GREEN DROP FOCUS FROM WITZENBERG MUNICIPALITY
PERSPECTIVE
SALGA
Water Services Master Class
Nathan Jacobs
Witzenberg Municipality
Manager: Water & Sewerage
CAPE WINELANDS LAYOUT
OP-DIE-BERGTULBAGH
P.A.HAMLET
WOLSELEYCERES
GREENDROP CONTENT
• INTRODUCTION
Overview
Our Goals
The benefits
• OUR GREEN DROP GROWTH
• HOW DO WE DEAL WITH IT
• WHAT DID WE IMPROVE
• CONCLUSION
OVERVIEW
The provision of water and sanitation services is a very dynamic and “fluid”
process implying that the variables relating to water and wastewater storage,
treatment, conveyance and consumer engagement need to be managed well. The
Blue Drop & Green Drop Certification Programmes provides the necessary tools
and guidance for a Municipality such as Witzenberg to achieve that in a very
structured and efficient manner. It has in fact resulted in a successful turnaround in
our business.
The most effective and comprehensive process thus far implemented by DWA is
the Blue Drop & Green Drop Certification Programme, which becomes an effective
monitoring tool to manage the entire water & wastewater cycle or segments
thereof within the control of WSAs and WSPs.
OUR GOALS
Witzenberg Municipality strives to:
• Continuously improve and maintain the provision of Excellent Final Effluent Quality
• Always have the TRUST of our communities
• Provide exceptional services as our standard
• Contribute to the overall successful implementation of efficient service delivery principles
• Realise the value of services in terms of community awareness, co-operation and satisfaction.
OUR GOALS
• Our passion is to implement effective standards for our business processes to uplift our communities
• This means:
WITZENBERG MUNICIPALITY
PASSION
COMMUNITY SATISFACTION
GREEN DROP - BENEFITS
• Permanent Green Drop status
• CONFIDENCE, TRUST and GOODWILL exist between
Municipality, Community and other Stakeholders
• Enhanced and sustained acceptable service delivery levels
• Responsible and responsive Consumers
• Economic development for our region
OUR GREEN DROP GROWTH
Criteria Ceres Tulbagh Wolseley ODB
Process Control & Maintenance
Competency
A A A A
Monitoring Programme Efficiency A A A A
Credibility of sample analysis A A A A
Data submission to DWA A A A A
WASTEWATER QUALITY compliance E E E E
Response to failures C G G C
Wastewater treatment works capacity C C C C
Green Drop score 74% 60% 60% 74%
2010 GREEN DROP REPORT
AVE GD SCORE = 67%
OUR GREEN DROP GROWTH
Criteria Ceres Tulbagh Wolseley ODB
Process Control & Maintenance
Competency
90 85.5 85.5 90
Monitoring Programme Efficiency 80 80 80 80
Credibility of sample analysis 100 100 100 100
Data submission to DWA 100 100 100 100
WASTEWATER QUALITY compliance 88 48 48 38
Response to failures 100 100 100 100
Bylaws 100 100 100 100
Asset Management 85 85 85 85
Green Drop score 92.9% 83.7% 83.7% 81.2%
2011 GREEN DROP REPORT
AVE GD SCORE = 89.7%
OUR GREEN DROP GROWTH - SUMMARY
The assessment figures speak for itself.
SYSTEM 2010 (%) 2011 (%)
CERES 74 92.9
OP-DIE-BERG 41 81.2
TULBAGH 60 83.7
WOLSELEY 60 83.7
OVERALL 2009 (%) 67.0
OVERALL 2010 (%) 89.7
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA?
BASED ON THE ASSESSMENTS,
THE FOLLOWING CRITERIA WAS HIGHLIGHTED TO BE
IMPROVED:
• Process control and Maintenance Competency
• Quality monitoring programmes
• Asset Management and Incident Management Protocols
• Wastewater Risk Abatement Plans
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA?
I.T.O PROCESS CONTROL AND MAINTENANCE
COMPETENCY
• Classification & Registration
• O&M’s
• Internal & External Maintenance Teams
• Training
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA…
I.T.O FINAL EFFLUENT QUALITY MONITORING
PROGRAMME EFFICIENCY
• We have upgraded our existing monitoring programmes which now includes operational and compliance monitoring with immediate preventative and corrective action plans.
• These programmes is now used as a trigger for immediate short term corrective actions in case target limits have not been met
• With these programmes we have a proactive and preventative approach which is comprehensive and extends from catchments to consumers.
• Our programmes is also informed by our Risk Abatement Plans process based on the risk assessments done.
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA…
I.T.O ASSET MANAGEMENT
• Approved and detailed asset registers were compiled and implemented for all our systems.
• Annual reports and registers on all the assets and infrastructure has been compiled.
• These registers contains every component from catchments to consumers
• These audit reports helped us to manage our infrastructure to ensure the production of excellent final effluent
• It also assists us with the evaluation of our operation and maintenance budgets.
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA…
I.T.O RISK ABATEMENT PLAN
• Risk Abatement plans for all our systems were compiled and implemented.
• Through these we understand the characteristics of our systems, the hazards that may arise and how these hazards create risks.
• This allowed us to have a comprehensive risk-based approach enabling the identification of hazards and their contribution to final effluent quality risks.
WHAT DID WE IMPROVE I.T.O THE GD
CRITERIA…
I.T.O INCIDENT RESPONSE MANAGEMENT
• These plans include easily executable procedures to address
incidents or emergencies and communication with the
appropriate authorities.
• Protocols were developed proactively to enable efficient,
effective and rapid response to incidents thereby limiting
negative impacts on the community to a minimum
IMPROVEMENT WITHIN
STRUCTURES:
• Excellent Cooperation
• Definite Ownership & Pride
• Commitment
COMMUNITIES
• We now have a very good open relationship with our communities
which includes awareness, regular publications of results and a
user friendly municipal website where all the results are available.
IMPROVEMENT I.T.O COMMUNICATION
WITH OTHER MUNICIPALITIES
• The Green Drop Certification Programmes has necessitate the
improvement of relations between municipalities and stakeholders
in the water Sector
• Communication happens more frequent via various media
• A Western Cape Municipal Water Care Forum
CONCLUSION
• Your passion for your Green Drop Goals will inspire your Community to positively contribute towards a better Water Quality.
• The true benefits of your career choice will become a reality.
• Your first attempt should not be your only attempt.
• Continuous improvement and development is very important. It takes a lot of effort and time to form the foundation, but once laid, progress and continuous development is inevitable.
• Regardless of the points, the experience and knowledge gained places you entirely in an advanced state of mind.
• The definition of a failure: “One who is not prepared to venture towards success”.
ACKNOWLEDGEMENT
• Council – Witzenberg Municipality
• EMANTI
• DWA
THANK YOU!