2013 Louisiana Transportation Conference
PREFABRICATED BRIDGE ELEMENTS AND SYSTEMS
Paul Vaught, P.E.
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
2/53
Every Day CountsPrefabricated Bridge Elements and Systems
OVERVIEW
Why PBES?
Past Experience Objectives
Deliverables
Moving Forward (EDC2)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
3/53
Every Day CountsPrefabricated Bridge Elements and Systems
WHY PBES?
Time Savings
Safety Advantages Constructability Advantages
Environmental Advantages
Cost Savings*
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
4/53
Every Day CountsPrefabricated Bridge Elements and Systems
PAST EXPERIENCE
Concept of PBES not new to DOTD
Prefabricated Elements Prefabricated Girders / Piles*
Prefabricated Caps
Prefabricated Decks
Prefabricated Systems
Self Propelled Modular Transporters (SMPTs) Heavy Lift
Jack and Slide
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
5/53
Every Day CountsPrefabricated Bridge Elements and Systems
I-10 Basin Bridge (Ramah to Henderson, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
6/53
Every Day CountsPrefabricated Bridge Elements and Systems
I-10 Basin Bridge (Ramah to Henderson, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
7/53
Every Day CountsPrefabricated Bridge Elements and Systems
I-10 Basin Bridge (Ramah to Henderson, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
8/53
Every Day CountsPrefabricated Bridge Elements and Systems
I-10 Twin Spans (New Orleans to Slidell, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
9/53
Every Day CountsPrefabricated Bridge Elements and Systems
I-10 Twin Spans (New Orleans to Slidell, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
10/53
Every Day CountsPrefabricated Bridge Elements and Systems
Audubon Bridge (New Roads to St. Francisville, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
11/53
Every Day CountsPrefabricated Bridge Elements and Systems
Audubon Bridge (New Roads to St. Francisville, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
12/53
Every Day CountsPrefabricated Bridge Elements and Systems
Audubon Bridge (New Roads to St. Francisville, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
13/53
Every Day CountsPrefabricated Bridge Elements and Systems
Audubon Bridge (New Roads to St. Francisville, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
14/53
Every Day CountsPrefabricated Bridge Elements and Systems
Well Road Overpass (West Monroe, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
15/53
Every Day CountsPrefabricated Bridge Elements and Systems
Well Road Overpass (West Monroe, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
16/53
Every Day CountsPrefabricated Bridge Elements and Systems
Well Road Overpass (West Monroe, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
17/53
Every Day CountsPrefabricated Bridge Elements and Systems
Lewis Street (New Iberia, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
18/53
Every Day CountsPrefabricated Bridge Elements and Systems
Lewis Street (New Iberia, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
19/53
Every Day CountsPrefabricated Bridge Elements and Systems
Lewis Street (New Iberia, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
20/53
Every Day CountsPrefabricated Bridge Elements and Systems
Huey P. Long Bridge (New Orleans, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
21/53
Every Day CountsPrefabricated Bridge Elements and Systems
Huey P. Long Bridge (New Orleans, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
22/53
Every Day CountsPrefabricated Bridge Elements and Systems
Huey P. Long Bridge (New Orleans, LA)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
23/53
Every Day CountsPrefabricated Bridge Elements and Systems
OBJECTIVES
Identify opportunities for PBES using a systematic approach
Evaluate current practices and details
Provide policy recommendations
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
24/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES
Decision Making Guide
Plan Notes and Special Provisions
Partial vs. Full Depth Deck Recommendations
Prefabricated Slab Bridge (75 year service life)
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
25/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Decision Making Guide
Factors for Consideration
High ADT
Emergency Replacement
Evacuation Routes, Routes over RRs or Navigable WWs
Lane Closures and Detours
Impacts to Project Critical Path
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
26/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Decision Making Guide
Evaluation Criteria
Rapid On-Site Construction
Safety Concerns for Workers and Motorists
Environmental Constraints
Difficult or Limited Site Access*
Repetitive Elements
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
27/53
Every Day CountsPrefabricated Bridge Elements and Systems
Decision Making Flowchart
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
28/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Plan Notes and Special Provisions
Encourage contractors innovation
Provide framework for evaluation
Remove Value Engineering restrictions
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
29/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Partial Depth Deck Panels
Eliminate Partial Depth Deck Panels (Optional Span Details )
Requires Crane for Placement
Requires Rebar and Concrete Placement
Does not Easily Accommodate Atypical Geometry
Not Recommended for Use in Negative Moment Regions
Steel Stay-In-Place Forms are Typically Allowed
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
30/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Full Depth Deck Panels
Expand use of Full Depth Deck Panels
Experimental Project
Bayou Lafourche Bridge on US 80
Full Depth Deck Panels using Accel_PB System*
Project Letting FY 2013-14
* Developed and Patented by Dr. Eddie He, P.E., S.E., Ph.D.
