Safety Audit Ppt Representation (2)

download Safety Audit Ppt Representation (2)

of 58

Transcript of Safety Audit Ppt Representation (2)

  • 8/3/2019 Safety Audit Ppt Representation (2)

    1/58

    SAFETY AUDIT

    IS 14489 : 1998

    DO INSPECTION AUDIT YOURSELF

    GROUP 5

  • 8/3/2019 Safety Audit Ppt Representation (2)

    2/58

    INTRODUCTION

    Safety Audit is management tool comprisingof a systematic ,periodic and objectiveevaluation of how well the safety

    organization, management and equipmentare performing, with the aim of helps tosafeguard a companys assets by facilitatingmanagement control of safety, health and

    environmental practices and assessingcompliance with established standards

  • 8/3/2019 Safety Audit Ppt Representation (2)

    3/58

    TYPES OF AUDITS

    External : These are conducted by a thirdparty

    Internal : Corporate : By headquartersor

    personnel from other units of

    the same company.

    Self :Inhouseby the plant personnelthemselves.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    4/58

    AUDITS OBJECTIVES

    Verify compliance with established standards(regulations, internal policies and industry wisestandards of practice )

    Identify deviation from designed and plannedoperating and maintenance procedure andstandards

    Identify plant condition or operating procedures

    that could lead to an accident and significantlosses to life or property

    Ensure that the plan and operating andmaintenance procedures match the design intent

    and standards

  • 8/3/2019 Safety Audit Ppt Representation (2)

    5/58

    Keep the operating personnel alert to the process

    hazards Review operating procedures for necessary

    revisions

    Seek to identify equipment or process changes

    that could have introduced new hazards

    Ultimate application of new technology to existing

    hazards

    Review adequacy of safety inspections Look for major risk situations recommend

    measures to improve overall safety performance

    of the plant

  • 8/3/2019 Safety Audit Ppt Representation (2)

    6/58

    Methodology in Conducting a Safety Audits

    The following activities are carried out in conducting a

    safety audit and implementing the audit recommendation

    Pre-audit activities

    Key on-sites activities

    Post-audit activities

  • 8/3/2019 Safety Audit Ppt Representation (2)

    7/58

    Pre-audit Activities

    The safety audit process being with the following activities

    before the actual onsite audit takes place :

    Request by management / identification of industry according to highhazards/high rate of accidents

    Scheduling of the audits

    Selection of the audit team

    Development of an audit plan which includes-Defining the scope of the audit

    -Selecting priority topics-Modifying the audit protocols-Allocating audit team resources

    Advance visit to the factory to gather background information and data,administering a questionnaire.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    8/58

    Background information to be gathered :

    1. List of products2. Brief description of the manufacturing process with

    process flow diagram/block diagram

    3. Built-up area and site plan/names of departments

    4. Number of company employees ( managers, supervisorsand workmen ) and contractors employees

    5. Organization structure, including SHE function

    6. List of chemicals handled:

    - Raw materials- Products

    - Intermediates

    - By-products

  • 8/3/2019 Safety Audit Ppt Representation (2)

    9/58

    Date to be gathered :

    1 Brief description of major accidents in the pastten years

    2 Accident statistics for the last five yearstypes/ cause of accidents and analysis

    3 Details of fires / explosions / toxic releases inthe last five years

  • 8/3/2019 Safety Audit Ppt Representation (2)

    10/58

    Key On-site Activities

    Understanding Management Systems:

    First of all a working understanding of the industrys

    internal safety management system, i.e. the set of

    formal and normal actions taken by the industry is

    required to be developed. This step usually includes

    developing a understanding of :

    Factory processes

    Internal controls ( both management and engineering)

  • 8/3/2019 Safety Audit Ppt Representation (2)

    11/58

    Plant organization and responsibilities

    Compliance parameters and other applicable requirements

    Any current or past problems The picture of internal management systems is usually drawn

    from the following sources:

    Discussions with management personnel, supervisors andworks

    Specially designed internal controls questionnaire Plant visits

    In some cases, a limited amount of verification testingconducted to help confirm the auditors initial understanding

    The auditor records his or her understanding in a flow chart-

    narrative, description, or some combination of the two-inorder to have a written description against which audit is to bedone.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    12/58

    Assessing Strengths and Weaknesses :

    In assessing strengths of internal controls,

    auditors look for the following indications.

