    Road Projects

    1

    Site Visit Report for Contract ER402

    New Link Road Between

    Upper Changi Road and Upper Changi Road East

    Date Visited : 13 June 2013

    Time Observation : 9:50 am till 11:10 am

    Reported By : Tay Ah Lek

  • 7/28/2019 Safety Inspection for ER420

    2/15

  • 7/28/2019 Safety Inspection for ER420

    3/15

    Road Projects

    3

    Site Access Security

    Observation : Missing

    hoarding

    Risk: Construction site is

    exposed and open to Public

    encroachment easily

    Propose : To immediately

    install the hoarding

  • 7/28/2019 Safety Inspection for ER420

    4/15

    Road Projects

    4

    Site Access Security

    Observation : Access is open

    to Public, no security gate

    and security check point at

    site access. Only plastic

    waterfilled are used to block

    the access after works

    Risk: Construction site is

    exposed and open to Public

    encroachment easily

    Propose : To install propergate or swing barriers with

    security check point.

  • 7/28/2019 Safety Inspection for ER420

    5/15

    Road Projects

    5

    Site Compound Layout (Safety Notice Board)

    Safety Notice Board Observation : Safety Notice

    Board is not labelled and

    organise for easy reading.

    Safety Issues: Difficult to

    retrieve safety informationfrom notice board. Worker

    may face problem in reading

    it.

    Propose : To label and re-

    organise notice board withdifference topic and provide

    additional notice board to

    promote hot topic like dengue

    cases and alert.

  • 7/28/2019 Safety Inspection for ER420

    6/15

    Road Projects

    6

    Site Office Compond Layout Safety

    Observation : Construction

    material storage areas are

    not centralised, no barricade

    and material are not properly

    stocked up

    Risk: obstruction and tripping

    hazard.

    Propose : To install

    temporary railing and provide

    control man access.Set up rack fro small item

    above ground

  • 7/28/2019 Safety Inspection for ER420

    7/15

    Road Projects

    7

    Pedestrian Footpath Safety at Site Access

    Observation : Site access

    intersect with pedestrianfootpath provide no warning

    sign or wording to alert public

    about construction vehicle

    access

    Risk: Pedestrian may knockdown by moving construction

    vehicles

    Propose : To paint zebra

    crossing and install warning

    signs at both side of theaccess.

  • 7/28/2019 Safety Inspection for ER420

    8/15

    Road Projects

    8

    Site Office Compound Layout Safety

    Observation : storage areas

    are not properly organised.No proper access with proper

    barricade (railing or

    hoarding), also without

    labelling signboard

    Safety issues: Site accessobstruction, unsightly and

    pose danger and fire hazard

    if flammable material is not

    properly organise and stored

    Propose : To install

    temporary railing to barricade

    the storage areas and with

    proper partition and labelling

    signs

  • 7/28/2019 Safety Inspection for ER420

    9/15

    Road Projects

    9

    Site Office Compound Housekeeping

    Observation : Earth spilling,

    washing bay is not properlymaintain. Muddy water was

    found. Damage watefilled are

    used.

    Safety issues: Environmental

    safety

    Propose : To sweep and

    maintain access clean at all

    time.

  • 7/28/2019 Safety Inspection for ER420

    10/15

    Road Projects

    10

    Construction Safety (No shoring)

    Surcharge can pose danger

    Observation : Loose

    excavated material is piling

    up high next to trench without

    shoring and store too near to

    trench edge.

    Safety Issues: Earth can

    collapse and pose danger to

    the workers in the trench.

    Propose: To install PEs

    design shoring or cutting

    gentle slope to prevent earthcollapse. Excavated loose

    material should not store next

    to the trench or should keep

    > 2m away from trench.

  • 7/28/2019 Safety Inspection for ER420

    11/15

    Road Projects

    11

    Construction Safety (No shoring)

    No shoring , Slope toe is not properly trimmed

    Observation : Loose

    excavated trench wall withoutshoring and high slope is

    next to the trench edge.

    Safety Issues: Earth can

    collapse and pose danger to

    the workers working between

    drain channels and the trench

    wall.

    Propose: To install PEs

    design shoring to preventearth collapse.

  • 7/28/2019 Safety Inspection for ER420

    12/15

    Road Projects

    12

    Construction Safety (Earth Control Measures)

    Earth is not covered, no perimeter drain,

    silt sump, silt trap

    Observation : Excavated

    earth is stockpile withoutproper earth control

    measures.

    Safety Issues: Pose earth

    control and environmental

    problems.

    Propose : To provide

    temporary perimeter drain ,

    silt sum and silt trap and

    cover the earth with coconutblanket .

  • 7/28/2019 Safety Inspection for ER420

    13/15

    Road Projects

    13

    Construction Safety (Water Pounding)

    Footpath edge water poundingObservation : Many water

    pounding within the sitepremises.

    Safety Issues: Can pose

    mosquitoes breeding.

    Propose : To install silt sump

    form connection point and

    level the ground next to

    footpath edge.Earth drain and pipes connection point water pounding

  • 7/28/2019 Safety Inspection for ER420

    14/15

    Road Projects

    14

    Construction Safety (Stagnant Water)

    Overgrown vegetation along earth drain Observation : Over grown

    grass over earth drain. Silt inthe drain blocking water flow.

    Safety Issues: Can pose

    mosquitoes breeding.

    Propose : To regularly cut

    vegetation to expose the

    earth drain, also desilting to

    ensure live water flowing.Drain stagenanted with water ,need regular desilting

  • 7/28/2019 Safety Inspection for ER420

    15/15

    Road Projects

    15

    Construction Safety (Stagnant Water)

    Observation : Deep

    excavation without properbarricade and warning sign

    keep workers away. No

    proper access steps to the

    excavtion holes.

    Safety Issues: Can pose

    falling hazard.

    Propose : To install railing

    barricade and proper step

    access.

    Deep excavated trench is not properly barricaded

    , no proper access and warning sign