San Diego City College Facilities and Master Plan Update
-
Upload
san-diego-community-college-district -
Category
Documents
-
view
216 -
download
1
description
Transcript of San Diego City College Facilities and Master Plan Update
Seven new teaching and learning facilities
Seven major renovations
Campus expansion willprovide facilities/programs toaccommodate eventual enrollment of 25,000 students
SDCCD Propositions S and N
City College Overview
Project Budget: $3.4 million
Completion Date: August 2007
Renovation to convert approximately 15,000 SF of
parking garage space into faculty offices, student
classrooms and support space. First Propositions S
and N project to obtain LEED certification.
City College Completed Projects
Learning Resource Center (LRC)
Project Budget: $10.3 million
Completion Date: April 2009
Complete, major renovation of two-story building
totaling 28,700 sq. ft. Serves as one-stop shopping
for all student services, including tutoring,
assessment, advising, and other student support
and student achievement programs.
City College Completed Projects
Academic Success Center (L Building Renovation)
Project Budget: $10.9 million
Completion Date: January 2010
Major interior and exterior renovation of two-
story concrete gymnasium building. Renovated
facility includes work-out rooms, locker rooms,
training areas, classrooms, faculty/staff areas, and
enhanced parking and ADA accessibility.
City College Completed Projects
P Building Renovation
Project Budget: $63.1 millionConstruction Start: May 2008Completion: June 2010
New five-story 88,000 sq. ft. facility to house the
Nursing, Cosmetology and Photography &
Digital Arts programs. Includes classrooms,
computer labs, medical simulation labs, a
gallery for student work, a 694-space parking
structure and new headquarters for City College
Police. It has nation’s largest vertical solar array.
City College Completed Projects
Career Technology Center (CTC)
Project Budget: $89.2 million
Expected Construction Start: Nov. 2010
Targeted Completion: October 2012
Arts & Humanities will consist of approximately
70,000 sq. ft. to include new classrooms, a lecture
hall, computer labs, studio space and a 100-seat
“black box theatre.”
Business Technology will consist of approximately
40,000 sq. ft. to include classrooms, computer labs
and areas for start-up businesses for students.
The project includes sublevel parking designated
for ADA and faculty.
Propositions S and N Projects in Progress
Humanities and Business Technology Buildings
Project Budget: $54.4 millionExpected Construction Start: March 2011Targeted Completion: Dec. 2012
Four-story, L-shaped building providing 73,000 square feet of new construction for classrooms, labs and a planetarium.
Propositions S and N Projects in Progress
Science Building
Project Budget: $80.9 million (incl. land acquisition)
Expected Construction Start: January 2011
Targeted Completion: May 2012
Project involves land acquisition and construction
of new 72,000 sq. ft. classroom and laboratory
building. It will include the District’s Corporate
Education Center, Military Education, a Family
Health Center and a six-story parking structure
with 400+ stalls.
City College Future Projects
Math and Social Sciences
Project Budget: $17.7Expected Construction Start: July 2010Targeted Completion: Nov. 2012
•Central Plant Expansion•Storm & Sewer Upgrades•IT/Data/Comm Infrastructure Upgrade
Propositions S and N Projects in Progress
Infrastructure Projects
Construction Start: Summer 2010
Estimated Construction Cost: $8 million
Project will provide:
•Installation of new electrical switchgear and distribution.
•Installation of new heating and cooling water piping and distribution to the main campus.
•Construction of a new Central Plantbuilding to the east of the L Building.
City College Current Projects
Central Plant Upgrade
Construction Start: Fall 2010
Estimated Construction Cost: $4 million
Project will provide:
•16th Street Sewer Replacement -From Russ Boulevard to Broadway
•Storm Drain Replacements-From T Building Parking Lot to B Street-From B Street to 16th Street-From 16th Street to C Street
City College Future Projects
16th Street Sewer/Storm Drain Upgrade Project
Construction Start: Fall 2010
Estimated Construction Cost: $1.2 million
Project will provide a data/IT loop around the City College campus. The construction documents have been completed and approved by the City.
City College Current Projects
Telecommunications Infrastructure
C Building RenovationProject Budget – $21.8 MillionDSA Submittal ETA – August 2011
M Building RenovationProject Budget – $9.7 MillionDSA Submittal ETA – December 2011
Child Development Center Project Budget – $11 MillionDSA Submittal ETA – September 2011
Eng. Technology / T Bldg RenovationProject Budget – $38.4 MillionDSA Submittal ETA – August 2011
A Building RenovationProject Budget – $28.9 MillionDSA Submittal ETA – August 2011
D Building RoofProject Budget – $3.1 Million DSA submittal – August 2010
SAN DIEGO COLLEGE
As the current projects in design and construction complete, these projects will need to be through the design phase
and ready to begin construction.
Propositions S and N
Projects in Planning
SAN DIEGO COLLEGE
Propositions S and N Facilities and Master Plan Update
Questions?
Dave UmstotVice Chancellor Facilities Management
[email protected] (619) 388-6546