San Dieguito Wetland Restoration

9
San Dieguito Wetland Restoration Update on Progress by SCE June 3, 2004

description

San Dieguito Wetland Restoration. Update on Progress by SCE June 3, 2004. Final Design and Permits Update. Work Completed Work in Progress Summary of Findings Schedule to Construction Discussion Modifications to Final Plan Other. Work Completed. New Aerial Photography - PowerPoint PPT Presentation

Transcript of San Dieguito Wetland Restoration

Page 1: San Dieguito Wetland Restoration

San Dieguito Wetland Restoration

Update on Progress by SCE

June 3, 2004

Page 2: San Dieguito Wetland Restoration

Final Design and Permits Update

• Work Completed

• Work in Progress

• Summary of Findings

• Schedule to Construction

• Discussion – Modifications to Final Plan– Other

Page 3: San Dieguito Wetland Restoration

Work Completed

• New Aerial Photography

• X-sections of River Bottom

• New 1 foot contour mapping

• Identification of existing utility conflicts

• Coordination with City of San Diego and City of Del Mar

• Coordination with JPA Trail Design

• Confirmation of Ownerships

• Geotechnical investigation

• Draft Grading Plan

• Updated Hydraulic Analysis based on new mapping

• Submitted Applications for City of Del Mar Permits

Page 4: San Dieguito Wetland Restoration

Work in Progress

• Final Grading Plans

• Planting Plans

• JPA Trail Plans

• Conditional Letter of Map Amendment

(CLOMR) from FEMA

• Resource Agency Permits

Page 5: San Dieguito Wetland Restoration

Summary of Findings

• Changes in Base Map – No significant changes in graded areas– Shift in river channel East of I-5– Significant scour near Jimmy Durante Bridge

• Grading – No significant changes in earthwork– Creates required wetlands

• Basic Concept of Final Plan Validated

Page 6: San Dieguito Wetland Restoration

ScheduleSouthern California Edison

San Dieguito Wetlands Restoration Project

June 3, 2004

1. Data Collection and Review

2. Engineering Documents

2.1 *Submit Plans to City of

San Diego/City of Del Mar

3. Permitting

Coastal Commission Approval

4. Construction

TASK

2004 2005 2006 2007 2008

July

Oct

Page 7: San Dieguito Wetland Restoration

Modifications to Existing Plan

• I-5 Embankment

• Berm Alignment East of I-5

Page 8: San Dieguito Wetland Restoration

Berm Alignment East of I-5

• Change in Alignment

• Impact of change on restoration

• Comments/Questions?

Page 9: San Dieguito Wetland Restoration

Change in Berm Alignment