lessthansignificantwithmitigation)
AccordingtothePEIR,sedimentaryrocks—geologicunitswithpotentialtocontainpaleontologicalresources—includemostunitsintheprogramarea.Becausemostoftheprogramareaischaracterizedbygeologicunitsconsideredtobesensitiveforpaleontologicalresources,thisanalysisassumesthesametobetrueoftheProjectarea.Substantialdamagetoordestructionofsignificantpaleontologicalresourceswouldbeasignificantimpact.ImplementationofMitigationMeasuresGEO‐7a,Retainaqualifiedprofessionalpaleontologisttomonitorsignificantground‐disturbingactivities;GEO‐7b,MitigationMeasureGEO‐1g:Retainaqualifiedprofessionalpaleontologisttomonitorsignificantground‐disturbingactivities;andGEO‐7c,Stopworkifsubstantialfossilremainsareencounteredduringconstruction,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 74: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/74.jpg)
Alameda County Community Development Agency Environmental Analysis
Greenhouse Gas Emissions
Sand Hill Wind Repowering Project Environmental Analysis
3.7‐1 September 2018
ICF 00631.17
3.7 Greenhouse Gas Emissions TheproposedProjectisasubsetoftheAPWRA‐widerepoweringevaluatedinthePEIR.Project‐levelgreenhousegas(GHG)emissionsandassociatedimpactswereassessedusingthesamemethodsasdescribedaboveinSection3.3,AirQuality.RefertoAppendixAforadditionalmodelingdetail,includingequipmentandvehicleassumptions.
3.7.1 Existing Conditions
BecauseGHGemissionsresultinglobalimpacts,andbecauseProject‐specificactivitiesarecommensuratewiththoseevaluatedinthePEIR,thedescriptionofexistingconditionspresentedinthePEIRisincorporatedherebyreference.NotethatsincepublicationofthePEIR,thestatehasadoptedSenateBill(SB)32,whichrequiresARBtoensurethatstatewideGHGemissionsarereducedtoatleast40percentbelow1990levelsby2030.The2017ClimateChangeScopingPlanpresentsmeasuresthestatewillimplementtoachievethisgoal,includingfurtheringtherenewablesportfoliostandard(RPS)torequirethat50%ofretailelectricitysalesoriginatefromrenewableresourcesby2030.
3.7.2 Environmental Impacts and Mitigation Measures
ImpactGHG‐1:Generategreenhousegasemissions,eitherdirectlyorindirectly,thatmayhaveasignificantimpactontheenvironment(lessthansignificant)
ThePEIRconcludedthatwhilerepoweringtheAPWRA(anaggregateofalltheanticipatedrepoweringprojectsproposedwithintheprogramarea)wouldresultinshort‐termemissionsofGHGs,primarilyassociatedwithconstructionactivities,andthepotentialoperationalemissionofsulfurhexafluoride(SF6),therepoweringprojectscollectivelywouldresultinanannualnetreductionofmorethan100,000tonsofcarbondioxideequivalentemissions(CO2e).Thisbeneficialimpactwouldbelessthansignificant.
AsdetailedinAppendixA,thewindenergygeneratedbytheproposedProjectwouldreduceGHGemissionsbyapproximately50,000metrictonsCO2eperyear.ThiswouldmorethanoffsetemissionsgeneratedbyProjectconstructionandO&M.Thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactGHG‐2:Conflictwithanapplicableplan,policy,orregulationadoptedforthepurposeofreducingtheemissionsofgreenhousegases(lessthansignificantwithmitigation)
ThePEIRevaluatedtherepoweringoftheprogramareaforconsistencywiththefollowingmeasuresrelevanttoGHGemissions.
AssemblyBill(AB)32ScopingPlanMeasureT‐7:Heavy‐DutyVehicleGHGEmissionReduction(AerodynamicEfficiency)—DiscreteEarlyAction.
AB32ScopingPlanMeasureE‐3:RenewablesPortfolioStandard(RPS)
AB32ScopingPlanMeasureH‐6:HighGlobalWarmingPotentialGasReductionsfromStationarySources–SF6LeakReductionandRecyclinginElectricalApplications.
![Page 75: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/75.jpg)
Alameda County Community Development Agency Environmental Analysis
Greenhouse Gas Emissions
Sand Hill Wind Repowering Project Environmental Analysis
3.7‐2 September 2018
ICF 00631.17
AlamedaCountyClimateActionPlan(CAP)MeasureE‐10:Requirenewconstructiontousebuildingmaterialscontainingrecycledcontent.
AlamedaCountyCAPMeasureWS‐2:StrengthentheConstructionandDemolitionDebrisManagementOrdinance.
WiththeexceptionofScopingPlanMeasureE‐3,thePEIRconcludedthattherepoweringprojectscouldpotentiallyconflictwithallthesemeasures.However,implementationofMitigationMeasuresGHG‐2a,Implementbestavailablecontroltechnologyforheavy‐dutyvehicles;GHG‐2b,InstalllowSF6leakratecircuitbreakersandmonitoring;GHG‐2c,Requirenewconstructiontousebuildingmaterialscontainingrecycledcontent;andGHG‐2d,Complywithconstructionanddemolitiondebrismanagementordinance,wouldreducethispotentialimpacttoaless‐than‐significantlevel.
