![Page 1: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/1.jpg)
Safety Induction to Safety Induction to the Lift & Escalator the Lift & Escalator IndustryIndustry
Part 5 - Working Places and SafePart 5 - Working Places and SafeAccessAccess
![Page 2: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/2.jpg)
ContentsContents
Part 1 – Working in the IndustryPart 1 – Working in the IndustryPart 2 – Personal Safety & HealthPart 2 – Personal Safety & HealthPart 3 – Tools & EquipmentPart 3 – Tools & EquipmentPart 4a – Manual HandlingPart 4a – Manual HandlingPart 4b – Mechanical HandlingPart 4b – Mechanical HandlingPart 5 – Working Places and Safe AccessPart 5 – Working Places and Safe AccessPart 6a – Working Safely - GeneralPart 6a – Working Safely - GeneralPart 6b – Working Safely - Specific AreasPart 6b – Working Safely - Specific AreasPart 6c – Working Safely - Other situationsPart 6c – Working Safely - Other situationsPart 7 – First AidPart 7 – First AidPart 8 – Environmental ProtectionPart 8 – Environmental ProtectionPart 9 – Legal ObligationsPart 9 – Legal ObligationsPart 10 – Accident Reporting and RecordingPart 10 – Accident Reporting and Recording
![Page 3: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/3.jpg)
• Regulations require a safe means of access to be provided and maintained to any place of work.
• Guards or other effective means are required where a person could fall.
• Scaffolding should be regularly examined by a competent person and records kept
• Any changes to scaffolding must be carried out by a competent person
• Do not move scaffold planks from a platform to use elsewhere
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access
General
![Page 4: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/4.jpg)
• All working places should have adequate lighting• Tool boxes and equipment should be lifted on to a working
platform by rope line• Any person in control of premises has a responsibility to
ensure safe access to work areas and adequate lighting.• Report all instances of poor access to your supervisor for
forwarding to LEIA.
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access
General
![Page 5: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/5.jpg)
• Wherever possible work at height should be avoided by other ways of working.
• Work in the lift well will normally be on scaffolds and working platforms erected by specialist scaffolders.
• When in use, scaffolds should be regularly examined, at least every 7 days by a competent person and records kept.
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access
Work at Height
![Page 6: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/6.jpg)
• If a scaffold tube has to be removed for your work, it must only be done by a competent scaffolder.
• Do not move scaffold planks to use elsewhere. Ensure that there is enough scaffold material on site.
• If the work is not easily accessible, the working platform should be repositioned by a competent scaffolder.
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access
Work at Height
![Page 7: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/7.jpg)
Voids during installation
• Guardrails should be fitted, at least 950mm high, where there is a risk of falling. Where guardrails, toeboards or barriers are impracticable then safety nets should be provided.
• Where safety nets are not reasonably practicable the use of anchored work restraint harnesses to prevent reaching the fall hazard may be used.
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access
Work at Height
![Page 8: Safety Induction to the Lift & Escalator Industry Part 5 - Working Places and Safe Part 5 - Working Places and SafeAccess.](https://reader030.fdocuments.us/reader030/viewer/2022032723/56649f585503460f94c7d9e8/html5/thumbnails/8.jpg)
Thank you for Attending
Any Questions?
Part 5 - Working Places and Safe AccessPart 5 - Working Places and Safe Access