MESSAGE DESK

.

CONTENTS

1 National Safety Day / Week

2 Lessons Learned

3 Safety training

4 Emergency Exercises

5 Corporate Safety highlights

6 R&R for Safety – Mar’14

7 Root cause analysis (RCA) of incidents –Mar’14

8 Security Highlights

Thought for the month

Build a Safety Culture for Sustainable Supply Chain!!!

1. National Safety Day / Week Celebrations- 2015

BORL, Bina

Flag Hoisting Safety Pledge

Safety March Tool Box Talk & Spot quiz

Safety Skit Prize distribution

CGPL

Inauguration by lighting lamp Safety Pledge

Safety Skit Safety March

Safety quiz competition Prize Distribution

CTTL

Safety Pledge Display of fire fighting and safety equipment

Training for Employees & Contractors Competitions like slogan, poster making etc

Poster competition for School children Prize Distribution

Distribution Customer Services

Safety Pledge Quiz competition

Skit competition

Prize distribution Address by senior leaders

Haldia

Flag hoisting Snake bite awareness session

Safety Awareness program for college

students

Various event for employee families

Safety Skit Prize distribution

Hydros

Safety oath Briefing the importance of safety at work place

Live safety Skit Emergency scenario ( skit )

Motive of Division Toward Safety Appreciation of employees for participation in

safety motivational activity

Jojobera

Flag Hoisting Address by Senior Leaders

Hot seat quiz competition Contractor safety meet along with Business

Continuity Plan (BCP) awareness session

Safety Skit competition Lamp lighting by dignitaries followed by prize

distribution

Kalinganagar

Flag Hoisting Safety Pledge

Safety March Safety Skit

Training on Working at Height, Electrical Safety, Welding & gas cutting

Safety Quiz competition Prize Distribution

MEPL

Flag hoisting Tool Box Talk in Control Room on “ Falling

Objects"

Tool Box Talk on Basics of fire fighting Tool Box Talk on “Using Full Face Mask”

Maithon

Safety March Quiz competition

Working at Height training Prize distribution

Power House#6

Flag hoisting Safety Pledge

PPE race Quiz competition

Prize Distribution

SED

Safety pledge Health & Safety awareness sessions

Fire fighting awareness session Safety Quiz competition

Safety Skit

Transmission

Flag Hoisting Safety Pledge

PPE Race Safety Skit

Fire Fighting demonstration

Derrick erection demo Prize Distribution

Transmission Projects

Flag hoisting Safety Pledge

Housekeeping campaign Fire fighting training

Work at height etc were conducted Prize distribution

Trombay

Lamp lighting ceremony Safety pledge

Safety Song sung by own employees Safety Skit

Contract Employee participation Prize distribution

WR Projects

Flag hoisting Safety Pledge

PPE race competition On the spot quiz competition

Prize distribution Keynote address by Senior leaders

Wind Operations

Safety Pledge Playing of “Safety Song”

Safety Training Key note address

Prize distribution

400KV Vikhroli Projects

Flag hoisting Safety Pledge

Key note address by Senior leaders

2. Lessons Learned

Division : Transmission Projects

Date of Incident : 04th January 2015

Type of incident : Occurrence

Incident Time :15:45 Hours

Description of Incident:

The Top disc insulator of B phase of the hoisted insulator string came out from ball of “Ball and

clevis” and the complete string of B Phase bumped to C Phase insulator string, four insulators

were broken because of the impact and broken pieces of ceramics fell on internal road of L&T.

Root Cause Analysis

Human Factors

Violation by supervisor : The supervisor did not ensured the correct locking of “M”

pin prior installation

Improper decision making or lack of judgment: The supervisor & workmen

assumed that desired locking property will be achieved

Physical Factors

Defective tools / equipment: The distorted “M” pin was used for the joint

Recommendations:

1. Check point for checking (by contractor supervisor & random checking by Tata Power

representative) all the locking pins of disc insulator and other hardware accessories

should be added to conductor stringing checklist.

2. All Contractor workmen and supervisors should be trained on how to check locking pin

of disc insulator and how to install it properly. A technically acceptable Good pin should

be available at site as a sample pin for comparison purpose.

3. Project engineering should be asked to check whether changing specification (for

increasing spring tension of M pin, increase of the thickness of the Cu flat of the pin) of

M pin could avoid such incidents.

3. Safety training

Trombay

Training on LOTO, Knowledge sharing session on working at height, First aid and fire fighting,

CSM, BCP workshop, DMP Awareness, Gas cylinder safety. Apart from Safety Induction

(picture), Safety training & IMS awareness training, ”, Safety training for unit#5 outage, Working

At Height trainings conducted during the month for Contractor employees.

Wind Operations

Supervision for safety was conducted at Agaswadi, Dalot, Nivade, Sadawagapur & Visapur wind

farms

Session on ‘Electrical Safety’ at Gadag wind

farm

Session on ‘Electrical Safety & Guidelines

to work inside WTG’ at Poolavadi wind farm

Session on ‘General Safety practice /

Guidelines at NSW wind farm

Session on ‘Electrical Safety’ at Samana

wind farm

4. Emergency Exercises

Wind Operations

Scenario of ‘Food Poisoning’ in Nivade Wind

farm

Scenario of ‘Oil Spillage’ in

Brahmanvel Wind farm

Scenario of ‘Heavy Lightning’ in Supa Wind

farm

Scenario of ‘Oil Spillage’ in

Bramanvel Wind farm

5. Corporate Safety Highlights – Mar’15

Conducted Weekly, Monthly & quarterly field safety audit at following sites:

1. DCS (WINGVISHNU SHIVAM TOWER, Thakur Village, Kandiwali East (Central

Zone))

2. Transmission (Dharavi & Mahalaxmi)

3. Transmission Projects (Powai GIS, 220KV Salsette - Saki Cable project & Sahar Sub

Station).

