San Carlos Apache Tribe Solar Feasibility Study
![Page 2: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/2.jpg)
San Carlos Apache Tribe And Reservation
• 90 miles east of Phoenix
• Membership: 15,000
• 1.83 million acres.
• 2nd highest rated level of solar resource potential
• Main employers: Tribe / IHS /BIA / Schools / Casino / Telecom
• Utilities: Telecom, MTSS, Utility Authority
• Revenue: Casino, farming, water leasing, saw mill, hunting/fishing, sand & gravel/telecom
San Carlos Apache Reservation
![Page 3: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/3.jpg)
San Carlos Apache Mission Statement
The Apache People will live a balanced life in harmony with spirituality, culture, language, and
family unity in an ever-changing world.
VISION: The Apache People shall create a strategic framework for our tribe to grow and prosper.
![Page 4: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/4.jpg)
CURRENT PROJECTS • SCTI * TRIBAL COLLEGE • OUTLET/STRIP MALL * NEW CASINO • NEW HOSPITAL * SCHOOL ADDITIONS • WATER RIGHTS PROJ * MASTER PLANNING
• PED
• NEEDS ASSESSMENT • TRIBAL CENSUS • STRATEGIC PLANNING SUMMIT
• CURRENT CONSTRUCTION
• HOSPITAL • SCHOOL • HOMES
![Page 5: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/5.jpg)
2008 - 2013 Energy Initiatives 2008: Tribal Strategic Plan including Tribal energy goals
2009: DOE ARRA Energy grant
2010: DOE ARA Energy-funded programs & projects undertaken.
2010 - 2012: San Carlos Tribal Energy Summits.
2011: US DOE-funded energy organization.
2011: Adopted Tribal Energy Strategy & Program (EECS).
2012: Adopted Tribal Energy Organization Analysis (EOA).
2012: Hired Tribal energy program coordinator.
2012: US DOE-funded solar feasibility study grant.
2012: Tribal radio station with solar power funded by EECBG.
2012: Initiated commercial-scale solar feasibility study.
2013: Casino community-scale solar power facility.
![Page 6: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/6.jpg)
Energy Strategy & Program PURPOSE
“Provides a framework for future energy initiatives that support the San Carlos Apache Tribe’s energy security and independence, and that will reduce the negative impacts of energy consumption and greenhouse gas emissions on the Tribe’s people and Reservation”. ********* “This Strategy sets the stage for a vigorous and forward-looking set of Tribal energy plans, projects, and programs”.
![Page 7: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/7.jpg)
Solar Study Objectives Inform sound decision-making for site selection and infrastructure development options for commercial-scale solar development within the southwestern Reservation.
**************
Identify opportunities for smaller community-scale solar developments within the Reservation.
![Page 8: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/8.jpg)
• Power - 100% purchased, 98% non-renewable, retail rates 2X+ Nat’l average.
• 4 power providers – SCIP (BIA), APS, Graham County Coop, Morenci Mine.
• Commercial hydropower potential – the 1930’s Coolidge Dam.
• Excellent solar and geothermal potential.
![Page 9: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/9.jpg)
Solar Feasibility Study
![Page 10: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/10.jpg)
Solar Study Objectives • Identify site & infrastructure options for
commercial-scale solar. • Identify opportunities and sites for
community-scale solar.
![Page 11: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/11.jpg)
Solar Feasibility Study Elements Phase 1 • Assess baselines conditions, including key site
characteristics • Match sites to infrastructure, generation, and transmission • Identify 2 to 3 sites for commercial-scale solar development • Identify sites for community-scale solar development Phase 2 • Conduct more detailed assessments for “finalist” sites • Identify costs and benefits - economic, cultural, social • Outline a business plan approach • Recommend priority sites and systems
![Page 12: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/12.jpg)
Constraints & Opportunities – Slope/Aspect
![Page 13: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/13.jpg)
Constraints & Opportunities – Land Uses/Environmental
![Page 14: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/14.jpg)
Commercial-scale Sites
![Page 15: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/15.jpg)
Bylas (Southeast Reservation)
![Page 16: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/16.jpg)
Phase 1 Findings • Slope (less than 4%) - LOTS of suitable land. • Aspect (southerly facing) - ditto! • Climate - highly suitable … no surprise here! • Environmental - preferred sites avoid problems • Development - preferred sites avoid conflicts • Cultural limitations - none identified • Site Potential - Many sites/facilities suitable for
commercial and/or community-scale solar. • Utility Support Programs – available from APS & GCEC,
none from SCIP • Road Access - highly variable conditions • Transmission - NONE for commercial-scale
![Page 17: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/17.jpg)
Possible Commercial Solar Sites: Tufa Stone and Coolidge Tufa Stone 1,950 acres
Coolidge 1,218 acres
![Page 18: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/18.jpg)
“BEST” Commercial Solar Site: Peridot Mesa
1,550 acres
1,550 acres
![Page 19: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/19.jpg)
Commercial-scale Recommendations
• Cost of new commercial-scale transmission may be PROHIBITIVE for the foreseeable future (new T-line thru SCIP to Peridot Mesa = 60-70 miles and $48 million).