Inconcept,theproposedProjectisbeingpursuedtopromotesustainabilityandfurtheralternativeenergy.AlthoughthemeasuresincludedintheAB32ScopingPlan,2017ClimateChangeScopingPlan,andAlamedaCountyCAParenecessarilybroad,theproposedProjectisgenerallyconsistentwiththegoalsanddesiredoutcomesoftheplans.TheadditionalwindenergygeneratedbytheProjectwilldirectlysupportthedecarbonizationoftheelectricpowersector,helpingCaliforniatomeetitsGHGgoalsinSB32andExecutiveOrderS‐3‐05.4Nevertheless,emissionsgeneratedbytheProjectcouldpotentiallyconflictwithapplicablemeasuresintheAB32ScopingPlan,2017ClimateChangeScopingPlan,andAlamedaCountyCAP.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
4CaliforniaEOS‐03‐05seekstoreduceemissionstoatleast80percentbelow1990levelsby2050.
![Page 76: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/76.jpg)
Alameda County Community Development Agency Environmental Analysis
Hazards and Hazardous Materials
Sand Hill Wind Repowering Project Environmental Analysis
3.8‐1 September 2018
ICF 00631.17
3.8 Hazards and Hazardous Materials ThePEIRevaluatedthepotentialforimpactsrelatingtohazardsandhazardousmaterials.BecausethecharacteristicsoftheProjectareaandtheactivitiesassociatedwithProjectconstructionandoperationarethesameasthosecontemplatedinthePEIR,existinghazardsandhazardousconditionsintheProjectareaaregenerallythesameasthoseanalyzedinthePEIR.TheuseofhazardousmaterialsduringProjectconstruction,operations,andmaintenanceactivitieswouldbesimilar.IssuesrelatedtotheProject’sproximitytoschoolsandairportsarecoveredunderthePEIRasarewildlandfirerequirements.DuetothelargergenerationcapacityoftheProject’sproposedturbines,fewerturbineswouldberequired.However,theywouldbelargerandwould,likeallrepoweringprojects,besubjecttoCountyreview.
3.8.1 Existing Conditions
TheProjectareaisinthenortheastportionoftheprogramareanorthofI‐580neartheTownofByron.TheconditionsdescribedinthePEIRalsopertaintotheProjectarea.ThecharacteristicsoftheProjectregardingthetypeofpotentialhazardsintheareaandthetypeanduseofhazardousmaterialswouldnotdifferfromthoseaddressedinthePEIR.Thepotentialforandtypeofbladethrow,addressedinthediscussionofImpactHAZ‐9,wouldnotdifferfromthosehazardsconsideredinthePEIR;however,discussionofthelargerturbinesisincludedforpurposesoffulldisclosure.
3.8.2 Environmental Impacts and Mitigation Measures
ImpactHAZ‐1:Createasignificanthazardtothepublicortheenvironmentthroughtheroutinetransport,use,ordisposalofhazardousmaterials(lessthansignificant)
ThePEIRconcludedthatProjectconstructionwouldinvolvesmallquantitiesofcommonlyusedmaterials,suchasfuelsandoils,tooperateconstructionequipment.TheProjectwouldimplementstandardconstructionBMPs,asrequiredbytheSWPPP,toreducepollutantemissionsduringconstruction.Thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactHAZ‐2:Createasignificanthazardtothepublicortheenvironmentthroughreasonablyforeseeableupsetandaccidentconditionsinvolvingthereleaseofhazardousmaterialsintotheenvironment(lessthansignificant)
TheProjectwouldnotinvolveactivitiesormaterialsbeyondthosedescribedinthePEIR.Further,theProjectwouldnotcreateasignificanthazardtothepublicortheenvironmentthroughreasonablyforeseeableupsetoraccidentconditionsinvolvingthereleaseofhazardousmaterialsintotheenvironment.Thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
![Page 77: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/77.jpg)
Alameda County Community Development Agency Environmental Analysis
Hazards and Hazardous Materials
Sand Hill Wind Repowering Project Environmental Analysis
3.8‐2 September 2018
ICF 00631.17
ImpactHAZ‐3:Emithazardousemissionsorinvolvehandlinghazardousoracutelyhazardousmaterials,substances,orwastewithin0.25mileofanexistingorproposedschool(noimpact)
TherearenopublicorprivateK–12schoolswithin0.25mileoftheProjectarea.Thenearestschool,MountainHouseElementarySchool,isapproximately0.54mileeastofthenearestProjectfacilitiesanditisunlikelythathazardousmaterialswouldbeemittedorreleasedwithin0.25mileofanyschools.Therewouldbenoimpact,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactHAZ‐4:Locationonahazardousmaterialssite,creatingasignificanthazardtothepublicortheenvironment(lessthansignificantwithmitigation)
TheProjectwouldinvolvesoildisturbanceand,asoutlinedinthePEIR,forallprojectsrequiringaCUP,theCountywouldrequirethataPhaseIEnvironmentalSiteAssessment(andremediation,ifnecessary)beconductedpriortoconstructionactivitiesasastandardconditionofapprovalfortheCUP.Accordingly,implementationofMitigationMeasureHAZ‐4,PerformaPhaseIEnvironmentalSiteAssessmentpriortoconstructionactivitiesandremediateifnecessary,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactHAZ‐5:Locationwithinanairportlanduseplanareaor,wheresuchaplanhasnotbeenadopted,within2milesofapublicairportorpublicuseairport,resultinginasafetyhazardforpeopleresidingorworkingintheprojectarea(lessthansignificantwithmitigation)
