S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti...

61
$0.50 $1.00 $1.50 $2.00 $2.50 0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 SQ FT S50151A ANTIGRAFFITI COATING 3 LOW BIDDERS 2014 2018 ANTIGRAFFITI COATINGSF Power (ANTIGRAFFITI COATINGSF)

Transcript of S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti...

Page 1: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.50

$1.00

$1.50

$2.00

$2.50

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000

SQ FT

S501‐51AANTI‐GRAFFITI COATING

3 LOW BIDDERS  2014 ‐ 2018

ANTI‐GRAFFITI COATING‐ SF Power (ANTI‐GRAFFITI COATING‐ SF)

Page 2: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$0.50

$1.00

$1.50

$2.00

0 5,000 10,000 15,000 20,000total cubic inches

S501‐55ALAMINATED ELASTOMERIC BEARINGS GRADE 3 POLYCHLOROPRENE

3 LOW BIDDERS 2014 ‐ 2017

laminated elastomeric Power (laminated elastomeric)

Use cost/cubic inch of pad for estimating, but show as EACH on the Cost Estimate

Page 3: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$0.50

$1.00

$1.50

$2.00

0 5,000 10,000 15,000 20,000total cubic inches

S501‐55ALAMINATED ELASTOMERIC BEARINGS GRADE 4 POLYISOPRENE

3 LOW BIDDERS 2014 ‐ 2017

laminated elastomeric Power (laminated elastomeric)

Page 4: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$0.50

$1.00

$1.50

$2.00

$2.50

$3.00

0 1,000 2,000 3,000 4,000total cubic inches

S501‐55APLAIN ELASTOMERIC BEARINGS GRADE 3 POLYCHLOROPRENE

3 LOW BIDDERS 2014 ‐ 2017

plain elastomeric Power (plain elastomeric)

Page 5: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$0.50

$1.00

$1.50

$2.00

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000total cubic inches

S501‐55APLAIN ELASTOMERIC BEARINGS GRADE 4 POLYISOPRENE

3 LOW BIDDERS 2014 ‐ 2015

plain elastomeric Power (plain elastomeric)

Page 6: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

0 100 200 300 400 500kips

S501‐55ASTAINLESS STEEL/PTFE BEARINGS

3 LOW BIDDERS 1992 ‐ 2014

ss‐ptfe Power (ss‐ptfe)

Use cost/kip for estimating, but show as EACH on the Cost Estimate

Page 7: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.04

$0.05

$0.06

$0.07

$0.08

$0.09

$0.10

$0.11

$0.12

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

CO

ST/L

F/AR

EA

LENGTH FEET

S501-30A 2017 STD SPECS577-005A 2018 STD SPECS

CASING for INTEGRAL ABUTMENT PILES3 LOW BIDDERS

2012 - 2018

INTEGRAL ABUTMENT CASING Power (INTEGRAL ABUTMENT CASING)

Page 8: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$100.00

$200.00

$300.00

$400.00

$500.00

$600.00

$700.00

$800.00

$900.00

$1,000.00

$1,100.00

0 1 2 3 4 5GALLONS

S501‐50A  2017 STD SPECS581‐010A  2018 STD SPECS

CRACK INJECTION3 LOW BIDDERS 2013 ‐ 2017

INJECT Power (INJECT)

Gallons equals cubic inches of crack divided by 231

Page 9: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$50.00

$100.00

$150.00

$200.00

$250.00

0 50 100 150 200 250 300 350FEET

S501‐30A  2017 STD SPECS581‐005A  2018 STD SPECS

CRACK PREPARATION3 LOW BIDDERS 2013 ‐ 2017

PREP Power (PREP)

Page 10: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$30

$40

$50

$60

$70

$80

$90

$100

0 100 200 300 400 500 600 700 800 900 1000 1100 1200

GALLONS

S501‐50ADECK SEALER MATERIAL

3 LOW BIDDERS  2014 ‐ 2015

HMWM Power (HMWM)

Page 11: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$1

$2

$3

$4

$5

$6

$7

$8

$9

$10

1000 2000 3000 4000 5000 6000 7000 8000 9000 10000

SQ YARDS

S501‐35ADECK SEALER PREPARATION3 LOW BIDDERS  2014 ‐ 2015

PREP Power (PREP)

Page 12: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

0 1000 2000 3000SQUARE FEET (BRIDGE PLAN AREA)

