FORM # J-011 (8/25/22) SHT 1 of 2 SAUDI ARAMCO PRE-COMMISSIONING FORM TURBINE, POSITIVE DISPLACEMENT, AND MAGNETIC FLOW METERS EQUIPMENT TYPE: USER REFERENCE: EQUIPMENT TAG NO.: DESCRIPTION: BI/JO NO.: PLANT NO. / LOCATION: REF. DRAWINGS & DOCUMENTS: MANUFACTURER: MODEL NO.: SERIAL NO.: COMMISSIONING DATE: METER FACTOR: REPEATABILITY : LINEARITY : CHECKS TO BE PERFORMED RESULT PASS FAIL SPIN METER TO CHECK FREEDOM OF MOVEMENT VERIFY THAT MAGNETIC FLOW METER WILL ALWAYS BE LIQUID FULL DURING PROCESS OPERATION CHECK METER RANGE AND SPAN CHECK UPSTREAM AND DOWN STREAM PIPING FOR STRAIGHT RUN REQUIREMENTS CHECK FLANGE TYPE AND RATING CHECK DIRECTION OF FLOW NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee. APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS Signature & Date Copyright©Saudi Aramco 2009. All rights reserved.

description

precom

Transcript of SA-J-011

BLANK Pre-Commissioning Form

FORM # J-011 (5/09)SHT 1 of 2SAUDI ARAMCO PRE-COMMISSIONING FORMTURBINE, POSITIVE DISPLACEMENT, AND MAGNETIC FLOW METERS

EQUIPMENT TYPE:USER REFERENCE:

EQUIPMENT TAG NO.:DESCRIPTION:

BI/JO NO.:PLANT NO. / LOCATION:

REF. DRAWINGS & DOCUMENTS:

MANUFACTURER:

MODEL NO.:SERIAL NO.:

COMMISSIONING DATE:

METER FACTOR:REPEATABILITY:

LINEARITY:

CHECKS TO BE PERFORMEDRESULT

PASSFAIL

SPIN METER TO CHECK FREEDOM OF MOVEMENT

VERIFY THAT MAGNETIC FLOW METER WILL ALWAYS BE LIQUID FULL DURING PROCESS OPERATION

CHECK METER RANGE AND SPAN

CHECK UPSTREAM AND DOWN STREAM PIPING FOR STRAIGHT RUN REQUIREMENTS

CHECK FLANGE TYPE AND RATING

CHECK DIRECTION OF FLOW

CHECK THAT INSTALLATION IS PER MANUFACTURER'S RECOMMENDATION

TABLE IS CONTINUED IN NEXT PAGE

OBTAIN 5 POINT MANUFACTURER CALIBRATION, LINEARITY AND REPEATABILITY CHECKS

CHECK METER MATERIAL

CHECK MANIFOLD CONFIGURATION

REMARKS:

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS

Signature & Date