TheclosestpublicairporttotheProjectareaistheByronAirport,approximately2.7milesnorthoftheProjectarea.LivermoreMunicipalAirportisapproximately11.4milessouthwestoftheProjectarea,andTracyMunicipalAirportisapproximately8milessoutheastoftheProjectarea.BecausetheProjectareaisnotwithin2milesofapublicairport,implementationoftheProjectwouldnotnormallyresultinasafetyhazardforpeopleresidingorworkingintheProjectarea.However,accordingtothePEIR,projectswithfacilitiesintheinfluenceareazonesoflocalairportsarerequiredtosubmitaNoticeofProposedConstructionorAlterationformtotheFAAforreviewandtoimplementallFAArequirementstoreducepotentialaviationimpacts.AreviewoftheByronAirportinfluenceareazoneindicatesthattheProjectisoutsideallinfluenceareazones.ImplementationofMitigationMeasureHAZ‐5,CoordinatewiththeContraCostaALUC[AirportLandUseCommission]priortofinaldesign,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactHAZ‐6:Locationwithinthevicinityofaprivateairstrip,resultinginasafetyhazardforpeopleresidingorworkingintheprojectarea(lessthansignificant)
TheclosestprivateairportisMeadowlarkAirfield,6.25milessouthwestoftheProjectarea.BecausetheProjectareaisnotwithin2milesofaprivateairport,implementationoftheProjectwouldnotresultinasafetyhazardforpeopleresidingorworkingintheProjectarea.AdherencetotherequirementsdescribedinImpactHAZ‐5wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 78: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/78.jpg)
Alameda County Community Development Agency Environmental Analysis
Hazards and Hazardous Materials
Sand Hill Wind Repowering Project Environmental Analysis
3.8‐3 September 2018
ICF 00631.17
ImpactHAZ‐7:Impairimplementationoforphysicallyinterferewithanadoptedemergencyresponseplanoremergencyevacuationplan(lessthansignificantwithmitigation)
ThePEIRconcludedthatimpactsassociatedwithemergencyresponseplanswouldbetemporary,occurringprimarilyduringconstruction,withthepotentialtocauseasubstantialtrafficincreaseonlocalcountyroads.ImplementationofMitigationMeasureTRA‐1,Developandimplementaconstructiontrafficcontrolplan,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactHAZ‐8:Exposepeopleorstructurestoasignificantriskofloss,injury,ordeathinvolvingwildlandfires,includingwherewildlandsareadjacenttourbanizedareasorwhereresidencesareintermixedwithwildlands(lessthansignificant)
ThePEIRconcludedthatwhilewindturbinescancausefireignitions,sufficientfireresponseprovidersarealreadyinplace.Moreover,fewerturbinesandtheimprovedsafetyofnewermodelsassociatedwithrepoweredprojectsareanticipatedtoresultinareductionofpotentialfireignitions.ThePEIRconcludedthatthefire‐relatedimpactofindividualrepoweringprojectswouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactHAZ‐9:Duringnormaloperation,theeffectsofbendingandstressonrotorbladesovertimecouldleadtobladefailureandbecomeapotentialbladethrowhazard(lessthansignificant)
BladethrowimpactsasassessedinthePEIRrelylargelyontheUpdatedAlamedaCountyTurbineSetbackRequirements(Table2‐3),whicharecalculatedbasedonrotor(blade)length,totalturbineheight,orapercentageofthegeneralsetback,withsomesetbacksalsoadjustedforelevation.TheproposedturbineswouldbewithinthePEIRspecificationsforrotortype,towertype,tower(hub)height,andtotalturbineheight.However,bladelengthswouldbeupto15feetlongerthanthebladescontemplatedinthePEIR.Thegeneralandalternativeminimumsetbacksthatuserotorlengthtoapplyasetbackstandardwouldonlyapplytoadjacentparcels(withorwithoutapprovedwindenergyCUPs).Sincethebladelengthsonlydifferby15feet,thischangewouldaddanadditionalsetbackdistanceof16.5feet(1.1timesbladelength)whenapplyingthesetbackrequirements—agreater(i.e.,moreprotective)setbackthanthatbasedonthebladelengthsenvisionedinthePEIR.PriortofinalProjectdesign,theCountywouldensurethatallsetbackrequirements,whethergeneraloralternativeminimum,aremet.SandHillwouldberequiredtoeithermeettheCounty’sgeneralsetbacksormeettheconditionsrequiredtoimplementalternativeminimumsetbacks.AdherencetoCountyrequirementswouldensurethatimpactsrelatedtobladethrowaremaintainedataless‐than‐significantlevel,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.Thus,thechangetoalargerturbinewouldhavenochangetotheapproachorfindingsregardingsetbacksandhazards.Therewouldbenonewsignificanteffectsorsubstantialincreaseintheseverityofeffectsforhazards.
