San Francisco Ocean Beach-Great Highway Erosion Control Project.

18
San Francisco San Francisco Ocean Beach-Great Highway Ocean Beach-Great Highway Erosion Control Project Erosion Control Project

Transcript of San Francisco Ocean Beach-Great Highway Erosion Control Project.

Page 1: San Francisco Ocean Beach-Great Highway Erosion Control Project.

San FranciscoSan FranciscoOcean Beach-Great Highway Ocean Beach-Great Highway

Erosion Control ProjectErosion Control Project

Page 2: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Historic ShorelineHistoric Shoreline Historically, the Ocean Beach Historically, the Ocean Beach

shoreline was situated several shoreline was situated several hundred feet landward of its hundred feet landward of its current location. current location.

Development in the 1800s and Development in the 1800s and early 1900s moved the early 1900s moved the shoreline seaward. shoreline seaward.

Winter storms have eroded Winter storms have eroded significant portions of the significant portions of the shoreline.shoreline.

From the Cliff House south, From the Cliff House south, there are a number of there are a number of seawalls and natural seawalls and natural landforms that limit storm-landforms that limit storm-generated impacts to public generated impacts to public facilities.facilities.

The approximately 3,000-foot The approximately 3,000-foot section of Ocean Beach that section of Ocean Beach that stretches from Sloat stretches from Sloat Boulevard to Fort Funston is Boulevard to Fort Funston is vulnerable to erosion. vulnerable to erosion.

Page 3: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The Problem AreaThe Problem Area

Artificial bluff material Artificial bluff material form the 1940-form the 1940-1960’s(concrete debris, 1960’s(concrete debris, bricks, soil and sand), bricks, soil and sand), formed a wide enough formed a wide enough barrier between the barrier between the Great Highway and the Great Highway and the ocean that erosion was ocean that erosion was not a perceived problemnot a perceived problem

Since 1995, however, Since 1995, however,

winter storms have winter storms have eroded large areas of eroded large areas of the man-made bluffs, the man-made bluffs, which consist mostly of which consist mostly of fill material from historic fill material from historic development, resulting development, resulting in the loss of parking in the loss of parking spaces within GGNRA, as spaces within GGNRA, as well as threats to the well as threats to the Great HighwayGreat Highway

Page 4: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The Problem AreaThe Problem Area

Page 5: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The Problem AreaThe Problem Area

Page 6: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The PartnershipThe Partnership

The City and County of San Francisco (CCSF), through The City and County of San Francisco (CCSF), through the Department of Public Works (DPW), is partnering the Department of Public Works (DPW), is partnering with :with :

U. S. Army Corps of Engineers (USACE) U. S. Army Corps of Engineers (USACE)

Golden Gate National Recreation Area (GGNRA, a Golden Gate National Recreation Area (GGNRA, a unit of the National Park Serviceunit of the National Park Service

California Department of Boating and Waterways California Department of Boating and Waterways

United State Geological Survey (USGS)United State Geological Survey (USGS)

Page 7: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Long Term GoalLong Term Goal

Develop long-term solutions to beach and Develop long-term solutions to beach and bluff erosion problems on park and city bluff erosion problems on park and city property along the Great Highway. property along the Great Highway. Solutions evaluated need to be consistent Solutions evaluated need to be consistent with federal and state regulations that with federal and state regulations that support the enhancement of natural support the enhancement of natural processes.processes.

Page 8: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Study AreaStudy Area

Page 9: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Timeline of Actions Timeline of Actions From 1997 to 2000 CCSF has funded several From 1997 to 2000 CCSF has funded several

temporary/emergency projects including a 600 foot rock temporary/emergency projects including a 600 foot rock revetment to protect City infrastructure. revetment to protect City infrastructure.

In response to concerns that "hard structure" In response to concerns that "hard structure" alternatives are detrimental, the City spent $1,300,000 alternatives are detrimental, the City spent $1,300,000 for sand placement and monitoring reports. for sand placement and monitoring reports.

In 2001 an emergency detour lane was constructed to In 2001 an emergency detour lane was constructed to carry traffic in the event of damage to the Great Highway. carry traffic in the event of damage to the Great Highway.

In 2000, the Mayor’s Office created the Ocean Beach Task In 2000, the Mayor’s Office created the Ocean Beach Task Force to bring the public and the many governmental Force to bring the public and the many governmental stakeholders together stakeholders together

DPW received grant funding from the California DPW received grant funding from the California Department of Boating and Waterways and technical Department of Boating and Waterways and technical assistance from USACE to continue seeking a long-term assistance from USACE to continue seeking a long-term solution to Ocean Beach issues that is compatible with solution to Ocean Beach issues that is compatible with National Park Service and other agency mandates (cont)National Park Service and other agency mandates (cont)

Page 10: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Timeline of Timeline of ActionsActions In 2002, the San Francisco Commission on the In 2002, the San Francisco Commission on the

Environment passed a resolution encouraging DPW Environment passed a resolution encouraging DPW and the other cooperating agencies to continue and the other cooperating agencies to continue monitoring the beach and bluffs south of Sloat Blvd. monitoring the beach and bluffs south of Sloat Blvd. The Commission also encouraged continued public The Commission also encouraged continued public involvement through the alternatives evaluation involvement through the alternatives evaluation process process

In 2004 DPW began transporting between 10,000 and In 2004 DPW began transporting between 10,000 and 15,000 cubic yards of sand from the Noriega Seawall 15,000 cubic yards of sand from the Noriega Seawall to the most several erosion area South of Sloat Blvd. to the most several erosion area South of Sloat Blvd.

