SA-G-110
description
Transcript of SA-G-110
GEARS
FORM # G-110 (5/09)SHT 1 of 1SAUDI ARAMCO PRE-COMMISSIONING FORMGEARS
EQUIPMENT TYPE:USER REFERENCE:
EQUIPMENT TAG NO.:DESCRIPTION:
BI/JO NO.:PLANT NO. / LOCATION:
REF. DRAWINGS & DOCUMENTS:
MANUFACTURER:
MODEL NO.:SERIAL NO.:
COMMISSIONING DATE:
1RECEIPT INSPECTION FOR DAMAGES AND SHORTAGESYES____ NO____ 2SOFT FEET CHECKED.YES____ NO____ 3INTERNAL ALIGNMENT CHECKED. ( TOOTH CONTACT CHECK WITH BLUING).YES____ NO____ 4COLD ALIGNMENT CHECKED.YES____ NO____ 5LUBE OIL SUPPLY PIPING FLUSHED AND CASING CLEANED.YES____ NO____ 6ALL BLIND FLANGES REMOVED.YES____ NO____ 7DIRECTION OF ROTATION CHECKED.YES____ NO____ 8DOWEL PINS INSTALLED.YES____ NO____ 9COUPLING HUBS ARE INSTALLED PER DWG.YES____ NO____10NAME PLATE DATA PER DWG.YES____ NO____11COUPLING GUARD IN PLACE AND SECURED.YES____ NO____12SHIMS MOUNTED PER SPEC.(MATERIAL, CONFIGURATION).YES____ NO____13TEMPERATURE SENSORS INSTALLED.YES____ NO____14VIBRATION SENSORS INSTALLED.YES____ NO____
NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS
Signature & Date
CopyrightSaudi Aramco 2009. All rights reserved.