FORM # G-110 (7/17/22) SHT 1 of 1 SAUDI ARAMCO PRE-COMMISSIONING FORM GEARS EQUIPMENT TYPE: USER REFERENCE: EQUIPMENT TAG NO.: DESCRIPTION: BI/JO NO.: PLANT NO. / LOCATION: REF. DRAWINGS & DOCUMENTS: MANUFACTURER: MODEL NO.: SERIAL NO.: COMMISSIONING DATE: 1 RECEIPT INSPECTION FOR DAMAGES AND SHORTAGES YES____ NO____ 2 SOFT FEET CHECKED. YES____ NO____ 3 INTERNAL ALIGNMENT CHECKED. ( TOOTH CONTACT CHECK WITH BLUING). YES____ NO____ 4 COLD ALIGNMENT CHECKED. YES____ NO____ 5 LUBE OIL SUPPLY PIPING FLUSHED AND CASING CLEANED. YES____ NO____ 6 ALL BLIND FLANGES REMOVED. YES____ NO____ 7 DIRECTION OF ROTATION CHECKED. YES____ NO____ 8 DOWEL PINS INSTALLED. YES____ NO____ 9 COUPLING HUBS ARE INSTALLED PER DWG. YES____ NO____ 10 NAME PLATE DATA PER DWG. YES____ NO____ 11 COUPLING GUARD IN PLACE AND SECURED. YES____ NO____ 12 SHIMS MOUNTED PER SPEC.(MATERIAL, CONFIGURATION). YES____ NO____ 13 TEMPERATURE SENSORS INSTALLED. YES____ NO____ 14 VIBRATION SENSORS INSTALLED. YES____ NO____ NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee. APPROVALS SAPMT INSPECTION OTHER DEPT. OPERATIONS Signature & Date Copyright©Saudi Aramco 2009. All rights reserved.

description

precom

Transcript of SA-G-110

GEARS

FORM # G-110 (5/09)SHT 1 of 1SAUDI ARAMCO PRE-COMMISSIONING FORMGEARS

EQUIPMENT TYPE:USER REFERENCE:

EQUIPMENT TAG NO.:DESCRIPTION:

BI/JO NO.:PLANT NO. / LOCATION:

REF. DRAWINGS & DOCUMENTS:

MANUFACTURER:

MODEL NO.:SERIAL NO.:

COMMISSIONING DATE:

1RECEIPT INSPECTION FOR DAMAGES AND SHORTAGESYES____ NO____ 2SOFT FEET CHECKED.YES____ NO____ 3INTERNAL ALIGNMENT CHECKED. ( TOOTH CONTACT CHECK WITH BLUING).YES____ NO____ 4COLD ALIGNMENT CHECKED.YES____ NO____ 5LUBE OIL SUPPLY PIPING FLUSHED AND CASING CLEANED.YES____ NO____ 6ALL BLIND FLANGES REMOVED.YES____ NO____ 7DIRECTION OF ROTATION CHECKED.YES____ NO____ 8DOWEL PINS INSTALLED.YES____ NO____ 9COUPLING HUBS ARE INSTALLED PER DWG.YES____ NO____10NAME PLATE DATA PER DWG.YES____ NO____11COUPLING GUARD IN PLACE AND SECURED.YES____ NO____12SHIMS MOUNTED PER SPEC.(MATERIAL, CONFIGURATION).YES____ NO____13TEMPERATURE SENSORS INSTALLED.YES____ NO____14VIBRATION SENSORS INSTALLED.YES____ NO____

NOTE: This non-mandatory form may be used as the starting point to assemble a pre-commissioning checklist. Entries should be revised, added and deleted and approvals adjusted to reflect the needs of the Project Acceptance Committee.APPROVALSSAPMTINSPECTIONOTHER DEPT.OPERATIONS

Signature & Date

CopyrightSaudi Aramco 2009. All rights reserved.