In 2005 An Ocean Beach Great Highway Storm Damage In 2005 An Ocean Beach Great Highway Storm Damage Protection report was completed. This report outlined Protection report was completed. This report outlined a project that focuses on the beneficial reuse of a project that focuses on the beneficial reuse of Dredged materials from the San Francisco Ship Dredged materials from the San Francisco Ship channelchannel

2005 to 2007 The Army Corps dredged and disposed 2005 to 2007 The Army Corps dredged and disposed of over 300,000 Cubic Yards of sand from the San of over 300,000 Cubic Yards of sand from the San Francisco Ship Channel and placed near shore Francisco Ship Channel and placed near shore

Page 11: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Public Agencies Involved in Public Agencies Involved in Ocean Beach Project PlanningOcean Beach Project Planning

Golden Gate National Recreation Area (GGNRA) - a Golden Gate National Recreation Area (GGNRA) - a unit of the National Park System owns and manages unit of the National Park System owns and manages Ocean Beach since it was transferred by the San Ocean Beach since it was transferred by the San Francisco Recreation and Parks Department in the Francisco Recreation and Parks Department in the 1970s. 1970s.

California Coastal Commission (CCC) - state agency California Coastal Commission (CCC) - state agency with primary regulatory jurisdiction along the with primary regulatory jurisdiction along the California coastline within 100 feet of the high tide California coastline within 100 feet of the high tide line. line.

U. S. Army Corps of Engineers (USACE) - federal U. S. Army Corps of Engineers (USACE) - federal agency with Congressionally-mandated authority to agency with Congressionally-mandated authority to cost-share in economically justified projects that cost-share in economically justified projects that comply with existing Federal laws, policies and comply with existing Federal laws, policies and regulations in its primary mission areas, which are regulations in its primary mission areas, which are commercial navigation, flood damage reduction, commercial navigation, flood damage reduction, shoreline protection and ecosystem restoration.shoreline protection and ecosystem restoration.

Page 12: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Public Agencies Involved in Public Agencies Involved in Ocean Beach Project PlanningOcean Beach Project Planning

San Francisco Recreation and Parks Department - San Francisco Recreation and Parks Department - owner of the Great Highway, owner of the Great Highway,

San Francisco Public Utilities Commission (SFPUC) - San Francisco Public Utilities Commission (SFPUC) - operates the wastewater treatment facilities that are operates the wastewater treatment facilities that are under the Great Highway and the easements through under the Great Highway and the easements through the Highway and the Beach to outfall facilities. the Highway and the Beach to outfall facilities.

San Francisco Department of Public Works (DPW) - San Francisco Department of Public Works (DPW) - department that has implemented emergency actions department that has implemented emergency actions to control bluff erosion, To date the DPW has to control bluff erosion, To date the DPW has requested and received permit approvals from the requested and received permit approvals from the California Coastal Commission and or the GGNRA for California Coastal Commission and or the GGNRA for the placement of the quarry stone revetment, the the placement of the quarry stone revetment, the sand barrier and beach/bluff top markers placed on sand barrier and beach/bluff top markers placed on federal Property. federal Property.

San Francisco Department of the Environment (DOE) - San Francisco Department of the Environment (DOE) - co-chaired the Ocean Beach Task Force and provides co-chaired the Ocean Beach Task Force and provides support for ongoing Ocean Beach planning and support for ongoing Ocean Beach planning and community involvement efforts.community involvement efforts.

Page 13: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Technical EffortTechnical Effort Since 1996 monitoring reports have been prepared Since 1996 monitoring reports have been prepared

on measuring bluff retreat and seasonal variable on measuring bluff retreat and seasonal variable beach elevationbeach elevation

The USGS has performed extensive current and sea The USGS has performed extensive current and sea floor mapping to determine the sediment transport floor mapping to determine the sediment transport with in the San Francisco Bay cell with in the San Francisco Bay cell

The Army Corps of Engineers have initiated a The Army Corps of Engineers have initiated a beneficial reuse of dredge material study under beneficial reuse of dredge material study under Section 933 of the Water Resources Development Section 933 of the Water Resources Development ActAct

DPW has initiated a technical study on and suitable DPW has initiated a technical study on and suitable material for Beach restoration dune designsmaterial for Beach restoration dune designs

Page 14: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The Potential SolutionsThe Potential Solutions

Page 15: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Sand Transport ModelSand Transport Model

Page 16: San Francisco Ocean Beach-Great Highway Erosion Control Project.

Potential SolutionsPotential Solutions

Investigate the beneficial reuse of dredged material (beach Investigate the beneficial reuse of dredged material (beach quality sand) quality sand)

Evaluate Beach Nourishment project that will use dredged Evaluate Beach Nourishment project that will use dredged material from the existing Bar Channel Navigation Project material from the existing Bar Channel Navigation Project

Identify areas of excess sand at ocean beach that can be Identify areas of excess sand at ocean beach that can be safely transported to the erosion areasafely transported to the erosion area

Page 17: San Francisco Ocean Beach-Great Highway Erosion Control Project.

The GoalThe Goal

BEFOREBEFORE AFTERAFTER

Page 18: San Francisco Ocean Beach-Great Highway Erosion Control Project.