1
Site Visit Report for Contract ER402
New Link Road Between
Upper Changi Road and Upper Changi Road East
Date Visited : 13 June 2013
Time Observation : 9:50 am till 11:10 am
Reported By : Tay Ah Lek
-
7/28/2019 Safety Inspection for ER420
2/15
-
7/28/2019 Safety Inspection for ER420
3/15
Road Projects
3
Site Access Security
Observation : Missing
hoarding
Risk: Construction site is
exposed and open to Public
encroachment easily
Propose : To immediately
install the hoarding
-
7/28/2019 Safety Inspection for ER420
4/15
Road Projects
4
Site Access Security
Observation : Access is open
to Public, no security gate
and security check point at
site access. Only plastic
waterfilled are used to block
the access after works
Risk: Construction site is
exposed and open to Public
encroachment easily
Propose : To install propergate or swing barriers with
security check point.
-
7/28/2019 Safety Inspection for ER420
5/15
Road Projects
5
Site Compound Layout (Safety Notice Board)
Safety Notice Board Observation : Safety Notice
Board is not labelled and
organise for easy reading.
Safety Issues: Difficult to
retrieve safety informationfrom notice board. Worker
may face problem in reading
it.
Propose : To label and re-
organise notice board withdifference topic and provide
additional notice board to
promote hot topic like dengue
cases and alert.
-
7/28/2019 Safety Inspection for ER420
6/15
Road Projects
6
Site Office Compond Layout Safety
Observation : Construction
material storage areas are
not centralised, no barricade
and material are not properly
stocked up
Risk: obstruction and tripping
hazard.
Propose : To install
temporary railing and provide
control man access.Set up rack fro small item
above ground
-
7/28/2019 Safety Inspection for ER420
7/15
Road Projects
7
Pedestrian Footpath Safety at Site Access
Observation : Site access
intersect with pedestrianfootpath provide no warning
sign or wording to alert public
about construction vehicle
access
Risk: Pedestrian may knockdown by moving construction
vehicles
Propose : To paint zebra
crossing and install warning
signs at both side of theaccess.
-
7/28/2019 Safety Inspection for ER420
8/15
Road Projects
8
Site Office Compound Layout Safety
Observation : storage areas
are not properly organised.No proper access with proper
barricade (railing or
hoarding), also without
labelling signboard
Safety issues: Site accessobstruction, unsightly and
pose danger and fire hazard
if flammable material is not
properly organise and stored
Propose : To install
temporary railing to barricade
the storage areas and with
proper partition and labelling
signs
-
7/28/2019 Safety Inspection for ER420
9/15
Road Projects
9
Site Office Compound Housekeeping
Observation : Earth spilling,
washing bay is not properlymaintain. Muddy water was
found. Damage watefilled are
used.
Safety issues: Environmental
safety
Propose : To sweep and
maintain access clean at all
time.
-
7/28/2019 Safety Inspection for ER420
10/15
Road Projects
10
Construction Safety (No shoring)
Surcharge can pose danger
Observation : Loose
excavated material is piling
up high next to trench without
shoring and store too near to
trench edge.
Safety Issues: Earth can
collapse and pose danger to
the workers in the trench.
Propose: To install PEs
design shoring or cutting
gentle slope to prevent earthcollapse. Excavated loose
material should not store next
to the trench or should keep
> 2m away from trench.
-
7/28/2019 Safety Inspection for ER420
11/15
Road Projects
11
Construction Safety (No shoring)
No shoring , Slope toe is not properly trimmed
Observation : Loose
excavated trench wall withoutshoring and high slope is
next to the trench edge.
Safety Issues: Earth can
collapse and pose danger to
the workers working between
drain channels and the trench
wall.
Propose: To install PEs
design shoring to preventearth collapse.
-
7/28/2019 Safety Inspection for ER420
12/15
Road Projects
12
Construction Safety (Earth Control Measures)
Earth is not covered, no perimeter drain,
silt sump, silt trap
Observation : Excavated
earth is stockpile withoutproper earth control
measures.
Safety Issues: Pose earth
control and environmental
problems.
Propose : To provide
temporary perimeter drain ,
silt sum and silt trap and
cover the earth with coconutblanket .
-
7/28/2019 Safety Inspection for ER420
13/15
Road Projects
13
Construction Safety (Water Pounding)
Footpath edge water poundingObservation : Many water
pounding within the sitepremises.
Safety Issues: Can pose
mosquitoes breeding.
Propose : To install silt sump
form connection point and
level the ground next to
footpath edge.Earth drain and pipes connection point water pounding
-
7/28/2019 Safety Inspection for ER420
14/15
Road Projects
14
Construction Safety (Stagnant Water)
Overgrown vegetation along earth drain Observation : Over grown
grass over earth drain. Silt inthe drain blocking water flow.
Safety Issues: Can pose
mosquitoes breeding.
Propose : To regularly cut
vegetation to expose the
earth drain, also desilting to
ensure live water flowing.Drain stagenanted with water ,need regular desilting
-
7/28/2019 Safety Inspection for ER420
15/15
Road Projects
15
Construction Safety (Stagnant Water)
Observation : Deep
excavation without properbarricade and warning sign
keep workers away. No
proper access steps to the
excavtion holes.
Safety Issues: Can pose
falling hazard.
Propose : To install railing
barricade and proper step
access.
Deep excavated trench is not properly barricaded
, no proper access and warning sign