    Whether factory personnel are trained andexperienced

    Whether responsibilities at various levels are clearlydefined and carefully assigned

  • 8/3/2019 Safety Audit Ppt Representation (2)

    13/58

    Whether duties are so divided that these minimize conflicts ofinterest

    Whether authorization systems are in existence

    Whether internal verification procedures are in place Whether protective measures-security systems and alarms are

    taken

    Whether procedures and compliance / exception results are inplace

    For each of the areas assigned, the auditor should ask himselfthe following questions :

    * If the facility is doing everything the way they say ithappens, is that acceptable ?* Is the facility incompliance with applicable requirementsand is the factory adequately protected ?

  • 8/3/2019 Safety Audit Ppt Representation (2)

    14/58

    Collecting Audit Evidence :

    Audit evidence forms the basis on which the teamdetermines compliance with laws, regulations,corporate policies and / or other standards.

    Suspected weaknesses in the management system areconfirmed in this step. Also management systemsthat appear sound are tested to verify that they workas planned and are consistently effective. Variouswork such as record reviews, examination of

    available data, observation and interviews withfactory personnel are used to gather audit evidence.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    15/58

    Completeness and authenticity of records

    Purpose and effectiveness of the format and theirsatisfactory filling-up.

    Checking of records and show-up action by neverauthorities.

    Method of maintaining records

    Interview with factory personnel :

    The auditor asks questions, both formally andinformally. The following points should be kept inmind while interviewing a person.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    16/58

    Interviewing persons is a difficult matter and should behandled properly.

    Sometimes due to various reasons, the person is reluctant to

    provide the required information. During interviews, unnecessary / irrelevant questions should

    be avoided.

    The person being interviewed should be kept at ease

    The interviewer should create a feeling of trust in the person

    being interviewed. Information should be collected by interviewing, persons at

    the appropriate level.

    Verify statements by interviewing persons of the same /different levels.

    The person should be interviewed at his normal workinglocation.

    Proper judgments should be used to select a sample of thework force for the interview.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    17/58

    Observation :

    Plant visit, observation is a significant aspect of safety

    audit. The auditor collect evidence through what can be

    seen, heard, touched or smell. The following points

    should be kept in mind during a plant visit :

    Visit to the plant must be during the normal working

    condition.

    Observation on relevant audit elements should berecorded on the spot.

    The auditor should develop skills ( keep eyes open ) to

    make observation of several elements at each location.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    18/58

    Once sufficient deficiencies relating to a particularitem are detected, checking of that item at other

    locations may be stopped. When sufficient observations ( particularly about

    acceptable systems ) are made on a particularelement during plant visit the auditor should spent

    less time in document verification of that item. Safe operating procedures should also be checked.

    The auditor should try to visit some locations undershut down maintenance, construction, etc.

    The auditor must make one visit during second shift/ holiday to assess conditions and functioning ofsystems apart from in the general shift.

    The auditor must check the availability of operatingprocedures in the plant.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    19/58

    Evaluating audit evidence :

    After the evidence is gathered, the audit findings

    and observations are evaluated. The audit team

    sets aside a few hours at the end of the audit to

    discuss, evaluate and finalize the tentative audit

    findings. The team confirms if there is sufficient

    evidence to support all findings. Findings that

    may be more significant than individualdeficiencies are identified and each finding is

    summarized in a way that most clearly conveys

    its significance.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    20/58

  • 8/3/2019 Safety Audit Ppt Representation (2)

    21/58

    Post-audit Activities

    The final audit report is issued to the chiefexecutive of the company. Some companies also

    distribute the report to various levels of the operatingand line management communication and distributedto those with a need to know. A formal procedure forresponding to the audit report is established. Theaction planning process is initiated as audit findingsare identified. If assigns responsibilities for correctiveaction, determines potential solutions and preparesrecommendations to correct any deficienciesmentioned in the audit report, and establishes time

    tables. Companies may also incorporates the actionplan in the final report. Action plans are monitoredand followed either by the operating management,the safety department. Or the auditors. The follow-upinvolves a written or oral inquiry to the status of the

    planned action.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    22/58

    Audit ElementsThe detailed scope of the audit is listed as a series of

    audit elements in two broad categories :

    1 Management Systems , and

    2 Technical / Hardware Aspects .

    Under each element a number of sub- elements have

    been listed. There may be many instances,particularly in small or medium sized plants, whereall elements need not be used. Further, for eachtype of industry (e.g. fertilizer petrochemical,pesticide ) detailed listings /checklists would need tobe prepared. Therefore selection of elements andsub-elements should be done using the professional

    judgment of the auditor, based on the type and sizeof the industry and other aspects.

