San Onofre, Unit 1Status & Lessons Learned
D&D Focus Area 2001Mid Year Review & Decommissioning
Symposium
Presented by: John Keelin, Engineering ManagerApril, 2001
![Page 2: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/2.jpg)
2
![Page 3: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/3.jpg)
3
Unit 1 Statistics
• 450 Mwe Westinghouse PWR w/3 Primary Loops
• Commercial Operation 1968, Shutdown 1992• Coastal Location, between Los Angeles & San
Diego, CA• Shares physical site with SONGS 2 & 3 Units• Co-owned by SCE (80%) and SDG&E (20%)• SONGS 1 Fuel located in SFP, at SONGS 2 &
3 and at Morris, Ill• On Federal land/Lease requires removal of
structures
![Page 4: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/4.jpg)
4
Accomplishments
• Milestones– General License submittal for fuel storage canisters - 9/00– Cold & Dark - 10/00
• Areas Cleared– Lube Oil– Main/Aux transformer– East and West Heater Decks– Safe shutdown diesel– Intake– TPCW– New Fuel
![Page 5: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/5.jpg)
5
![Page 6: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/6.jpg)
6
Accomplishments
• Buildings Removed– Diesel Generator– Small office building
• Other Equipment– RHR Heat exchanger– Other containment hot spots– Reactor cavity equipment– Turbine/Generator– RCP Motors
![Page 7: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/7.jpg)
7
![Page 8: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/8.jpg)
8
Long Range Schedule• Control Building & East Heater Deck Demo - 9/01• Reactor Vessel Internals Segmentation - 12/01• Large Component Removal Complete - 7/03• Unit 1 Fuel in the ISFSI - 6/04• Intake System Removal - 11/05• Turbine Building Removal - 8/06• Fuel Building Removal - 8/06• Containment Removal - 3/07• Site Restoration - 1/08
![Page 9: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/9.jpg)
9
![Page 10: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/10.jpg)
10
Challenges
• Physical– Limited real estate– Common protected area
• Personnel & vehicle entry• Boundary breech
– Shared plant systems– Accuracy of underground drawings
• Personnel– Competing for personnel with operating units– Operating vs. decommissioning mentality
![Page 11: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/11.jpg)
11
![Page 12: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/12.jpg)
12
Challenges
• Programmatic– Establishing and managing the budget– Procedures designed for an operating unit
• Schedule• Other
– RVI segmentation– Storage of GTCC– RPV disposal site
![Page 13: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/13.jpg)
13
SONGS - ISFSI Plan
![Page 14: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/14.jpg)
14
Key Solutions/Lessons
• Develop a plan early to accommodate decommissioning and site needs
• Communicate, communicate, communicate• Create space by removing abandoned structures &
components• Relocate the Security boundary• Adjust and/or develop new processes to support work
requirements• Dedicated staff in critical areas
![Page 15: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/15.jpg)
15
Key Solutions/Lessons
• We have no idea what is underground• Plan around the operating unit’s schedule• Partnering is needed with developing industry
![Page 16: San Onofre, Unit 1 Status & Lessons Learned · Unit 1 Statistics • 450 Mwe Westinghouse PWR w/3 Primary Loops • Commercial Operation 1968, Shutdown 1992 • Coastal Location,](https://reader035.fdocuments.us/reader035/viewer/2022081611/5f02e0297e708231d4067222/html5/thumbnails/16.jpg)
16
Closing
• Develop and communicate the plan early and often
• Dedicated a portion of the staff minimizes competition for resources
• Demolition isn’t perfect, but there is no evidence to the contrary