![Page 79: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/79.jpg)
Alameda County Community Development Agency Environmental Analysis
Hydrology and Water Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.9‐1 September 2018
ICF 00631.17
3.9 Hydrology and Water Quality ThePEIRcontemplatedtheimpactsonhydrologyandwaterqualitythatcouldresultfromconstructionandoperationofwindrepoweringprojectsthroughouttheprogramarea.TheonlychangerelevanttothisresourcetopicfromtheprojectsconsideredinthePEIRisthelargercapacityoftheturbinesproposedforuseintheSandHillProject:3.6–3.8MWturbinescontrastedwithamaximumof3MWconsideredinthePEIR.TheconsequenceofthischangewouldbeatleasteightfewerturbinesundertheSandHillProjectthanwouldhavebeennecessarytoachievethesamenameplatecapacity(i.e.,144.5MW)undertheturbinespecificationsconsideredinthePEIR.DespitethelargergenerativecapacityoftheSandHillturbines,theiroveralldimensionswouldbewithintheparametersestablishedinthePEIR—mostimportantly(pertainingtotheintroductionofimpervioussurfaces),thefootprintofindividualturbineswouldbethesameasdescribedinthePEIR.
3.9.1 Existing Conditions
AsdisclosedinthePEIR,theProjectareaissouthwestoftheSanJoaquin–SacramentoDeltaintheCliftonCourtForebaywatershed,andisintheTracygroundwatersubbasin.TheconditionsdescribedinthePEIRpertaintotheProjectarea.
3.9.2 Environmental Impacts and Mitigation Measures
ImpactWQ‐1:Violateanywaterqualitystandardsorwastedischargerequirements(lessthansignificantwithmitigation)
TheProjectwouldentailthesametypesofconstructionactivitiesasdisclosedinthePEIR,andtheseactivitieswouldpotentiallyresultinthesamerangeofimpacts.Trenchingandsitepreparationcreateareasofbaresoilthatcanincreasesedimentdischargetoreceivingwaters.ImplementationofMitigationMeasureWQ‐1,ComplywithNPDESrequirements,(e.g.,erosioncontrolBMPs,implementationofastormwaterpollutionpreventionplan[SWPPP]),wouldreducetheseimpactstoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactWQ‐2:Substantiallydepletegroundwatersuppliesorinterferesubstantiallywithgroundwaterrecharge,resultinginanetdeficitinaquifervolumeoraloweringofthelocalgroundwatertablelevel(e.g.,theproductionrateofpre‐existingnearbywellswoulddroptoalevelthatwouldnotsupportexistinglandusesorplannedusesforwhichpermitshavebeengranted)(lessthansignificant)
AsdisclosedinthePEIR,ProjectconstructionandoperationwouldentailminimaluseofwaterbeyondstandardBMPssuchasroadandworksitedustcontrolmeasures.Accordingly,demandongroundwatersupplieswouldbenegligible.ThePEIRalsoconcludedthattherelativelysmallfootprints(approximately2.6acresforthe40turbinesoftheSandHillProject)ofthewindturbineswouldnotinterferewithgroundwaterinfiltration.Moreover,whilethePEIRassumedamaximumindividualturbinecapacityof3MW,theSandHillProjectcontemplates3.8MWturbines,requiring40turbinestoachievetheProject’s144.5MWcapacitycomparedtothe48turbinesthatwouldhave
![Page 80: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/80.jpg)
Alameda County Community Development Agency Environmental Analysis
Hydrology and Water Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.9‐2 September 2018
ICF 00631.17
beenrequiredunderthePEIRassumptions.Thedecreaseofeightturbineswouldequatetoapproximately0.5acrelessofimpermeablesurfacethanthatconsideredinthePEIR.Theimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactWQ‐3:Substantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,inamannerthatwouldresultinsubstantialerosionorsiltationonsiteoroffsite(lessthansignificantwithmitigation)
AsdisclosedinthePEIR,noturbineswouldbeconstructedwithinexistingdrainageareas,andProjectfacilitieswouldbedesignedtoavoidanydownstreamerosionduringtherainyseason.ImplementationofMitigationMeasureWQ‐1wouldensurethatprogram‐relatedstormwaterrunoffwouldnotresultinsubstantialerosionordownstreamsiltation.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactWQ‐4:Substantiallyaltertheexistingdrainagepatternofthesiteorarea,includingthroughthealterationofthecourseofastreamorriver,orsubstantiallyincreasetherateoramountofsurfacerunoffinamannerthatwouldresultinfloodingonsiteoroffsite(lessthansignificantwithmitigation)