  • 8/3/2019 Safety Audit Ppt Representation (2)

    23/58

    Management SystemThe essential elements of safety management system

    to be audited are given below :

    1 Safety, Health & Environment ( SHE ) Policyi ) Managements commitment to SHEii ) Accountability and Responsibility

    iii ) Implementationiv ) Policy review

    2 Safety and Health Organizational Set-upi ) Safety Department

    - Structure- Responsibilitiesii ) Occupational Health Servicesiii ) Safety Committee

  • 8/3/2019 Safety Audit Ppt Representation (2)

    24/58

    3 Education and Training

    i ) Induction training for new employees-Category-Topics-Duration

    -Feedback-Methodology

    ii ) Periodic Training

    -Category

    -Topics-Duration-Periodicity-Feedback-Methodology

  • 8/3/2019 Safety Audit Ppt Representation (2)

    25/58

    4 ) Communication / Motivation /Promotion in Safetyi) Safety suggestion schemeii) Safety competitions- Safety performance- Housekeeping

    - Safety essay, slogan and posteriii) Display Board informationiv) Safety publicationsv) Safety week / Day celebrations

    5 ) Safety Inspectionsi) Periodic inspectionii) Routine inspectioniii) Special inspection

  • 8/3/2019 Safety Audit Ppt Representation (2)

    26/58

    6) Accident Reporting, Investigation and

    Implementation of Recommendations

    i) Reportable- Fatal- Serious- Othersii) Non-Reportable

    iii) Dangerous occurrences / Near misses7) Maintenance of Accident Statistics and its

    Utilization

    i) Accident rate per 1000 workers employedii) Frequency rateiii) Severity- Type-wise and cause-wise analysis ofaccidents

  • 8/3/2019 Safety Audit Ppt Representation (2)

    27/58

    8) Safety Audits

    i) External auditsii) Internal audits

    - Self

    - Corporate

    9) Personal Protective

    Equipmentsi) Types and selection

    ii) Training and motivationiii) Enforcement

    iv) Maintenance

    v) Testing

    P / Pl M difi i P d

  • 8/3/2019 Safety Audit Ppt Representation (2)

    28/58

    10) Process / Plant Modification Procedure

    ( including Technology Change )

    11) Safe Operating Procedurei) Implementationii) Review

    12) Work Permit System

    i) Line breakingii) Confined space entry

    iii) Hot workiv) Electrical lockout and tag systemv) Excavationvi) Working at heightvii) Working on fragile

  • 8/3/2019 Safety Audit Ppt Representation (2)

    29/58

    13) Fire Fighting System

    i) Selection of fire fighting equipment

    ii) Fire fighting proceduresiii) Fire fighting teamiv) Communication systemv) Drillsvi) Inspection and maintenance of fire fighting

    equipments14) Health and Safety Improvement Plan /

    Targets

    i) Accident / Incident rate reduction

    ii) Improvement in environmental standards

  • 8/3/2019 Safety Audit Ppt Representation (2)

    30/58

    15 Prevention of Occupational Diseasesi) Identification of areas with potential for occupationaldiseasesii) Engineering control measuresiii) Administrative control measures

    16) Work Environment Monitoring System

    i) In-plant facilitiesii) Assistance from outside organizations

    17) Medical Examinationi) Pre-employmentii) Periodical

  • 8/3/2019 Safety Audit Ppt Representation (2)

    31/58

    18) Material Safety Data Sheetsi) Preparation

    ii) Updates

    iii) Dissemination

    19) Emergency Preparedness Plan ( On-site / off-

    site )

    i) Emergency response systemii) Emergency alarm system

    iii) Mock drills

    iv) Co-ordination with the local authorities

    v) Education of general publicvi) Communication with the public

  • 8/3/2019 Safety Audit Ppt Representation (2)