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
31/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
32/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
33/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
34/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
35/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
36/53
Every Day CountsPrefabricated Bridge Elements and Systems
Full Depth Deck Panels Accel_PB System
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
37/53
Every Day CountsPrefabricated Bridge Elements and Systems
DELIVERABLES Prefabricated Slab Span Bridge
75 Year Design Life On/Off System Use
Experimental Project
US 165 Bridges Near Fenton
Project Letting FY 2013-14
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
38/53
Every Day CountsPrefabricated Bridge Elements and Systems
Prefabricated Slab Span Bridge Concept Sketch
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
39/53
Every Day CountsPrefabricated Bridge Elements and Systems
MOVING FORWARD
EDC 2 Regional Summit November 2012
Combined PBES and GRS Initiatives
Expand Decision Making Guide
Monitor and Report on Experimental Projects (Including GRS)
Develop Special Details for Prefabricated Slab Span Bridge
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
40/53
Every Day CountsPrefabricated Bridge Elements and Systems
CONTACT INFORMATION
Paul Vaught, P.E.
Bridge Standards Manager
(225) 379-1816
AccelBridge
Dr. Eddie He, P.E., S.E., Ph.D.(312) 952-3071
mailto:[email protected]:[email protected]:[email protected]:[email protected] -
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
41/53
Every Day CountsPrefabricated Bridge Elements and Systems
Presentation Observations
and Suggestions
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
42/53
Every Day CountsPrefabricated Bridge Elements and Systems
PowerPoint Set-Up
People like clip art
and heavy use of slide animations
But hate sarcasm
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
43/53
Every Day CountsPrefabricated Bridge Elements and Systems
PowerPoint Set-Up
Color schemes are a fun way to express your creativity
I prefer yellow text on a white background
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
44/53
Every Day CountsPrefabricated Bridge Elements and Systems
Rule for Formulas
Use of formulas should be limited
Formulas = bad
Order of Preference
a + b = c English
+ = Greek cos2x dx Newton
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
45/53
Every Day CountsPrefabricated Bridge Elements and Systems
Rules for Graphs
Use of graphs should be limited
Good > Graphs > Formulas = Bad
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
46/53
Every Day CountsPrefabricated Bridge Elements and Systems
Leave graphs on the screen long enough for the
audience to gain interest and try to discern them,
but not long enough for them to succeed.
GRAPH COMPLEXITY
TIMEONSCREEN
(SE
CONDS)
Complexivity vs. Screen Time Graph
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
47/53
Every Day CountsPrefabricated Bridge Elements and Systems
Graphics
People like pictures
Graphs are not pictures
People really like videos
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
48/53
Every Day CountsPrefabricated Bridge Elements and Systems
If you dont have a video just find a picture and insert it in your
presentation and pretend like it is a video and you are having
trouble making it work.
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
49/53
Every Day CountsPrefabricated Bridge Elements and Systems
Name Dropping
Mention Hurricane Katrina
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
50/53
Every Day CountsPrefabricated Bridge Elements and Systems
How to Salvage a Presentation
No matter how bad the presentation you can save it
at the end with an epic video
This presentation has two
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
51/53
Every Day CountsPrefabricated Bridge Elements and Systems
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
52/53
Every Day CountsPrefabricated Bridge Elements and Systems
-
7/29/2019 S56_Innovative Bridge Applications in Louisiana Prefabricated Bridge Elements_LTC2013
53/53
Every Day CountsPrefabricated Bridge Elements and Systems
Thank you