S
-
Upload
sriram-baskaran -
Category
Documents
-
view
212 -
download
0
description
Transcript of S
S.NOObservationsControl measuresTimescale
Hazards and consequencesImmediate and longer term actions
01
Observation:
Open Cable Trench without proper Barricading
Hazard :
People and Objects Falling in the Trench
Consequences:
May lead to Several injuries or Property Damage to Objects falling in Trench
Immediate Action:
Barriers should be provided with Guard Rails to prevent people falling in.
Toe Boards to be provided to prevent Objects being Kicked down in to the Trench.
Long Term Action:
Trench should be inspected by a Competent Person Before Start of work
Immediate
Immediate
Regularly
02Observation:
Temporary gate is not installed since there is 24 Hr Live substation.
Hazard :
Entry of un authorised persons
Consequence :
Lead to theft, Damage to Equipments or Misuse Of Equipments.
Short Term Action:
Temporary gate with Security personnel to be appointed.
Long Term Action:
Video Surveillance System ( CCTV ) shall be installed interlinking with
Immediately
3 Months
03Observation:
All the Power Tools (i.e Grinding and Drilling Tool ) Operated in 240V
Hazard:
Electric Shock or Secondary Effects
Consequence:
Severe Injury or Fatality.Short Term Action:
All the power tools used in the site must be operated at 110V only as per OES-4
Long Term Action:
Combination of Inspection and Testing should be Implemented.
Immediately
Monthly Basis
04Observation:
While Demolishing of Fire Wall, Workers were not wearing required PPEs ( Dust Mask, Ear Plug and Anti Vibration Gloves )
Hazard and Consequences:
Vibration Can cause Long term painful damage to your Hand and Fingers
Noise Hearing Loss
Dust Asthma and Breathing Problems Control Measure:
Short Term :
Provide Appropriate PPEs to worker
Long Term:
Planning the work to eliminate the hazard by keeping workers away from the area by using Crane or Excavators.
Immediately
Future Demolition
05Observation:
Workers were Lifting the Hollow Blocks with their Hands.
Hazard:
Manual Handling
Consequences:
Can cause back bone problem, slip disc issue, Hernia, can cause musculoskeletal disorders (MSDs).Control Measure:
Short Term :
Provide job rotation with other riggers
Long Term :
Provide Trolleys
Immediately
Within a Week
06Observation:
In Concrete Mixer
Continuous seepage of Diesel in ground is observed from the Machine
Hazard:
Risk of Exposure to Vapours and Exhaust gases.
Consequence:
Acute Respiratory problems or Bronchitis or Ashtma
Control Measures :
Short Term:
Arrangement of Maintenance to Stop Seepage.Appropriate PPEs ( i.e Respirator )
Long Term:
Visual Inspection
Immediately
Before Start of Work
07Observation:
Scaffold is Erected on plywood which is placed as a cover of Internal Cable Trench and No access ladder is provided.
Hazard:
Collapse of ScaffoldFall from Height
Consequences:
Fatality
Control Measures :
Short Term: Should be positioned on the Firm Ground ( Base Plate should be Placed to)
Long Term:
Erection, Inspection, alteration and Maintenance should be done by Competent Person
Immediately
Weekly Basis
08Observation:
There is no Sufficient Drinking Water Facilities inside the Rest Room
Hazard & Consequences:
Dehydration and Heat Stress
Control measure:
Short Term:
Minimum 3 Drinking Facilities should be facilitated.
Long Term :
Drinking water bio & Chemical tests are to be conducted and test reports should be available.
Immediate Requirement
1 Month
09Observation:
Poor House Keeping make difficult for the workers to shift materials and do the Mason Works
Hazard & Consequences:
Unsafe Movement of Workers and Risk of slip, trip and fall of workers in the workplace area
Consequences:
Cuts and Fractures
Control Measure:
Short Term:
Areas should be kept clean and ensure proper housekeeping of the Workplace on daily basis
Long Term :
Routine Inspection
Make Employees aware of the Hazard by giving Trainings
1Day
Daily Basis
10 Days
10Observation
Trailing Cables were laid down on the floor for Grinding and Drilling Operation
Hazard & Consequences:
Risk of slip, trip and fall of workers in the workplace area which may cause cuts and bone fractures.Immediate:
Secure trailing by making Underground or Over Head from the floor surfaces.
Long Term:
Make employees aware of the hazards by Providing instructions and supervision.
Immediately
1 Week
-11Observation:
Worker was smoking in the Stacking area
Hazard:
Fire hazard like wood material and Paper material was available may cause fire
Consequences:Result in severe injuries and property damage
Control Measures:
Immediate:
No Smoking Sign Board to be placed.
Long Term:
Provide Training to the Employees regarding the hazard
Facilitate a Smoking area outside the Construction Site
Immediately
7 Days
1 Month
12Observation:
Carpentry Equipment is been used without the placement of Self Adjusting Guard.
