San Bernardino County Transportation Funding Update
-
Upload
california-asphalt-pavement-association -
Category
Engineering
-
view
19 -
download
2
Transcript of San Bernardino County Transportation Funding Update
![Page 1: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/1.jpg)
cta cogsan bernardino countytransportation authority
san bernardinocouncil of governments
The California Asphalt Pavement Association
CalAPASpring Asphalt Pavement Conference & Equipment Expo
April 12, 2017
Paula Beauchamp, PEDirector of Project Delivery
![Page 2: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/2.jpg)
Agenda• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
2
![Page 3: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/3.jpg)
3
CouncilOf
Governments
CountyTransportation
Commission
TransportationAuthority
SubregionalPlanningAgency
CongestionManagement
Agency
![Page 4: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/4.jpg)
2
![Page 5: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/5.jpg)
Project Delivery
Development & construction of highway projects:
Freeways/Highways
Interchanges
Railroad Grade Separations
5
![Page 6: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/6.jpg)
Project Delivery
• Environmental Phase • Environmental/Engineering Studies
• Design and Right of Way Phases• Land Surveys• Geometrics• Acquisition• Utility Coordination
• Construction• Post Construction
• Project Close out• Landscape
What we are doing…
6
![Page 7: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/7.jpg)
Agenda
• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
7
![Page 8: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/8.jpg)
Freeway Mainline
8
![Page 9: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/9.jpg)
9
Freeway Mainline
![Page 10: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/10.jpg)
Freeway Mainline
10
Mixed Flow Lane Addition
PA&EDJanuary 2017
Final Design CompleteSummer 2018
Begin ConstructionSpring 2019
![Page 11: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/11.jpg)
Freeway Mainline
Project Name CurrentPhase
TotalAmount
Opento
Public1 I-10 EB Truck Climbing Lane Planning $25.0M 20212 I-15 Corridor Express Lanes Environmental $371.0M 20243 I-10 Corridor Express Lanes Environmental $1.85B 20244 SR-210 Lane Addition Design / ROW $133.3M 20205 US 395 Widening Design / ROW $57.6M 2020
6I-215 Bi-County HOV Gap Closure Close Out $207.6M 2015
7 I-215 Widening Close Out / Landscape $326.3M 20148 SR-210 Freeway Landscape $223.4M 2007
$3.19B
11
![Page 12: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/12.jpg)
Agenda
• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
12
![Page 13: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/13.jpg)
Interchanges
13
![Page 14: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/14.jpg)
14
Interstate 215Barton Road InterchangeCM/GC
Construction Starts
Fall 2017
Interchanges
![Page 15: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/15.jpg)
15
InterchangesInterstate 215
University Parkway Interchange
California’s first Divergent Diamond Interchange
![Page 16: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/16.jpg)
I-10 Tippecanoe II
Interchanges
16
![Page 17: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/17.jpg)
I-15 / I-215 / Devore
Interchanges
17
![Page 18: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/18.jpg)
InterchangesProject Name Current Phase Total
AmountOpen to Public
1 I-10 / Mountain View Planning $3M 20202 I-10 / Mount Vernon Planning $37.6M 20223 I-10 / Monte Vista Environmental $31.3M 20214 I-215 / University Environmental $5.6M 20205 SR 60 / Archibald Environmental $14.6M 20216 SR 60 / Central Environmental $20M 20207 I-10 / Alabama Environmental $10.0M 20208 I-10 / Cedar Design / ROW $72M 20219 SR-210 / Baseline Design / ROW $19M 202010 I-215 / Barton Construction $43.7M 201911 SR-210 / Pepper Construction $24.5M 201812 I-10 / University Construction $5.9M 201813 I-10 / Pepper Construction $10.5M 201714 I-15 / Baseline Construction $50.5M 201615 I-15 / I-215 / Devore ROW / Close Out $325M 201616 I-15 / Ranchero Close Out $58.3M 201517 I-10 / Cherry Close Out $80.7M 201518 I-10 / Citrus Close Out / Landscape $57.7M 201419a I-10 / Tippecanoe I Landscape $24.9M 201419b I-10 / Tippecanoe II Close Out / Landscape $54.2M 201620 I-10 / Riverside Landscape $40M 201121 I-10 / Wildwood Canyon Conceptual TBD TBD
$989M 18
![Page 19: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/19.jpg)
Agenda
• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
19
![Page 20: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/20.jpg)
Grade Separations
20
![Page 21: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/21.jpg)
Laurel Street / BNSF
Grade Separations
21
![Page 22: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/22.jpg)
Grade Separations
Project Name Current Phase Total Amount
Open to Public
1 Mount Vernon Avenue Viaduct Environmental / Design $124M 2024
2 Monte Vista Avenue / UPRR Construction $26.7M 2018
3 North Vineyard / UPRR Construction $56.4M 2016
4 Palm Avenue / BNSF Close Out $24.2M 2015
5 South Milliken / UPRR Close Out $72.1M 2017
6 Lenwood Road / BNSF Close Out $30.9M 2015
7 Laurel Street / BNSF Close Out $59.9M 2016
8 Hunts Lane / UPRR Close Out $34.0M 2014
9 Glen Helen Pkwy / BNSF Close Out $32.5M 2015. $460.7M
22
![Page 23: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/23.jpg)
Agenda
• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
23
![Page 24: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/24.jpg)
Transit & Rail Programs
24
Downtown San BernardinoPassenger Rail Project
Construction = 70% complete
Revenue service begins in spring 2017
![Page 25: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/25.jpg)
Transit & Rail Programs
25
Final Design 2015-2017
Vehicle Procurement2016-2020
Construction 2017-2019
Begin Service2020
![Page 26: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/26.jpg)
Transit & Rail Programs
West Valley Connector
26
West Valley Connector - BRT
![Page 27: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/27.jpg)
Project Name CurrentPhase
TotalAmount
Opento Public
Metrolink Eastern Maintenance Facility Operational $13.1M 2014 San Bernardino Transit Center Operational $23M 2015 San Bernardino Transit Center Landscaping & Emergency Generator Pre-Construction $0.8M 2017 Downtown San Bernardino Passenger Rail Construction $110M 2017 Redlands Passenger Rail Design/Early Utilities $285.5M 2020
Gold Line to Montclair*Advanced Conceptual
Engineering $70M 2025
Metrolink Double Track – Lilac to Rancho
Environmental/ Preliminary Engineering $74M TBD
Shortway Quiet Zone Right of Way $4M 2017 Sierra & Juniper Grade Crossings Pre-Construction $3.7M 2017 West Valley Connector Environmental $170M+ TBD Zanja Bridge Removal Environmental $0.06M N/A Mountain Transit Facility Upgrade Study Study $0.3M N/A
$754M+
Transit & Rail Programs
27
![Page 28: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/28.jpg)
28
• SBCTA Background• Project Delivery
• Freeways• Interchanges• Grade Separations
• Transit & Rail• Doing Business with SBCTA
Agenda
![Page 29: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/29.jpg)
Doing Business
2929
![Page 30: San Bernardino County Transportation Funding Update](https://reader035.fdocuments.us/reader035/viewer/2022070520/58f1e0ee1a28ab6e6d8b4597/html5/thumbnails/30.jpg)
cta cogsan bernardino countytransportation authority
san bernardinocouncil of governments
Thank You
Questions/Comments
Paula BeauchampDirector of Project Delivery