S500‐11A  2017 STD SPECS560‐005A  2018 STD SPECS

DEWATER BRIDGE ‐ NO COFFERDAM3 LOW BIDDERS 2013 ‐ 2018

BRIDGE ‐ NO COFFERDAM Power (BRIDGE ‐ NO COFFERDAM)

Page 13: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

0 1000 2000 3000 4000 5000 6000 7000 8000 9000

SQUARE FEET (PERIMETER X HEIGHT)

S500‐11A  2017 STD SPECS560‐005A  2018 STD SPECS

DEWATER BRIDGE W/COFFERDAM3 LOW BIDDERS 2012 ‐ 2016

COFFERDAM Power (COFFERDAM)

Use cost/sf of cofferdam form area for estimating, but show as LS on the Cost Estimate.Cofferdam form area is equal to the perimeter of the seal concrete times the difference in elevation of the bottom of the seal concrete and cofferdam vent elevation

Page 14: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

 $‐

 $5.00

 $10.00

 $15.00

 $20.00

 $25.00

 $30.00

0 500 1000 1500 2000 2500 3000 3500 4000SQUARE FEET (CULVERT PLAN AREA)

S500‐11A  2017 STD SPECS560‐005A  2018 STD SPECS

DEWATER CULVERT ‐ NO COFFERDAM3 LOW BIDDERS  2013 ‐ 2018

CULVERT ‐ NO COFFERDAM Power (CULVERT ‐ NO COFFERDAM)

Page 15: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

$90.00

$100.00

$110.00

$120.00

$130.00

$140.00

0

100

200

300

400

500

600

700

800

900

1,00

0

COST/LF/SQ

. FT OF AR

EA

LENGTH ‐ FT

DRILLED SHAFTS3 LOW BIDDERS  2013 ‐ 2015

DRILLED SHAFTS Power (DRILLED SHAFTS)

Use cross‐section area area of the drilled shaft for preliminay estimating.  Final cost is based on multiple bid items.

Page 16: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

2.50

3.00

3.50

4.00

4.50

5.00

5.50

6.00

1,00

0

11,000

21,000

31,000

41,000

51,000

61,000

71,000

81,000

91,000

101,000

111,000

121,000

131,000

141,000

151,000

161,000

171,000

181,000

191,000

201,000

211,000

221,000

231,000

241,000

SQUARE FOOT

S501‐51A  2017 STD SPECS553‐005A  2018 STD SPECS

Epoxy Overlay3 LOW BIDDERS  2013 ‐ 2017

Epoxy Overlay ‐ SQ FT Power (Epoxy Overlay ‐ SQ FT)

Page 17: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$25

$30

$35

$40

$45

$50

$55

$60

$65

$70

$75

$80

$85

$90

$95

$100

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

1700

1800

1900

2000

2100

2200

2300

2400

2500

2600

2700

2800

2900

3000

3100

3200

3300

3400

3500

SQUARE FEETheight x length

S501‐51AGRS‐IBS ABUTMENT

3 LOW BIDDERS  2015 ‐ 2016

GRS‐IBS ABUTMENT Power (GRS‐IBS ABUTMENT)

Page 18: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$300

$350

$400

$450

$500

0 50 100 150 200 250

CUBIC FEET

S501‐05A  2017 STD SPECS565‐005A  2018 STD SPECS

Asphaltic Plug Joint3 LOW BIDDERS  2012 ‐ 2017

Asphaltic Plug Joint Power (Asphaltic Plug Joint)

Page 19: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$10

$15

$20

0 50 100 150 200 250 300

COST/LF/INCH

FEET

S501‐06A  2017 STD SPECS566‐005A  2018 STD SPECSCOMPRESSION SEALS = 2"3 LOW BIDDERS  2012 ‐ 2017

COMPRESSION SEALS ONLY=2" Power (COMPRESSION SEALS ONLY=2")

Page 20: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$10

$15

$20

$25

0 50 100 150 200 250 300

COST/LF/INCH

FEET

S501‐06A  2017 STD SPECS566‐005A  2018 STD SPECSCOMPRESSION SEALS > 2"3 LOW BIDDERS  2012 ‐ 2017

COMPRESSION SEALS ONLY >2" Power (COMPRESSION SEALS ONLY >2")

Page 21: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$10

$15

$20

$25

$30

$35

$40

0 50 100 150 200 250 300 350 400 450 500 550 600

COST/LF/INCH

FEET

S501‐06A  2017 STD SPECS566‐005A  2018 STD SPECSCOMPRESSION SEALS < 2"3 LOW BIDDERS  2012 ‐ 2017

COMPRESSION SEALS ONLY <2" Power (COMPRESSION SEALS ONLY <2")

Use cost/lf/inch for estimating, but show as FT on the Cost Estimate.Use uncompressed joint width size to determine cost.