TheanalysisinthePEIRconcludedthatthemostextensiveincreaseinimpervioussurfaceswouldresultfromroadimprovementsnecessarytoaccommodatethenew,largerturbines.However,asdisclosedinthePEIR,thesoilsunderlyingtheprogramareaoverallarehighrunoffsoils,witharunoffpotentialcomparabletothatofcompactedgravelroads.Becausetheroadsthemselveswouldnotconsequentlyentailintroductionofnewimpervioussurfaces,andbecausetheNPDESstormwaterConstructionGeneralPermitrequirespostconstructionrunoffmanagementmeasuresbeimplementediftheSWPPPdeterminesthattheProjectcouldcauseanincreaseinpeakrunoffflows,implementationofMitigationMeasureWQ‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactWQ‐5:Createorcontributerunoffwaterthatwouldexceedthecapacityofexistingorplannedstormwaterdrainagesystemsorprovidesubstantialadditionalsourcesofpollutedrunoff(lessthansignificantwithmitigation)
AsestablishedinthePEIR,theprogramareadoesnotcurrentlyhaveexistingorplannedstorm‐waterdrainagefacilities;accordingly,theProjectwouldnotexceedcapacitiesofsuchfacilities.Moreover,aspreviouslydiscussed,implementationofMitigationMeasureWQ‐1wouldensurethattherewouldbenoincreaseintherateofpollutedrunoff.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactWQ‐6:Otherwisesubstantiallydegradewaterquality(lessthansignificantwithmitigation)
Because,asdisclosedinthePEIR,theprogramareadoesnotcurrentlyhaveanysubstantialwaterqualityissuesordrainagesthatcouldcarryasubstantialamountofpollutedrunofftoreceivingwaters,Projectconstructionisnotanticipatedtosubstantiallydegradewaterquality.Moreover,Projectoperationwouldnotresultinasubstantialamountofadditionalrunoff.Implementationof
![Page 81: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/81.jpg)
Alameda County Community Development Agency Environmental Analysis
Hydrology and Water Quality
Sand Hill Wind Repowering Project Environmental Analysis
3.9‐3 September 2018
ICF 00631.17
MitigationMeasureWQ‐1wouldreducethepotentialimpactsofconstruction‐relateddischargestoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactWQ‐7:Placehousingwithina100‐yearfloodhazardarea,asmappedonafederalFloodHazardBoundaryorFloodInsuranceRateMaporotherfloodhazarddelineationmap(noimpact)
NoportionoftheProjectareaiswithina100‐yearfloodhazardarea.
ImpactWQ‐8:Placewithina100‐yearfloodhazardareastructuresthatwouldimpedeorredirectfloodflows(noimpact)
NoportionoftheProjectareaiswithina100‐yearfloodhazardarea.
ImpactWQ‐9:Exposepeopleorstructurestoasignificantriskofloss,injury,ordeathinvolvingflooding,includingfloodingasaresultofthefailureofaleveeordam(lessthansignificant)
AsdisclosedinthePEIR,becausetheProjectareaisinrollinghillsandthereareno100‐yearfloodplains,thelikelihoodofafloodeventintheareaisconsideredminimal.Inaddition,becausetheProjectwouldnotinvolveconstructionofhousing,ifBethanyReservoirDamweretofail,thelikelihoodofsignificantriskorlossisconsideredminimal.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactWQ‐10:Contributetoinundationbyseiche,tsunami,ormudflow(lessthansignificantwithmitigation)
AsthePEIRconcluded,thelikelihoodofseicheortsunamiisconsideredminimal.Amudflowisalsohighlyunlikely,butsuchaneventcouldbepossibleinrollinghillsifproperBMPsarenotusedduringtheconstructionprocess.ImplementationofMitigationMeasureWQ‐1wouldensurethatProject‐relatedstormwaterrunoffwouldbeproperlycontainedandwoulddrainappropriatelytoprecludebuilduportocauserillsandsedimentationthatcouldresultinthepotentialforamudflow.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 82: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/82.jpg)
Alameda County Community Development Agency Environmental AnalysisLand Use and Planning
Sand Hill Wind Repowering Project Environmental Analysis
3.10‐1 September 2018
ICF 00631.17
3.10 Land Use and Planning Becausetherearenoestablishedcommunitiesintheprogramareathatwouldbebisectedbyanyproposedrepoweringproject,windenergyproductionisanestablishedandpermittedusethroughouttheAPWRA,andtheprogramareaisnotwithinanHCPorNCCParea,thePEIRconcludedthattherewouldbenoimpactsonlanduseandplanningassociatedwithrepoweringprojectswithintheprogramarea.BecausetheProjectareaisasubsetoftheprogramarea,theanalysisremainsvalid.Accordingly,thisresourcetopicisnotaddressedfurtherinthisanalysis.
