Saleem CV2
-
Upload
saleem-khan -
Category
Documents
-
view
15 -
download
1
Transcript of Saleem CV2
SALEEMULLAH BS TELECOMMUNICATION
FATHER NAME
SAID MAHMOOD
DATE OF BIRTH
1th January 1991
MARITAL STATUS
Single
NIC
15302-1459895-7
NATIONALITY
Pakistani
A D D R E S S :
Village Colony Balambat, P.O, Timergara, Tehsil Balambat District Dir (L) KPK Pakistan.
CELL
+923449769105 E M A I L
O B J E C T I V E
To work in a challenging environment, where I can deliver my professional skills in the
field of BS Telecommunication. Self starter and team player with ability to work under
minimum supervision.
E D U C A T I O N A L Q U A L I F I C A T I O N SE D U C A T I O N A L Q U A L I F I C A T I O N S
Qualification College/University Passing
YearDivision/
CGPA
BS(Telecommunic
ation)
Hazara University Mansehra
KPK Pakistan.
2010-14 1 st Division
HSSC
(Pre-Engineering)Government post Graduate
college Timergara.
2008-10 1st Division
SSC Govt Centennial High School
Timergara District Dir(L)
2008 1st Division
C O U R S E S A T T E N D E DC O U R S E S A T T E N D E D
One-Year (OPTICAL FIBER) Diploma (Trade Testing Board Recognized
From Directorate of Technical Education.)
(From 05-11-2012 to 05-11-2013) Three Month (CCNA) Certificate (Trade Testing Board Recognized
From Directorate of Technical Education.)
(From 15-09-2013 to 15-11-2013)
CERTIFIED FROM HUAWEI UET TELECOM IT CENTER UET LAHORE IN;(MARCH 2014)
Radio Network Optimization includes: GSM Um Interface, GSM Radio Resource Management Algorithms, GSM BSS Signalling Flow, performance management and improving QoS.
Base Station Subsystem (BTS+BSC) includes: GSM BTS System, BSC Hardware System, GSM BTS Data Configuration, and BSC Field Maintenance.
Main Switching Centre includes: MSOFTX Hardware System, MSOFTX Basic Data Configuration, MSOFTX Routine Operation and Maintenance.
Home Location Register includes: HLR Hardware System, HLR Basic Data Configuration, HLR Routine Operation and Maintenance.
P R O J E C T SP R O J E C T S
Final Year Project:- Designing and Reducing the Value of SAR of wearable Antenna.
Description: The purpose of our project is to reduce the affect of Electromagnetic
Signals on human bodies.
T E C H N I C A L A N D C O M P U T E R S K I L L S : -T E C H N I C A L A N D C O M P U T E R S K I L L S : -
Software’s:-
CST , Mat lab, Packet Tracer
Office Automation:-
Office 2003,2007,2010,2013(Word ,Excel, Access & PowerPoint)
Used Operating System:-
Linux. Windows (XP, 7, 8, Vista)
PROFESSIONAL EXPERIENCE:-
HITECH Private Limited. O&M TELENOR PROJECT (1-january 2015 till now) I have worked on ZTE SDR and NEC IPASSO Work on NSN Equipment. I have command in Alarms Installation and Testing. I have maintained documentation of P.M and C.M. Work on ZTE ZXD3000 Rectifier.
Pakistan Telecommunication Company Limited.
INTERNEE :
6 Weeks internship under the domain of General
Manager,Technical,Rawalpindi,
In the field of NGN, OFS, Switching (OMC) & WLL.
LANGUAGES
English (S/R/W) Urdu (S/R/W)
REFERENCES
Hazara University Mansehra
Khyber PakhtunkhwaPakistan
: (+92-997-414163) F a x : ( +92-997-
530046) Web: www.hu.edu.pk
References will be furnished upon Request.