Page 22: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$25

$30

$35

$40

$45

$50

$55

$60

$65

$70

$75

$80

$85

$90

$95

$100

$105

$110

0 50 100 150 200 250 300 350

COST /FT/INCH

FEET

S501‐06A  2017 STD SPECS566‐005A  2018 STD SPECS

COMPRESSION SEALS W/ARMOR ANGLES ‐ ALL SIZES3 LOW BIDDERS  2015 ‐ 2015

COMPRESSION SEALS W/ARMOR ANGLES Power (COMPRESSION SEALS W/ARMOR ANGLES)

Page 23: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$3,000

$4,000

$5,000

$6,000

$7,000

$8,000

$9,000

$10,000

$11,000

$12,000

$13,000

$14,000

$15,000

$16,000

0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15CUBIC YARDS

S501‐40A  2017 STD SPECS568‐005A  2018 STD SPECS

Elastomeric Concrete Header3 LOW BIDDERS  2013 ‐ 2018

Elastomeric Concrete Header Power (Elastomeric Concrete Header)

Page 24: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$25

$30

$35

$40

$45

$50

$55

$60

0 50 100 150 200 250 300 350 400 450 500 550 600 650 700 750 800 850 900 950 1000

COST/FT/INCH

FEET

S501‐06A  2017 STD SPECS566‐005A  2018 STD SPECS

JEENE TYPE JOINTS 3 LOW BIDDERS  2012 ‐ 2018

JEENE JOINT (W or J SERIES) Power (JEENE JOINT (W or J SERIES))

Page 25: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$125

$130

$135

$140

$145

$150

$155

$160

$165

$170

$175

$180

$185

$190

$195

$200

0 50 100 150 200

COST/FT/INCH

FEET

S501‐06AMODULAR JOINTS 

3 LOW BIDDERS  2011 ‐ 2015

MODULAR JOINTS Power (MODULAR JOINTS)

Page 26: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$25

$30

$35

$40

$45

$50

$55

$60

$65

$70

$75

$80

50 100 150 200 250 300 350 400 450 500 550 600 650FEET

S501‐06A  2017 STD SPECS569‐005A  2018 STD SPECSREMOVE ARMOR JOINTS 

3 LOW BIDDERS  2012 ‐ 2017

ARMOR JOINT REMOVAL Power (ARMOR JOINT REMOVAL)

Page 27: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$10

$15

$20

$25

$30

$35

$40

$45

$50

$55

$60

$65

0 50 100 150 200 250 300 350 400 450 500

FEET

S501‐06ASILICONE SEALANT JOINT3 LOW BIDDERS  2012 ‐ 2017

SILICONE SEALANT JOINT Power (SILICONE SEALANT JOINT)

Page 28: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$100

$150

$200

$250

$300

$350

0 50 100 150 200 250

COST/FT

FEET

S501‐06A  2017 STD SPECS567‐005A  2018 STD SPECS

4" STRIP SEALS W/EXTRUSION 3 LOW BIDDERS  2013 ‐ 2018

STRIP SEALS W/EXTRUSIONS Power (STRIP SEALS W/EXTRUSIONS)

Use cost/lf/inch of joint width for estimating, but show as FT on the Cost Estimate.Use total movement range for size to determine cost.

Page 29: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

 $‐

 $0.50

 $1.00

 $1.50

 $2.00

 $2.50

 $3.00

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000 50,000 55,000 60,000

SQ FT

S501‐70APAINT CONCRETE

3 LOW BIDDERS  1990 ‐ 2014

PAINT CONCRETE Power (PAINT CONCRETE)

Page 30: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$130.00

$135.00

$140.00

$145.00

$150.00

$155.00

$160.00

$165.00

$170.00

$175.00

$180.00

$185.00

$190.00

$195.00

$200.00

500 1000 1500 2000 2500 3000 3500feet

S501‐70A  2017 STD SPECS587‐005A  2018 STD SPECS

PAINT PICKET FENCE RAIL IN FIELD3 LOW BIDS 2009 ‐ 2015

PICKET FENCE Power (PICKET FENCE)

Page 31: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$10.00

$20.00

$30.00

$40.00

$50.00

$60.00

$70.00

$80.00

$90.00

$100.00

$110.00

$120.00

0 500 1000 1500 2000 2500 3000 3500 4000square feet

S501‐70APAINT SHELL PILES

3 LOW BIDDERS 2012 ‐ 2016

PAINT SHELL PILES Power (PAINT SHELL PILES)