    32/58

    20) Hazardous Waste Treatment and

    Disposal

    i) Incineration of solid waste

    ii) Efficient treatment

    iii) Disposal

    iii) Air pollution control measures

    21) Transportation of Hazardous Materialsi) Provision of informationii) Emergency response

  • 8/3/2019 Safety Audit Ppt Representation (2)

    33/58

    22) Hazard Identification

    i) Checklist

    ii) What if ? review of operations

    iii) Hazard and operability study ( Hazop )

    iv) Fault Tree Analysisv) Mond and Dow index

    23) Contractor Safety Systems

    24) New Equipment Review / Inspection

  • 8/3/2019 Safety Audit Ppt Representation (2)

    34/58

    Technical Aspects

    The essential elements of a technical safety audit are

    based on the scope of the audit. These may be actedin a particular plant / operation / aspect or mayextend to technical safety aspects of the entire

    factory.

    The following technical aspects are to be looked into in detail while carrying out the safety audit.1) Building and Structuresi) Location and lay-out

    ii) Conforming to standards

    iii) Stability certificateiv) Escape routes and exitsv) Fire-proof constructionvi) Lighting arrestor

  • 8/3/2019 Safety Audit Ppt Representation (2)

    35/58

    2) Operational Safety and Procedures

    i) Availability and compliance of operating andsafety manualsii) Control of operating parametersiii) Start-up and shut-down procedures

    iv) Venting / Scrubbing systemsv) Running of emergency equipmentduring power failurevi) Cleaning and tank entry procedures

    vii) Work permit systemsviii) Precautions against endothermic /exothermic run-away reactions

  • 8/3/2019 Safety Audit Ppt Representation (2)

    36/58

    3) Chemical Process Safetyi) Plant lay out

    - Separation and isolation, - Drainage,- Enclosed spacesii) Material compatibilityiii) Contamination control

    iv) Physical facilitiesv) Inspection and maintenancevi) General containment and controlsvii) Instrumentation

    viii) Piping systemsix) Protective systems ( not quality control)x) Electrical equipmentxi) Pressure vessels

    ii) P d

  • 8/3/2019 Safety Audit Ppt Representation (2)

    37/58

    xii) Pumps and compressorsxiii) Reactionsxiv) Venting

    xv) Interlock devices for critical operationsand equipmentsxvi) Over-pressure: relief devicesxvii) Continuous operation of neutralizationsystem and connecting it with diesel generating setin case of power failurexviii) Connecting critical equipment with dieselgenerating set in case of total power failurexix) Alarm warning system in case of emergency

    xx) Indication and alarm system for processparameters controlxxi) Installation of fail-safe instruments

  • 8/3/2019 Safety Audit Ppt Representation (2)

    38/58

    4 Handling and Storage of Chemicalsi) Site selection

    -Storage area away from buildings or

    structures , - Distances as per the statutory

    regulations , - Well ventilated area , - Easy

    access from the control room

    ii) Alarm and indications

    - High level alarm , - High pressure & high

    temperature alarms , - Isolation of the tank ,-Remote control valve

    iii) Fencing

    iv) Distance between two tank

  • 8/3/2019 Safety Audit Ppt Representation (2)

    39/58

    v) Dyke walls with drainage systemvi) Display of caution notice

    vii) Support for above ground tanksviii) Ventingix) Valvesx) Level measurementxi) Pumpsxii) Sources of ignitionxiii) Lighting

    xiv) Marking of tanks , connections andfittingsxv) Gas leakages and control

  • 8/3/2019 Safety Audit Ppt Representation (2)

    40/58

    xvi) Safety valves discharge connection tothe neutralization system / flarexvii) Flame proof fittingsxviii) Electrical grounding of the vesselsand pipe linesxix) Diesel generating set connected to the

    emergency power supplyxx) Minimizing of inventoryxxi) Storage of chemicals under lowpressure

    xxii) House keepingxxiii) Fire fighting arrangement andprovision of static water

  • 8/3/2019 Safety Audit Ppt Representation (2)

