Form No. P- 012 Issue Date: March 2006 Sheet 1 of 1 SAUDI ARAMCO PRE-COMMISSIONING FORM METERING Equipment Type: User Reference: Equipment Tag No: Equipment Description: BI/JO No: Plant No. / Location: Ref. Drawings & Documents: Manufacturer: Model No: Serial No: Test Completion Date: FIELD INSTALLATION CHECK LIST VISUAL AND MECHANICAL Yes No 1. Examine all devices for broken parts, indication of shipping damage and wire connection tightness. 2. Verify meter connections in accordance with single line meter and relay diagram. 3. Verify meter scale is compatible with Current Transformer, Voltage Transformer and/or transducer ratings. ELECTRICAL TESTS Yes No 1. Calibrate all meters and transducers in accordance with manufacturer's instructions. Verify meter deflection and accuracy at 0, 1/4, 1/2, 3/4, and 100% full scale values. Provide calibration data. 2. Verify all meter multipliers. 3. Verify instrument transformer secondary wiring terminal to terminal. Witness PDD Inspection Operation/Maintenance Contractor Signature & Date Copyright©Saudi Aramco 2009. All rights reserved.

Transcript of SA-P-012

Form No. P- 012 Issue Date: March 2006Sheet 1 of 1

SAUDI ARAMCO PRE-COMMISSIONING FORM

METERING

Equipment Type:User Reference:

Equipment Tag No:Equipment Description:

BI/JO No:Plant No. / Location:

Ref. Drawings & Documents:

Manufacturer:

Model No:Serial No:

Test Completion Date:

FIELD INSTALLATION CHECK LISTVISUAL AND MECHANICAL

YesNo

1. Examine all devices for broken parts, indication of shipping damage and wire connection tightness.

2. Verify meter connections in accordance with single line meter and relay diagram.

3. Verify meter scale is compatible with Current Transformer, Voltage Transformer and/or transducer ratings.

ELECTRICAL TESTS

YesNo

1. Calibrate all meters and transducers in accordance with manufacturer's instructions. Verify meter deflection and accuracy at 0, 1/4, 1/2, 3/4, and 100% full scale values. Provide calibration data.

2. Verify all meter multipliers.

3. Verify instrument transformer secondary wiring terminal to terminal.

WitnessPDDInspectionOperation/MaintenanceContractor

Signature & Date