![Page 83: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/83.jpg)
Alameda County Community Development Agency Environmental Analysis
Noise
Sand Hill Wind Repowering Project Environmental Analysis
3.11‐1 September 2018
ICF 00631.17
3.11 Noise ICFconductedshort‐andlong‐termnoisemonitoringnearresidentialusesinsupportofapreviousProjectinportionsoftheProjectareainJanuary2016(ICFInternational2016).TheresultsoftheanalysisconductedforthecurrentSandHillProjectarepresentedinSoundTechnicalReportfortheSandHillWindRepoweringProject,AlamedaCounty,California(SoundTechnicalReport)(AppendixD).
3.11.1 Existing Conditions
TheProjectvicinityisprimarilyagriculturalwithsomescatteredruralresidences.SoundsourcesintheProjectareaareprimarilytrafficonlocalanddistantroadwaysandnaturalsourcessuchasbirdsandwindblowingthroughtallgrass.TheolderexistingturbinesintheProjectareahaveeitherbeenremovedorarenonoperational.NewturbinesthathavebeeninstalledonadjacentpropertiesareasourceofsoundbutarenotdominantinthesoundenvironmentoftheProjectarea.
3.11.2 Environmental Impacts and Mitigation Measures
ImpactNOI‐1:Exposureofresidencestonoisefromnewwindturbines(lessthansignificantwithmitigation)
TheSoundTechnicalReportidentifiedtwosensitivereceptorsthatwouldbeexposedtonoiselevelsinexceedanceofthe55A‐weighteddecibel(dBA)thresholdestablishedbytheCounty:oneonAltamontPassRoadinthesouthernportionoftheProjectarea,andoneonMountainHouseRoadintheeasternportion.ThePEIRconcludedthatsuchexceedanceswouldbepossibleasprojectsaredesignedandconstructed,andthatsuchexceedanceswouldconstituteasignificantimpact.Accordingly,thefindingsoftheSoundTechnicalReportareconsistentwiththeconclusionsofthePEIR.ImplementationofMitigationMeasureNOI‐1,Performproject‐specificnoisestudiesandimplementmeasurestocomplywithCountynoisestandards,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactNOI‐2:Exposureofresidencestonoiseduringdecommissioningandnewturbineconstruction(lessthansignificantwithmitigation)
ThePEIRconcludedthatsomeresidencesintheprogramareawouldbewithindistancesofconstructionactivitiesthatcouldexposethemtonoiselevelsinexceedanceofAlamedaCountynoiseordinancestandards.ThereceptoridentifiedasR1intheSoundTechnicalreportiswithin550feetofalaydownareaandwithin1,000feetofthenearestturbine;R3iswithin1,000feetofthenearestturbine.ThenoiselevelstowhichthesereceptorscouldbeexposedduringremovalofsomeoldturbinefoundationsandconstructionofProjectfacilitiesandinfrastructurewouldconstituteasignificantimpact.AsdisclosedinthePEIR,implementationofMitigationMeasureNOI‐2,Employnoise‐reducingpracticesduringdecommissioningandnewturbineconstruction,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 84: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/84.jpg)
Alameda County Community Development Agency Environmental Analysis
Noise
Sand Hill Wind Repowering Project Environmental Analysis
3.11‐2 September 2018
ICF 00631.17
3.11.3 References Cited
ICFInternational.2016.SoundTechnicalReportfortheSandHillProposedWindProject,AlamedaCounty,California.March.(ICF00716.15.)Sacramento,CA.PreparedforOgin,Inc.,Waltham,MA.
![Page 85: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/85.jpg)
Alameda County Community Development Agency Environmental AnalysisPopulation and Housing
Sand Hill Wind Repowering Project Environmental Analysis
3.12‐1 September 2018
ICF 00631.17
3.12 Population and Housing ThePEIRanticipatedcontinuinggrowthinAlamedaCounty.However,itconcludedthattherepoweringprojectsconstitutingtheoverallAPWRArepoweringeffortwouldnotinducepopulationgrowtheitherdirectlyorindirectly.BecausetheProjectisasubsetofthisanalysis,theanalysisremainsvalid.TheProjectwouldnotinvolvecreationofanyhousingunits,norwoulditdisplaceanyexistinghousingunitsorpeople.Therewouldbenoimpactandnomitigationisrequired;accordingly,thisresourcetopicisnotaddressedfurtherinthisanalysis.