Hazard:
Mechanical Hazard
Consequences:
Laceration or Amputation Control Measure:
Immediate Action:
Self Adjusting Guard to be Installed( After Installation of the Guard only work should commence)
Long Term Action:
Trainings
Visual inspection
3 Days
7 Days
Daily Basis Prior Use
13.Observation:There was no Sign Boards displayed near the Steel Cutting Machine
Hazard: Unauthorized person Operation
Consequences: May lead to Several Injuries or Cuts
Control measures Immediate Action:
Signages Like Authorised Personnel Only to use the Machine with Competent Person photograph Sign Board for Hazard (i.e. Cutting of Hand) & PPE to be used to be Displayed.Long Term Action:Instructions and Training Related to Hazard
Immediately
3 Days
14Observation:Two Live 20MVA Transformers are assembled where there is no Fire Extinguisher
Hazard & Consequences:
During Emergency there is a increase chance of accident.
Control measure : Short Term:
2 x 12Kg Dry Chemical Powder Fire Extinguisher to be placed.
Long Term:
2x 50 Kg Dry Chemical Powder Fire Extinguisher to be placed.
Training how to use a Fire Extinguisher during Emergency
Immediately
14 Days
5 Days
15Observation:Minimal Spillage of Transformer oil from the un used Barrel in the Stacking area.
Hazard:Environmental Hazard
Consequence:Soil Contamination Inhalation of soil Contaminants which has Vaporized Contents Control measure:Immediate Measures:
Spill Control agent like Sand to be used for Clearing the Transformer Oil
Long Term Measures:
Training for Staffs or Employees
Suitable operating procedure to prevent Leaks and Spills.
Immediately
1Month
1Month
16Observation:
Paints Stored in a area where there is no exposure to air.
MSDS Sheets not available.
Hazard:
Fire and Chemical Hazard
Consequences:
Fire Hence paint is in unventilated area Skin Contact Rashes SwellingInhalation Fatigue, nausea hence no Ventilation
Control Measures:
Short Term:
Storage area of Paints to be of Ventilated Type.
MSDS Sheet to be available inside the store.
Long Term:
Training on how MSDS helps to use the Paints safely.
Immediately
Immediately
15 Days
17Observation:
First Aid Box not available near the Paint Storage Area
Hazard & Consequence:
May cause delay in giving First Aid to the Casualty during Emergency.
Control measures: Immediate Action:
First Aid Box as per OSHA recommendation for 25 Persons to be placed near Paint Storage area.
Long Term Action:
Implement systems of weekly checks of first aid Box
Immediately
Weekly Basis
18Observation:
No Signage on access Roads to construction Site and Sub Station.
Hazard & Consequences:
Risk of Vehicle Speeding and Causing Road Traffic Accidents
Control measures :
Immediate Action:
Sign Boards like Speed Limit and Designated Parking areas to be fixed near the access road
Immediately
19Observation:
The earth pit in front of the Temporary Power Supply DB is not covered with Cover
Hazard: Trip & Slip Hazard
Consequences:
Physical Injury or Minor Injury
Control Measure:
Immediate Action:
Earth pit should be covered by Concrete slabs and the area to be barricaded.
Immediately
20Observation:
While Welding Operation when Employees were using Oxygen and Acetylene Cylinder Flash Back Arrestor was not installed on both the Cylinder.Hazard: Explosion Consequence: Fatality
Control Measure:
Immediate Measure:
Flash back Arrestor to be installed
Long term Action:
Visual Inspection and Testing
Training
Within 2 Days
Weekly Basis
Within 15 Days
21Observation : Workers working at height were wearing Helmet without chin Strap
Hazard: Fall from Height
Consequence:
May hurt the persons who stands in Ground position
Control measures :
Immediate Action:
Hard Hat with Chin Strap to be Given to Workers.
Long Term Action:
Training on Advantages of Wearing PPEs
Immediately
Within 5 Days
22Observation:
No Access or Egress provided in the Duct Excavation
Hazard:Fall from Height
Consequence:
Fatality or Severe Injuries Control measures:
Immediate Action:
Ladders should be provided with 5 Rungs above the above the edge of the excavation to give a secure stepping of point
Long Term Action:
Ladder should be Inspected Regularly
Immediately
Daily Basis
23Observation:
Protruding reinforcing steel was found in the Support area of Roof
Hazard: Impalement Hazard
Consequences : Fatality or Severe Injuries Control Measures:
All protruding reinforcement steel shall be protected with rebar cap
Immediately
24Observation:
All Debris( Hazardous waste and Non Hazardous Waste )Dumped in the Same Location without any Signages
Hazard & Consequences: Environment Hazard Soil Contamination Health Risk- Nausea, Fatigue, Skin Rashes and Asthma
Control measures: Immediate Action:
Bins to be Provided for Both Hazardous Waste and Non Hazardous Waste.
Waste to be disposed as per Waste Management plan
Long Term Action:
Training on Waste disposal Procedure
Immediately
When our Waste is Disposed
15 Days
.