Page 32: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

15000 20000 25000 30000 35000 40000 45000 50000 55000 60000 65000 70000 75000square feet

S501‐70A  2017 STD SPECS587‐005A  2018 STD SPECS

COMPLETE REPAINT STEEL GIRDERS IN FIELD3 LOW BIDS  2003 ‐ 2017

COMPLETE REPAINT IN FIELD Power (COMPLETE REPAINT IN FIELD)

Page 33: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20.00

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 11000 12000 13000 14000 15000square feet

S501‐70A  2017 STD SPECS587‐005A  2018 STD SPECS

PAINT STEEL GIRDER AT EXPANSION JOINTS3 LOW BIDS  2013 ‐ 2017

AT EXP JOINTS Power (AT EXP JOINTS)

Page 34: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$40

$50

$60

$70

$80

$90

$100

$110

$120

$130

$140

$150

$160

$170

$180

$190

$200

0 10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 290 300

SQUARE FEET

S501‐51A  2017 STD SPECS582‐010A  2018 STD SPECS

PATCH & REPAIR DECK CONCRETE3 LOW BIDDERS  2014 ‐ 2017

DECK Power (DECK)

Page 35: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$100$110$120$130$140$150$160$170$180$190$200$210$220$230$240$250$260$270$280$290$300$310$320$330$340$350

0 5 10 15 20 25 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100

105

110

115

120

125

130

135

140

145

150

155

160

165

170

175

180

185

190

195

200

SQUARE FEET

S501‐51A  2017 STD SPECS582‐005A  2018 STD SPECS

PATCH & REPAIR CONCRETE SURFACE3 LOW BIDDERS  2013 ‐ 2017

CONC SURFACE Power (CONC SURFACE)

Page 36: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$1,000

$2,000

$3,000

$4,000

$5,000

$6,000

0 100 200 300 400 500

CUBIC YARD

S501‐40A  2017 STD SPECS551‐010A  2018 STD SPECSPolyester Overlay Material 3 LOW BIDDERS  2014 ‐ 2018

MATERIAL ‐ CY Power (MATERIAL ‐ CY)

Compute the quan ty of material using ⅞" thickness to account for irregulari es.

Page 37: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$10

$20

$30

$40

$50

$60

$70

$80

$90

$100

$110

$120

$130

$140

$150

0

500

1,00

0

1,50

0

2,00

0

2,50

0

3,00

0

3,50

0

4,00

0

4,50

0

5,00

0

5,50

0

6,00

0

6,50

0

7,00

0

7,50

0

8,00

0

8,50

0

9,00

0

9,50

0

10,000

10,500

11,000

11,500

12,000

12,500

13,000

13,500

14,000

14,500

15,000

SQUARE YARD

S501‐35A  2017 STD SPECS551‐005A  2018 STD SPECS

Polyester Overlay Preparation 3 LOW BIDDERS  2014 ‐ 2018

PREPARATION ‐ SY Power (PREPARATION ‐ SY)

Page 38: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$15.00

$20.00

$25.00

$30.00

0 50 100 150 200 250

CO

ST/O

PEN

ING

SF/

LF

Length - ft

S501-25A 2017 STD SPECS578-005A 2018 STD SPECSPRECAST BOX CULVERTS

AVERAGE 3 LOW BIDS2013 - 2018

PRECAST BOX CULVERTS Power (PRECAST BOX CULVERTS)

Use clear span opening times clear height in square feet for estimating, but show as LS on the Cost Estimate.Cost includes barrel and wings.

Page 39: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$10.00

$15.00

$20.00

0 50 100 150 200

CO

ST/O

PEN

ING

SF/

LF

Length - ft

S501-25A 2017 STD SPECS578-005A 2018 STD SPECS

PRECAST STIFFLEG CULVERTSAVERAGE 3 LOW BIDS

2013 - 2017

PC STIFFLEG Power (PC STIFFLEG)

Use clear span opening times clear height in square feet for estimating, but show as LS on the Cost Estimate.Cost includes barrel and wings.

Page 40: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$1,000.00

$1,500.00

$2,000.00

$2,500.00

$3,000.00

$3,500.00

$4,000.00

10 20 30 40 50 60 70 80 90 100 110 120 130 140 150cubic yards

PRECAST ABUTMENT PILE CAPAVERAGE 3 LOW BIDS

2014 ‐ 2018

PRECAST ABUTMENT PILE CAP Power (PRECAST ABUTMENT PILE CAP)

Cost includes concrete and reinforcement and should be used for preliminary estimating only.