![Page 86: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/86.jpg)
Alameda County Community Development Agency Environmental Analysis
Public Services
Sand Hill Wind Repowering Project Environmental Analysis
3.13‐1 September 2018
ICF 00631.17
3.13 Public Services ThePEIRconcludedthattherewouldbenoimpactsonpublicservices.Becausethereductioninthenumberofturbinesandtheimprovedsafetyofnewermodelswouldresultinareductionofpotentialfireignitions,therewouldbenoincreaseinthedemandforfireprotectionservices.Policeprotectionfacilitiesandinfrastructurerequiredtoprotecttheprogramareaarealreadyinplacetoprotecttheexistingwindenergyfacilities.Noresidenceswouldbeconstructed,noschoolsarepresentintheProjectarea,andbecausethePEIRconcludedthatrepoweringtheAPWRAwouldnotinducegrowth,therewouldbenoincreaseddemandonschoolsorrecreationalfacilities.Therewouldbenoimpactandnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.BecausetheProjectareaisasubsetoftheprogramarea,theanalysisremainsvalid.Accordingly,thisresourcetopicisnotaddressedfurtherinthisanalysis.
![Page 87: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/87.jpg)
Alameda County Community Development Agency Environmental Analysis
Recreation
Sand Hill Wind Repowering Project Environmental Analysis
3.14‐1 September 2018
ICF 00631.17
3.14 Recreation Becausetherearenorecreationalfacilitiesintheentireprogramareaandbecausetherepoweringprogramoverallwouldnotleadtoanincreaseinuseofnearbyfacilities,thePEIRfoundthattherewouldbenoimpactonrecreationalfacilitiesandnomitigationisrequired.BecausetheProjectareaisasubsetoftheprogramarea,theanalysisremainsvalid.Accordingly,recreationisnotfurtherconsideredinthisanalysis.
![Page 88: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/88.jpg)
Alameda County Community Development Agency Environmental AnalysisTransportation/Traffic
Sand Hill Wind Repowering Project Environmental Analysis
3.15‐1 September 2018
ICF 00631.17
3.15 Transportation/Traffic ThePEIRevaluatedtrafficimpactsforageneric80MWprojectaswellasfortwospecificprojectsintheprogramarea.NoProject‐specifictrafficanalysiswasnecessaryfortheSandHillProjectbecausetheimpactsidentifiedaspotentiallysignificantinthePEIR(e.g.,increasedtrafficcongestionandtraffichazards)wouldalsoapplytotheProject,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthoseimpacts.
3.15.1 Existing Conditions
TheroadnetworkandotherexistingconditionspertainingtotrafficandtransportationwasdescribedinthePEIRfortheentireprogramarea,ofwhichtheProjectareaisasubset.MostoftheProjectareawouldbeaccessedusingroadsasdescribedinthePEIR(e.g.,I‐580,AltamontPassRoad),butsomeoftheturbinesontheeastsideofBethanyReservoirandtheCaliforniaAqueductwouldbeaccessedfromMountainHouseRoad,whichwasnotspecificallyaddressedinthePEIR.However,theprogram‐levelanalysisadequatelydisclosesthepotentialimpactsassociatedwiththeproposedProject.
3.15.2 Environmental Impacts and Mitigation Measures
ImpactTRA‐1:Conflictwithanapplicableplan,ordinance,orpolicyestablishingmeasuresofeffectivenessfortheperformanceofthecirculationsystem,takingintoaccountallmodesoftransportation,includingmasstransitandnon‐motorizedtravelandrelevantcomponentsofthecirculationsystem,including,butnotlimitedto,intersections,streets,highwaysandfreeways,pedestrianandbicyclepaths,andmasstransitorconflictwithanapplicablecongestionmanagementprogram,including,butnotlimitedto,level‐of‐servicestandardsandtraveldemandmeasuresorotherstandardsestablishedbythecountycongestionmanagementagencyfordesignatedroadsorhighways(lessthansignificantwithmitigation)
ThePEIRconcludedthatconstructionactivitiescouldcauseasubstantialtrafficincreaseonlocalcountyroadsthatprovidedirectaccesstoProjectconstructionsites,becausetheseroadsgenerallyhavelowtrafficvolumes.However,theseincreases,whiletheycoulddegradetrafficoperations,wouldbeoftemporaryduration.ImplementationofMitigationMeasureTRA‐1,Developandimplementaconstructiontrafficcontrolplan,wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactTRA‐2:Conflictwithanapplicablecongestionmanagementprogram,including,butnotlimitedto,level‐of‐servicestandardsandtraveldemandmeasuresorotherstandardsestablishedbythecountycongestionmanagementagencyfordesignatedroadsorhighways(lessthansignificant)
ThePEIRconcludedthatProject‐relatedtrafficwouldnotsubstantiallydegradethelevelofserviceonacongestionmanagementprogram–designatedroadway(i.e.,I‐580)becauseitwouldcontributesuchasmallpercentageoftotaltraffic.Accordingly,thisimpactwouldbelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
![Page 89: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/89.jpg)
Alameda County Community Development Agency Environmental AnalysisTransportation/Traffic
Sand Hill Wind Repowering Project Environmental Analysis
3.15‐2 September 2018
ICF 00631.17
ImpactTRA‐3:Resultinachangeinairtrafficpatterns,includingeitheranincreaseintrafficlevelsorachangeinlocationthatresultsinsubstantialsafetyrisks(lessthansignificant)
ThePEIRconcludedthatrepoweringintheprogramareawouldnotresultinachangeinairtrafficpatternsoranyincreaseinrelatedsafetyrisks.BecausetheProjectwouldbewithintheareaanalyzed,theProject‐levelimpactwouldalsobelessthansignificant,andnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.
