SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey,...

22
SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Presented by Jason G. Souden, PE Jason G. Souden, PE Patrick Kelsey, CPSS/SC Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Christopher B. Burke Engineering, Ltd. Ltd. Wills Burke Kelsey Associates, Ltd. Wills Burke Kelsey Associates, Ltd. July 14, 2009 July 14, 2009

Transcript of SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey,...

Page 1: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

SALT CREEK

STREAM BANK STABILIZATION

STAGE 3

Presented by Presented by

Jason G. Souden, PEJason G. Souden, PE

Patrick Kelsey, CPSS/SCPatrick Kelsey, CPSS/SC

Christopher B. Burke Engineering, Ltd.Christopher B. Burke Engineering, Ltd.

Wills Burke Kelsey Associates, Ltd.Wills Burke Kelsey Associates, Ltd.

July 14, 2009July 14, 2009

Page 2: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

2

SALT CREEK STREAM BANK STABILIZATIONSTAGE 3

• Area A – Kennedy Pond1230 feet of improved creek bank(at $119/ft)

• Area B – Central Road School 1030 feet of improved creek bank (at $325/ft)

• Area C – Homes South of Central168 feet of improved creek bank (at $ $503/ft)

• Area C (Alt) – Homes South of Central168 feet of improved creek bank(at $531/ft)

• Total Estimated Construction Cost = $705,000

Page 3: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

3

Existing Conditions : Area A - Kennedy Pond

Page 4: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

4

Existing Conditions : Area A - Kennedy Pond

Page 5: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

5

Proposed Typical Sections

Page 6: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

6

Example: Stone Toe with Emergent Plants – Kennedy Pond

Page 7: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

Example: Native Buffer Zone –Central School and Homes South of Central

Page 8: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

Example: Steep Bank with Native Buffer and Gabion –Central School and Homes South of Central

Page 9: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

9

Living with Streams & Ponds

• Drainage

• Flood Conveyance

• Flood Storage

• Habitat

• Amenity

Page 10: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

10

When we bought the house …

It had a little creek in back

The kids like to play back there

We fed the geese We dumped our grass

clippings That’s where I get rid of

brush

Now it’s a thicket The banks are eroding The geese are

everywhere. They make such a mess

What does it hurt to throw grass and branches in the creek?

Page 11: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

11

On Flooding & Erosion

Page 12: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

12

Managing Native Vegetation

The Three Phases of Life

Page 13: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

13

Birth to Toddler

Page 14: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

14

The Teenage Years

Page 15: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

15

The Golden Years

Page 16: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

16

Wildlife Habitat

Page 17: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

17

Don’t feed the Geese

Page 18: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

18

Native Plants for the Home

Flowering Plants

• Brown-Eyed Susan• Purple Coneflower• White Coneflower• Spiderwort• Tall Coreopsis• New England Aster• Smooth Blue Aster• Goldenrods

Grasses, Sedges, Rushes

• Little Bluestem• Northern Dropseed• Chair Maker’s Rush• Soft Stem Bulrush• Wooly Sedge• Crested-Oval Sedge• Fox Sedge

Page 19: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

19

GOLDENROD

PURPLE CONEFLOWER

BROWN-EYED SUSAN

TALL COREOPSIS

SPIDERWORT

SMOOTH BLUE ASTER

Page 20: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

20

FOX SEDGEWOOLY SEDGE

CHAIR MAKER’SRUSH

SOFT STEM BULRUSH

LITTLE BLUESTEMNORTHERNDROPSEED

Page 21: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

21

Protecting your investment

• Recycle grass clippings

• Notify the City if you see erosion

• Don’t dig in the bank slope of the creek

• Don’t build on the slope

• Do not place mulch on the slope

Page 22: SALT CREEK STREAM BANK STABILIZATION STAGE 3 Presented by Jason G. Souden, PE Patrick Kelsey, CPSS/SC Christopher B. Burke Engineering, Ltd. Wills Burke.

Thank YouQUESTIONS?

22