SAMPLE LOCATION AND FIELD TEST RESULTS
Transcript of SAMPLE LOCATION AND FIELD TEST RESULTS
Region
Item #
Material placed in Line Item #'s
Entrained Air Slump Concrete Temperature Yield W/C Ratio
Hours Initial cure
in molds
Set No. Conc. Class28 Day
Break Date
Number of
Specimens
Cylinders 4 X 8 Cubes 2 X 2
Cubic Yards
Square Yards
Specimen Age Area
Maximum
Load PSI
Break
Type % Aggregate
Fractured
IAT:
Previous forms are obsolete and may not be used
Lab Comments:
Email:
Lineal Feet
Diameter
1 & 2
Electronic Signature of IA Personnel:Cell Phone No:Submitted By:
FS# = (Contract ID-Seq.#)
Email completed form to IA personnel
Batch Ticket #
Submit completed form to: [email protected]
6 X 12
Mark each specimen with Field Sheet # and Break Date
Consultant Lab
CDOT Field Lab
Sample ID
Date/Time Molds RemovedLocation Stored in Field:
Contract ID
Project Number
Project Location
__ __ __ __ __ -- __ __ __ __
Concrete Supplier: CDOT Mix # Description:
COLORADO DEPARTMENT OF TRANSPORTATION
Mold Date
Concrete Cylinders Compressive Strength C39
Cubes Compressive Strength C109
Additional methods C1064, T119, T121, T152
Manner of Protection:
Type of specimen submitted
SAMPLE LOCATION AND FIELD TEST RESULTS
Field Tester Name
Final Cure Method
Water at 73.5⁰
Moist Room Cure 73.5⁰
Specimen Data
Placed at (Str. No. or station/lane/portion)
Unit Weight
Initial cure temperature
(60-80⁰F)
(68-78⁰F)
Time Specimen for:
Design Adequacy
Field CureMaintained moist and temperature by:
Field Comments:
For Cast specimens, report cast by
Required Strength____________ psi.
28 Day Average Compressive Strength ________ psi.
Date Submitted to Lab Specimens tested at:
Central Lab
Region Lab
Represented Quantity
Previous Qty Total to DateThis Sheet
Other: ______________
CDOT Form 82 2/18
Upload completed form into the
attachment icon for the sample record
Cylinder Compressive Strength Results
Break Date
Non-SMM/LIMS: Completed form in materials book
For specimens submitted to Central Lab:SMM/LIMS:
Place IA Stamp Here:
12
3
4
5
6
7