ImpactTRA‐4:Substantiallyincreasehazardsbecauseofadesignfeature(e.g.,sharpcurvesordangerousintersections)orincompatibleuses(e.g.,farmequipment)duetoconstruction‐generatedtraffic(lessthansignificantwithmitigation)
ThePEIRconcludedthatthepresenceoflarge,slow‐movingconstructionanddeliveryvehiclescouldincreasetrafficsafetyhazards.Additionally,someofthesevehiclescouldexceedroadwayloadandsizelimits.PermitsfromCaliforniaDepartmentofTransportationDistrict4andotherrelevantjurisdictionswouldberequiredforsuchvehicles.CompliancewithpermitrequirementsandimplementationofMitigationMeasureTRA‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactTRA‐5:Resultininadequateemergencyaccessduetoconstruction‐generatedtraffic(lessthansignificantwithmitigation)
Large,slow‐movingconstructionanddeliveryvehiclesandtemporaryroadandlaneclosurescoulddelayorobstructthemovementofemergencyvehicles,asdisclosedinthePEIR.ImplementationofMitigationMeasureTRA‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
ImpactTRA‐6:Conflictwithadoptedpolicies,plans,orprogramsregardingpublictransit,bicycleorpedestrianfacilities,orotherwisedecreasetheperformanceorsafetyofsuchfacilities(lessthansignificantwithmitigation)
ThePEIRconcludedthatnopublictransitservicesorpedestrianfacilitiesarepresentontheProjectaccessroutesintheprogramarea.However,oversizedconstructionvehiclescouldpotentiallydisruptthemovementofbicyclestravelingontheshouldersofsomelocalaccessroads(e.g.,AltamontPassRoad,WestGrantLineRoad,MountainHouseRoad),andlaneorroadclosuresassociatedwithmaterialdeliveriescouldtemporarilydisruptbicycleaccess.ImplementationofMitigationMeasureTRA‐1wouldreducethisimpacttoaless‐than‐significantlevel.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR,andthemitigationmeasuressetforthinthePEIRwouldadequatelyaddressthisimpact.
![Page 90: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/90.jpg)
Alameda County Community Development Agency Environmental Analysis
Utilities and Service Systems
Sand Hill Wind Repowering Project Environmental Analysis
3.16‐1 September 2018
ICF 00631.17
3.16 Utilities and Service Systems ThePEIRanalyzedpotentialimpactsonutilitiesandservicesystemsanddeterminedthattherewouldbenoimpactsorthatimpactswouldbelessthansignificant.Similarly,asdescribedinthePEIRwastewatergenerationanddrainagefortheProjectwouldnotaffectcapacityofawaterorwastewatertreatmentfacility.Becauseofthereducednumberofturbines,waterneedsfortheProjectwouldbeequaltoorlessthanthoseanalyzedforthePEIR.Waterforconstructionactivitieswouldbeprovidedthroughanagreementwithmunicipalorprivatesuppliersandwouldthereforenotaffectanywatersupplyorrequireexpandedentitlements.SolidwastewouldbegeneratedprimarilyduringProjectconstructionandwouldnotexceedthecapacityoflandfills.TheProjectwouldberequiredtocomplywithlocal,state,andfederalsolidwasteregulations.Therewouldbenoimpactandnomitigationisrequired.ThisconclusionisconsistentwiththeanalysispresentedinthePEIR.Accordingly,thisresourcetopicisnotaddressedfurtherinthisanalysis.
![Page 91: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/91.jpg)
Sand Hill Wind Repowering Project Environmental Analysis
4‐1 September 2018
ICF 00631.17
Chapter 4 List of Preparers
Thefollowingindividualsparticipatedinthepreparationofthisanalysis.
Lead Agency (Alameda County Community Development Agency)
AndrewYoung,SeniorPlanner
SandiRivera,DeputyDirector
Technical Assistance (ICF)
AngelaAlcala,Biologist
LarryGoral,TechnicalWriter
TimMessick,GraphicArtist
BradNorton,ProjectDirector
BradSchafer,ProjectManager
DanSchiff,GISanalyst
TinaSorvari,EnvironmentalPlanner
SusanSwift,SeniorReviewer
![Page 92: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/92.jpg)
Appendix A Air Quality Technical Memorandum
![Page 93: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/93.jpg)
Appendix B Biological Resources Evaluation Report
![Page 94: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/94.jpg)
Appendix C Cultural Resources Survey Report
![Page 95: SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL … · SAND HILL WIND REPOWERING PROJECT ENVIRONMENTAL ANALYSIS PREPARED BY: Alameda County Community Development Agency 224 W. Winton](https://reader034.fdocuments.us/reader034/viewer/2022042710/5f6b363c64ca557b9c5ba669/html5/thumbnails/95.jpg)
Appendix D Sound Technical Report