Page 41: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$1,000.00

$1,500.00

$2,000.00

$2,500.00

$3,000.00

0 50 100 150 200 250cubic yards

PRECAST PIER CAPAVERAGE 3 LOW BIDS

2012 ‐ 2015

PRECAST PIER CAP Power (PRECAST PIER CAP)

Page 42: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$500.00

$1,000.00

$1,500.00

$2,000.00

$2,500.00

$3,000.00

30 40 50 60 70 80 90 100cubic yards

PRECAST PIER SHAFTAVERAGE 3 LOW BIDS

2012 ‐ 2014

PRECAST PIER SHAFT Power (PRECAST PIER SHAFT)

Page 43: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$1,000.00

$1,500.00

$2,000.00

$2,500.00

$3,000.00

$3,500.00

$4,000.00

0 5 10 15 20cubic yards

PRECAST WINGSAVERAGE 3 LOW BIDS

2012 ‐ 2018

PRECAST WINGS Power (PRECAST WINGS)

Page 44: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$25

$30

$35

$40

$45

$50

$55

$60

$65

$70

$75

$80

$85

$90

$95

$100

0

100

200

300

400

500

600

700

800

900

1000

1100

1200

1300

1400

1500

1600

CUBIC YARDS

S501‐95AGEOSYNTHETIC REINFORCED ABUTMENT BACKFILL

3 LOW BIDDERS  2014 ‐ 2018

REINFORCED ABUTMENT BACKFILL ‐ CY Power (REINFORCED ABUTMENT BACKFILL ‐ CY)

Page 45: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0.00

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

100

600

1,10

0

1,60

0

2,10

0

2,60

0

3,10

0

3,60

0

4,10

0

4,60

0

5,10

0

5,60

0

SQ YARDS

S501‐35A  2017 STD SPECS580‐005A  2018 STD SPECSREMOVE ASPHALT OVERLAY3 LOW BIDDERS  2013 ‐ 2017

Remove Asphalt Overlay ‐ SY Power (Remove Asphalt Overlay ‐ SY)

Page 46: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$30.00

$35.00

$40.00

$45.00

$50.00

$55.00

$60.00

$65.00

$70.00

$75.00

$80.00

0 500 1,000 1,500 2,000 2,500 3,000 3,500 4,000square feet

S501‐15AMODULAR BLOCK

3 Low Bids 2005 ‐ 2016

MODULAR BLOCK Power (MODULAR BLOCK)

Page 47: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$80.00

$85.00

$90.00

$95.00

$100.00

$105.00

$110.00

$115.00

$120.00

0 500 1,000 1,500 2,000 2,500 3,000 3,500feet

S501‐18ACOPING FOR MSE WALL3 Low Bids 2013 ‐ 2017

COPING Power (COPING)

Page 48: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$30.00

$35.00

$40.00

$45.00

$50.00

$55.00

$60.00

0 5,000 10,000 15,000 20,000 25,000 30,000 35,000 40,000 45,000square feet

S501‐17AMSE WALL

3 Low Bids 2013 ‐ 2017

MSE Power (MSE)

Page 49: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$25.00

$30.00

$35.00

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000square feet

S501‐15ASEGMENTAL BLOCK

3 Low Bids 2012 ‐ 2016

SEGMENTAL BLOCK Power (SEGMENTAL BLOCK)

Page 50: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$55.00

$60.00

$65.00

$70.00

$75.00

5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000 19,000 20,000 21,000 22,000 23,000 24,000 25,000square feet

S501‐15ASOIL NAIL

3 Low Bids 2009 ‐ 2015

SOIL NAIL Power (SOIL NAIL)

Page 51: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$50.00

$55.00

$60.00

$65.00

$70.00

$75.00

$80.00

$85.00

$90.00

1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000square feet

S501‐15ASOLDIER PILE

3 Low Bids 2008 ‐ 2015

SOLDIER PILE Power (SOLDIER PILE)

Page 52: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$50.00

$55.00

$60.00

$65.00

$70.00

0 1,000 2,000 3,000 4,000 5,000 6,000 7,000 8,000 9,000 10,000 11,000 12,000 13,000 14,000 15,000 16,000 17,000 18,000square feet

S501‐15AWELDED WIRE WALL W/CONC FACING

3 Low Bids 2012 ‐ 2014

WELDED WIRE W/CONC FACING Power (WELDED WIRE W/CONC FACING)

