Safety Walk Report Form SAFETY WALK NO.: 02 DATE: 12.08.2015 SAFETY WALK DETAILS: Area/ Location TG -3 Name Dipti Prakash Bhanja Contractor Power Mech Signature OBSERVATIONS (Pros & Cons): Cable taken for construction power ( Area Lighting) was not properly dressed. GENERAL COMMENTS or FOLLOW-UP ACTIONS TO BE TRACKED: Discussed with Power Mech Engineer and same is rectified. OPGC II DISTRIBUTION : Original to Reporting Officer/Manager Copy to HSE&S department OPGCII-CMT-HSE&S 102 Rev 1 Updated: 23/04/14

description

SAfety

Transcript of Safety Walk Aug 2

Page 1: Safety Walk Aug 2

Safety Walk Report Form

SAFETY WALK NO.: 02 DATE: 12.08.2015

SAFETY WALK DETAILS: Area/

Location TG -3 Name Dipti Prakash Bhanja

Contractor Power Mech

Signatur

e

OBSERVATIONS (Pros & Cons):Cable taken for construction power ( Area Lighting) was not properly dressed.

GENERAL COMMENTS or FOLLOW-UP ACTIONS TO BE TRACKED:Discussed with Power Mech Engineer and same is rectified.

OPGC II DISTRIBUTION: Original to Reporting Officer/Manager

Copy to HSE&S department