• Reserve land for FUTURE commercial-scale solar on Peridot Mesa and Coolidge sites.
![Page 20: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/20.jpg)
Community-scale Sites and Facilities
![Page 21: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/21.jpg)
Large Facility Sites
• Retro-fit existing casino/resort and the skill center with solar panels meeting facility electrical demand.
• Design new casino/resort on Highway 77 to include solar power.
Apache Gold Casino Resort
Skill Center Ball Field
![Page 22: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/22.jpg)
Community-scale Recommendations
• Include solar in Bylas new community development plans.
• Encourage the installation of solar panel arrays on individual buildings and smaller facilities throughout the Reservation.
• Develop a phased 5MW solar facility on Peridot Mesa off-setting electrical demand in the SCIP service territory.
![Page 23: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/23.jpg)
Peridot Mesa Five-Megawatt Facility
![Page 24: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/24.jpg)
Peridot Mesa Substation Connection Option
![Page 25: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/25.jpg)
Key Findings and Recommendations
Commercial Transmission and Sale Closest feasible transmission connection is 18 miles away. Pursuit of commercial scale solar should be a long-term goal but is not recommended until transmission-scale lines are available.
![Page 26: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/26.jpg)
Key Findings and Recommendations
Solar Site Development 3 sites with commercial-scale potential were advanced to Phase Two. Two sites should be reserved as future commercial-solar: Peridot Mesa and Coolidge
![Page 27: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/27.jpg)
Key Findings and Recommendations
Community-scale Solar Development 3 cost-effective sites were identified: (1) Casino – largest consumer; already have 1.1 mw solar installation. (2) Tribal College / Training Center (3) Winkleman Casino – a new planned resort on US 77.
![Page 28: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/28.jpg)
Key Findings and Recommendations
Bylas Provide rooftop ground mounted solar for commercial buildings on US 70, and incorporate clustered or individual solar as new buildings are constructed
![Page 29: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/29.jpg)
Key Findings and Recommendations
Phased Community Scale Development Peridot Mesa is recommended for development of 5-10 mw, which could connect to the SCIP distribution system at the base of the mesa via short (< 1mile) and economical ($250,000/mile) extensions of 12kV lines.
![Page 30: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/30.jpg)
Key Findings and Recommendations Small Solar: Use1 mw or smaller installations to reduce purchased electricity. Rooftop/ground-mounted panels should be considered in all development or remodeling. Energy Efficiency: Continue E audits and retrofits to reduce solar installations needed and to meet remaining demand. Continue E education.
![Page 31: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/31.jpg)
Key Findings and Recommendations
Energy Corporation/Joint Venture Being considered to support efforts with private developers at the casino and other sites. Tribal Energy Utility May be necessary long term to build and operate phased solar connecting to distribution or transmission lines.
![Page 32: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/32.jpg)
91.1 KYAY RADIO STUDIO
![Page 33: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/33.jpg)
91.1 KYAY TOWER SITE
![Page 34: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/34.jpg)
SCHA - NEW HOUSING
![Page 35: San Carlos Apache Tribe – Solar Feasibility Study (AZ)](https://reader033.fdocuments.us/reader033/viewer/2022042707/5866784c1a28ab45408b4940/html5/thumbnails/35.jpg)
APACHE SOLAR PROJECT - 1.1 mw
• Spring 2014 ground breaking * 2.37 mil incentive • PPA Completed * Fully owned by SCAT • Training/jobs for Tribal Members for maintaining equipt. • First Step towards SCAT Tribal Energy Utility