    41/58

    xxiv) Extension of liquid inlet line to avoid static

    charge

    xxv) Personal protective equipments

    xxvi) Hydraulic testing and inspection of

    pipelines

    xxvii) Material safety data sheetxxviii) Trem (Transit Emergency ) card

    xxix) Emergency information panel

    xxx) Labeling of packaging material

    xxxi) Loading and unloading procedurexxxii) Transport emergency preparedness

    xxxiii) Emergency kit / fire fighting equipment

  • 8/3/2019 Safety Audit Ppt Representation (2)

    42/58

    (5) Fire and Explosion hazards

    1 Fire prevention- No smoking restricted area-Periodic checking & continuity of ear thing-Prevention of spillages

    -Accumulation of waste and combustible inprocess areas-Water sprinklers-Fire alarms-Lightning arrestor-Flame proof fittings-Flame arrestor-Static charge

    -Fire exits

  • 8/3/2019 Safety Audit Ppt Representation (2)

    43/58

    2- Fire Protection-Location and capacity of fire hydrant pump-Booster pump and standby pump

    -Hydrant pump starting system and procedure-Static water quantityLayout of linesSpace between the hydrantsWater jet monitorsHydrant boxesFoam requirement

    3- Fire extinguishers :

    Testing and certification by competent authorities

    Fire siren systemFire fighting team

    Fire fighting training

    Mutual aid scheme

  • 8/3/2019 Safety Audit Ppt Representation (2)

    44/58

    (6) Material Handling

    i) Manual handling :

    Procedures-Handling aids-Condition of material handling areas

    ii) Lifting machinery and tackles :

    -Selection-Design criteria-Inspection and testing-Compliance with standards

    -Periodic checking and maintenance-Storages-Safe working load, identification, markings etc.-Slinging practices

  • 8/3/2019 Safety Audit Ppt Representation (2)

    45/58

    iii) Material Handling procedures :

    -Stacking and restacking procedures :-Compliance with standards-Load bearing capacity

    -Stacking stability-Safe handling procedure for chemicals andexplosives-Storage facilities ( adequacy & suitability )

    including pallets-Clearance and passages-Provision of aisles

  • 8/3/2019 Safety Audit Ppt Representation (2)

    46/58

    7) Machine Guardingi) Types of guards

    ii) Guarding materialsiii) Maintenance of guardsiv) Periodic inspection

    8) Pumps and Compressorsi) Pressure design of casing

    ii) Rating of in stream pipingiii) Check valves / Control valvesiv) Suction piping and over pressurev) Isolation valvevi) Speed control

    vii) Design temperature controlviii) Leakagesix) Lubricationx) Reverse flow / rotationxi) Vibration / Alignment

  • 8/3/2019 Safety Audit Ppt Representation (2)

    47/58

    9) Inspection & Testing of Pressure Vessels

    i) Schedule and inspection and testingii) Testing and inspection reportsiii) Compliance with standardsiv) Inspection and testing of pressure relief valves andrupture discs

    10 Personal Protective Equipments

    - Selection and suitabilityi) Proper useii) Display

    iii) Inspection and testingiv) Maintenancev) Proper storage

  • 8/3/2019 Safety Audit Ppt Representation (2)

    48/58

    11) Electrical Hazards

    i) Area classification

    ii) Selection and use of electrical appliances

    iii) Overload and short-circuit devices

    iv) Power isolation procedures

    v) Electrical fire-fighting devices

    vi) Flame proof fittings

    vii) Lightning arrestorviii) Ear thing / Earth leakage circuit breaker

    ix) Lock out and tagging procedures

  • 8/3/2019 Safety Audit Ppt Representation (2)

    49/58

    12) Instrumentation

    i) Provision and suitability of instrument in

    process / equipmentii) Instrument calibration proceduresiii) Tripping devices for control of processparameters

    iv) Fail-safe instrumentation proceduresv) Periodic maintenance proceduresvi) Testing and inspection proceduresvii) Checking against response time

    viii) Effects of humidity and temperature oninstrumentsix) Back-up proceduresx) Checking of air ( quality, pressure, etc )

  • 8/3/2019 Safety Audit Ppt Representation (2)

    50/58

    13) Preventive Maintenance

    i) Schedule

    ii) Maintenance checklist / reportsiii) Equipment change-over schedule

    iv) Review of equipment failures

    14) Pollution Systemi) Effluent treatment plant

    ii) Air pollution control and monitoring

    iii) Hazardous wastes disposal

    iv) Noise pollution

  • 8/3/2019 Safety Audit Ppt Representation (2)

