Safety Walk Report Form SAFETY WALK NO.: 02 DATE: 12.08.2015 SAFETY WALK DETAILS: Area/ Location TG -3 Name Dipti Prakash Bhanja Contractor Power Mech Signature OBSERVATIONS (Pros & Cons): Cable taken for construction power ( Area Lighting) was not properly dressed. GENERAL COMMENTS or FOLLOW-UP ACTIONS TO BE TRACKED: Discussed with Power Mech Engineer and same is rectified. OPGC II DISTRIBUTION : Original to Reporting Officer/Manager Copy to HSE&S department OPGCII-CMT-HSE&S 102 Rev 1 Updated: 23/04/14
-
Upload
dipti-bhanja -
Category
Documents
-
view
215 -
download
3
description
SAfety
Transcript of Safety Walk Aug 2
Safety Walk Report Form
SAFETY WALK NO.: 02 DATE: 12.08.2015
SAFETY WALK DETAILS: Area/
Location TG -3 Name Dipti Prakash Bhanja
Contractor Power Mech
Signatur
e
OBSERVATIONS (Pros & Cons):Cable taken for construction power ( Area Lighting) was not properly dressed.
GENERAL COMMENTS or FOLLOW-UP ACTIONS TO BE TRACKED:Discussed with Power Mech Engineer and same is rectified.
OPGC II DISTRIBUTION: Original to Reporting Officer/Manager
Copy to HSE&S department