4. DSS (Powai, MUDH island & Gawanpada store)

5. Trombay

6. Haldia

Conducted Train the Trainer Courses for Haldia employees on Critical Safety Procedures.

Web based training on Office safety was configured for Carnac, Dharavi, Technopolis &

Noida office based employees.

Conducted Fire risk assessment at DCS.

Safety Convention was held on 5th March 2015 inaugurated by CEO & MD, COO &

Executive Director, CHRO, Chief Culture Officer. Divisional Heads have participated in the

same.

6. R&R for Safety – Mar’15

Divisional Safety Champions

CG

PL

Mr. Tushar Navinbhai Tripathi, Group Head – CHP is Divisional Safety Champion for March 2015. He has reported 16 unsafe conditions during the month.

Ka

linga

na

ga

r

Mr. Manoj Kumar Padhi, Lead Engineer - Mechanical Const. is Divisional Safety Champion for March 2015. He has reported 11 unsafe conditions during the month.

Ma

ith

on

Mr. Vijay Kumar, Lead Engineer - Mechanical Maint. is Divisional Safety Champion for March 2015. He has reported 12 unsafe conditions during the month.

Win

d

Ope

ratio

ns

Mr. Pravin Wagh, Asset Manager-Agaswadi is Divisional Safety Champion for March 2015. He has reported 15 unsafe conditions during the month.

Star Safety Champions

Ma

ith

on

Mr. Vijay Kumar, Lead Engineer - Mechanical Maint. is Star Safety Champion for Q4-FY’15.

Win

d

Op

era

tio

ns

Mr. Pramod Alva, Asset Manager – Gadag wind farm is Star Safety Champion for Q4-FY’15.

7. Root Cause Analysis (RCA) of incidents – Mar’15

Human Factors Physical Factors

System Factors

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

50.0%

Apr'14

369

May'14

283

Jun'14

207

July'14

319

Aug'14

284

Sep'14

283

Oct'14

205

Nov'14

263

Dec'14

218

Jan'15

209

Feb'15

175

Mar'15

288

Ca

us

es

Human Factors TrendProcedural non compliance No/ improper use of tools or equipment

Not using protective methods Inattention/ Lack of awareness

Total no.of causes

0.0%

5.0%

10.0%

15.0%

20.0%

25.0%

30.0%

35.0%

40.0%

45.0%

Apr'14

179

May'14

140

Jun'14

127

Jul'14

228

Aug'14

167

Sep'14

187

Oct'14

125

Nov'14

158

Dec'14

137

Jan'15

128

Feb'15

108

Mar'15

179

Cau

ses

Physical Factors TrendInadequate/ defective tools, equipment & vehicle Work exposure to

Workplace environment layout Inadequate/ defective protective system

Total no. of causes Total no. of causes

0.0

5.0

10.0

15.0

20.0

25.0

30.0

35.0

40.0

45.0

50.0

Apr'14

202

May'14

183

Jun'14

111

Jul'14

261

Aug'14

131

Sep'14

263

Oct'14

121

Nov'14

144

Dec'14

118

Jan'15

121

Feb'15

101

Mar'15

175

System Factors Trend

Skill Level

Management / Supervision / Employee Leadership

Engineering / Design

Work Planning

Purchasing, Material Handling & Material Control

Tools & Equipment

Communication

Mental State

Note: Insignificant causes(consistently less than 5%) arenot shown

Total no. of causes

8. Security Highlights

I. Trombay 26 Mar 2015 – An interactive session on crime against women, domestic violence and

women empowerment was organized at junior club by Tata Colony Residents Association

by Security Trombay. Total 150 colony residents including female members & children.

30 Mar 2015 – Mock drill was carried out (Level III) by fire department with Scenario “Fire in

contractor’s shed near U#7, suspect gas fire”. U#7 MO/SCR regarding fire at contractor’s

shed near U#7.

Mock Drill on security scenario, safety briefing and OJT training in March were conducted in

Trombay.

02 Mar 2015 – BCP Stage II audit in view of testing

readiness of the organization and meeting the

challenges of a continuously changing environment

successfully completed at Trombay for ISO

22301:2012 BCMS Certifications.

II. MPL(Maithon)

Security Review meeting was held on 27.03.2015 with the external customer at site office conference hall with the security related issues.

. A training session on use of wireless hand set and procedure of

transmission was conducted for the security personnel.

Checking of Hyvas in the month of March 732 vehicle was arrested by over speeding and

2878 vehicle was checked without tarpaulin/without seal/helper.

Security arrangement on crisis situation at all access points

III. CGPL Mundra:

Founder’s Day celebration in CGPL –as on 3/3/15.

Risk Audit & CISF Survey Visit in March in CGPL.

Safety week Highlights

Fire Mock Drill

Security Training on Boom Barrier

CORPORATE SECURITY-TATA POWER