    51/58

    15) Emergency Preparedness

    i) Organization

    ii) Emergency planningiii) Emergency control centeriv) Escape routesv) Assembly pointsvi) Evacuation proceduresvii) Communication within the plantviii) Identification of hazardous areasix) Key personnelx) Emergency response equipments

    xi) First aid and medical facilityxii) Communication ( authorities and public )xiii) Dispersion modelsxiv) Training and drills

  • 8/3/2019 Safety Audit Ppt Representation (2)

    52/58

    16) Boilers / Furnaces

    i) Compliance with statutory requirements

    ii) Feed water piping

    iii) Steam outlet piping

    iv) Quality of waterv) Drum water level

    vi) Maintenance of instrument

    vii) Gas burner control

    viii) Interlocks

  • 8/3/2019 Safety Audit Ppt Representation (2)

    53/58

    viii) Interlocksix) Shut-off valvesx) Dampers

    xi) Low pressure, high pressure alarmsxii) Pressure and vacuum relief valvesxiii) Flame arrestor on discharge of relief valvesxiv) Stack height

    xv) Emergency relief devicexvi) Monitoring of stack emissionxvii) Economizer and super heaterxviii) Access to control valvesxix) Inspection of furnace liningxx) Explosion hazardsxxi) Fuel controlxxii) Insulationsxxiii) Measurement of heat stress

    17) H d T l d P t bl P T l

  • 8/3/2019 Safety Audit Ppt Representation (2)

    54/58

    17) Hand Tools and Portable Power Tools

    i) Selection

    ii) Maintenance

    iii) Quality

    iv) Storage

    v) Guarding

    vi) Ear thing of portable power tools

    18) Lighting / illumination

    i) Type of lighting

    ii) Illumination levelsiii) Compliance with standards

    iv) Ratio of contrast

    v) Glare

    vi) Maintenance of fixtures and fittings

    19) H k i

  • 8/3/2019 Safety Audit Ppt Representation (2)

    55/58

    19) House-keeping

    i) Floor surface

    ii) Cleanliness and tidinessiii) Disposal binsiv) Fencing of dangerous spots andditches

    v) Covering of trenches and pitsvi) Steps, ladders, staircases, ramps,walkwaysvii) Passages

    viii) Drainageix) Work platformsx) Left over materialsxi) Stacking

  • 8/3/2019 Safety Audit Ppt Representation (2)

    56/58

    IMPORTANT ASPECT FOR ACCIDENT

    PREVENTATION

    TO

    PREVENT

    ACCIDENT

    HAZARD IDENTIFICATION

    -HAZOP

    -HAZAN-FAULT TREE ANALYSIS

    -EVENT TREE ANALYSIS

    -DOW INDEX

    -SAFETY AUDIT

    -SAFETY INSPECTION

    WORK PERMIT SYSTEM-MECH. MAINTENANCE PERMIT

    -ELEC. MAINTENANCE PERMIT

    -HOT WORK PERMIT

    -COLD WORK PERMIT

    -VESSEL ENTRY PERMIT

    -WORK AT HEIGHT PERMIT

    -ESCAVATION PERMIT

    -E.T.C. PERMIT

    JOB SAFETY ANALYSIS

    I

    SAFE OPERATING PRACTICE

    I

    TRAINING

  • 8/3/2019 Safety Audit Ppt Representation (2)

    57/58

    170 How is the medical emergency communication with localbodies and other organizations ensured ? Give details.

    171 Is any alternate power source identified ? Give details.172 What is the medical emergency response system ? Give

    details.

    173 Are you a member of any MUTUAL-AID-SCHEME of yourarea ? If so give details.

    174 How many emergency alarm system (s) is / are available ?Give details.

    22) PLANT LAYOUT AND AREACLASSIFICATION

    175 What is the system of classification of hazardous zones in the plant for

    electrical installations ? Please specify.176 Whether periodic inspection and preventive maintenance of electrical

    installations is done by a qualified person and record is maintained ?

    177 Whether plant layout with area classification has been displayed atappropriate place (s) ?

  • 8/3/2019 Safety Audit Ppt Representation (2)

    58/58

    THANKS