Page 53: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$25.00

$30.00

$35.00

$40.00

$45.00

$50.00

$55.00

500 1,000 1,500 2,000square feet

S501‐15AWELDED WIRE WALL3 Low Bids 2013 ‐ 2018

WELDED WIRE Power (WELDED WIRE)

Page 54: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$30

$40

$50

$60

$70

$80

$90

$100

$110

0 100 200 300 400 500 600 700 800 900 1000

SQ YARDS

S501‐35AROCK SLOPE PROTECTION3 LOW BIDDERS  2010 ‐ 2018

ROCK SLOPE PROTECTION Power (ROCK SLOPE PROTECTION)

Page 55: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$5

$10

$15

$20

$25

1,00

0

2,00

0

3,00

0

4,00

0

5,00

0

6,00

0

7,00

0

8,00

0

9,00

0

10,000

11,000

12,000

13,000

14,000

15,000

16,000

17,000

18,000

19,000

20,000

21,000

22,000

23,000

24,000

25,000

SQ FT AREA OF BRIDGE

S501‐90A  2017 STD SPECS584‐005a  2018 STD SPECS

TEMPORARY SHORING FOR BRIDGES3 LOW BIDDERS  2013 ‐ 2018

TEMPORARY SHORING Power (TEMPORARY SHORING)

Use cost/sf of new bridge plan area for estimating, but show as LS on the Cost Eestimate.

Page 56: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$5

$10

$15

$20

$25

$30

$35

$40

0

500

1,00

0

1,50

0

2,00

0

2,50

0

3,00

0

SQ FT PLAN AREA OF CULVERT

S501‐90A  2017 STD SPECS584‐005A  2018 STD SPECS

TEMPORARY SHORING FOR CULVERTS3 LOW BIDDERS  2013 ‐ 2018

TEMPORARY SHORING Power (TEMPORARY SHORING)

Use cost/sf of new culvert plan area for estimating, but show as LS on the Cost Estimate.

Page 57: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$20

$30

$40

$50

$60

$70

$80

$90

$100

$110

$120

$130

$140

0 100 200 300 400 500 600 700 800 900 1000

SQ YARDS

S501‐60A  2017 STD SPECS575‐005A  2018 STD SPECS

TEXTURED CONCRETE SURFACE3 LOW BIDDERS  2013 ‐ 2018

TEXTURED CONCRETE SURFACE Power (TEXTURED CONCRETE SURFACE)

Page 58: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$0

$5

$10

$15

$20

0

1,00

0

2,00

0

3,00

0

4,00

0

5,00

0

6,00

0

7,00

0

8,00

0

9,00

0

10,000

SQ FT AREA (PERIMETER X DEPTH) 

S501‐51ATEMPORARY TURBIDITY CURTAIN

3 LOW BIDDERS  2014 ‐ 2017

TEMPORARY TURBIDITY CURTAIN Power (TEMPORARY TURBIDITY CURTAIN)

Page 59: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$5.00

$10.00

$15.00

$20.00

50 100 150 200 250 300 350 400 450 500feet of conduit

S501‐30A  2017 STD SOECS586‐005A  2018 STD SPECS

UTILITY CONDUIT ‐ Complete Installation with No Hangars3 low bids2013 ‐ 2018

Complete WITH NO HANGARS Power (Complete WITH NO HANGARS)

Page 60: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$5.00

$10.00

$15.00

$20.00

$25.00

$30.00

0 500 1000 1500 2000 2500 3000 3500 4000 4500 5000feet of conduit

S501‐30A  2017 STD SOECS586‐005A  2018 STD SPECS

UTILITY CONDUIT ‐ Complete Installation with Hangars3 low bids2013 ‐ 2018

Complete WITH DECK HANGARS Power (Complete WITH DECK HANGARS)

Page 61: S501 51A ANTI GRAFFITI COATING 3 LOW BIDDERS 2014 2018 Cost... · 2018. 5. 30. · anti‐graffiti coating 3 low bidders 2014 ‐ ... armor joint removal power (armor joint removal)

$5.00

$6.00

$7.00

$8.00

$9.00

$10.00

$11.00

$12.00

$13.00

$14.00

$15.00

0 500 1000 1500 2000 2500 3000 3500 4000total length ‐ feet

S501‐30A  2017 STD SPECS586‐005A  2018 STD SPECS

UTILITY CONDUIT ‐ Partial Installation3 low bids2012 ‐ 2018

Partial Power (Partial)